HomeMy WebLinkAbout20160372 Ver 2_Year 2 Monitoring Report_2020 (Stream)_20210225 Mitigation Project Information Upload Type of Mitigation Project:* g Stream ❑Wetlands ❑ Buffer ❑ Nutrient Offset (Select all that apply) Is this a Prospectus,Technical Proposal or New 0 Yes !3 No Site?* Project Contact Information Contact Name:* Lindsay Crocker Email Address:* lindsay.crocker@ncdenr.gov Project Information Existing 20160372 Existing 1 (DWR)ID#:* (nurrbersonty...nodash) Version:* (nurrbersony) Project Name:* Stony Fork Project Type:* O DMS O Mitigation Bank County:* Johnston Document Information Mitigation Document Type:* Mitigation Monitoring Report File Upload: Stony_Fork_97085_MY2_2020.pdf 29.94MB Rease upload only one Ft7F of the corrplete file that needs to be subnitted... Signature Print Name:* Lindsay Crocker Signature:* Cq oeffddgeie Date 02/25/2021 Monitoring Report MY02 Stony Fork Restoration Site Upper Neuse River Basin - 03020201 Monitoring Year 02 DMS Contract 6830 DMS Project Number 97085 DWR#: 2016-0372 USACE Action ID: 2016-00875 Johnston County, North Carolina 41 _ ; '-'•%,' ' '' r ,VW - _ ?,* *,1 1.„ L , ' ^ ',, '1, -4:= ,1,',410` k` - , i R f k R y R _ 1 I 1 . I Prepared for: NCDMS, 1652 Mail Service Center,Raleigh,NC 27699-1652 Monitoring Data Collected: 2020 Date Submitted: January 2021 Monitoring and Design Firm Prepared by: 111 KCI TECHNOLOGIES mop- KCIETC KCI ENVIRONMENTAL ASSOCIATES OF NC TECHNOLOGIES AND CONSTRUCTION INC. KCI Associates of North Carolina 4505 Falls of Neuse Road Suite 400 Raleigh,NC 27609 (919) 783-9214 Project Contact: Tim Morris Email: tim.morris(a,kci.com Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 2020-MY02 KCI ASSOCIATES OF N ORTH C AROLINA, P.A. www.kci.com Employee-Owned Since 1988 MEMORANDUM Date: February 24, 2021 To: Lindsay Crocker, DMS Project Manager From: Tim Morris, Project Manager KCI Associates of North Carolina, PA Subject: MY-02 Monitoring Report Comments Stony Fork DMS #6830, Contract 006830 Neuse River Basin CU 030202018 Johnston County, North Carolina Please find below our responses in italics to the MY-02 Monitoring Report comments from NCDMS received on February 2, 2021 for the Stony Fork Restoration Site. 1. There was ATV encroachment and evidence of trails throughout portions of the easement, along with visual evidence of ATV activity during the DMS site visit. This encroachment should be eliminated by working with the landowner. Please reach out to DMS Property and/or Stewardship if you need assistance with this effort, including suggestions for additional signage, etc. There should be a formal letter or memo documenting notification to the landowner to ensure this is handled in the future. Please provide that documentation to DMS. KCI Response: KCI first noted the evidence of ATV encroachment on June 5, 2020. At this time, the landowner was alerted of the issue. KCI monitored this area for continued trespass at each site visit after it was first noted and as of December 8, 2020 no evidence of further trespass was noted. At a site visit on February 9, 2021, fresh ATV tracks were noted entering the easement from the end of Sherrill Farm Dr. The landowner has been informed of this encroachment and the letter that was sent to him has been included at the end of the report. 2. Please also document the extent of the encroachment on the CCPV map and measure the area to be reported on the visual assessment table 6 (#5 Easement Encroachment Areas). KCI Response: The extent of the ATV encroachment was surveyed with a handheld GPS on February 9, 2021 and the CCPV and visual assessment table have been updated to show the encroachment. 3. Resubmit the buffer features, ensuring that they are organized as they are presented in the asset table. Previous digital submissions of these features do not appear to match the square footage reported in the asset table. KCI Response: The correct buffer features have been submitted with the digital deliverables. 4. Digital review of SF3 does not match the asset table (691 ft vs. 624 ft) from the Mitigation Plan. This possibly an issue with the crossing not being removed (as footnoted on the asset table). Please segment this feature or provide the correct geometry for the SF3 that is equal to the creditable stream length (624). E NGINEERS • S CIENTISTS • S URVEYORS • C ONSTRUCTION M ANAGERS 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 (919) 783-9214 (919) 783-9266 Fax KCI Response: The submitted shapefile contained the section of stream that a restoration level of work was performed on, but which did not generate any credit due to the limited buffer width. These segments of the stream have been marked as "No Credit." Sincerely, Tim Morris Project Manager KCI ASSOCIATES OF NORTH CAROLINA, P.A. www.kci.com Employee-Owned Since 1988 TABLE OF CONTENTS Project Summary 1 Monitoring Results 2 Figure 1. Project Site Vicinity Map 4 References 5 Appendix A— Background Tables Table 1. Project Components and Mitigation Credits 7 Table 2. Project Activity and Reporting History 8 Table 3. Project Contacts 9 Table 4. Project Information 10 Appendix B — Visual Assessment Data CCPV 13 Table 5. Visual Stream Morphology Assessment 18 Table 6. Vegetation Condition Assessment 24 Photo Reference Points 25 Permanent Vegetation Monitoring Plot Photos 29 Random Vegetation Monitoring Plot Photos 32 Appendix C — Vegetation Plot Data Table 7. Stem Count Total and Planted by Plot and Species 34 Appendix D — Stream Measurement and Geomorphology Data Table 8. Baseline Stream Data Summary 38 Table 9. Cross-section Morphology Data Table 46 Cross-section Plots 49 Pebble Counts 65 Appendix E — Hydrologic Data Bankfull Verification and Precipitation Plot 74 Table 10. Verification of Stream Flow 75 Table 11. Stream Flow Criteria Attainment 75 Stream Flow Verification and Precipitation Plots 77 Appendix F — Additional Information Notice of Easement Violation 81 Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 2020-MY02 PROJECT SUMMARY The Stony Fork Restoration Site (SFRS) was completed in May 2019 and restored a total of 6,810 linear feet of stream and 949,747 square feet of riparian buffer under the Neuse Buffer Rule (NCAC Rule 15A 02B.029). The SFRS is a riparian system in the Upper Neuse River Basin (03020201 8-digit cataloging unit) in Johnston County, North Carolina. The site's natural hydrologic regime had been substantially modified through the relocation and straightening of the existing stream channels, impacted by land clearing, and cleared of any riparian buffer. This completed project will restore impacted agricultural and timber lands to a stable stream ecosystem with a functional riparian buffer and floodplain access. The SFRS is protected by a 24.4 acre permanent conservation easement,held by the State of North Carolina. The site is located approximately 5.5 miles north of Benson,NC. Specifically,the site is 0.2 mile west on Elevation Road from its intersection with Federal Road(SR-1331). The North Carolina Ecosystem Enhancement Program(NCEEP)published the Neuse River Basin Priorities in 2010. These were updated in for the Neuse 01 cataloging unit(CU) in 2015 due to extensive mitigation needs and changes in watershed conditions since 2010. The project 14 digit CU (03020201150010) was identified as a Targeted Local Watershed(TLW) in the updated priorities. The goals and priorities for the SFRS are based on the information presented in the Neuse River Basin Restoration Priorities: maintaining and enhancing water quality,restoring hydrology, and improving fish and wildlife habitat(NCEEP, 2009). The project will support the following basin priorities: - Managing stormwater runoff - Improving/restoring riparian buffers - Reducing sediment loading - Improving stream stability The goals for the project are to: - Restore channelized and agriculture impacted streams to stable C/Cb channels. - Restore a forested riparian buffer to provide bank stability, filtration, and shading. The project goals will be addressed through the following objectives: - Relocate a channelized stream to its historic landscape position. - Install cross-sections sized to the bankfull discharge. - Create bedform diversity with pools,riffles, and habitat structures - Plant the site with native trees and shrubs and an herbaceous seed mix. Project planting and construction were completed in May 2019. The SFRS involved restoration and establishment of a functioning stream ecosystem with 6,810 linear feet of stream restored by re-meandering the stream and by tying the bankfull elevation to the historic floodplain where feasible. The entire site was planted to establish a forested riparian buffer. The site was constructed as designed with no major modifications from the design plan. The monitoring components were installed in May 2019. Four automatica recording pressure transducer stream gauges that take a reading every 10 minutes were installed in the upper third of Ti, T1-A, T2 and T3 to document flow within those reaches. Cameras were installed in the vicinity of each of these gauges and set to record a short video once a day to provide additional verification of flow.An additional automatic recording pressure transducer stream gauge was installed near the bottom of the main stem(SF3)to record the occurrence of bankfull events. To determine the success of the planted mitigation areas, seven 10 m x 10 m permanent vegetation monitoring plots were established. An additional five 10 m x 10 m random vegetation monitoring plots were sampled as well. The locations of the planted stems relative to the origin were recorded within the permanent plots and the species and height of each planted stem were recorded for all plots. Any volunteers found within the plots were also grouped into size categories by species, but separate from the planted stems. Twelve permanent photo reference points were established and will be taken annually. Sixteen permanent cross-sections(eight riffle Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 1 2020-MY02 cross-sections and eight pool cross-sections)were also established and a detailed longitudinal profile of the stream was taken. Wolman pebble counts were performed at all of the riffle cross-sections. The cross- section measurements will be repeated in future monitoring years,but the longitudinal profile will only be repeated if there are concerns about bed elevation adjustments. Reports will be submitted to DMS each year. Vegetative success criteria for the stream mitigation is 260 woody stems/acre after five years, and 210 woody stems/acre after seven years. Trees in each plot must average seven feet in height at Year 5 and ten feet in height at Year 7.Volunteer species must be present for a minimum of two growing seasons and must be a species from the approved planting list to count toward vegetative success. A single species may not account for more than 50% of the required number of stems within any plot. A minimum of four bankfull events must also be recorded during the monitoring period. All project streams must show a minimum of 30 continuous days of flow within a calendar year for three out of the first four years of monitoring. Bank height ratios(BHR) should not exceed 1.2 and the entrenchment ratios(ER) should be 2.2 or greater. BHR and ER at any measured riffle cross-section should not change more than 10%from the baseline condition during any given monitoring interval(e.g. no more than 10%between years 1 and 2,2 and 3, 3 and 5, or 5 and 7).Visual assessments will also be used to identify problem areas. Vegetative success criteria for the areas proposed for riparian buffer credit is 260 woody stems/acre at the end of five years of monitoring.Trees in each plot must average seven feet in height at Year 5.There should be a minimum of four native hardwood tree species,with no species accounting for greater than 