Loading...
HomeMy WebLinkAboutNCS000409_Audit Notification_20210223ROYCOOPER Governor MICHAEL S. REGAN Secretory BRIAN WRENN Director CERTIFIED MAIL RETURN RECEIPT REQUESTED NORTH CAROLINA Environmental Quality February 23, 2021 City of Belmont Attention: Mr. Adrian Miller, City Manager Post Office Box 431 Belmont, North Carolina 28012 70191640 00013337 8768 Subject: MS4 PERMIT COMPLIANCE AUDIT NOTIFICATION City of Belmont NPDES MS4 Permit No. NCS000409 Gaston County Dear Mr. Miller: The Department of Environmental Quality (DEQ) has reviewed the documents submitted in response to the February 9, 2021 pre -audit documentation request. Based upon this review, staff will be performing the following National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Permit compliance audit for the subject permit. An on -site audit will be performed, which includes a review of provided documentation, on -site interviews with MS4 representatives and site inspection(s) of municipal industrial facilities that are potentially subject to NPDES Industrial Stormwater permitting. The on -site audit is scheduled for March 30, 2021 beginning at 9:00 am and is expected to take at least two (2) full day (see attached agenda). Please arrange for an appropriate meeting space that will accommodate your representatives, 2-3 staff members from DEQ, and access to any electronic tools routinely utilized to implement the MS4 Program (e.g. databases, GIS, forms, etc.) and notify Jesse McDonnell of the location. You are expected to ensure that all relevant staff, contractors and management/leadership/officials are present for scheduled audit meetings. The audit is structured but informal, and the agenda will be flexible depending upon progress. However, the Preliminary Findings portion of the audit will be held as scheduled so that management and elected officials can plan to attend. On -site meeting rooms must provide adequate space for all participants to maintain appropriate social distancing protocols for COVID-19. If special arrangements or schedule adjustments are necessary to achieve this, please discuss this with Jesse McDonnell prior to the on -site meeting date. All participants of on -site meetings are expected to wear personal protective equipment in North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704.663,1699 Audit Notification City of Belmont February 22, 2021 Page 2 of 2 accordance with current state requirements, guidelines and recommendations; and to also maintain appropriate social distancing protocols for COVID-19 at all times. Should you have any questions regarding the upcoming MS4 Permit compliance audit, please feel free to contact Jesse McDonnell at jesse.mcdonnell@ncdenr.eov or (704) 235-2139. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Division of Energy, Mineral and Land Resources Enclosure: Preliminary Agenda for MS4 Program Audit ec: Carmen Davis, Storm water Coordinator, cdavis(2citvofbelmont.org, Jeanette Powell, DEMLR MS4 Program Coordinator Jeanette.Powell@ncdenr.gov, DEMLR NPDES MS4 Permit Laserfiche File DPreliminary Agenda for MS4 Program Audit /' Belmont, NC March 30-31, 2021 Meeting Location: TBD 9:00 am - 9:30 am I Opening Discussions and Program Management Overview 9:30 am - 10:15 am Office Discussion: Illicit Discharge Detection and Elimination (IDDE) 10:15 am - 11:00 am Office Discussion: Pollution/Prevention and Good Housekeeping for Municipal Operations 11:00 am - 11:15 am Break 10:45 am - 11:30 am I Office Discussion: Construction Site Runoff Controls 11:30 am - 11:45 pm I Logistics Planning for Site Visits 11:45 pm - 1:00 pm Lunch Break 1:00 pm - 4:30 pm Site Visits (IDDE, Pollution Prevention/Good Housekeeping, Construction Sites) 4:30 pm - 5:00 pm I Recap and Planning for Wednesday 8:00 am - 11:00 am I Additional Site Visits and/or Follow-up Discussions 11:00 am - 11:30 am I DEQ Inspection Team Internal Discussion 11:30 am - 12:00 pm I Closing Conference/Preliminary Findings Page t