HomeMy WebLinkAbout20000846 Ver 1_Monitoring Report Review_20120625wo," tk� ii`i Mpg
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Waklid Dee Freeman
Governor Director Secretary
June 25 2012
I
Mr Richard Darling
Michael Baker Engineering
8000 Regency Parkway Suite 200
Cary NC 27518
Re Horsepen Creek Mitigation Site for Runway 5L/23R
Piedmont Triad International Airport
Guilford County
DWQ # 2000 0846 V
Dear Mr Darling
The Division of Water Quality (Division) Winston Salem Regional Office has reviewed the recent monitoring results specific to the
continued monitoring as noted in a letter by the Division on July 21 2011 for the above referenced site In addition a site visit was
conducted on June 13 2012 with you David Brame and Michael Brame of ECS Carolinas and John Thomas with the USACE The
Division is in receipt of a letter dated June 14 2012 from ECS Carolinas requesting complete termination of the compliance
monitoring program for this site The Division concurs with this request and has determined that the Horsepen Creek Mitigation Site
has met the established success criteria at this time
The long term protection mechanisms included in the approved Mitigation Plan must remain in effect in perpetuity
If you have any questions related to our comments or this mitigation project please feel free to contact me at 336 771 4964 or
sue homewood @ncdenr gov
Cc John Thomas USACE Raleigh Regulatory Field Office (via email)
Mickie Elmore PTAA PO Box 35445 Greensboro NC 27401
David Brame ECS Carolinas (via email)
DWQ WSRO
DWQ= 40LWetlands Unit File Copy1
North Carolina Division of Water Quality Winston Salem Regional Office
Location 585 Waughtown St Winston Salem North Carolina 27107
Phone 336 7715000 1 FAX 336 771 -46301 Customer Service 1-877. 623 -6748
Internet www ncwaterquality org
An Equal Opportunity 1 Affirmative Action Employer
Sincerely
Sue Homewood
DWQ Winston Salem Regional Office
NorthCarohna
Naturally