50%of the stems. Volunteer species must be from the approved planting list to count toward vegetative success. MONITORING RESULTS The second-year vegetation monitoring was conducted between September 2 and September 4, 2020. The site averaged 573 planted stems/acre across all 12 plots. Eleven of the twelve plots had greater than 260 planted stems/acre. Including volunteers,the site averaged 782 total stems/acre. The plot that did not meet the success criteria(Plot#5) is located near the bottom of Reach T2-1. Since this reach is an Enhancement II reach,the work that was done here was much less extensive than other areas of the site and the majority of the mature trees in this area were left intact. This area has canopy coverage and there are many mature trees both in and around this plot.In general the site is well vegetated,with widespread herbaceous coverage and healthy planted stems. The stream gauge near the bottom of SF3 recorded eight bankfull events in 2020. All four stream flow gauges recorded at least 30 consecutive days of flow.All four of the gauges recorded flow for the entirety of the period that they recorded. This consisted of a period of 96 consecutive days from January 1 to April 5, and a period of 152 consecutive days from June 3 to November 1. The gap between April 5 and June 3 was caused by a gauge malfunction but based on the rainfall pattern and previous year's data it is likely that the streams were all flowing during this period as well. The cameras on T 1 and T3 either were obscured or malfunctioned throughout the majority of the year, but the camera on T 1 A recorded a maximum of 183 consecutive days of flow before being obscured by vegetation growth. The camera on T2 recorded a maximum of 53 days before malfunctioning. Camera malfunctions have been repaired for MY03. The second-year cross-section survey was completed between June 18 and 28, 2020 and found that the dimensions of the stream are as designed, with some small variation as is typical for stream restoration projects. Cross-section 9, located on T3, showed about six inches of aggradation. This reach received a large amount of sediment input during 2020 from portions of the stream located upstream of the project reaches.This section of the project will be monitored to ensure that this sediment washes through the system in the coming monitoring years. The monitored cross-section data have been calculated by adjusting the bankfull elevation to maintain the baseline bankfull area for each cross-section. Stony Fork Restoration Site KC Associates of NC,PA DMS Project#97085 2 2020-MY02 During a site visit on June 5,2020,ATV tracks entering the easement were noted.These tracks entered the easement from the end of Sherrill Farm Dr., turned northeast for approximately 500 feet before turning around and traveling along the northern edge of the easement until exiting the site along the relic farm road that runs parallel to Sherrill Farm Dr.At this time,the landowner was alerted of the issue and KCI monitored this area for continued trespass.As of December 8,2020 no evidence of further trespass was noted but at a site visit on February 9,2021,fresh ATV tracks were noted. These tracks ran from the end of Sherrill Farm Rd. to the relic farm road and did not turn northeast, as the original ones had. The landowner has been issued a formal notice of violation, which is included in Appendix F—Additional Information. Please see Appendix B—Visual Assessment Data for further information. Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 3 2020-MY02 v NASH I WAKE 1 WILSON \ -..1 Black Cree \ JOHNSTON ,/* �a \ �\e J ,\o� HARNETT AYNE * (Y SAMPSON 40 L_ a) ID a) u.. 1 \ ,,,, Sot \ 301 I . ------( 95 44166 BENSON u .TI 7 \ /i._ r / , , FIGURE 1. VICINITY MAP, STONY FORK RESTORATION SITE, JOHNSTON COUNTY, NC . 41 Project Site Location Major Roads f Airports(none within a 5-mi radius) N 0 0.5 1 KC I . County Boundary Minor Roads Major Rivers and Streams Miles ASSOCIATES OF NC Cities and Towns REFERENCES NCDEQ,Division of Mitigation Services.March 2015. 2015 Neuse 03020201 Priorities. Last accessed at: http://portal.ncdenr.org/c/document_library/get_file?uuid=340a3 f58-336b-42bf-bab2- fb663cbfd78d&groupId=60329 NCDENR,Ecosystem Enhancement Program. 2014.NCDENR,Ecosystem Enhancement Program. 2014. Stream and Wetland Mitigation Monitoring Guidelines.Last accessedl/2016 at: http://portal.ncdenr.org/c/document_library/get_file?p_1_id=60409&folderld=18877169 &name=DLFE-86604.pdf NCDENR,Ecosystem Enhancement Program. 2014. Stream and Wetland Mitigation Monitoring Guidelines. Last accessed 6/2015 at: http://portal.ncdenr.org/c/document_library/get_file?p_l_id=60409&folderld=18877169 &name=DLFE-86606.pdf NC Wetland Functional Assessment Team. 2010.NC Wetland Assessment Method(NC WAM) User Manual,version 4.1. Last accessed 11/2012 at: http://portal.ncdenr.org/c/document_library/get_file?uuid=76f3 c58b-dab8-4960-ba43- 45 b7faf06f4c&groupld=3 83 64 Schafale,M.P. and A.S.Weakley. 2012. Guide to the Natural Communities of North Carolina: Fourth Approximation.Natural Heritage Program,Division of Parks and Recreation, N.C. Department of Environment and Natural Resources. Raleigh,NC. Soil Survey Staff,Natural Resources Conservation Service,United States Department of Agriculture. Soil Survey of Johnston County, North Carolina. 1994 Stony Fork Restoration Site KC Associates of NC,PA DMS Project#97085 5 2020-MY02 APPENDIX A Background Tables Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 6 2020-MY02 Table 1.Project Components and Mitigation Credits Stony Fork Restoration Site,DMS Project#97085 Mitigation Credits Riparian Non-riparian Nitrogen Phosphorous Stream Wetland Wetland Buffer Nutrient Nutrient Offset Offset Type R RE R RE R RE R REMilir Linear 6,405 405 450,285 sf 499,462 sf Feet/Acres Credits 6,405 181 425,434 59,904 TOTAL 6,586 480,338 CREDITS Project Components Project Restoration Existing Approach MP As-built Component Stationing/ -or- Mitigation Footage/ (PI PII Restoration Restoration -or- Location Ratio Square Footage etc.) Restoration Footage* Footage Reach ID Equivalent SF1 10+00-21+55 1,235 PI/PII R 1,155 1,155 1:1 SF2 21+55—49+54 2,453 PI R 2,707** 2,714** 1:1 SF3 49+54—56+08 618 PI R 624** 624** 1:1 T1 100+00-105+10 365 PI/PII R 510 510 1:1 T1A 150+00-151+59 47 PI/PII R 159 159 1:1 12-1 200+00—203+34 327 N/A EII 334 334 2.5:1 T2-2 203+34—206+71 326 PI/PII R 337 337 1:1 12-3 206+71—215+26 780 PI/PII R 855 855 1:1 T3-1 300+00—300+71 72 PI/PII EI 71 71 1.5:1 T3-2 300+71—301+29 82 PI/PII R 58 58 1:1 Buffer Restoration N/A 413,194 N/A R 413,194 413,194 100% TOB to 100' Buffer Restoration N/A 37,091 N/A R 37,091 37,091 33% 101-200' Buffer Enhancement N/A 74,802 N/A E 74,802 74,802 50% TOB to 100' Buffer Preservation N/A 424,660 N/A P 424,660 424,660 10% TOB to 100' *Mitigation Plan footage used for credit calculations.**Crossings have been removed from creditable linear footage for all project streams Stony Fork Restoration Site KC I Associates of NC,PA DMS Project#97085 7 2020-MY02 Component Summation Stream Riparian Wetlands Non-Riparian Restoration Level (linear feet) (Acres) Wetlands Buffer(square feet) (Acres) Riverine Non-Riverine Restoration _ 6,405 450,285 Enhancement 74,802 Enhancement I 71 Enhancement II 334 AILMAS Creation Preservation 424,660 175,029 allowable for credit High Quality 1111 Preservation TOTAL CREDITS 6,586 l 480,338 Table 2. Project Activity&Reporting History Stony Fork Restoration Sites,DMS Project#97085 Activity or Report Data Collection Complete Actual Completion or Deliver Mitigation Plan September 5,2018 Final Design-Construction Plans Oct. 15,2018 Construction Grading Completed May 3,2019 Planting Completed May 6 2019 Baseline Monitoring/Report May 2019 July 2018 Vegetation Monitoring May 9,2019111 Stream Survey May 15,2019 Year 1 Monitoring November 2019 January 2020 Vegetation Monitoring November 5,2019 Stream Survey November 11,2019 Year 2 Monitoring November 2020 January 2021 Vegetation Monitoring September 4,2020 Stream Survey June 29,2020 Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 8 2020-MY02 Table 3.Project Contacts Stony Fork Restoration Site,DMS Project#97085 Design Firm KCI Associates of North Carolina 4505 Falls of Neuse Road Suite 400 Raleigh,NC 27609 Contact: Mr.Tim Morris Phone: (919)278-2512 Fax: (919)783-9266 Construction Contractor Fluvial Solutions,Inc. Stony Fork and T3 PO Box 28749 Raleigh,NC 27611 Contact: Mr.Peter Jelenevsky Phone: (919)605-6134 Construction Contractor KCI Environmental Technologies and Construction Ti,T1A,and T2 4505 Falls of Neuse Road, Suite 400 Raleigh,NC 27609 Contact: Mr.Tim Morris Phone: (919)278-2512 Planting Contractor Bruton Natural Systems,Inc. PO Box 1197 Fremont,NC 27830 Contact: Mr.Charlie Bruton Phone: (919)783-9214 Monitoring Performers KCI Associates of North Carolina 4505 Falls of Neuse Road Suite 400 Raleigh,NC 27609 Contact:Mr.Adam Spiller Phone: (919)278-2514 Fax: (919)783-9266 Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 9 2020-MY02 Table 4.Project Information Stony Fork Restoration Site,DMS Project#97085 Project Name Stony Fork Restoration Site County Johnston County Project Area(acres) 24.4 acres Project Coordinates(lat.and long.) 35°26'55.0"N,78°31'18.5"W Project Watershed Summary Information Physiographic Province Coastal Plain River Basin Neuse USGS Hydrologic Unit 8-digit 03020201 USGS Hydrologic Unit 14-digit 03020201150010 DWQ Sub-basin 03-04-04 Project Drainage Area(acres) 497 acres Project Drainage Area Percentage of 5% Impervious Area Managed Herbaceous Cover 53%(262 ac),Mixed Hardwoods/Conifers 31%(150 ac),Low CGIA Land Use Classification Density Developed 9%(42 ac),Medium Density Residential 5%(24 ac), Transportation/Impervious 3%(13 ac) Existing Reach Summary Information Parameters Stony Fork T1 and T1A T2 T3 Length of reach(linear feet) 3,141 412 1,433 154 Drainage area(acres) 497 12 150 29 Perennial,Intermittent,Ephemeral Perennial Intermittent Perennial Intermittent NCDWQ Water Quality Classification C;NSW C;NSW C;NSW C;NSW Stream Classification(exisiting) G4c G4 G4 G4 Stream Classifcation(proposed) C4 C4 C4 C4 Evolutionary trend(Simon) Channelized,Stage III Channelized,Stage III Channelized,Stage III Modified with pond,Stage III FEMA classification None None None None Existing Wetland Summary Information Parameters Size of Wetland(acres) 0.33(WA and WE) 0.06(WB) 0.14(WC and WF) Wetland Type Headwater Forest Bottomland Hardwood Non-Tidal Freshwater Marsh Forest Mapped Soil Series Gilead sandy loam Bibb sandy loam Bibb sandy loam Drainage class Moderately Well Poorly Drained Poorly Drained Drained Soil Hydric Status Non-hydric Hydric Hydric Source of Hydrology Surface Water Stream Floodplain Stream Floodplain Restoration or Enhancement Method N/A N/A N/A Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 10 2020-MY02 Regulatory Considerations Regulation Applicable? Resolved? Supporting Documentation Waters of the United States — Section Yes Yes 404 permit 404 Waters of the United States — Section Yes Yes 401 permit 401 Endangered Species Act No N/A N/A Historic Preservation Act No N/A N/A Coastal Zone Management Act (CZMA)/Coastal Area Management Act No N/A N/A (CAMA) FEMA Floodplain Compliance No Yes Essential Fisheries Habitat No N/A N/A Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 11 2020-MY02 APPENDIX B Visual Assessment Data Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 12 2020-MY02 Stream Mitigation _ Project Easement �._ •� - , •r,,„il OW R (6,405 If/6,405 SMCs) Easement Encroachment -. — ' ID �_ L. • *. El (71 If/47 SMCs) - - - • Cross-Sections ^• ,II - • Ell (334 If/134 SMCs) �,`{ Photo Points l'� �_ �- , Buffer Mitigation • Flow Gauge -- 4• — R 0-100' (413,194 sf/413,194 credits) Camera - I ' 2-2 �.• l I x��r R 101-200' (37,091 sf/12,240 credits) • Bankfull Gauge R . T2-1 ..�,.; / • E (74,802 sf/37,401 credits) Vegetation Monitoring Plots - +pis* . np P (424,660 sf/17,503 credits) Success Criteria Met — 0 �k M ©, T+ ,, h `+ Success Criteria Not Met I - IP t c 77 , 1 -;;r, Sheet 4 I I t - • .rj1Y 1`- T2-3 • n 4 . Y - • � I SF3 - - 111 mot. I ,' ` __ ' _ - • - Sheet 3 -= • .i y _„ _s-• - � �� ` it .;--- - .- ••6' I .♦ fi' T1 T1A I �" �`- �" s I _ _• n ,i `, tie. I°. ..„--- . IPIP: I �. Sheet 2 Sheet 1 lek ,- . T3-1 /T3-2 ♦ ' - SF2 ,r' ' • I�♦ , l e \Start SF1 I_Iii,dro .1 CURRENT CONDITIONS PLANVIEW N Overview iy 0 150 300 STONY FORK RESTORATION SITE Source:Google Earth,2018 ion C Feet JOHNSTON COUNTY, NC • Stream Mitigation II Project Easement • - R (6,405 I f/6,405 SMCs) Easement Encroachment r • • El (71 If/47 SMCs) - - - . Cross-Sections . Ell (334 If/134 SMCs) ' Photo Points Y(_ " - .'` it T 1 A Buffer Mitigation • Flow Gauge R 0-100' (413,194 sf/413,194 credits) Camera .• . Ilk li 1 , •` _ •-%. '' � , *V R 101-200' (37,091 sf/12,240 credits) • Bankfull Gauge ♦ e�` r �. Vegetation MonitoringPlots *.' xo E (74,802 sf/37,401 credits) 9 . ' 1 >t, ♦� 1.11 . N P (424,660 sf/17,503 credits) _ Success Criteria Met ixv.1 ! �• •, • - _ - Success Criteria Not Met li wil ir det . . . a VI ":..11111)1 x o . '...15r,sp, 4e. • Ati: .- e. vit k ,' 2 41:1113PIP !\ii,,, e . .... i-♦ pr .• � � .... ♦ -14 ��� oO ice• • r� r + 1 ,I _ t ;� 1, r „02. • R5 Ir r� " , ili, + Po • obi i • 1 fir - irk /111-4117,10111P‘ i -T..- jil s . PII .:11. 4.4 %. -ie . . 1111110‘.. • • it 44,4:* '4 -YIP •_,•# 8 . ...Balt - .• . *17-Ntik,jp - = A* .- %No. Atvit 4iss , . a c', • xp0 �'♦ • 0 1 • oo+sd. o R3 •�' Y N o T3-1a o .�. , xkb Z a .♦ 8 R2 x ii> ♦ - P i .f ...• 40101111111010,- _ 10 `♦ �• - • 1 3+ • O ♦♦ t \\\ I - Start S F 1 CURRENT CONDITIONS PLANVIEW N SHEET 1 of 4 0 50 100 STONY FORK RESTORATION SITE Source:Google Earth,2018 acumIt � Feet JOHNSTON COUNTY, NC9 1 Stream Mitigation II Project Easement �. • .. e R (6,405 If/6,405 SMCs) Easement Encroachment e .- Jib El (71 If/47 SMCs) - - - Cross Sections ~ Ell (334/f/134 SMCs) `{ Photo Points ..I - �'�... Buffer Mitigation • Flow Gauge 'f t�� R 0-100' (413,194 sf/413,194 credits) Camera • Ilk" R 101-200' (37,091 sf/12,240 credits) • Bankfull Gauge . ` 00+1 . E (74,802 sf/37,401 credits) Vegetation Monitoring Plots o P (424,660 sf/17,503 credits) _ Success Criteria Met �, o - J Success Criteria Not Met AMMO • ,- ° 11 J a 4. J '! NI- • a& 2111111rr 4, , - dr /.h i4 . lr C 1 J ." /f ` ot . ; 41• . ' _ ,.•'.! t.. %. '1 * Imo`. • S e l w--- li 00 16., , x0 1 44, - k...._ 111111411% .1 00 . ,:fl 111.1 01.16, . i ; L 4. • 1 00 .o cbc:2 . e, Ny -4 . + __. , . „, ..., ,fix N .11- • 1 00 • p x! 4.)11111411- Ole o • 0 . t 014 • , , 2 • � ¢. -� • `� �t — 4.. CURRENT CONDITIONS PLANVIEW N SHEET 2 of 4 6. v • 0 50 100 STONY FORK RESTORATION SITE k ` *' �+` r - • ` �� Feet JOHNSTON COUNTY, NC Source Google Earth,2018 ^_ ^_ T2-3 SF3 42+0041+0056+0055+0054+0053+0052+0051+0050+0048+0047+0046+0045+0044+0043+00214+0021 3 +00 2 1 2 +0 0211+00210+00209+0049+00215+00208+00207+0020 6 +0 0 6 5 75 6 816157 6 3 R4 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Source: Google Earth, 2018 CURRENT CONDITIONS PLANVIEW STONY FORK RESTORATION SITEJOHNSTON COUNTY, NC ±0 10050Feet Stream Mitigation R (6,405 lf / 6,405 SMCs) EI (71 lf / 47 SMCs) EII (334 lf / 134 SMCs) Buffer Mitigation R 0-100'(413,194 sf / 413,194 credits) R 101-200'(37,091 sf / 12,240 credits) E (74,802 sf / 37,401 credits) P (424,660 sf / 17,503 credits) Project Easement Easement Encroachment Cross-Sections ^_Photo Points Flow Gauge Camera Bankfull Gauge Vegetation Monitoring Plots Success Criteria Met Success Criteria Not Met SHEET 3 of 4 Stream Mitigation II Project Easement , - - — R (6,405If/6,405 SMCs) Easement Encroachment 1r aiiik- - . _. o El (71 If/47 SMCs) - - - . Cross-Sections _ .` - • oo -2 Ell (334 If/134 SMCs) `{ Photo Points • 2 • N_' • ,�xoo o Buffer Mitigation • Flow Gauge •� o - R 0-100' (413,194 sf/413,194 credits) Camera o O,LkO� NM - R 101-200' (37,091 sf/12,240 credits) • Bankfull Gauge \'� ' 4 _ E (74,802 sf/37,401 credits) Vegetation Monitoring Plots e . • * , '�• �,a+ P (424,660 sf/17,503 credits) _ Success Criteria Met 5 Success Criteria Not Met ...I, , 2O4,(oO ,9+ thik;:a. .--: -...-,- - • Srs` . , .4 . i iiiii; II �I - -% '28y.00 -t t i .4 e. , . , - __ o " 206+00 6 p r •Pilill 0 ti o p _ N p • o N -• I ' •` • ( �``T2-3 • NL . • tit L w ♦ l p 1UNI MC f .212+00 ,• ` - 213+00 • ,tom `. ,t • ,, 1,W-L, . .11 l'i A -/ . 4 lir I-‘ %. 1 t 14 *,4 k. . 1r ,. . 0 . 0 Xett ',..., ,1 CTA lir 1 ' 11144 \'‘ \ . '' ile.m. . t?.*- r t; 0 aY N is 1 • , R4 ♦♦ oo . IP 1041. - illi 6 jois 7 ` 11, CURRENT CONDITIONS PLANVIEW N SHEET 4 of 4 • `fir 0 50 100 STONY FORK RESTORATION SITE • L r C Feet JOHNSTON COUNTY, NC Source Google Earth,2018 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site,DMS Project#97085 Reach ID SF1 Assessed Length 1,155 Number Stable, Number of Amount of %Stable, Major Channel Channel Performing as Total Number Unstable Unstable Performing as Category Sub-Category Metric Intended in As-built Segments Footage Intended 1.Bed 1.Vertical Stability 1. Aggradation-Bar formation/growth sufficient to significantly deflect 0 0 100% flow laterally(not to include point bars) (Riffle and Run units) 2. Degradation-Evidence of downcutting 0 0 100% 2.Riffle Condition 1. Texture/Substrate-Riffle maintains coarser substrate 18 18 100% 3.Meander Pool 1. Depth Sufficient(Max Pool Depth:Mean Bankfull Depth>1.6) 17 17 100% Condition 2. Length appropriate(>30%of centerline distance between tail of 17 17 100% upstream riffle and head of downstrem riffle) 1.Thalweg centering at upstream of meander bend(Run) 17 17 100% 4.Thalweg Position 2.Thalweg centering at downstream of meander(Glide) 17 17 100% MID i 2.Bank 1.Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or 0 0 100% scour and erosion Banks undercut/overhanging to the extent that mass wasting appears 2.Undercut likely. Does NOT include undercuts that are modest,appear sustainable 0 0 100% and are providing habitat. 3.Mass Wasting Bank slumping,calving,or collapse 0 0 100% Totals 0 0 100% 3.Engineered 1.Overall Integrity Structures physically intact with no dislodged boulders or logs. 5 5 100% Structures 2.Grade Control Grade control structures exhibiting maintenance of grade across the sill. 5 5 100% 2a.Piping Structures lacking any substantial flow underneath sills or arms. 5 5 100% Bank erosion within the structures extent of influence does not exceed 3.Bank Protection 5 5 100% 15%.(See guidance for this table in EEP monitoring guidance document) Pool forming structures maintaining.Max Pool Depth:Mean Bankfull ° 4.Habitat Depth ratio>1.6 Rootwads/logs providing some cover at base-flow. 5 5 100/o Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 18 2020-MY02 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site,DMS Project#97085 Reach ID SF2 Assessed Length 2,802 Number Stable, Number of Amount of %Stable, Major Channel Channel Performing as Total Number Unstable Unstable Performing as Category Sub-Category Metric Intended in As-built Segments Footage Intended 1.Bed 1.Vertical Stability 1. Aggradation-Bar formation/growth sufficient to significantly deflect 0 0 100% flow laterally(not to include point bars) (Riffle and Run units) 2. Degradation-Evidence of downcutting 0 0 100% 2.Riffle Condition 1. Texture/Substrate-Riffle maintains coarser substrate 36 36 100% 3.Meander Pool 1. Depth Sufficient(Max Pool Depth:Mean Bankfull Depth>1.6) 35 35 100% Condition 2. Length appropriate(>30%of centerline distance between tail of 35 35 100% upstream riffle and head of downstrem riffle) 1.Thalweg centering at upstream of meander bend(Run) 35 35 100% 4.Thalweg Position 2.Thalweg centering at downstream of meander(Glide) 35 35 100% Bank lacking vegetative cover resulting simply from poor growth and/or 2.Bank 1.Scoured/Eroding 0 0 100% _ scour and erosion Banks undercut/overhanging to the extent that mass wasting appears 2.Undercut likely. Does NOT include undercuts that are modest,appear sustainable 0 0 100% and are providing habitat. 3.Mass Wasting Bank slumping,calving,or collapse 0 0 100% Totals 0 0 100% 3.Engineered 1.Overall Integrity Structures physically intact with no dislodged boulders or logs. 8 8 100% Structures 2.Grade Control Grade control structures exhibiting maintenance of grade across the sill. 8 8 100% 2a.Piping Structures lacking any substantial flow underneath sills or arms. 8 8 100% Bank erosion within the structures extent of influence does not exceed 3.Bank Protection 8 8 100% 15%.(See guidance for this table in EEP monitoring guidance document) 4.Habitat Pool forming structures maintaining—Max Pool Depth:Mean Bankfull 8 8 100% Depth ratio>1.6 Rootwads/logs providing some cover at base-flow. Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 19 2020-MY02 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site,DMS Project#97085 Reach ID SF3 Assessed Length 618 Number Stable, Number of Amount of %Stable, Major Channel Channel Performing as Total Number Unstable Unstable Performing as Category Sub-Category Metric Intended in As-built Segments Footage Intended 1.Bed 1. Aggradation-Bar formation/growth sufficient to significantly deflect ° 1.Vertical Stability flow laterally(not to include point bars) 0 0 100/o (Riffle and Run units) 2. Degradation-Evidence of downcutting 0 0 100% 2.Riffle Condition 1. Texture/Substrate-Riffle maintains coarser substrate 9 9 100% 3.Meander Pool 1. Depth Sufficient(Max Pool Depth:Mean Bankfull Depth>1.6) 8 8 100% Condition 2. Length appropriate(>30%of centerline distance between tail of 8 8 ■ 100% upstream riffle and head of downstrem riffle) 1.Thalweg centering at upstream of meander bend(Run) 8 8 100% 4.Thalweg Position 2.Thalweg centering at downstream of meander(Glide) 8 8 100% 2.Bank 1.Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or 0 0 100% scour and erosion Banks undercut/overhanging to the extent that mass wasting appears 2.Undercut likely. Does NOT include undercuts that are modest,appear sustainable 0 0 100% and are providing habitat. 3.Mass Wasting Bank slumping,calving,or collapse 0 0 100% Totals 0 0 100% 3.Engineered 1.Overall Integrity Structures physically intact with no dislodged boulders or logs. 1 1 100% Structures 2.Grade Control Grade control structures exhibiting maintenance of grade across the sill. 1 1 100% 2a.Piping Structures lacking any substantial flow underneath sills or arms. 1 1 100% Bank erosion within the structures extent of influence does not exceed 3.Bank Protection 1 1 100% 15%.(See guidance for this table in EEP monitoring guidance document) 4.Habitat Pool forming structures maintaining.Max Pool Depth:Mean Bankfull 1 1 100% Depth ratio>1.6 Rootwads/logs providing some cover at base-flow. Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 20 2020-MY02 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site,DMS Project#97085 Reach ID T1 Assessed Length 365 Number Stable, Number of Amount of %Stable, Major Channel Channel Performing as Total Number Unstable Unstable Performing as Category Sub-Category Metric Intended in As-built Segments Footage Intended 1.Bed 1. Aggradation-Bar formation/growth sufficient to significantly deflect ° 1.Vertical Stability flow laterally(not to include point bars) 0 0 100/o (Riffle and Run units) 2. Degradation-Evidence of downcutting 0 0 100% 2.Riffle Condition 1. Texture/Substrate-Riffle maintains coarser substrate 13 13 100% 3.Meander Pool 1. Depth Sufficient(Max Pool Depth:Mean Bankfull Depth>1.6) 12 12 100% Condition 2. Length appropriate(>30%of centerline distance between tail of 12 12 100% upstream riffle and head of downstrem riffle) 1.Thalweg centering at upstream of meander bend(Run) 12 12 100% 4.Thalweg Position 2.Thalweg centering at downstream of meander(Glide) 12 12 100% 2.Bank Bank lacking vegetative cover resulting simply from poor growth and/or 1.Scoured/Eroding 0 0 100% _ scour and erosion Banks undercut/overhanging to the extent that mass wasting appears 2.Undercut likely. Does NOT include undercuts that are modest,appear sustainable 0 0 100% and are providing habitat. 3.Mass Wasting Bank slumping,calving,or collapse 0 0 100% Totals 0 0 100% 3.Engineered 1.Overall Integrity Structures physically intact with no dislodged boulders or logs. 4 4 100% Structures 2.Grade Control Grade control structures exhibiting maintenance of grade across the sill. 4 4 100% 2a.Piping Structures lacking any substantial flow underneath sills or arms. 4 4 100% Bank erosion within the structures extent of influence does not exceed 3.Bank Protection 4 4 100% 15%.(See guidance for this table in EEP monitoring guidance document) 4.Habitat Pool forming structures maintaining—Max Pool Depth:Mean Bankfull 4 4 100% Depth ratio>1.6 Rootwads/logs providing some cover at base-flow. Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 21 2020-MY02 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site,DMS Project#97085 Reach ID T2 Assessed Length 1,433 Number Stable, Number of Amount of %Stable, Major Channel Channel Performing as Total Number Unstable Unstable Performing as Category Sub-Category Metric Intended in As-built Segments Footage Intended 1.Bed 1. Aggradation-Bar formation/growth sufficient to significantly deflect I o 1.Vertical Stability 0 0 100/o flow laterally(not to include point bars) (Riffle and Run units) 2. Degradation-Evidence of downcutting 0 0 100% 2.Riffle Condition 1. Texture/Substrate-Riffle maintains coarser substrate 27 27 100% 3.Meander Pool 1. Depth Sufficient(Max Pool Depth:Mean Bankfull Depth>1.6) 26 26 100% Condition 2. Length appropriate(>30%of centerline distance between tail of 26 26 100% upstream riffle and head of downstrem riffle) 1.Thalweg centering at upstream of meander bend(Run) 26 26 100% 4.Thalweg Position 2.Thalweg centering at downstream of meander(Glide) 26 26 100% 1 2.Bank 1.Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or 0 0 100% _ scour and erosion Banks undercut/overhanging to the extent that mass wasting appears 2.Undercut likely. Does NOT include undercuts that are modest,appear sustainable 0 0 100% and are providing habitat. 3.Mass Wasting Bank slumping,calving,or collapse 0 0 100% Totals 0 0 100% 3.Engineered 1.Overall Integrity Structures physically intact with no dislodged boulders or logs. 7 7 100% Structures 2.Grade Control Grade control structures exhibiting maintenance of grade across the sill. 7 7 100% 2a.Piping Structures lacking any substantial flow underneath sills or arms. 7 7 100% Bank erosion within the structures extent of influence does not exceed 3.Bank Protection 7 7 100% 15%.(See guidance for this table in EEP monitoring guidance document) Pool forming structures maintaining—Max Pool Depth:Mean Bankfull ° 4.Habitat Depth ratio>1.6 Rootwads/logs providing some cover at base-flow. 7 7 100/o Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 22 2020-MY02 Table 5 Visual Stream Morphology Stability Assessment Stony Fork Stream Restoration Site,DMS Project#97085 Reach ID T3 Assessed Length 154 Number Stable, Number of Amount of %Stable, Major Channel Channel Performing as Total Number Unstable Unstable Performing as Category Sub-Category Metric Intended in As-built Segments Footage Intended 1.Bed 1. Aggradation-Bar formation/growth sufficient to significantly deflect u 1.Vertical Stability flow laterally(not to include point bars) 0 0 100/o (Riffle and Run units) 2. Degradation-Evidence of downcutting 0 0 100% 2.Riffle Condition 1. Texture/Substrate-Riffle maintains coarser substrate 3 3 100% 3.Meander Pool 1. Depth Sufficient(Max Pool Depth:Mean Bankfull Depth>1.6) 2 2 100% Condition 2. Length appropriate(>30%of centerline distance between tail of 2 2 ■ 100% upstream riffle and head of downstrem riffle) 1.Thalweg centering at upstream of meander bend(Run) 2 2 100% 4.Thalweg Position 2.Thalweg centering at downstream of meander(Glide) 2 2 100% 2.Bank 1.Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or 0 0 100% scour and erosion Banks undercut/overhanging to the extent that mass wasting appears 2.Undercut likely. Does NOT include undercuts that are modest,appear sustainable 0 0 100% and are providing habitat. 3.Mass Wasting Bank slumping,calving,or collapse 0 0 100% Totals 0 0 100% 3.Engineered 1.Overall Integrity Structures physically intact with no dislodged boulders or logs. N/A N/A N/A Structures 2.Grade Control Grade control structures exhibiting maintenance of grade across the sill. N/A N/A N/A 2a.Piping Structures lacking any substantial flow underneath sills or arms. N/A N/A N/A Bank erosion within the structures extent of influence does not exceed 3.Bank Protection N/A N/A N/A 15%.(See guidance for this table in EEP monitoring guidance document) 4.Habitat Pool forming structures maintaining.Max Pool Depth:Mean Bankfull N/A N/A N/A Depth ratio>1.6 Rootwads/logs providing some cover at base-flow. Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 23 2020-MY02 Table 6 Vegetation Condition Assessment Stony Fork Stream Restoration Site,DMS Project#97085 Planted Acreage 24.4 Mapping Number of Combined %of Planted Vegetation Category Definitions Threshold CCPV Depiction Polygons Acreage Acreage 1. Bare Areas Very limited cover of both woody and herbaceous 0.1 acres Pattern and Color 0 0.00 0.0% material. 2. Low Stem Density Areas Woody stem densities clearly below target levels 0.1 acres Pattern and Color 0 0.00 0.0% based on MY3,4,or 5 stem count criteria. Total 0 0.00 0.0% 3.Areas of Poor Growth Rates or Vigor Areas with woody stems of a size class that are 0.25 acres Pattern and Color 0 0.00 0.0% obviously small given the monitoring year. Cumulative Total 0 0.00 0.0% Easement Acreage 9.5 Mapping Number of Combined %of Easement Vegetation Category Definitions Threshold CCPV Depiction Polygons Acreage Acreage 4.Invasive Areas of Concern Areas or points(if too small to render as polygons 1000 SF Pattern and Color 0 0.00 0.0% at ma, scale . 5.Easement Encroachment Areas Areas or points(if too small to render as polygons none Pattern and Color 1 0.05 0.5% at map scale). Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 24 2020-MY02 Photo Reference Photos f ��*L-..,3:'r.„,...- ._�' - j v -, 4 a ems '' S 4 i 7 y 1k _ 'rr .' �5 I'F t k X " fit ..1'.PP %'tf . {Y$ AA \�PkY •� -l , `A- - , tf • <t ril, PS Wi yf ✓ , , . '` ff PP1U—MY-00—5/15/19 PP1U—MY-02— 12/8/20 4 j gip. . ,- hlr Li. . • ..,: , ... , . ,._, .. . . . ._ ,..... , .,. a .., PP1D—MY-00—5/15/19 PPID—MY-02— 12/8/20 • • �� 9,, ;� I� S�� a ���� i� 1 yI 1 o �,r��l`�{ � 'fit' Ip�sl. � %Ft .. \ \\ � �4� i� i f.�A� k s III 1 kNi 4 pe^ �J'f; +r .fie., ;� T'` ' 4' i p ' � k { 1^1.11f.'.1��ail �fR ; �f�' � l '1 �i•'� "° • ;t } ,, ,-•� �%' 'p `tea , /r PP2U—MY-00—5/15/19 PP{23U—MY-02— 12/8/20 Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 25 2020-MY02 • i3'II1!! *a' Q ' • ." • PP2D MY-00—5/15/19 PP2D—MY-02— 12/8/20 . =. —;..'-"iitc-: riClitk f,',r'-P''' ''''';'''- y z ref PP3U—MY-00—5/15/19 PP3U—MY-02— 12/8/20 2 �M i,�,i b_o,.e P! • O' : 51. PP3D—MY-00—5/15/19 PP3D—MY-02— 12/8/20 Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 26 2020-MY02 ` E 1�'•. ,b , . • m' E „ ., r L,'j i7 PP4U M Y 00 5/15/19 PP4U—MY-02— 12/8/20 TT-Att •_;41 7 , ;1 r .3,. • 'pi` ;,..— b �R.• .4,..'Ln si t" . ri 4i�"S�c.:ti PP4D—MY-00 5/15/19 PP4D—MY-02— 12/8/20 .. i.f. . " s a , zg : . . ...,• n,-,..,,,, f p it f. �• �Pw e " ,6 , l' er , ,� '4— 'Fr! Srr,: r t y ,: t �t • • u sly .� of PP5U—MY-00—5/15/19 PP5U—MY-02— 12/8/20 Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 27 2020-MY02 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 28 2020-MY02 PP5D – MY-00 – 5/15/19 PP5D – MY-02 – 12/8/20 PP6U – MY-00 – 5/15/19 PP6U – MY-02 – 12/8/20 PP6D – MY-00 – 5/15/19 PP6D – MY-02 – 12/8/20 Stony Fork Restoration Site KCI Associates of NC, PA DMS Project # 97085 29 2020-MY02 Permanent Vegetation Monitoring Plot Photos Vegetation Plot 1 – MY-00 – 5/15/19 Vegetation Plot 1 – MY-02 – 9/2/20 Vegetation Plot 2 – MY-00 – 5/15/19 Vegetation Plot 2 – MY-02 – 9/2/20 Vegetation Plot 3 – MY-00 – 5/15/19 Vegetation Plot 3 – MY-02 – 9/2/20 •-VA::'P:intio. . • - t � yr. ,� T��`+�.?;� • � °" i • C y A • I Y3 [ T 6 my °• } Vegetation Plot 4—MY-00—5/15/19 Vegetation Plot 4 MY-02 9/2/20 AFC' •"-':'''''''''- A' .ki • • ., r. . • ', '••• .••• .eat +b j - •e* .„'�` r •f 4 t M Vegetation Plot 5—MY-00—5/15/19 Vegetation Plot 5—MY-02—9/2/20 .:, ��» vie „wi - tea:11,/-"iY•f# - � T , b .-:::‘.,151,64-,.._,-0., :r.-,:..'.7-4.;,-.:e...-7;...-4.,ear.,r..0:_;...: :„,...-;....,......:. , c " +ate a 04 Vegetation Plot 6 MY-00 5/15/19 Vegetation Plot 6 MY-02 9/2/20 Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 30 2020-MY02 • 4 . " ' .,•:".-'-- fi'''':.: `,._. '1:,. ','...; i;t,'-''...'..'.': ... - - ..- - � ' b •~ ? iF H +. 2. ~ : h ti' 9A a§iEf f S ',-*,-:,:,.i4,5J- T,i Ay{ d t� '�° I r 4it' ''"y' 'ea 4?. F j' . .d' Vegetation Plot 7 MY 00 5/15/19 Vegetation Plot 7—MY-02—9/2/20 Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 31 2020-MY02 Random Vegetation Monitoring Plot Photos s ii ! Y � ! '� 5 r a� ;k_SAX ,87d � k '" df � fa't 3h " . - t .4,,_:,:L..,_,,,,,,:,,,,,t,___,-;4.-?„,,,,,,,A,,,, k ft,„:.,,,,,Lr",&..,..,,,,..r...,,,...,:.-",,mi.,:„4-.1—',..:,,t?,—,.::::;;":,.,...„":,;,,,,,,‘;,!...„..i.....„4:-,,,,,,,,...;,0_,,,,,,,,,,,..:tii-,-::::,;--;„:1,4:,-,.,,,,,r,;: .s.,..,, r,'-',27,'i-5':'.---..r.7-4..',.'- :-..‘t, -4".".t.:.4--, ,re,;" • Vegetation Plot R1 —MY-02—9/4/20 Vegetati Plc; R2—MY-02—9/4/20 e on E , ,y. , �. ' k G.✓s--,, w rt �� ?'f': .`Cf �' k'''' 4'''alb y , ✓ , .Z.FI.:fogy '-' -_z 3 .. Y a' S it Vegetation Plot R3—MY-02—• 9/4/20 Vegetation Plot R4—MY-02—9/4/20 .. J. �. xr. > , ,.' t ` �J K a'4 ' �� FMf 5 • l ,. N a A..: - - f7 k.. 'x , rp. r Vegetation Plot R5—MY-02—9/4/20 Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 32 2020-MY02 APPENDIX C Vegetation Plot Data Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 33 2020-MY02 Table 7. Stem Count by Plot and Species Stony Fork Restoration Site,DMS Project#97085 Current Plot Data(MY02 2020) Plot 01 Plot 02 Plot 03 Plot 04 Plot 05 Plot 06 Plot 7 Species Planted Total Planted Total Planted Total Planted _Total Planted Total Planted Total Planted Total American Elm(Ulm us americana) _ 2 American Persimmon(Diospyros virginiana) _ American Sycamore(Platanus occidentalis) 5_ 5 7 8 1 1 2 2 1 1 3 3 2 2 Bald Cypress(Taxodium distichum) 1 1 4 4 Black Willow(Salix nigra) 1 I 3 Elderberry (Sambucus canadensis) 3 Green Ash(Fraxinus pennsylvanica) 2 2 4 4 4 4 1 1 Loblolly Pine(Pinus taeda) 12 3 8 Oak(Quercus sp.) _ Pin Oak(Quercus palustris) 2 2 2 2 1 1 1 1 1 1 2 2 Red M ap le(Acer rubrum) 1 1 2 Red Oak(Quercus rubra) _ River Birch(Betula nigra) 1 1 1 1 1 1 1 1 2 2 2 2 Silky Dogwood(Cornus amomum) _ 5 5 1 1 I 1 Sugar Berry (Celtis laevigata) _ Swamp Chestnut Oak(Quercus michauxii) 2 2 1 1 1_ 1 1 1 Sweet Bay (Magnolia virginiana) 1 Sweet Gum(Liquidambar styracua) 1 _ Tulip Poplar(Liriodendron tulipifera) 1 2 1 1 1 1 1 Water Oak(Quercus nigra) Wax Myrtle(Myrica cerifera) 1 _ White Oak(Quercus alba) 1 1 1 1 I Willow Oak(Quercus phellos) 1 1 1 1 3 3 6 6 3 3 2 2 Unknown _ Stem count 14 29 15 21 11 11 16 28 4 11 13 16 14 14 size(ares) 1 1 1 1 1 1 1 size(ACRES) 0.025 0.025 0.025 0.025 0.025 0.025 0.025 Species count 7 10 5 8 6 6 6 10 _ 4 8 0 0 0 0 Stems per ACRE 567 1,174 607 850 445 445 647 1,133 162 445 526 647 567 567 Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 34 2020-MY02 Table 7. Stem Count by Plot and Species Stony Fork Restoration Site,DMS Project#97085 Current Plot Data(MY02 2020) Plot Rl Plot R2 Plot R3 Plot R4 Plot R5 Species Planted Total Planted Total Planted Total Planted )Total Planted Total American Elm(Ulmus americana) 1 American Persimmon(Diospyros