Loading...
HomeMy WebLinkAboutGW1-2021-01505_Well Construction - GW1_20210309 WELL CONSTRUCTION RECORD(GW-1) For internal Use only: 1.Well Contractor Information: Alfred Kiesling Sr ,4.:.1tA'R:z VES::,:>.:.. FROM TO DESCRIPTION Well Contractor Name f 2670-A NC Well Contractor Certification Numberr ;CA fam { ;plr:illVElt eatile' B & K Well Drillin Inc FROM TO KkVIETER THICKNESS MATERLAL g 0 ft. 190 tt• 61/4 in. SDR-21 PVC Company Name >2Gi'1�1rR Y'A'531�1(";[)R Tl)B�7k?: cethe>•maketosc��"�} 2.Well Construction Permit#: FROM TO DIAME'1'EK THICKNESS MATERIAL List all applicable well construction permits fi.e.U1C Comity.State.Variance.ate.) fl. f6 in. ft. ft. in. 3.Well U (check well use): 1.7 SCREEN.: Wa Supply Well: FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL icultural OMunicipal/Public ft. ft. in. ❑Gcothennal(Heating/Cooling Supply) 19Residential Water Supply(single) ft. it, in. hercial OResidential Water Supply(shared) ❑lndustnal Contn <11;s:t',ItUi3'r''aa<;>.» ;:>:;»:;:;:::;i's:;<�5:;>:; ,:;<;:,<:;<;;; :;;<:; ❑irrigation ❑Wells> 100,000 GPD FROM TO I MATERIAL EMPLACEMENT METHOD&AINIOUNT Non-Water Supply Well: 0 ft. 20 ft• Benton ite Pour ❑Monitoring ORcu:ovcry ft. ft. Injection Well: ft. ft. ❑Aquifer Recharge ❑(iroundwater Remedialion 1�SrIBtGvd.PkFtHf: <' ❑Aquifer Storage and Recovery: OSaliniry Barrier FROM TO MATERIAL EMPLACEMENT f1F.THOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. OExperimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(,Closed Loop) ❑Tracer ZORl E[1NCt U. iittiicgall eile3steeis3friecessarvl';:.::>'::::' FROM TO DESCRiPT1ON color rdness,soilln-k e. .o siu.etel ❑Geothermal(HeatigWCooling Return) ❑Other(explain under 421 Remarks) ft. ft. 4.Date Well(s)Complete_' � Well ID# } t. R O ft. hado 4 5 �C1 `Sa..Well Location: l� a. 6, f Facility/Owner Na e l FacilityM (ifapplicable) ft. ft. 3 ft.Ll1 Llnr MOUAC r 5 a , r t a�� � i ft ft"('�� a Physical Address..City.and Zip - TtE;1tii.1Rir5 County Parcel Identification No.(PIN) y F1\ 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: nrv. Y ) �sit (ifw•ell field,one lau'long k suftieicnq 22.Certiticatilm y 17) N W Signature of Certified Well Contractor Date 6.Is(are)the well(s): Permanent or ❑Temporary' Brsigning this ftnm.1 herehr cerai that the,:rll(.0,vas(were)construt red in a-cordance with ❑Yes or D 1 S.-1.VCAC 01C.OlOa or 15.a tiCAC 01C.0100!Pell Construction Standards and that a cops• 7.is this a repair to an existing well: !f this is a repair.fill out knout well canstnavinn informaiinn ar explain the nature nj the of this rrenrd has been provided m the xrll owner. repair under#21 remarks section or on the back of this form. 23•Site diagram or additional well details: S.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction-only I GW-1 is needed. Indicate TOTAL NUMBER of w>clls (add'See ON-ce in Remarks Box).You tnay also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (ft.) Submit this GW-1 within 30 days of well completion per the folkodring: Fur multiple wells list all depths if thfferent(enampte-3(g000'and 2@100') 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing:40 (ft•) Information Processing Unit,1617 MSC.Raleigh,NC 276994617 lf,ruter level is abuse casing.use'•+•• 6 1/8 24b.For Infection Wells:Copy to DWR,Underground Injection Control(IOC) 11.Borehole diameter: (�) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method:Air Rotary 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary.cable,direct push,etc.) county environmental health department of the county where installe t FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100.000 GPD:Copy to DWR,CCPCUA 13a.Yield(gent) Method of test: Air Lift Permit Program,1611 MSC,Raleigh.NC 27699-1611 13b.Disinfection type! Chlor. Tabs Amount: 1 1/2 Lbs Form GW-1 North Carolina Department of En,irorimcmal Quality-Division of Water Resources I:evised 6-6-2019