Loading...
HomeMy WebLinkAboutSW3201202_Supplemental Info Review_20210302Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 3/2/2021 7:51:29 AM (Supplemental Submittal) Submit by McCoy, Suzanne 3/2/2021 8:15:43 AM (Supplemental Info Submittal) • The task was assigned to McCoy, Suzanne 3/2/2021 7:52 AM Submittal Dated: 3/2/2021 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Existing Project Information: Rease suDDly the Derrrit nunber for this Drolect. D# * Perait Nurrber SW3201202 Examples: SWxxxxxxx, NC Gxxxxxx, or NCSxxxxxx Facility Name:* Yadkin Regional Water Supply Project - Water Treatment Plant County: Union Name: Kelly Boone, CDM Smith Mo is subaitting the inforrration? Email Address:* boonekr@cdmsmith.com Please upload all files that need to be submited. aick the upload button or drag and drop files here to attach document Union County_YWRSP 2021_03_01_WTP - 1.23MB Stormwater Comments Response Cover Letter.pdf Union 1.5MB County_YWRSP 20210211_StateStormwaterPerm... Union County_YWRSP Application_Revised pg 1.12MB 1,3,4.pdf Union County_YWRSP State Stormuater 21.96MB Resubmittal Permit Dravvings.pdf Union County_YWRSP Stormvater Calcs_021621 10.89MB SIGNED.pdf Union County_YWRSP SuppEZ-2020-Version-2.1.3 2.22MB (Union Co)_signed.pdf Only pdf files are accepted. Please alert us to any confidential information contained in the uploaded documents. Uploads contain r NO Confidential r YES Information * NOTE The following information cannot be claimed as confidential: the narre and address of any perrrit applicant or pernittee, pernit applications, perrrits, effluent data, information required by NRJES application forms provided by the Director inclusive of all forrrs and attachments [Ref. 40 CFR 122.7(b) and (c)]. Describe the attachments: These attachments are in response to DEQ's 1-28-2021 letter requesting additional information on SW3201202 (Yadkin Regional Water Supply Project - Water Treatment Plant). Attachments include: Comment Response Cover Letter; O&M Agreement; revised Application pages; revised Plans; revised Calculations; and Supplement EZ Form. * V By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the Supplemental Information form." Full Name:* Kelly Reiser Boone Signature: �// lrT fi 16emP- Date Submitted: 03/02/2021 Initial Review Updated ID#: IWORfANT. RE\/1RAE 2SH0LLDVMFY and revise here if necessary. SW3201202 Who needs a W Central Office copy?* r Regional Office Central Office Reviewer:* Jim Farkas - eads\jjfarkas Review Date * 03/02/2021