virginiana) 2 2 American Sycamore(Platanus occidentalis) 2 2 5 5 6 6 8 8 1 1 Bald Cypress(Taxodium distichum) _ _ _ Black Willow(Salix nigra) 2 2 Elderberry(Sambucus canadensis) _ _ _ Green Ash(Fraxinus pennsylvanica) 2 2 6 6 7 7 5 5 Loblolly Pine(Pinus taeda) 7 Oak(Quercus sp.) Pin Oak(Quercus palustris) 2 2 Red Maple(Acer rubrum) _ _ _ 1 Red Oak(Quercus rubra) River Birch(Betula nigra) _ 6 6_ 2 2 7 7 4 4 Silky Dogwood(Corpus amomum) 3 3 Sugar Berry(Celtic laevigata) _ _ _ Swamp Chestnut Oak(Quercus michauxii) Sweet Bay (Magnolia virginiana) _ Sweet Gum(Liquidambar styracua) _ 1 3 6 Tulip Poplar(Liriodendron tulipifera) 3 3 Water Oak(Quercus nigra) Wax Myrtle(Myrica cerifera) White Oak(Quercus alba) I I 2 2 Willow Oak(Quercus phellos) 3 3 2 2 2 2 Unknown _ Stem count 12 13 _ 22 25 17 30 _ 22 23 10 11 size(ares) 1 1 1 1 1 size(ACRES) 0.025 _ 0.025 _ 0.025 0.025 0.025 Species count 6 _ 7 5 6 4 6 4 5 4 5 Stems per ACRE 486 526 890 1,012 688 1,214 890 931 405 445 Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 35 2020-MY02 Table 7. Stem Count by Plot and Species Stony Fork Restoration Site,DMS Project#97085 Annual Means MY02(2020) MY01(2019) MY00(2019) Species Planted Total Planted Total Planted Total American Elm(Ulmus americana) 3_ American Persimmon(Diospyros virginiana) 2 2 4 4 _ American Sycamore(Platanus occidentalis) 43 44 40 40 9 9 Bald Cypress(Taxodium distichum) 5 5 7 7 1 1 Black Willow(Salix nigra) 2 6 2 Elderberry(Sambucus canadensis) 3 1 1 2 2 Green Ash(Fraxinus pennsylvanica) 31 31 25 25 29 29 Loblolly Pine(Pinus taeda) 30 2 2 Oak(Quercus sp.) 1 1 18 18 Pin Oak(Quercus palustris) 11 11 7 7 3 3 Red Maple(Acer rubrum) 5 4 11 2 Red Oak(Quercus rubra) 2 2 River Birch(Betula nigra) 27 27 17 17 2 2 Silky Dogwood(Cornus amomum) 10 10 8 8 10 10 Sugar Berry (Celtis laevigata) 2 2 Swamp Chestnut Oak(Quercus michauxii) 5 5 7 7 7 7 Sweet Bay(Magnolia virginiana) 1 1 1 Sweet Gum(Liquidambar styracua) 11 2 8 Tulip Poplar(Liriodendron tulipifera) 6 8 14 20 14 14 Water Oak(Quercus nigra) 1 1 Wax Myrtle(Myrica cerifera) 1 White Oak(Quercus alba) 5 6 12 15 1 4 Willow Oak(Quercus phellos) 23 23 30 30 3 3 Unknown 4 4 199 199 Stem count 170 232 187 212 301 307 size(ares) 12 12 12 size(ACRES) 0.300 0.300 0.300 Species count 12 19 18 20 15 17 Stems per ACRE 773 623 707 1,003 1,023 Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 36 2020-MY02 APPENDIX D Stream Measurement and Geomorphology Data Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 37 2020-MY02 Table 8a. SF1 Data Summary Stony Fork Restoration Site,DMS Project#97085 Parameter Pre-Existing Condition Reference Reach(es)Data Design As-built Dimension-Riffle Min Mean Max n Bankfull Width(ft) 7.2 14.8-18.8 9.7 9.3 1 Floodprone Width(ft) 8.7 >50 100 >80 1 Bankfull Mean Depth(ft) 0.9 1.3-1.8 0.7 0.8 1 Bankfull Max Depth(ft) 1.2 1.9-2.4 1.1 1.2 1 Bankfull Cross-Sectional Area(ft2) 6.4 25 7.0 7.0 1 Width/Depth Ratio 8.1 9.0-14.0 13.5 12.2 1 Entrenchment Ratio 1.2 >2.5 10.3 8.7 1 Bank Height Ratio 2.9 1.0-1.2 1.0 1.0 1 Pattern Channel Beltwidth(ft) * 60 30-55 30-55 Radius of Curvature(ft) * 16-87 20-29 20-29 Rc:Bankfull width(ft/ft) * 3.5-12.9 9.6-13.6 9.6-13.6 Meander Wavelength(ft) * 66-191 93-132 93-132 Meander Width Ratio * 4.1 3.1-5.7 3.1-5.7 Profile Riffle Length(ft) i Ila 23.40 31.55 40.95 17 Riffle Slope(ft/ft) 0.009 0.013-0.035 0.009-0.015 0.0031 0.0141 0.0137 17 Pool Length(ft) * 14-33 21-46 12.47 28.73 41.34 17 Pool Spacing(ft) * 2.7-7.1 5.6-7.3 44.28 68.72 142.01 17 Substrate and Transport Parameters SC%/Sa%/G%/C%/B%/Be% 3/40/57/0/0/0 0/4/90/7/0/0 d16/d35/d50/d84/d95(mm) 0.15/1.2/2.2/7.5/11/-0.4/7.1 Gravel Gravel 9.4/16/22/33/53/70 Channel length(ft) 1235 1155 1155 Drainage Area(SM) 0.27 1.49 0.27 0.27 Rosgen Classification G4c C4 C4 C4 Sinuosity 1.3 1.3 1.2 1.2 Water Surface Slope(ft/ft) 0.009 0.005 0.009 0.01 ':no data shown for pools,radius of curvature or meanders in existing stream do to channelization/lack of bed diversity Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 38 2020-MY02 Table 8b. SF2 Baseline Stream Data Summary Stony Fork Restoration Site,DMS Project#97085 Parameter Pre-Existing Condition Reference Reach(es)Data(SF) Design As-built Dimension-Riffle Min Mean Max n Bankfull Width(ft) 5.0-10.0 14.8-18.8 11.3 12.2 12.4 12.6 2 Floodprone Width(ft) 7.4-14.5 >50 100 53.3 67.0 80.7 2 Bankfull Mean Depth(ft) 1.0-1.4 1.3-1.8 0.8 0.9 0.95 1.0 2 Bankfull Max Depth(ft) 1.3-2.2 1.9-2.4 1.2 1.4 1.5 1.6 2 Bankfull Cross-Sectional Area(ft2) 6.9-8.9 25 9.4 10.6 11.6 12.5 2 Width/Depth Ratio 3.7-11.2 9.0-14.0 13.5 12.8 13.5 14.1 2 Entrenchment Ratio 1.4-1.5 >2.5 8.8 4.2 5.4 6.6 2 Bank Height Ratio 1.6-2.1 1.0-1.2 1.0 1 1 1 2 Pattern Channel Beltwidth(ft) * 60 37-65 37-65 Radius of Curvature(ft) * 16-87 22-33 22-33 Rc:Bankfull width(ft/ft) * 3.5-12.9 9.3-13.1 9.3-13.1 Meander Wavelength(ft) * 66-191 105-148 105-148 Meander Width Ratio * 4.1 3.3-5.8 3.3-5.8 Profile Riffle Length(ft) 17.58 39.07 86.38 36 Riffle Slope(ft/ft) 0.003-0.008 0.013-0.035 0.009-0.015 0.0021 0.0118 0.0256 36 Pool Length(ft) * 14-33 24-52 12.51 28.83 52.39 34 Pool Spacing(ft) * 2.7-7.1 5.2-7.4 43.01 81.44 178.86 34 Substrate and Transport Parameters SC%/Sa%/G%/C%/B%/Be% 20.3/30/49.8/0/0/0 5/8/54/33/0/0 d16/d35/d50/d84/d95(mm) 0.33/0.61/1.2/6.2/9.8/0.3/5.5 Gravel Gravel 5.9/31/45/61/98.5/140 Channel length(ft) 2453 2802 2802 Drainage Area(SM) 0.41 1.49 0.41 0.41 Rosgen Classification G4c-G5c C4 C4 C4 Sinuosity 1.1 1.3 1.2 1.2 Water Surface Slope(ft/ft) 0.008 0.005 0.008 0.008 *:no data shown for pools,radius of curvature or meanders in existing stream do to channelization/lack of bed diversity Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 39 2020-MY02 Table 8c. SF3 Baseline Stream Data Summary Stony Fork Restoration Site,DMS Project#97085 Parameter Pre-Existing Condition Reference Reach(es)Data(SF) Design As-built Dimension-Riffle Min Mean Max n Bankfull Width(ft) 10.5 14.8-18.8 12.6 11.6 1 Floodprone Width(ft) 14.4 >50 100 92.4 1 Bankfull Mean Depth(ft) 1.2 1.3-1.8 0.9 1.1 1 Bankfull Max Depth(ft) 1.3 1.9-2.4 1.4 1.7 1 Bankfull Cross-Sectional Area(ft2) 12.5 25 11.8 12.9 1 Width/Depth Ratio 8.9 9.0-14.0 13.5 10.4 1 Entrenchment Ratio 1.4 >2.5 7.9 8.0 1 Bank Height Ratio 2.0 1.0-1.2 1.0 1.0 1 Pattern Channel Beltwidth(ft) * 60 46-77 46-77 Radius of Curvature(ft) * 16-87 28-35 28-35 Rc:Bankfull width(ft/ft) * 3.5-12.9 11.7-14 11.7-14 Meander Wavelength(ft) * 66-191 148-176 148-176 Meander Width Ratio * 4.1 3.7-6.1 3.7-6.1 Profile Riffle Length(ft) 7.4 35.2 52.4 7 Riffle Slope(ft/ft) 0.006 0.013-0.035 0.01 0.0032 0.0075 0.0175 7 Pool Length(ft) * 14-33 35-62 12.4 33.9 39.7 7 Pool Spacing(ft) * 2.7-7.1 6.7-8.0 92.0 103.1 114.4 7 Substrate and Transport Parameters SC%/Sa%/G%/C%/B%/Be% 10/0/0/0/0/0 21/21/40/18/0/0 d16/d35/d50/d84/d95(mm) 1.1/6.0/8.3/12/15/-0.7/3.3 Gravel Gravel 0.06/0.77/16/29/70/120 Channel length(ft) 618 654 654 Drainage Area(SM) 0.84 1.49 0.84 0.84 Rosgen Classification G4c C4 C4 C4 Sinuosity 1.1 1.3 1.2 1.2 Water Surface Slope(ft/ft) 0.006 0.005 0.008 0.006 :no data shown for pools,radius of curvature or meanders in existing stream do to channelization/lack of bed diversity Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 40 2020-MY02 Table 8d. T1 Baseline Stream Data Summary Stony Fork Restoration Site,DMS Project#97085 Parameter Pre-Existing Condition Reference Reach(es)Data(SF) Design As-built Dimension-Riffle Min Mean Max n Bankfull Width(ft) 3.4 14.8-18.8 5.0 4.2 1 Floodprone Width(ft) 4.5 >50 50 45.0 1 Bankfull Mean Depth(ft) 0.3 1.3-1.8 0.4 0.2 1 Bankfull Max Depth(ft) 0.4 1.9-2.4 0.6 0.5 1 Bankfull Cross-Sectional Area(ft2) 0.9 25 1.9 0.9 1 Width/Depth Ratio 12.7 9.0-14.0 13.5 18.6 1 Entrenchment Ratio 1.3 >2.5 10 10.8 1 Bank Height Ratio 4.5 1.0-1.2 1.0 1.0 1 Pattern Channel Beltwidth(ft) * 60 23-37 23-37 Radius of Curvature(ft) * 16-87 11-17 11-17 Rc:Bankfull width(ft/ft) * 3.5-12.9 11.6-14.4 11.6-14.4 Meander Wavelength(ft) * 66-191 58-72 58-72 Meander Width Ratio * 4.1 4.6-7.4 4.6-7.4 Profile Riffle Length(ft) W. 4.53 18.2 29.1 11 Riffle Slope(ft/ft) 0.035 0.013-0.035 0.014-0.04 0.00 0.024 0.045 11 Pool Length(ft) * 14-33 11-29 7.29 40.2 65.6 11 Pool Spacing(ft) * 2.7-7.1 6.2-8.8 35.7 45.7 60.3 11 Substrate and Transport Parameters SC%/Sa%/G%/C%/B%/Be% IIMEr111 10/3/21/66/0/0 d16/d35/d50/d84/d95(mm) Silt-Clay Gravel Gravel 37/65/78/94/130/170 Channel length(ft) 365 MIill 510 510 Drainage Area(SM) 0.02 1.49 0.02 0.02 Rosgen Classification G5 7C4 C4 C4 Sinuosity 1.0 1.3 1.2 1.2 Water Surface Slope(ft/ft) 0.035 0.005 0.020 0.019 ':no data shown for pools,radius of curvature or meanders in existing stream do to channelization/lack of bed diversity Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 41 2020-MY02 Table 8e. T2-1 Baseline Stream Data Summary Stony Fork Restoration Site,DMS Project#97085 Parameter Pre-Existing Condition Reference Reach(es)Data Design As-built Dimension-Riffle Bankfull Width(ft) 4.5-5.7 14.8-18.8 5.0 Floodprone Width(ft) 5.7-30.7 >50 50 Bankfull Mean Depth(ft) 0.8-1.7 1.3-1.8 0.4 Bankfull Max Depth(ft) 1.2-2.1 1.9-2.4 0.6 Bankfull Cross-Sectional Area(ft2) 3.6-9.4 25 1.9 Width/Depth Ratio 3.4-5.4 9.0-14.0 13.5 Entrenchment Ratio 1.3-5.4 >2.5 10 MOW_ Bank Height Ratio 1.5-4.1 1.0-1.2 1.0 Pattern Channel Beltwidth(ft) * 60 I 25-40 25-40 Radius of Curvature(ft) * 16-87 12-15 12-15 Rc:Bankfull width(ft/ft) * 3.5-12.9 14 14 Meander Wavelength(ft) * 66-191 70 70 Meander Width Ratio * 4.1 5.0-8.0 5.0-8.0 Profile Riffle Length(ft) 'EMr =!' Riffle Slope(ft/ft) 0.009-0.020 0.013-0.035 0.016 Pool Length(ft) * 14-33 6-16 Pool Spacing(ft) * 2.7-7.1 6.4-8.0 W_ Substrate and Transport Parameters SC%/Sa%/G%/C%/B%/Be% d16/d35/d50/d84/d95(mm) Silt-Clay Gravel Gravel Channel length(ft) 327 334 334 Drainage Area(SM) 0.23 1.49 0.04 0.04 Rosgen Classification G5c C4 C4 C4 Sinuosity 1.1 1.3 1.2 1.2 Water Surface Slope(ft/ft) 0.014 0.005 0.012 :no data shown for pools,radius of curvature or meanders in existing stream do to channelization/lack of bed diversity Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 42 2020-MY02 Table 8f. T2-2 Baseline Stream Data Summary Stony Fork Restoration Site,DMS Project#97085 Parameter Pre-Existing Condition Reference Reach(es)Data Design As-built Min Mean Max n Bankfull Width(ft) 4.5-5.7 14.8-18.8 7.6 9.7 1 Floodprone Width(ft) 5.7-30.7 >50 50 43.4 1 Bankfull Mean Depth(ft) 0.8-1.7 1.3-1.8 0.6 0.6 1 Bankfull Max Depth(ft) 1.2-2.1 1.9-2.4 0.8 1.0 1 Bankfull Cross-Sectional Area(ft2) 3.6-9.4 25 4.3 5.8 1 Width/Depth Ratio 3.4-5.4 9.0-14.0 13.4 16.4 1 Entrenchment Ratio 1.3-5.4 >2.5 6.6 4.5 1 Bank Height Ratio 1.5-4.1 I 1.0-1.2 1.0 1.0 1 Pattern Channel Beltwidth(ft) * 60 28-45 28-45 Radius of Curvature(ft) * 16-87 16-23 16-23 Rc:Bankfull width(ft/ft) * 3.5-12.9 11.2-11.8 11.2-11.8 Meander Wavelength(ft) * 66-191 85-90 85-90 Meander Width Ratio * 4.1 3.7-5.9 3.7-5.9 Profile Riffle Length(ft) MMIL '10- 20.0 29.0 56.7 6 Riffle Slope(ft/ft) 0.009-0.020 0.013-0.035 0.014 0.01 0.018 0.028 6 Pool Length(ft) * 14-33 14-24 10.8 17.6 22.8 6 Pool Spacing(ft) * 2.7-7.1 5.7-6.6 47.0 48.8 51.2 6 Substrate and Transport Parameters SC%/Sa%/G%/C%/B%/Be% _ 6/45/15/33/0/0 d16/d35/d50/d84/d95(mm) Silt-Clay Gravel Gravel 26/35/42/51/74/110 Channel length(ft) 326 - 337 337 Drainage Area(SM) 0.23 1.49 0.15 0.15 Rosgen Classification G5c C4 C4 C4 Sinuosity 1.1 1.3 1.2 1.2 Water Surface Slope(ft/ft) 0.014 0.005 0.012 0.011 ':no data shown for pools,radius of curvature or meanders in existing stream do to channelization/lack of bed diversity Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 43 2020-MY02 Table 8g. T2-3 Baseline Stream Data Summary Stony Fork Restoration Site,DMS Project#97085 Parameter Pre-Existing Condition Reference Reach(es)Data Design As-built Dimension-Riffle Min Mean Max n Bankfull Width(ft) 4.5-5.7 14.8-18.8 9.0 8.6 1 Floodprone Width(ft) 5.7-30.7 >50 50 80.9 1 Bankfull Mean Depth(ft) 0.8-1.7 1.3-1.8 0.6 0.7 1 Bankfull Max Depth(ft) 1.2-2.1 1.9-2.4 1.0 1.2 1 Bankfull Cross-Sectional Area(ft2) 3.6-9.4 25 5.8 6.0 1 Width/Depth Ratio 3.4-5.4 9.0-14.0 13.9 12.3 1 Entrenchment Ratio 1.3-5.4 >2.5 5.6 9.4 1 Bank Height Ratio 1.5-4.1 1.0-1.2 1.0 1.0 1 Pattern Channel Beltwidth(ft) * 60 I 32-45 32-45 Radius of Curvature(ft) * 16-87 18-23 18-23 Rc:Bankfull width(ft/ft) * 3.5-12.9 10.2-11.1 10.2-11.1 Meander Wavelength(ft) * 66-191 92-100 92-100 Meander Width Ratio * 4.1 3.6-6.0 3.6-6.0 Profile Riffle Length(ft) !!' 