HomeMy WebLinkAboutNCC190773_NOT Closeout Documents_20210305R*WAN
COLNTY
NORTH CAROLINA
Be an original.
Rowan County Environmental Management
PO Box 430 • East Spencer, NC 28039
Telephone 704-216-8589 • FAX 704-216-8969
October 19, 2020
Mr. Donald E. Moore
ABCD Moore Properties, LLC
1900 S. Pennsylvania Avenue
Morrisville, PA 19067
SUBJECT: EROSION CONTROL INSPECTION
PROJECT: VANQUISH FENCING
LOCATION: LANDIS, NC
Dear Mr. Moore:
Attached is a copy of the inspection report which was prepared following an on -
site inspection of the above referenced project. This report is intended to provide you
with information concerning the status of the project as it relates to compliance with the
Rowan County Soil Erosion & Sedimentation Ordinance.
Please review this report carefully as it may contain corrective actions needed or
comments which will assist you in meeting the required performance standards of the
Ordinance.
It is our desire that any and all possible problems be discussed and resolved at the
earliest possible time. If you have any questions concerning this matter, please contact
our office.
Sincerely,
Greg GPne, ESC
Environmental Specialist
Enclosure: Sedimentation Inspection Report Dated 10-16-20
ec: Ken Cooley, LaFave's Construction
Brandon Ervin, Ervin Excavating
2727-D Old Concord Road, Salisbury, NC 28146 Telepbone: (704) 216-8589 Fax: (704) 216-8969
Project: a4 L(f..
t
Project Location:
Person
financially responstbl : 11 r.
I.
Pictures: Yes: r No: Prints: r Slides: r Video: r
Digital: r
2.
Weather and soil conditions:
Initial inspection: Yes: r No: r�
3.
_
Is site currently under notice of violation? Yes: r No:
�T
4.
Is the site in compliance with S.P.C.A. and RCSESO? Yes: r✓
No: r If no, check violations below:
5.
Violations:
r
a. No approved plan, G.S. 113A-57 (4) and RCSESO Sec. 18-23(4)
r g. Inadequate buffer zone, G.S. 113A-57(1) and
RCSESO Sec. 18-23(1)
r
b. Failure to follow approved plan, G.S. 1 I3A-61.1 and RCSESO
Sec. 18-52(J)
r h. Graded slopes and fills too steep, G.S. 113-A-57 (2)
and RCSESO Sec. 18-23(2)
r
C. Failure to submit revised plan, G.S. 113A-54.l(b) and
r i. Unprotected exposed slopes, G.S. 113A-57(2) and
RCSESO Sec. 18-52(e)
RCSESO Sec. 18-22(5)
r
d. Failure to provide adequate groundcover, G.S. 113A-57(3) and
r }. Failure to maintain erosion control measures,
RCSESO Sec. 18-23(3)
RCSESO Sec. 18-29
r
e. Insufficient measures to retain sediment on site, G.S. 113A-57(3)
and RCSESO Sec_ 18-22(5)
r k. Other (describe)
r
f Failure to take all reasonable measures, RCSESO Sec. 18-21(b)
6. Potential NPDES Permit Violation? Yes: r No: f7( Describe:
7. Has sedimentation damage occurred since last inspection? Yes: r If yes, where? (check all that apply) No
Lake/natural watercourse on the tract: r Lake/natural watercourse off the tract: r Other property: r
Description:
Degree of damage: slight: r moderate: r severe: r
8. Contact made with (name): Title:
Inspection report given: r or sent: r to person financially responsible. Date given/sent:
9. Corrective actions needed: N9+1C
10. Comments:
Report by: Greg Greene Others present:
Date of inspection: Time arriving on site: I ;- 57 Time leaving site: Yi S-
cc: