Loading...
HomeMy WebLinkAboutWQCS00037_Annual Report 2020_20210303 NORTH CAROLIN Post Office Box 207 Shelby,NC 28151-0207 Iq �' February 25, 2021 System Performance Annual Report RE n DEQ DWR PERCs Unit CEl�� ►J 1617 Mail Service Center MAR 3 3 2021 Raleigh, North Carolina 27699-1617 NCDEQ/DwRi, , RE: 2020 System Performance Annual Report .LiE$ Dear Sir or Ma'am: As required, please find attached two (2) copies of the system performance report for: • Sanitary Sewer Collection System WQCS00037 • First Broad Wastewater Treatment Plant NC0024538 If you should have any questions, please contact me at david.hux@cityofshelby.com or (704) 669-6570. Regards, -91/1/14, —ws/C David Hux Director of Water Resources Enclosures Cc: Adam Howell, Field Operations Supervisor/ORC Brad Greene, Plant Operations Superintendent Steve Smith,Wastewater Treatment Plant ORC Certified Mail: 7012 2920 0001 9633 8256 www.cityofshelby.com Monthly Spill Totals As Reported to NCDEQ INFRASTRUCTURE IMPROVEMENTS All overflows and violations have been corrected and She11 reported to the State of NC. No environmental impacts Sewer Collections System or fish kills occurred with these events. • Sewer Replacements and Repairs NOR II CARor.NN A -{ ` Jan 275,000 May 0 Sep 0 • Forest Hill(40') I .I • W Dale Street(72') . ...,,, Feb 1,587,675 Jun 225 Oct 0 • Manhole Replacements—3 manholes '— • Sewer Extensions—Shell Building#3(725') Mar 100 Jul 0 Nov 857,325 • Sewer Point Repairs—Various point repairs identified by assessments or by staff Apr 3,125 Aug 0 Dec 0 Wastewater Treatment Plant ANNUAL SYSTEM • Ongoing Wastewater Treatment Plant Projects for PERFORMANCE ENVIRONMENTAL PROGRAMS AND SERVICE 2021 INITIATIVE • Biosolids Handling Improvements— 1 $18 Million dollar project to upgrade the Biosolids REPORT 2020 As part of a commitment to support educational Handling Facility.Project is scheduled for comple- awareness and promote better learning,Shelby offers tion in February 2021. tours of the wastewater treatment plant to various interest groups. For a tour of the plant, contact the COPIES OF THIS REPORT ARE AVAILABLE AT: Wastewater Plant Supervisor at 704-484-6850. ' t City Hall at 300 South Washington Street FATS,OILS and GREASE PROGRAM Utilities Operations Center at 824 West Grover Street , . S First Broad River Wastewater Treatment Plant at 1940 Grease is a leading cause of sewer blockages and over- �. \ flows in the sewer system and can lead to sewer back- South Lafayette Street '. ups into homes. The Cityurges residents to helpour On the City's website at www.cityofshelbY•com fight against grease: For more detailed information,contact the • Never pour Director of Water Resources,David Hux - grease down the at 704-484-6840 or david.hux@citvofshelbv.com. drain. a:f • Scrape grease 40110 and food scraps into the trash. ,, j Facility Information: • Use sink strainers - =- First Broad River WastewaterCD to prevent food I certify under penalty of law that this report is complete Treatment Plant scraps from go- goo, and accurate to the best of my knowledge. I further certify 1940 South Lafayette Street "sFu.sa ing down the that this report has been made available to the users or roiso W., drain. Shelby, North Carolina 28152 customers of the named system and that those users have The Fats, Oil and Grease (FOG) Program seeks to re- been notified of its availability. Permits: duce these occurrences by education to the public on how to prevent grease from entering the sewer sys- Collection System:WQC500037 tem. Wastewater Treatment: NC0024538 1 Compost Facility:WQ0007780 Special emphasis has been placed on food service es- Laboratory Certification:238 tablishments, but we all need to do our part to keep Stave grease out of the sewer system. For more information Operator inR•sponsIbleMoroi WWTP Stormwater Permit: NCG110040 on our program,contact the Pretreatment Coordinator � � at 704-484-6850. City of Shelby Utilities Ada^HO1e* 824 West Grover Street F&d Operations Crew Supervisor/ Brochure Number:WWT1003-000 operator in ResponsibleCharp Shelby,North Carolina 28151 SYSTEM OVERVIEW flows into the aeration basin where microorganisms break- WASTEWATER TREATMENT down the pollutants. PLANT COMPLIANCE The City of Shelby wastewater collection and treatment system serves a customer base of 8,422 residential, The wastewater then flows into final clarifiers where the NCDEQ requires all wastewater collection and treat- commercial,and industrial users. During last year the microorganisms settle out and are returned to the basins. ment systems to annually report to its customers all