25.8 33.6 38.9 15 Riffle Slope(ft/ft) 0.009-0.020 0.013-0.035 0.012-0.015 0.002 0.014 0.024 15 Pool Length(ft) * 14-33 12-34 8.48 35.6 91.4 14 Pool Spacing(ft) * 2.7-7.1 5.1-7.0 45.7 57.3 77.4 14 Substrate and Transport Parameters SC%/Sa%/G%/C%/B%/Be% 4/7/65/24/0/0 d16/d35/d50/d84/d95(mm) 0.031/0.13/0.21/2.0/6.1/0.1/8 Gravel Gravel 18/35/45/77/120 Channel length(ft) 780 855 855 Drainage Area(SM) 0.23 1.49 0.23 0.23 Rosgen Classification G5c C4 C4 C4 Sinuosity 1.1 1.3 1.2 1.2 Water Surface Slope(ft/ft) 0.014 0.005 0.011 0.011 ':no data shown for pools,radius of curvature or meanders in existing stream do to channelization/lack of bed diversity Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 44 2020-MY02 Table 8h. T3 Baseline Stream Data Summary Stony Fork Restoration Site,DMS Project#97085 Parameter Pre-Existing Condition Reference Reach(es)Data Design As-built Dimension-Riffle Min Mean Max n Bankfull Width(ft) 4.2-4.8 14.8 5.0 5.2 1 Floodprone Width(ft) 5.0-5.9 >50 50 38.0 1 Bankfull Mean Depth(ft) 0.4-0.6 1.3-1.8 0.4 0.4 1 Bankfull Max Depth(ft) 0.6-0.7 1.9-2.4 0.6 0.7 1 Bankfull Cross-Sectional Area(ft2) 1.9-2.6 25 1.9 2.1 1 Width/Depth Ratio 6.9-12.6 9.0-14.0 13.5 13.0 1 Entrenchment Ratio 1.2 >2.5 10 7.2 1 Bank Height Ratio 3.2-3.4 1.0-1.2 1.0 1.0 1 Pattern Channel Beltwidth(ft) ** 60 16-26 16-26 Radius of Curvature(ft) ** 16-87 11-14 11-14 Rc:Bankfull width(ft/ft) ** 3.5-12.9 8.6-9.4 8.6-9.4 Meander Wavelength(ft) ** 66-191 43-47 43-47 Meander Width Ratio ** 4.1 3.2-5.2 3.2-5.2 Profile Riffle Length(ft) 34.3 36.9 39.5 2 Riffle Slope(ft/ft) ** 0.013-0.035 0.0025 0.006 0.0098 0.014 2 Pool Length(ft) ** 14-33 7-15 38.43 1 Pool Spacing(ft) ** 2.7-7.1 4.2-5.4 Substrate and Transport Parameters SC%/Sa%/G%/C%/B%/Be% 8/67/25/0/0/0 9/15/58/19/0/0 d16/d35/d50/d84/d95(mm) N/A Gravel Gravel 0.3/8.2/18/35/72/140 Channel length(ft) 154 129 129 Drainage Area(SM) 0.05 1.49 0.02 0.02 Rosgen Classification G4 C4 C4 C4 Sinuosity 1.0 1.3 1.2 1.2 Water Surface Slope(ft/ft) 0.007 0.005 0.0016 0.005 ":channel affected by former pond Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 45 2020-MY02 Table 9. Cross Section Dimensional Morphology Summary Stony Fork Stream Restoration Site,DMS Project#97085 Cross-Section 1(Pool) Cross-Section 2(Riffle) Cross-Section 3(Riffle) Dimension and Substrate Station 13+58,SF Station 13+85,SF Station 22+44,SF Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Bankfull Elevation(ft)based on AB BKF area 206.8 206.7 206.7 206.6 206.6 206.6 192.5 192.5 192.4 Bankfull Width(ft) 12.6 11.7 11.6 9.3 11.0 10.2 12.6 11.9 12.5 Floodprone Width(ft) - - - >80 >80 >80 53.3 53.2 50.1 Bankfull Mean Depth(ft) 0.9 1.0 1.0 0.8 0.6 0.7 1.0 1.0 1.0 Bankfull Max Depth(ft) 1.9 2.0 2.1 1.2 1.1 1.3 1.6 1.7 1.5 Cross-Sectional Area(ft2)based on AB BKF area 11.5 11.5 11.5 7.0 7.0 7.0 12.5 12.5 12.5 Cross-Sectional Area(ft2)based on AB BKF elevation 11.5 11.9 12.1 7.0 7.1 6.8 12.5 13.2 13.8 Bankfull Width/Depth Ratio - - - 12.2 17.3 14.8 4 12.8 11.4 12.6 Bankfull Entrenchment Ratio - - - 8.7 7.2 8.0 4.2 4.5 4.0 Bankfull Bank Height Ratio - - - 1.0 0.9 1.0 1.0 1.0 1.0 d50(mm) - - - 22 32 24 I 38 46 20 Cross-Section 4(Pool) Cross-Section 5(Riffle) Cross-Section 6(Pool) Station 26+17,SF Station 35+12,SF Station 41+94,SF Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Bankfull Elevation(ft)based on AB BKF area 192.0 191.9 191.9 182.1 182.2 182.2 181.7 181.8 181.7 Bankfull Width(ft) 12.5 13.0 12.4 I 12.2 13.6 13.2 12.0 13.1 11.5 Floodprone Width(ft) - - - >80 >80 >80 - - - Bankfull Mean Depth(ft) 1.1 1.1 1.1 0.9 0.8 0.8 1.2 1.1 1.3 _MNPi- Bankfull Max Depth(ft) 1.9 2.1 2.1 1.4 1.3 1.3 2.4 2.4 2.5 Cross-Sectional Area(ft2)based on AB BKF area 13.6 13.6 13.6 10.6 10.6 10.6 14.5 14.5 14.5 Cross-Sectional Area(ft2)based on AB BKF elevation 13.6 14.5 15.2 10.6 10.1 9.3 14.5 14.3 15.2 Im Bankfull Width/Depth Ratio - - - 14.1 17.4 16.4 - - - Bankfull Entrenchment Ratio - - - 6.6 5.9 6.1 - - - Bankfull Bank Height Ratio - - - 1.0 1.0 1.0 - - - d50(mm) - - - 52 44 25 - - - Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 46 2020-MY02 Table 9. Cross Section Dimensional Morphology Summary Stony Fork Stream Restoration Site,DMS Project#97085 Cross-Section 7(Riffle) Cross-Section 8(Pool) Cross-Section 9(Pool) Station 42+58,SF Station 57+19,SF Station 57+44,T3 Base MY1 MY2 MY3 MY4 MY5 MY+' Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Bankfull Elevation(ft)based on AB BKF area 176.0 176.0 176.0 175.3 175.2 175.2 207.0 206.9 207.3 Bankfull Width(ft) 11.6 13.4 14.2 13.5 14.5 15.7 5.5 5.9 8.2 Floodprone Width(ft) >90 >90 >90 - - - - - - Bankfull Mean Depth(ft) 1.1 1.0 0.9 1.5 1.4 1.3 0.7 0.6 0.4 Bankfull Max Depth(ft) 1.7 1.6 1.8 2.7 2.7 2.5 1.1 1.1 0.8 Cross-Sectional Area(ft2)based on AB BKF area 12.8 12.8 12.8 20.7 20.7 20.7 3.7 3.7 3.7 Cross-Sectional Area(ft2)based on AB BKF elevation 12.8 13.2 13.3 20.7 21.4 21.5 3.7 4.0 2.0 Bankfull Width/Depth Ratio 10.4 14.0 15.7 - - - - - - Bankfull Entrenchment Ratio 8.0 6.8 6.5 - - - - - - Bankfull Bank Height Ratio 1.0 1.0 1.0 - - - - - - d50(mm) 16 29 41 - - - - - - Cross-Section 10(Riffle) Cross-Section 11(Riffle) Cross-Section 12(Pool) Station 96+69,T3 Station 99+07,Tl Station 99+25,Tl Base MY1 MY2 MY3 MY4 MY5 MY+ Base I MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Bankfull Elevation(ft)based on AB BKF area 207.1 207.1 207.2 198.4 198.3 198.3 198.4 198.3 198.3 Bankfull Width(ft) 6.2 5.5 5.4 6.0 5.8 5.7 7.5 7.3 7.4 Floodprone Width(ft) 38.0 39.4 41.5 >60 >60 >60 - - - Bankfull Mean Depth(ft) 0.4 0.4 0.4 0.3 0.3 0.4 0.6 0.7 0.7 Bankfull Max Depth(ft) 0.7 0.7 0.7 0.7 0.7 0.6 12 1.2 1.1 Cross-Sectional Area(ft2)based on AB BKF area 2.2 2.2 2.2 2.0 2.0 2.0 4.8 4.8 4.8 Cross-Sectional Area(ft2)based on AB BKF elevation 2.2 2.1 1.8 2.0 2.6 2.6 4.8 5.5 5.3 Bankfull Width/Depth Ratio 17.7 13.7 13.4 18.3 17.1 16.0 - - - Bankfull Entrenchment Ratio 6.1 7.2 7.7 10.9 10.9 11.2 - - - Bankfull Bank Height Ratio 1.0 0.9 0.8 1.0 1.1 1.2 - - - d50(mm) 18 20 3 78 75 57 - - - Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 47 2020-MY02 Table 9. Cross Section Dimensional Morphology Summary Stony Fork Stream Restoration Site,DMS Project#97085 Cross-Section 13(Pool) Cross-Section 14(Riffle) Cross-Section 15(Pool) Station 252+25,T2 Station 225+97,T2 Station 226+04,T2 Base MY1 MY2 MY3 Iv1Y4 MY5 MY'- Base MY1 MY2 MY3 MI74 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Bankfull Elevation(ft)based on AB BKF area 188.4 188.4 188.2 187.9 187.9 188.0 180.9 180.8 180.7 Bankfull Width(ft) 11.3 12.7 9.5 9.7 11.8 11.1 11.8 11.7 10.9 Floodprone Width(ft) - - - 43.4 46.8 47.2 - - - Bankfull Mean Depth(ft) 0.8 0.7 1.0 0.6 0.5 0.5 _ 1.0 1.0 1.0 Bankfull Max Depth(ft) 1.5 1.4 1.7 1.0 1.1 1.1 1.8 1.9 1.8 Cross-Sectional Area(ft2)based on AB BKF area 9.3 9.3 9.3 5.8 5.8 5.8 11.2 11.2 11.2 Cross-Sectional Area(ft2)based on AB BKF elevation 9.3 8.7 11.0 5.8 5.3 4.4 - 11.2 11.8 12.8 Bankfull Width/Depth Ratio - - - 16.4 24.0 21.4 - - - Bankfull Entrenchment Ratio - - - 4.5 4.0 4.2 - - - Bankfull Bank Height Ratio 1.0 0.8 0.9 - - - d50(mm) - - - 42 16 1.4 I - - - Cross-Section 16(Riffle) Station 252+25,T2 Base MY1 MY2 MY3 MY4 MY5 MY+1 Bankfull Elevation(ft)based on AB BKF area 180.7 180.7 180.8 Bankfull Width(ft) 8.6 9.9 10.0 Floodprone Width(ft) >80 >80 >80 Bankfull Mean Depth(ft) 0.7 0.6 0.6 Bankfull Max Depth(ft) 1.2 1.1 1.0 Cross-Sectional Area(ft2)based on AB BKF area 6.0 6.0 6.0 Cross-Sectional Area(ft2)based on AB BKF elevation 6.0 5.8 5.2 Bankfull Width/Depth Ratio 12.3 16.3 16.6 Bankfull Entrenchment Ratio 9.4 8.3 7.6 Bankfull Bank Height Ratio 1.0 1.0 0.9 d50(nun) 45 44 37 Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 R 2020-MY02 Cross-Section Plots River Basin: Neuse River -+ :j. •�- IkI �' c rr Site: Stony Fork . XS ID XS1 ,,Ai ti xr , J"t • Drainage Area(sq mi): 0.28 .h _ r Date: 2020 ... FielddT.Se Crew: T.Seelinger,A.Gutierrez • y�e,-. +' .:y. ' Station Elevation SUMMARY DATA • 0.0 208.48 Bankfull Elevation(ft)-Based on AB-Bankfull Area 206.70 - 4.8 207.89 Bankfull Cross-Sectional Area: 11.5 • , 11.4 207.36 Total Cross-Sectional Area: 12.1 20.4 207.20 Bankfull Width: 11.6 = 28.0 206.91 Flood Prone Area Elevation: --- -1 37.9 207.12 Flood Prone Width: _ --- y. ' t " 45.1 206.89 Max Depth at Bankfull: 2.1 - r 4 49.1 206.63 Mean Depth at Bankfull: 1.0 .5_ 49.9 206.54 W/D Ratio: --- 50.3 206.53 Entrenchment Ratio: --- i . 51.1 206.40 Bank Height Ratio: --- 51.6 206.15 Thalweg Elevation: 204.6 ` n • - 52.4 205.51 53.5 204.63 54.6 204.57 Stony Fork,XS1,Pool,SF 56.2 204.82 209 56.2 204.95 57.7 205.58 208 58.0 206.15 58.4 206.25 58.8 206.36 207 59.7 206.75 60.8 206.85 t 62.9 206.88 0 206 64.3 207.44 66.7 207.69 73.1 207.45 W 205 79.8 206.91 88.3 206.53 88.3 206.96 204 0 10 20 30 40 50 60 70 80 Station(feet) --Bankfull -MY00 -MY01 -MY02 Cross-Section Plots River Basin: Neuse River Site: Stony Fork _ • XSID XS2 r Drainage Area(sq mi): 0.28 Date: 6/18/2020 _ -- .• - t;.. .s. ' 'S, r .. Field Crew: T.Seelinger,A.Gutierrez .r•$'F -; ,''4- r; rC, « ' • Station Elevation SUMMARY DATA j4F. ` +s.:-.`=.-� j, ---`-�lr..' %_' :n r _-• 0.0 208.30 Bankfull Elevation(ft)-Based on AB-Bankfull Area 206.60 - r � �f �� _-:x%'�{a�1,,-- `'�•'f.�`" ; '' 0.3 207.95 Bankfull Cross-Sectional Area: 7.0 �'w' •i ". d.i?_ 6.7 207.66 Total Cross-Sectional Area: 6.8 '.. ' _ =;.k - `_' ; '• - s'. 13.7 207.26 Bankfull Width: 10.2 ; -1 • • . "�1.. 20.5 206.79 Flood Prone Area Elevation: 207.9 .' ---- +`` �•-s, "• 27.5 206.60 Flood Prone Width: _ 82.0 1 - `�-v Y r 33.8 206.60 Max Depth at Bankfull: 1.3 39.7 206.83 Mean Depth at Bankfull: 0.7 ~: 42.5 206.63 W/D Ratio: 14.8 ' - • '_: 43.6 206.63 Entrenchment Ratio: 8.0 • 44.6 206.41 Bank Height Ratio: 1.0 A. 45.8 206.11 Thalweg Elevation: 205.3 46.5 205.90 47.4 205.53 48.3 205.39 Stony Fork,XS2,Riffle,SF 48.7 205.31 209 - 49.0 205.40 209 50.4 205.46 50.9 205.56 208 51.1 205.86 52.1 206.10 208 _ 53.2 206.39 53.9 206.57 t 207 \\ 56.3 206.55 0 _ -� 60.0 206.52 207 \ /- 65.9 206.62 72.2 206.75 W 206 _ \ / \ 83.7 206.66 206 A',f 83.7 207.00 0 10 20 30 40 50 60 70 80 Station(feet) ----Bankfull ----Flood Prone Area MY00 MYOI -MY02 Cross-Section Plots River Basin: Neuse River Site: Stony Fork .`••s-' XS ID XS3 Drainage Area(sq mi): 0.46 Date: 6/18/2020 L _: x f { Field Crew: T.Seelinger,A.Gutierrez F ly �'' x' + gym.il Sl t R 'r^°}f • Station Elevation SUMMARY DATA qqJ r L. _ M ^max ' 0.0 195.53 Bankfull Elevation(ft)-Based on AB-Bankfull Area 192.41 • • },�;_, " , 4.0 195.33 Bankfull Cross-Sectional Area: 12.5 rfr t t 11.1 194.91 Total Cross-Sectional Area: 13.8 ?' w 1= ` 14.3 194.59 Bankfull Width: 12.5 g = - '' .' 18.9 193.54 Flood Prone Area Elevation: 193.9 - `i y+ ;": . 21.8 193.26 Flood Prone Width: 50.1 'q�" ' 26.2 193.00 Max Depth at Bankfull: 1.5 �; "�+ t••;a. •:'t: ' 31.0 192.66 Mean Depth at Bankfull: 1.0 y, - . 34.6 192.56 W/D Ratio: 12.6 36.9 192.46 Entrenchment Ratio: 4.0 1 , , 37.9 192.51 Bank Height Ratio: 10. "k 1�'4 - 39.1 191.94 Thalweg Elevation: 190.9 '•r= s:'.; . pc.., v L. Y x , ._. 40.6 191.43 41.2 191.39 42.3 191.05 Stony Fork,XS3,Riffle,SF 43.6 190.90 196 -- 44.7 190.92 i 45.2 190.91 195 45.6 190.93 46.7 190.99 194 - 48.0 191.43 -- 49.1 191.90 50.8 192.48 t 193 53.4 192.57 s o • 56.5 192.63 192 \.,40, / 60.4 192.78 63.6 193.25 W 69.2 194.25 191 -_ 70.8 194.24 70.9 194.54 190 - 0 10 20 30 40 50 60 70 Station(feet) --Bankfull ----Flood Prone Area -MY00 -MYOI -MY02 Cross-Section Plots River Basin: Neuse River Site: Stony Fork . XS ID XS4 51••.