Loading...
HomeMy WebLinkAbout20210242 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210307Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, March 7, 2021 12:02 AM To: tbeasley@withersravenel.com Cc: Goss, Stephanie Subject: Pre -Filing Time Clock has been reached for Rogers Farm - 20210242 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Rogers Farm that you submitted on 2/4/2021. The ID number for that project is 20210242, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20210242 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 2/4/2021 ..................................................................................................................................................................................................................................................... Contact Name * Troy Beasley Contact Email Address* tbeasley@Wthersravenel.com Project Name* Rogers Farm Project Owner* Project County* Owner Address: Mitchell Mill Investors LLC Wake Street Address 105 Weston Estates Way Address Line 2 aty Cary Fbstal / Zip Code 27513 Is this a transportation project?* r Yes r No State / Province / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below. The project consists of construction of a residential subdivision. The proposed impacts will occur from construction of the entrance road from Rolesville Road and rehabilitation of the existing pond dam. The construction of the entrance road will impact the majority (0.36 ac) of a herbaceous headwater wetland within a fallow agricultural field, leaving a small (0.13 ac) acre remnant portion of the wetland on the south side of the entrance road. Since this wetland has been historically impacted from farming and would be too small to be viable in the post development condition, the remaining 0.13 acres of wetland are proposed to be impacted for Lots 115 & 116. The rehabilitation of the existing pond dam will result in 0.002 acres (103 sf) for replacement of the outfall structure and construction of a plunge pool below the dam. Please give a couple of dates you are available for a meeting. 2/8/2021 2/12/2021 2/22/2021 2/24/2021 2/25/2021 Please attach the documentation you would like to have the meeting about. Rogers Farm Overall Site Plan.pdf 764.62KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/4/2021