Loading...
HomeMy WebLinkAboutNCG030430_Inspection Report_20210225ROY COOPER Governor MICHAELS.REGAN Secretary BRIAN WRENN Director Blue Ridge Metals Corporation Attention: Larry Freeman 180 Mills Gap Road Fletcher, North Carolina 28732 NORTH CAROLINA Environmental Quality February 25, 2021 Subject: Compliance Evaluation Inspection Blue Ridge Metals Corporation Permit: NCG030000 Certificate of Coverage: NCG030430 Henderson County, North Carolina Dear Mr. Freeman: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on February 24, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Since Isaiah Reed, EI, CPSWQ, MS4 ECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 �� u:rvn enwnu.av� / 828.296.4500 Compliance Inspection Report Permit: NCG030430 Effective: 11/01/18 Expiration: 05/31/21 Owner: Blue Ridge Metals Corporation SOC: Effective: Expiration: Facility: Blue Ridge Metals Corporation County: Henderson 180 Mills Gap Rd Region: Asheville Fletcher NC 28732 Contact Person: Larry Freeman Title: Phone: 828-974-9225 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/24/2021 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 02:50PM Exit Time: 04:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030430 Owner- Facility: Blue Ridge Metals Corporation Inspection Date: 02/24/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On February 24, 2021 this facility was inspected for compliance. I met with Carol Morgan on site. During the inspection, the following items were noted. 1) The Stormwater Pollution Prevention Plan was found to be incomplete and not correctly maintained. The permittee is directed to review and revise the Stromwater Pollution Prevention Plan as outlined in the NCG030000 General Permit. 2) Totes were observed being stored without required secondary containment The permittee shall evaluate all liquids storage on site and provide secondary containment as outlined in the NCG030000 General Permit. 3) Monitoring data showed recent monitoring results outside the benchmark range for pH and Zinc. The permittee is directed to review all historical monitoring data and determine the current Tier Response status that the facility is operating under. Please give the above items your immediate attention. This facility will be re -inspected on or after April 13, 2021. If the above items have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG030430 Owner -Facility: Blue Ridge Metals Corporation Inspection Date: 02124/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ N ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: The Stormwater Pollution Prevention Plan was found to be incomplete and not maintained at the time of the inspection. Qualitative Monitorina Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Please send a scanned copy of the Qualitative Monitoring data Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3