- Drainage Area(sq mi): 0.46 .� ' . Date: 6/18/2020 .• Field Crew: T.Seelinger,A.Gutierrez --. - Station Elevation SUMMARY DATA •= 0.0 195.27 Bankfull Elevation(ft)-Based on AB-Bankfull Area 191.88 P :.° _ -.:_ - 4. "":- • 0.3 194.88 Bankfull Cross-Sectional Area: 13.6 r-•,. -' 5.0 194.52 Total Cross-Sectional Area: 15.2 `4 .- , •• 9.1 194.34 Bankfull Width: 12.4 �•j• I- • • �u!y 14.1 193.61 Flood Prone Area Elevation: --- - 18.4 192.88 Flood Prone Width: _ --- 22.3 192.42 Max Depth at Bankfull: 2.1 - 23.7 192.21 Mean Depth at Bankfull: 1.1 24.8 192.29 W/D Ratio: --- 26.0 191.88 Entrenchment Ratio: --- 26.7 191.24 Bank Height Ratio: --- - 27.0 190.47 Thalweg Elevation: 189.8 28.3 190.21 29.1 189.81 30.1 189.79 Stony Fork,XS4,Pool,SF 31.9 189.92 196 -- 32.7 190.59 33.7 191.18 195 36.2 191.55 38.6 191.91 194 44.6 192.10 51.4 192.19 193 m 58.4 192.70 t 66.0 193.45 0 192 ,_ • 66.1 193.84 o.) 191 W 190 0 10 20 30 40 50 60 Station(feet) ----Bankfull -MY00 -MY01 -MY02 Cross-Section Plots River Basin: Neuse River • ' Site: Stony Fork - fg XS ID XSS '�' • Drainage Area(sq mi): 0.46 t l- Date: 6/18/2020 _rri ,+' , •_vr:- .. '.�4''> Field Crew: T.Seelinger,A.Gutierrez - ' Station Elevation SUMMARY DATA - 0.0 183.14 Bankfull Elevation(ft)-Based on AB-Bankfull Area 182.23 "'• n 0.2 182.51 Bankfull Cross-Sectional Area: 10.6 si 5.5 182.31 Total Cross-Sectional Area: 9.3 . 14.0 182.42 Bankfull Width: 13.2 . - •? �s�'i.--'..-:..,.,- : ' 23.0 182.75 Flood Prone Area Elevation: 183.6 +.. !� Y'S , Y 28.2 182.47 Flood Prone Width: _ 80.7 r ar�'!�- " � °•,nn " `' .;.', .`: 30.4 182.34 Max Depth at Bankfull: 1.3 _ .t Y f es i v . 31.1 182.25 Mean Depth at Bankfull: 0.8 cli-'' 4 f !T 3 rY �' t 32.1 181.96 W/DRto: 16.4 j'r ey %-''•.. 4" - '- . ` �'ca :f 33.1 181.65 Entrenchment Ratio: 6.1 �- _:r :. A,,,,":".4 .- ,�ry `- 34.2 181.24 Bank Height Ratio: 1.0 -; ,yr 35.4 180.90 Thalweg Elevation: 180.9 :',diy ‘ a4d .:k. _ _. 36.0 181.04 36.9 180.94 37.5 180.98 Stony Fork,XS5,Riffle,SF 38.6 181.02 184 39.7 181.08 _ 41.8 181.64 43.4 182.07 183 44.8 182.31 43.8 182.31 57.3 182.60 --- 65.4 182.56 t 182 75.0 182.48 s 0 79.5 182.70 80.7 183.28 ° 181 W 180 1 ' 0 10 20 30 40 50 60 70 80 Station(feet) ----Bankfull ----Flood Prone Area -MY00 -MYOI -MY02 Cross-Section Plots River Basin: Neuse River : t Site: Stony Fork w a _ Y- Si• e" XS ID XS6 i = Drainage Area(sq mi): A 0.46 r a :., , Date: 6/18/2020 • . v ; Field Crew: T.Seelinger,A.Gutierrez .1` f~` +� Station Elevation SUMMARY DATA t . e T 0.0 183.40 Bankfull Elevation(ft)-Based on AB-Bankfull Area 181.68 r, 0.2 183.22 Bankfull Cross-Sectional Area: 14.5 }tigj` a.-LA' w 1 . 3.4 182.72 Total Cross-Sectional Area: 15.2 �` 6.1 182.76 Bankfull Width: 11.5 ~ 11.2 182.07 Flood Prone Area Elevation: --- F"; _ '._ ... • 17.1 181.95 Flood Prone Width: _ --- w':1 r:.j;; :. 19.6 181.80 Max Depth at Bankfull: 2.5 ".% 20.9 181.89 Mean Depth at Bankfull: 1.3y f , , 21.9 181.68 W/D Ratio: --- N.:.•7 i r`'_:' ,{ .,,,,. .: -.: 4; 4 -ca 22.4 181.49 Entrenchment Ratio: --- • is c 23.3 180.93 Bank Height Ratio: --- r tT.24.4 179.72 Thalweg Elevation: 179.2 25.9 179.20 26.9 179.35 28.5 179.92 Stony Fork,XS6,Pool,SF 29.7 180.47 184 -- 30.9 181.23 32.9 181.40 183 33.9 181.87 34.5 181.93 182 37.7 181.88 = ____________ 44.9 181.74 52.5 181.99 t 181 - 58.9 182.34 s 0 69.6 182.47 a 180 78.0 182.66 81.1 183.18 W 179 0 10 20 30 40 50 60 70 80 Station(feet) --Bankfull -MY00 -MY01 -MY02 Cross-Section Plots River Basin: Neuse River } ;' r, ; 4 " ' Site: Stony Fork '- -• _t, ,_ { , r, XSID XS7 •• �k., ►+ ` 1x. .. Drainage Area(sq mi): 0.83 4 it ; �gg • �; f t Date: 6/29/2020 iF. r rt Field Crew: T.Seelinger,A.Gutierrez +� a . -. .•.(&''1 .. Station Elevation SUMMARY DATA 0.0 177.93 Bankfull Elevation(ft)-Based on AB-Bankfull Area 175.99 5.0 176.69 Bankfull Cross-Sectional Area: 12.8 et • i m.- 10.5 176.44 Total Cross-Sectional Area: 13.3 - _ • • ::r-_•�� ;;'+zed-. t: 17.4 176.27 Bankfull Width: 14.2 '' ^ '• 24.9 176.00 Flood Prone Area Elevation: 177.8 P .a " iY`' ;'7R_'4" 30.5 176.08 Flood Prone Width: 92.2 - h; Z' ="` 4` - ,. 38.2 176.20 Max Depth at Bankfull: 1.8 ' ''. .. '. . f a'_r 39.6 175.90 Mean Depth at Bankfull: 0.9 '" •'r ,-- ~'. : ` `"` rn- •.•::,. .-.. 41.0 175.46 W/D Ratio: 15.7 _-..-• '•• • 41.8 175.18 Entrenchment Ratio: 6.5 'k 1s t'• +,-.••1 - ' 42.5 174.93 Bank Height Ratio: 1.0 Y ,..C-Cs ),,„ 1, • . : 43.2 174.54 ThalwegElevation: 174.2 � ry�.�,. ""'•• {I; 44.1 174.32 45.4 174.21 46.5 174.46 Stony Fork,XS7,Riffle,SF 47.0 174.54 179 47.5 174.60 48.1 174.80 178 - 49.0 175.09 50.5 175.47 52.1 175.87 177 53.7 176.02 56.9 176.00 t 60.6 175.86 0 176 - 66.0 176.02 'j 71.2 176.04 76.5 176.19 W 175 81.6 176.47 87.6 176.76 92.5 177.01 174 92.8 177.15 0 10 20 30 40 50 60 70 80 90 Station(feet) ----Bankfull ----Flood Prone Area -MY00 -MYOI -MY02 Cross-Section Plots River Basin: Neuse River . ' ...... - 3" - ii .: - I f.41r, 1 ' ' : Site: Stony Fork t z XS ID XS8 " • , - t t Drainage Area(sq mi): 0.83 Date: 6/29/2020 sib Field Crew: IMMII T.Seelinger,A.Gutierrez ' •; •;", y� ',' •-_•' . r• ,l• Station Elevation SUMMARY DATA II ,` �? 1,i 'r- , '"' 1�• , o id 0.0 176.54 Bankfull Elevation(ft)-Based on AB-Bankfull Area 175.21 .t-•Y ,' et' , • • 0.1 175.98 Bankfull Cross-Sectional Area: 20.7 4 _ ?;K_-, 3.9 175.69 Total Cross-Sectional Area: 21.5 E r` I _ ! 10.8 175.61 Bankfull Width: 15.7 n 18.4 175.61 Flood Prone Area Elevation: :• .- 'c2 ' bil# -.: 24.9 175.56 Flood Prone Width: _ --- r=' dr ' - _ 31.1 175.55 Max Depth at Bankfull: 2.5 - 35.4 175.40 Mean Depth at Bankfull: 1.3 ...sr_ 38.3 175.24 W/D Ratio: --- a tb'�s. " 40.9 175.19 Entrenchment Ratio: --- A •L 42.3 175.20 Bank Height Ratio: --- t 43.9 174.89 Thalweg Elevation: 172.7 y' 45.5 174.39 46.4 174.26 47.3 173.91 Stony Fork,XS8,Pool,SF 48.0 173.82 179 48.7 173.29 49.7 172.85 178 50.9 172.75 52.2 172.71 177 53.0 172.72 54.0 173.07 176 54.6 173.55 55.0 174.20 0 : : ! 56.3 174.70 '�58.1 175.24 59.4 175.47 W 63.0 175.37 173 67.3 175.43 - 71.0 175.87 172 73.6 175.97 0 10 20 30 40 50 60 70 80 75.8 176.24 78.4 176.53 Station(feet) 80.9 176.78 ----Bankfull -MY00 -MY01 -MY02 81.0 177.63 Cross-Section Plots River Basin: Neuse River V ;a; Site: Stony Fork .t - ' �;1 :�. XS ID XS9 - {' • , s • .. - ry . Drainage Area(sq mi): 0.04 _ -i..,' •:;',t.-..: . : :, 1 r., rt ; !s =r^ ; `,a" ' •.'` • Date: 6/18/2020 �: ' d{� Field Crew: T.Seelin er,A.Gutierrez ; 'n� ..- ��4 '�'',� �' �} B '.) .. r,, 4,47 j' a Y` Station Elevation SUMMARY DATA = :f ..,„ r'i -- • ' ^ ,, -.' ,;y f 0.0 210.78 Bankfull Elevation(ft)-Based on AB-Bankfull Area 207.26 at; 'i ..'. - 0.0 210.18 Bankfull Cross-Sectional Area: 3.7 • •.g 6.9 210.06 Total Cross-Sectional Area: 2.0 _ -- . - I. ' 4 , 10.2 209.83 Bankfull Width: 8.2 �F• -''•'' . :,-..e -: 12.9 208.84 Flood Prone Area Elevation: _ --- r; ' ,l!• .. Y _ ^: !_ •18.8 207.42 Flood Prone Width: --- .4.,4` 0' . ;; .a ; 22.7 207.30 Max Depth at Bankfull: 0.8 - 24.6 207.18 Mean Depth at Bankfull: 0.4 _; r . te • �•. r - e •- 26.0 207.03 W/D Ratio: d r'�. �• * 1 26.4 207.01 Entrenchment Ratio: ..# rr. . • 26.6 206.95 Bank Height Ratio: --- " t fe.i`tw 26.9 206.72 Thalweg Elevation: 206.4 27.7 206.43 28.4 206.48 29.2 206.46 Stony Fork,XS9,Pool,T3 30.6 206.50 212 - 31.0 206.98 31.6 207.18 211 32.4 207.08 36.5 207.08 210 -_ - 41.9 207.16 45.6 207.50 209 o, 50.0 207.93 o 57.2 208.67 n 208 0 60.4 208.85 �/ 60.7 209.33 207 W \ Li..-- 206 205 0 10 20 30 40 50 60 Station(feet) --Bankfull -MY00 -MY01 -MY02 Cross-Section Plots River Basin: Neuse River - , ✓: ,,-s.'• `i' kE Site: Stony Fork s • )• ,r.C.' `- � �. r , '.i XS ID XS10 ; �r44" {r i j�'.:c+'Ta2'/ a y. Drainage Area(sq mi): 0.04 :i t �a .. q..r , Date: 6/18/2020 , p _ -!•, Field Crew: T.Seelinger,A.Gutierrez �:: .•a;;, ' L1 ., Station Elevation SUMMARY DATA k;' 'J s 0.0 209.78 Bankfull Elevation ft -Based on AB-Bankfull Area 207.17 • F:' 6. �s . r . 0.0 209.22 Bankfull Cross-Sectional Area: 2.2 �< i: 'z%�[`•• 'I' . 6.0 208.71 Total Cross-Sectional Area: 1.8 1 k9 f' _ ti J .ram ... '`1,` :-:. '.'. 12.4 208.29 Bankfull Width: 5.4 _ Y 17.3 207.99 Flood Prone Area Elevation: 207.9 }� a r 21.3 207.81 Flood Prone Width: 41.5 %a� .r a. f:': ' i `: 'i +... ,' 'r. s 26.0 207.65 Max Depth at Bankfull: 0.7 1 . 'r _ C• 32.3 207.49 Mean Depth at Bankfull: 0.4 • , E . • :3 1 n r 38.6 207.42 W/D Ratio: 13.4 ;' 40.9 20Z26 Entrenchment Ratio: 7.7 4,.- . � { _ : • • 41.5 207.26 Bank Height Ratio: 0.8 , g •42.4 207.11 Thalweg Elevation: 206.5 ;s 42.7 206.93 43.4 206.56 Stony Fork,XS10,Riffle,T3 44.2 206.53 211 44.6 206.49 - 45.3 206.68 46.1 206.82 210 46.8 206.98 - 47.4 207.01 50.2 206.99 209 54.0 207.12 o, 57.9 207.50 t 63.5 208.03 0 208 69.2 208.15 71.9 208.36 71.9 209.09 W 207 206 , 0 10 20 30 40 50 60 70 Station(feet) --Bankfull ----Flood Prone Area MY00 MYOI -MY02 Cross-Section Plots River Basin: Neuse River - .�` 'P `• '•.° {a .i Site: Stony Fork •.,!• ta4'• .s'.' XSID XS11 Drainage Area(sq mi): iii 0.02 , - Date: 6/18/2020 Field Crew: T.Seelinger,A.Gutierrez -'� _ �L sue,..; ,, }. Station Elevation SUMMARY DATA ` ` v `;1 =? 0.0 199.11 Bankfull Elevation(ft)-Based on AB-Bankfull Area 198.27 , :.�,' i- 0.2 198.68 Bankfull Cross-Sectional Area: 2.0 ='Kf i r' ��� % ►'f;r 7.7 198.70 Total Cross-Sectional Area: 2.6 r• T i f] ; --., a.:Alf. s4, 14.9 198.72 Bankfull Width: 5.7 4x. ��c i� �3•� '� ; 22.8 198.52 Flood Prone Area Elevation: 198.9 { ' 6 rf k ,i • �Cr'1 1 30.6 198.43 Flood Prone Width: 63.2 '.•,° 1. ,,. ! J ` y 34.8 198.40 Max Depth at Bankfull: 0.6 w , - •' ••r•,'• ;-. r .- 3i aid,`l'i. t. - 36.7 198.21 Mean Depth at Bankfull: 0.4 •• ,' i� :;.7 - r x {y . z-. r - ' � _,i 37.6 198.16 W/D Ratio: 16.0 err • _-ram,; A-'-'. •me. � a. 38.2 197.94 Entrenchment Ratio: 11.2 ; �''•:�':•" - - • � =_�-'! 38.6 197.63 Bank Height Ratio: 1.2 '-�� --_ :. l.�v...ti.- -�•. ; 39.9 197.64 Thalweg Elevation: 197.6 40.6 197.72 41.2 198.01 42.1 198.44 Stony Fork,XS11,Riffle,T1 43.9 198.44 201 - 47.1 198.45 201 52.2 198.46 59.1 198.59 200 65.8 199.12 69.6 199.35 200 72.5 199.43 72.6 199.79 t 199 s ° 199 W 0 198 - 198 0 10 20 30 40 50 60 70 Station(feet) ----Bankfull ----Flood Prone Area -MY00 -MYOI -MY02 Cross-Section Plots River Basin: Neuse River •.F..Ft'. 1 _ Site: Stony Fork , XS ID XS12 - Drainage Area(sq mi): 0.02 . s'. • - Date: 6/18/2020 ,. Field Crew: T.Seelinger,A.Gutierrez Station Elevation SUMMARY DATA 0.0 199.27 Bankfull Elevation(ft)-Based on AB-Bankfull Area 198.34 , 0.2 198.88 Bankfull Cross-Sectional Area: 4.8 7.8 198.72 Total Cross-Sectional Area: 5.3 .!. 15.3 198.73 Bankfull Width: 7.4 • ""., <' -•,-`v-j ;= S 24.0 198.35 Flood Prone Area Elevation: _ --- r z ` ri R 33.0 198.57 Flood Prone Width: --- /��, / 'c -1t - 37.3 198.38 Max Depth at Bankfull: 1.1 /+r,�t '(=' .•;. • ;r 41.3 198.35 Mean Depth at Bankfull: 0.7 f ' __ - �cp; ',_ 42.8 197.93 W/D Ratio: --- / .ae '`� ,'� 0-` r : ; • 43.6 197.82 Entrenchment Ratio: 44.3 197.48 Bank Height Ratio: --- .,p 45.1 197.26 Thalweg Elevation: 197.2 ./ '` ''R 1 � .=. .w 46.1 197.21 46.9 197.23 47.8 197.89 Stony Fork,XS12,Pool,T1 48.9 198.40 201 50.6 198.50 52.7 198.47 200 �� - 55.4 198.82n. 58.3 199.50 63.2 199.77 199 67.8 199.68 o, 71.4 199.77 t 75.3 200.03 0 198 W 197 - 0 10 20 30 40 50 60 70 Station(feet) --Bankfull -MY00 -MY01 -MY02 Cross-Section Plots River Basin: Neuse River Site: Stony Fork 4';'``- XS ID XS13 Drainage Area(sq mi): 0.14 -:' Date: 6/29/2020 , �', . Field Crew: T.Seelinger,A.Gutierrez � `" Station Elevation SUMMARY DATA 0.0 190.20 Bankfull Elevation(ft)-Based on AB-Bankfull Area 188.20 • }le _ ''4,; 2.6 189.52 Bankfull Cross-Sectional Area: 9.3 . -•. 7• F .: . .