First Broad River Wastewater Treatment Plant(WWTP) The flow is disinfected before the treated water is returned sanitary sewer overflows, violations of state issued collected and treated an average of 3.86 million gal- to the First Broad River. permit limits and reporting requirements. The follow- Ions per day(MGD);included in this flow is wastewater ing overflows and violations occurred from January from Kingstown and Fallston. The solids,which have been removed from the process,are 2020 through December 2020. pumped to a holding tank where they are held until they are The sewer collection system consists of gravity sewer processed through our Compost Facility, where the solids lines, lift stations, and force mains that convey are combined with bark mulch and treated for 30+ days. Date Violation Result Limit wastewater to the First Broad River WWTP. The City After processing, the compost is provided to the public for owns and maintains 219.7 miles of gravity sewer and home use around trees and flowers. The product is also 1/15/2020 pH Effluent S.9 6.0 force main lines with twenty(20)lift stations. The City being used as fertilizer for pastures. of Shelby also maintains the sewer collection systems 2/7/2020 pH Effluent 5.8 6.0 for the Town of Fallston and the Town of Kingstown. COLLECTION SYSTEM MAINTENANCE 2/24/2020 pH Effluent 5.6 6.0 The Field Operations Division maintains collection system pipes and lines in order to prevent sanitary sewer overflows 2/25/2020 pH Effluent 5.8 6.0 ,a " "? . Aerial View (SSOs) and keep wastewater flowing through the collection system to the treatment plant for treatment. During this 2/26/2020 pH Effluent 5.6 6.0 a of the First report year,46.3 miles of sewer lines(21.1%)were cleaned MBA" P .o Z. Broad River by rodding/jetting/bucket cleaning,6.55 miles of sewer lines Al!pH issues were resolved. 1 ♦� may{ . t = '.• W P (3.0%) were videoed to inspect sewer lines for problems, `--- �e and the City acoustic tested 1.6 miles for blockages. During SANITARY SEWER OVERFLOWS — the year,Field Operations also conducted inspections of 148 _ ik exposed aerial crossings and also performed maintenance of Spills Greater Than 1,000 Gallons sewer right-of-ways. Field Operations is responsible for in- Reaching Surface Water WHAT IS WASTEWATER? stallation of sewer connections and also perform repairs to problematic connections, lines and manholes. Smoke Wastewater is sewage from your home's sinks,toilets, testing is also performed to determine sources of inflow and Date Address Gallons Cause bathtubs, and washing machines. People also create infiltration. wastewater at work. Offices,businesses and manufac- turers create not only domestic wastewater but also Plant Maintenance conducts inspections of all lift stations FF can create wastewater combined with the discharge and performs both preventative and corrective maintenance 2/6/2020 Multiple Locations 1,587,675 TR/ associated with manufacturing processes or services. on the stations and the force mains. The City's lift stations (13) SF are equipped with alarm systems and are served with back- The City of Shelby's collection system and lift stations up generation(either permanent or portable capabilities). 4/30/2020 1140 New Pro- 2,000 HR direct the flow of the wastewater to the First Broad spect Church Rd River WWTP for treatment. The First Broad River Dumping waste into the City's manholes without permis- WWTP is located on South Lafayette Street. sion is illegal. Residents can report suspicious activity, 4/30/2020 1623 W Zion 1,125 HR sewer overflows and other sewer issues any time by dialing Church Rd HOW DO WE TREAT WASTEWATER? (704)484-6866. 11/11/2020 Multiple Locations 857,325 HR/ _ Wastewater treatment plants clean our wastewater COMPLIANCE SUMMARY (9) SF and prevent pollution from getting into the environ- ment. When wastewater enters our 6 MGD facility,bar The City of Shelby's First Broad WWTP has permit limits and screens catch and remove trash and large objects. Grit monitoring requirements regulated by the North Carolina **HR—Heavy Rain**HR/SF—Heavy Rain/Severe chambers then remove heavy particles like gravel, Department of Environmental Quality(NCDEQ). During the Flooding**SW—Severe Weather**TR/FF— sand,seeds,and coffee grounds. The wastewater then year thousands of samples are collected and analyzed to Torrential Rain/Flash Flooding flows through large settling tanks called clarifiers document compliance and to monitor plant operations. where heavy solids settle to the bottom and are re- moved. After the primary clarifiers,the liquid portion