HomeMy WebLinkAbout20071134 Ver 5_Inspection_20120629AjZA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Waklid P E
Governor Director
June 26 2012
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
Subject Inspection US Highway 19
DWQ Project 07 1134
Individual Certification No 3706
TIP Nos R 2519A
Yancey County
Dear Mr Swain
On June 25 2012 I inspected the construction project on the US Highway 19 Project in Yancey County
Construction continues along most of the project with heavy grading utility construction and culvert
installation
s .�
,�eenian
etary
4 k+1
It s important that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters Also please refer to the attached inspection report for
any specific items noted during the inspections
If you have questions please call me at 828 296 4500
Sincerely
- /"' �/, /, � , 6
Michael R Parker
Environmental Senior Specialist
Attachment
cc Randy McKinney PE
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
US 19 R 2519A June 2012 inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296 4500 1 FAX 828 299 7043
Internet www ncwaterguality org
An Equal Opportunity 1 Affirmative Action Employer
NorthCaro /hna
Wetland Inspection Report
Project Num 20071134 Version 6 Status Issued
Project Name NCDOT US 19 /US 19E R 2518 A R 2518 B & Project Type Road /Highway Widening
R 2519A
County Madison Region Asheville
Location NCDOT US 19 /US 19E R 2518 A R 2518 B & R 2519A
Latitude Longitude
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 06/25/2005
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person
On Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Facility compliance Status 0 Compliant
Program Area 401 (includes isolated /non 404)
Question Areas
0 Permit (401 WQC)
Title
n Not Compliant
Phone
Phone 828 296 4500
Inspection Summary
Inspected US 19 from Jacks Creek Road to Micaville
Ensure all sediment and erosion control devices are operating properly and that adequate measures are installed below the large cut
slopes
Seed amd mulch all areas as required
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment
■ n n n
■ n Cl n
■ n n n
Page 1