Loading...
HomeMy WebLinkAbout20000846 Ver 1_Monitoring Report Review_20120625wo," tk� ii`i Mpg NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Waklid Dee Freeman Governor Director Secretary June 25 2012 I Mr Richard Darling Michael Baker Engineering 8000 Regency Parkway Suite 200 Cary NC 27518 Re Horsepen Creek Mitigation Site for Runway 5L/23R Piedmont Triad International Airport Guilford County DWQ # 2000 0846 V Dear Mr Darling The Division of Water Quality (Division) Winston Salem Regional Office has reviewed the recent monitoring results specific to the continued monitoring as noted in a letter by the Division on July 21 2011 for the above referenced site In addition a site visit was conducted on June 13 2012 with you David Brame and Michael Brame of ECS Carolinas and John Thomas with the USACE The Division is in receipt of a letter dated June 14 2012 from ECS Carolinas requesting complete termination of the compliance monitoring program for this site The Division concurs with this request and has determined that the Horsepen Creek Mitigation Site has met the established success criteria at this time The long term protection mechanisms included in the approved Mitigation Plan must remain in effect in perpetuity If you have any questions related to our comments or this mitigation project please feel free to contact me at 336 771 4964 or sue homewood @ncdenr gov Cc John Thomas USACE Raleigh Regulatory Field Office (via email) Mickie Elmore PTAA PO Box 35445 Greensboro NC 27401 David Brame ECS Carolinas (via email) DWQ WSRO DWQ= 40LWetlands Unit File Copy1 North Carolina Division of Water Quality Winston Salem Regional Office Location 585 Waughtown St Winston Salem North Carolina 27107 Phone 336 7715000 1 FAX 336 771 -46301 Customer Service 1-877. 623 -6748 Internet www ncwaterquality org An Equal Opportunity 1 Affirmative Action Employer Sincerely Sue Homewood DWQ Winston Salem Regional Office NorthCarohna Naturally