Loading...
HomeMy WebLinkAbout20120677 Ver 1_401 Application_2012071220120677 DATE July 7 2012 TO DWQ Buffer Authorization Reviewer FROM John R Davis Jr LSS RE PCN s for wooden piers at Holt Lake Smithfield NC Mr J C Bright has had some conversations with Mr Martin Richmond DWQ representative in the Raleigh Regional office and with Mr Thomas Brown U S Army Corps of Engineers office about construction of two piers for residences at Holt Lake I am working with David Revoir engineer with Appian Consulting Engineers to obtain permits Holts Lake was formed by a dam on Black Creek The dam is only about 1 mile west of the Neuse River Not sure of water classification because website is not working We understand that since we will not be doing any filling or grubbing in wetlands only driving pilings and constructing mostly by hand that we do not need a 404 permit We understand that water dependent structures such as piers are allowable in the riparian buffers No parking lots etc will be constructed in the riparian buffer only the wooden walkways The impact that these walkways and piers will have in the riparian buffers will be minimal All high value trees will be avoided in the buffer The walkways are pervious so rainfall will move through the boards to tree roots The pilings at the 1300 Country Club Road site will most likely be installed into auger borings in high ground and the ones at 1146 Country Club Road will most likely be driven into wet soils Please look over these applications and call me if you have any questions at 919 818 5087mb Thanks John Davis 1(IL 1 0 2012 DENR wATER QUALITY 'etlands A e.._.. _ . W ATF9 O T 201 20677 Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version Pre - Construction Notification PCN Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps El Section 404 Permit ❑Section 10 Permit lb Specify Nationwide Permit (NWP) number or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ❑ No For the record only for Corps Permit ❑ Yes ❑ No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1 g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project 1146 Country Club Pier 2b County Johnston 2c Nearest municipality / town Smithfield 2d Subdivision name Holt Lake 2e NCDOT only T I P or state project no n/a 3 Owner Information 0�2 3a Name(s) on Recorded Deed Sammy Jackson 3b Deed Book and Page No 1832/28 pENR ATER Branch 3c Responsible Party (for LLC if applicable) Sammy Jackson 3d Street address 1130 Country Club Road 3e City state zip Smithfield NC 27577 3f Telephone no 3g Fax no 3h Email address Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name John R Davis Jr 5b Business name (if applicable) Soil Horizons Inc 5c Street address 285 Dreamcatcher Trail 5d City state zip Youngsville NC 27596 5e Telephone no 919 818 5087 5f Fax no 919 554 2363 5g Email address soilhorizons @gmad com Page 2 of 10 PCN Form — Version 1 3 December 10 2008 Version June 29 2012 RE AGENT AUTHORIZATION FORM As owner concerning the above referenced property I do hereby authorize and give permission for J C Bright, Appian Consulting Engineers and Soil Horizons , to represent or act as an agent on my behalf and apply for a preconstruction notification or permit and allow the US Army Corps of Engineers and NC Division of Water Quality or any other regulatory agency to go on the property for such purposes as necessary to perform the Job tasks Name / Title Sammy G Jackson 1130 Country Club Road Smithfield NC 27577 919 934 4839 Date 1146 Country Club Road, Smithfield, NC - Google Maps Address 1146 Country Club Rd Google Smithfield, NC 27577 Page 1 of 1 Site Vicinty Road Map https://maps.google.com/maps?f--q&source=s—q&hl=en&geocode=&q=l 146+Country+Clu... 7/5/2012 Holt Lake Jackson and Adams Address: 1146 Country Club Road er: Smithfield, NC 27577 Owner: Sammy Jackson County: Johnston County NC Pin: 167212- 86.5668 Address: 1 0 Co Club R ad 5 er: Cr SnCo ki County. Joy NC Pin: 16 7 Proposed Pier Sketch Address: 1146 Country Club Road Smithfield, NC 27577 Owner: Sammy Jackson County: Johnston County NC Pin: 167212 -86 -5668 Latitude 35.470008 Longitude - 78.399832 �+ir7lnlriliw CONSULTING ENGINEERS, PA CIVII, MUNICIPAL d STRUCTIIRAI- ENGINEERS COMPREHENSIVE ENVIRONMENTAL. SERVICES P -O. box 7966 • Raay M—M. NC 27604 Phanc (M) 972 -770;4 Eax.(252)9'72 -7676 v 'aPPIanengi "en.cnm B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) 167212 86 8668 lb Site coordinates (in decimal degrees) Latitude 35 47002 Longitude 78 399864 (DD DDDDDD) ( DD DDDDDD) 1c Property size 1 55 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to proposed project Holts Lake 2b Water Quality Classification of nearest receiving water 2c River basin Neuse 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Site is part of a single family residential community on Holts Lake The proposed private pier will serve one residence 3b List the total estimated acreage of all existing wetlands on the property 0 2 Acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project Construction of a 5 wide elevated wooden pier on wooden piles to access public waters 3e Describe the overall project in detail including the type of equipment to be used Construction of a 5 wide elevated wooden pier on wooden piles in existing path through the woods no removal of trees stumps or shrubs is required no placement of fill is required 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the pasty Comments El Yes ❑ No Unknown 4b If the Corps made the jurisdictional determination what type of determination was made? ❑ preliminary ❑ Final 4c If yes who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No ® Unknown 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain Page 3 of 10 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary 1 a Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ —non 404 other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P FIT ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non 404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑ PEI T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ®No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ® Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 61 ®P ❑ T Pier Holts Lake ® No 30 x5 = 150 sf 20 x5 = 100 sf B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 150 sf 100 sf 61 Comments No removal of trees stumps or shrubs is required no placement of fill is proposed Page 5 of 10 PCN Form — Version 1 3 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The elevated wooden pier will be constructed in an existing path through the woods no tree stump or shrub removal is required Total disturbance is approximately 250 sf 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques The elevated wooden pier will be constructed by hand 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this projects ❑ Mitigation bank El Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank n/a 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 7 of 10 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why Comments Proposed wooden pier to be elevated above existing grades No ® Yes ❑ No change is proposed to runoff through the riparian buffer 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? (wooden slatted deck proposed is considered pervious) /o 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why Less than 0 5 ac disturbed Approximately 250 sf will be disturbed by this project 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ® Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? Johnston County ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter ) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility Page 9 of 10 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ❑ No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑ No impacts? ❑ Raleigh 5c If yes indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a WIII this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑ No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would Impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes ❑ No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodpla(n determination? 1164 / Oav+ r T 7_0'/) Applicant/Agents Printed Name Applicant/Agent sZignature Date (Agents signature is valid only if an authorization letter from the applicant is provided ) Page 10 of 10 PCN Form — Version 1 3 December 10 2008 Version