{ 5.0 189.12 Total Cross-Sectional Area: 11.0 - } ' 8.1 188.79 Bankfull Width: 9.5 19.2 188.42 Flood Prone Area Elevation: --- _ ` `~'• � 26.7 188.18 Flood Prone Width: _ --- 31.1 188.53 Max Depth at Bankfull: 1.7 33.4 188.48 Mean Depth at Bankfull: 1.0 34.3 188.50 W/D Ratio: --- 35.4 188.21 Entrenchment Ratio: --- _,' , 37.1 187.73 Bank Height Ratio: --- 38.7 187.15 Thalweg Elevation: 186.5 „ j 39.2 186.75 39.7 186.57 40.7 186.48 Stony Fork,XS13,Pool,T2 41.7 186.60 191 42.5 186.84 43.1 187.23 190 44.3 187.69 45.0 188.37 45.7 188.41 189 47.5 188.59 o, 54.0 189.18 t 59.4 189.70 0 188 62.5 189.90 62.6 190.51 W 187 - 0 10 20 30 40 50 60 Station(feet) --Bankfull -MY00 -MY01 -MY02 Cross-Section Plots River Basin: Neuse River Site: Stony Fork - • . XSID XS14 Sr {• : s • tic Drainage Area(sq mi): 0.14 i: _ 4 Date: 6/29/2020 . i + 's 'c ;..t.+ `i -7 Field Crew: T.Seelinger,A.Gutierrez Station Elevation SUMMARY DATA 0.0 190.42 Bankfull Elevation(ft)-Based on AB-Bankfull Area 188.05 • 0.0 189.80 Bankfull Cross-Sectional Area: 5.8 -�- `. r 3.0 189.56 Total Cross-Sectional Area: 4.4 i 4.5 189.21 Bankfull Width: 11.1 - - -; ,r_• 6.3 189.18 Flood Prone Area Elevation: 189.1 8.2 188.80 Flood Prone Width: 47.2 15.2 188.38 Max Depth at Bankfull: 1.1 17.4 188.42 Mean Depth at Bankfull: 0.5 24.3 188.23 W/D Ratio: 21.4 29.7 188.14 Entrenchment Ratio: 4.2 33.3 188.02 Bank Height Ratio: 0.9 34.6 187.85 Thalweg Elevation: 187.0 35.6 187.66 36.8 187.19 Stony Fork,XS14,Riffle,T2 37.8 186.98 192 38.4 186.99 - 39.0 187.04 - 39.6 187.04 191 39.8 187.28 40.7 187.31 190 41.8 187.61 42.6 187.96 42.7 187.97 t 189 46.0 188.29 s 48.7 188.21 :Sia 188 51.3 188.53 _ -- 52.8 188.58 W -_ 53.8 189.12 187 -_ 55.3 189.19 58.7 189.39 62.4 189.77 0 10 20 30 40 50 60 62.5 190.56 Station(feet) ----Bankfull ----Flood Prone Area MY00 MYOI -MY02 Cross-Section Plots River Basin: Neuse River Site: Stony Fork '4 _: 1' .,. I I r14.P:- z •^i• '{� -. '.t XS ID XS15 ^,; i :i " F 7 Drainage Area(sq mi): 0.22 oz l i . ( f r lic : I '-.4t 1 Date: 6/29/2020 f*. Field Crew: T.Seelinger,A.Gutierrez . Station Elevation SUMMARY DATA ' - - 0.0 183.66 Bankfull Elevation(ft)-Based on AB-Bankfull Area 180.73 --' y 2.5 182.71 Bankfull Cross-Sectional Area: 11.2 r h•:- 4.0 182.43 Total Cross-Sectional Area: 12.8 i - 744 5.2 182.31 Bankfull Width: 10.9 s-- 6.3 182.17 Flood Prone Area Elevation: --- 11.7 181.78 Flood Prone Width: _ --- rl . k. , r l ' 16.9 181.55 Max Depth at Bankfull: 1.8 s as ° r. 22.7 181.48 Mean Depth at Bankfull: 1.0 '�'i - :�, 28.7 181.11 W/D Ratio: --- '" `' 33.2 181.07 Entrenchment Ratio: --- r 4 a - 35.3 180.97 Bank Height Ratio: --- 35.9 180.89 Thalweg Elevation: 178.9 37.1 180.81 38.5 180.62 39.7 180.39 Stony Fork,XS15,Pool,T2 40.6 180.12 185 41.5 179.65 42.1 179.46 184 43.3 179.11 44.6 178.93 183 \,....,,,..... 45.5 178.99 46.2 179.04 182 m 46.8 179.32 t 47.2 179.54 I -' ''''. ./ 53.9 181.33 179 55.4 181.82 = 60.5 182.01 178 66.2 181.91 0 10 20 30 40 50 60 70 73.1 181.86 76.5 181.91 Station(feet) 76.6 182.51 ----Bankfull -MY00 -MY01 -MY02 Cross-Section Plots River Basin: Neuse River Site: Stony Fork d-' .-; : _,, j W ',',14_i f i' 3 { • Drainage Area(sq mi): 0.22 _ } - Date: 6/29/2020 1 Field Crew: T.Seelinger,A.Gutierrez I- +_ 4.0 P,ii '.. Station Elevation SUMMARY DATA " ' 0.0 183.72 Bankfull Elevation(ft)-Based on AB-Bankfull Area 180.81 - - . .. 2.5 182.78 Bankfull Cross-Sectional Area: 6.0 _ • r r, f 4.0 182.43 Total Cross-Sectional Area: 5.2 ` ^_ 6.5 182.12 Bankfull Width: 10.0 .--.- ° - -. 9.8 181.79 Flood Prone Area Elevation: 181.8 • i ,y1 �- 12.2 181.42 Flood Prone Width: 75.5 =•h += 14.8 181.41 Max Depth at Bankfull: 1.0 ": '^;~s_` 17.4 181.32 Mean Depth at Bankfull: 0.6 ' -x'�` ' -1;w 1 7 22.1 181.23 W/D Ratio: 16.6 f " 27.4 181.05 Entrenchment Ratio: 7.6 •32.0 180.95 Bank Height Ratio: 0.9 :t . • ' 32.8 180.84 Thalweg Elevation: 179.8 J 34.2 180.92 35.8 180.56 Stony Fork,XS16,Riffle,T2 36.8 180.15 37.3 180.02 185 -- 38.0 179.88 - 38.9 179.95 184 39.9 179.88 40.6 179.80 183 41.3 179.90 41.9 180.02 !;I 180.38 180.62 180.73 180.95 181.40 181.60 181.90 181.65 179 - 90.5 181.48 0 10 20 30 40 50 60 70 80 90 90.5 182.27 Station(feet) ----Bankfull ----Flood Prone Area -MY00 -MYOI -MY02 Cross-Section 2 Riffle-MY02 Particle Millimeter Count Particle Size Distribution Stony Fork Silt/Clay <0.062 S/C 2 XS 2 Riffle Very Fine .062- .125 S 7 Fine .125-.25 A 2 Medium .25- .50 N 4 Coarse .50- 1 D 2 100% • • • • • Very Coarse 1 -2 S 4 ;, Very Fine 2-4 5 .r, 80% Fine 4-5.7 G E M Built Fine 5.7-8 R 3 �? 60% MY°I Medium 8- 11.3 A 1 -a-MYO2 Medium 11.3 - 16 V 8 E. Coarse 16-22.6 E 10 5 40% Coarse 22.6-32 L 9 1, e Very Coarse 32-45 S 10 20% Very Coarse 45-64 13 Small 64-90 C 5 0% -, .----;• • • ! • , Small 90- 128 0 11 0.01 0.1 1 l0 100 woo loom Large 128- 180 B 3 Particle Size-Millimeters Large 180-256 L 1 Small 256-362 B Size(mm) Size Distribution Type Small 362-512 L D16 0.71 mean 7.7 silt/clay 2% Medium 512- 1024 D D35 14 dispersion 18.7 sand 19% Lrg-Very Lrg 1024-2048 R D50 24 skewness -0.34 gravel 59% Bedrock >2048 BDRK D65 42 cobble 16% Total 100 D84 84 boulder 0% Note: D95 120 bedrock 0% hardpan 0% wood/det 0% artificial 0% Cross-Section 3 Riffle-MY02 Particle Millimeter Count Particle Size Distribution Stony Fork Silt/Clay <0.062 S/C XS 3 Riffle Very Fine .062- .125 S 6 Fine .125-.25 A 3 Medium __ .25- .50 N 4 Coarse .50- 1 D 3 100% ■ r Very Coarse 1 -2 S 2 Very Fine 2-4 7 a 80% Fine __ 4-5.7 G 1 i Fine 5.7-8 R 2 v 0 60% — nse�aa Medium 8- 11.3 A 9 a T MY01 Medium 11.3- 16 V 6 Ed C 40% —A,—MY°2 Coarse 16-22.6 E 12 w Coarse 22.6-32 L 8 0 Very Coarse 32-45 S 9 20% Very Coarse 45-64 12 Small 64-90 C 6 0% Small 90- 128 0 6 0.01 0.1 1 10 100 moo moo Large 128- 180 B 3 Particle Size-Millimeters Large 180-256 L 2 Small 256-362 B Size(mm) Size Distribution Type Small 362-512 L D16 1.1 mean 8.6 silt/clay 0% Medium 512- 1024 D D35 10 dispersion 10.8 sand 18% Lrg-Very Lrg 1024-2048 R D50 20 skewness -0.27 gravel 65% Bedrock >2048 BDRK D65 35 cobble 17% Total 101 D84 67 boulder 0% Note: D95 130 bedrock 0% hardpan 0% wood/det 0% artificial 0% Cross-Section 5 Riffle-MY02 Particle Millimeter * Cou Particle Size Distribution Stony Fork Silt/Clay <0.062 S/C XS 5 Riffle Very Fine .062- .125 S 7 Fine .125-.25 A 2 Medium .25- .50 N 3 I Coarse .50- 1 D 1 100% — ■ ■ ■ ■ Very Coarse 1 -2 S 6 Ti Very Fine 2-4 11 as 80% Fine 4-5.7 G 1 E a Fine 5.7-8 R 4 60% Medium 8- 11.3 A 3 a T MY01 Medium 11.3- 16 V 4 E. MY°Z Coarse 16-22.6 E 7 0 40% w Coarse 22.6-32 L 6 0 Very Coarse 32-45 S 16 20% Very Coarse 45-64 11 Small 64-90 C 12 0% 1 • Small 90- 128 0 7 0.01 0.1 1 10 100 1000 10000 Large 128- 180 B 1 Particle Size-Millimeters Large 180-256 L Small 256-362 B _ Size(mm) Size Distribution Type Small 362-512 L D16 1.5 mean 10.3 silt/clay 0% Medium 512- 1024 D D35 8.6 dispersion 9.8 sand 19% Lrg-Very Lrg 1024-2048 R D50 25 skewness -0.30 gravel 62% Bedrock >2048 BDRK D65 41 cobble 20% Total 102 D84 71 boulder 0% Note: D95 100 bedrock 0% hardpan 0% wood/det 0% artificial 0% Cross-Section 7 Riffle-MY02 Si Particle Millimeter ii. Cou Particle Ston Fyorkbution Silt/Clay <0.062 S/C 6 XS 7 Riffle Very Fine .062- .125 S 6 Fine .125-.25 A Medium .25- .50 N 1 Coarse .50- 1 D 1 100% ■ ■ ■ Very Coarse 1 -2 S 3 Very Fine 2-4 4 80% Fine __ 4-5.7 G 2 1 Fine 5.7-8 R 3 60% mB°at Medium 8- 11.3 A 1 a T MY01 Medium 11.3 - 16 V 4 N 40% -A-MY02 Coarse 16-22.6 E 6 w Coarse 22.6-32 L 11 e Very Coarse 32-45 S 14 20% Very Coarse 45-64 13 Small 64-90 C 19 0% Small 90- 128 0 15 0.01 0.1 1 10 100 1000 10000 Large 128- 180 B 5 Particle Size-Millimeters Large 180-256 L 1 Small 256-362 B 2 Size(mm) Size Distribution ffill Small 362-512 L D16 2.7 mean 16.4 silt/clay 5% Medium 512- 1024 D D35 25 dispersion 8.8 sand 9% Lrg-Very Lrg 1024-2048 R D50 41 skewness -0.32 gravel 50% Bedrock >2048 BDRK D65 65 cobble 33% 117 D84 100 boulder 2% Note: D95 150 bedrock 0% hardpan 0% wood/det 0% artificial 0% Cross-Section 10 Riffle-MY02 SizParticle Millimeterii. Count Particle Stony eD�oscbution k Silt/Clay <0.062 S/C 12 XS 10 Riffle Very Fine .062- .125 S 17 Fine .125-.25 A 6 Medium _ .25- .50 N Coarse .50- 1 D 8 100% ■ ■ ■ ■ ■ ■ Very Coarse 1 -2 S 6 Very Fine 2-4 8 ti 80% Fine __ 4-5.7 G 1 1 Fine 5.7-8 R 2 60% As Buie a Medium 8- 11.3 A 2 a T MY01 Medium 11.3- 16 V 5 N 40% —A—n�ro2 Coarse 16-22.6 E 4 w Coarse 22.6-32 L 5 e Very Coarse 32-45 S 6 20% ila Very Coarse 45-64 9 Small 64-90 C 9 0% Small 90- 128 0 3 0.01 0.1 1 10 100 1000 10000 Large 128- 180 B Particle Size-Millimeters Large 180-256 L Small 256-362 B Size(mm) Size Distribution Type Small 362-512 L D16 0.075 mean 2.0 silt/clay 12% Medium 512- 1024 D D35 0.55 dispersion 27.5 sand 36% Lrg-Very Lrg 1024-2048 R D50 2.5 skewness -0.06 gravel 41% Bedrock >2048 BDRK D65 16 cobble 12% 103 D84 54 boulder 0% Note: D95 83 bedrock 0% hardpan 0% wood/det 0% artificial 0% Cross-Section 11 Riffle-MY02 Particle Millimeter Cou Particle Size Distribution Stony Fork Silt/Clay <0.062 S/C 10 xs 11 Riffle Very Fine .062- .125 S 3 Fine .125-.25 A 6 Medium .25- .50 N 1 Coarse .50- 1 D 2 100% ■ ■ ■ ■ Very Coarse 1 -2 S 3 Very Fine 2-4 3 cl 80% 11 Fine 4-5.7 G _ a Fine 5.7-8 R C 60% As Bulk Medium 8- 11.3 A s ' T AYm Medium 11.3- 16 V N 40% T a�roz Coarse 16-22.6 E a Coarse 22.6-32 L 1 e A AAA AA- / Very Coarse 32-45 S 9 20% Very Coarse 45-64 20 r: I A A AAAA AA Small 64-90 C 15 0% , Small 90- 128 0 24 0.01 0.1 1 10 100 1000 10000 Large 128- 180 B 6 Particle Size-Millimeters Large 180-256 L Small 256-362 B Size(mm) Size Distribution Type Small 362-512 L D16 0.19 mean 4.6 silt/clay 10% Medium 512- 1024 D D35 42 dispersion 151.0 sand 15% Lrg-Very Lrg 1024-2048 R D50 57 skewness -0.66 gravel 32% Bedrock >2048 BDRK D65 78 cobble 44% Total 103 D84 110 boulder 0% Note: D95 130 bedrock 0% hardpan 0% wood/det 0% artificial 0% Cross-Section 14 Riffle-MY02 Particle Millimeter i Count Particle Size Distribution Stony Fork Silt/Clay <0.062 S/C 3 XS 14 Riffle Very Fine .062- .125 S 5 Fine .125-.25 A 8 Medium __ .25- .50 N 25 Coarse .50- 1 D 8 100% .. ■ ■ ■ • ■ Very Coarse 1 -2 S 4 Very Fine 2-4 4 0 80% i Fine __ 4-5.7 G 1 i Fine 5.7-8 R C60% - BotMedium 8- 11.3 A a T aaro1 Medium 11.3- 16 V 1 C 40% —A—a�ro2 Coarse 16-22.6 E 2 .5 Coarse 22.6-32 L 2 e Very Coarse 32-45 S 6 20% Very Coarse 45-64 15 Small 64-90 C 6 0% • ,■ Small 90- 128 0 9 0.01 0.1 1 10 too 100o 1oo00 Large 128- 180 B 3 Particle Size-Millimeters Large 180-256 L Small 256-362 B Size(mm) Size Distribution Type Small 362-512 L D16 0.25 mean 4.2 silt/clay 3% Medium 512- 1024 D D35 0.43 dispersion 27.8 sand 49% Lrg-Very Lrg 1024-2048 R D50 1.4 skewness 0.30 gravel 30% Bedrock >2048 BDRK D65 39 cobble 18% 102 D84 70 boulder 0% Note: D95 120 bedrock 0% hardpan 0% wood/det 0% artificial 0% Cross-Section 16 Riffle-MY02 Particle Millimeter Cou Particle Size Distribution Stony Fork Silt/Clay <0.062 S/C XS 16 Riffle Very Fine .062- .125 S _ 2 Fine .125-.25 A 5 Medium .25- .50 N 2 Coarse .50- 1 D 2 100% ■ ■ ■ ■ ■ Very Coarse 1 -2 S 3 Very Fine 2-4 8 80% Fine __ 4-5.7 G 3 1 Fine 5.7-8 R 3 60% As Bulk a Medium 8- 11.3 A 3 a • • • - T MYO, Medium 11.3- 16 V 1 N 40% —A—a�roz Coarse 16-22.6 E 7 5 Coarse 22.6-32 L 8 e Very Coarse 32-45 S 14 20% Very Coarse 45-64 16 Small 64-90 C 18 0% Small 90- 128 0 9 0.01 0.1 1 10 100 1000 10000 Large 128- 180 B 3 Particle Size-Millimeters Large 180-256 L Small 256-362 B Size(mm) Size Distribution Type Small 362-512 L D16 2.6 mean 14.6 silt/clay 0% Medium 512- 1024 D D35 21 dispersion 8.2 sand 13% Lrg-Very Lrg 1024-2048 R D50 37 skewness -0.33 gravel 59% Bedrock >2048 BDRK D65 54 cobble 28% 107 D84 82 boulder 0% Note: D95 120 bedrock 0% hardpan 0% wood/det 0% artificial 0% APPENDIX E Hydrologic Data Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 73 2020-MY02 Stony Fork Restoration Site Hydrograph Stream Gauge SF Main 183 J 5.0 January 1,2020 182 4.0 Gauge malfunction w 0 181 I I 1 iJ& 3.0 et 7Z w II. C 180 2.0 E. ct I. LALLAIL1411414,j 'ASIAIPt444,...*..0.0„4,.......L. I 1 179 I I I 1.0 [IIII 1� L1 . i i .178 . < < ilL 1I 0.0 , — N w N w 00 N A — N N — N N -1 N A ,-' N w i v.:, — N Q, — N N ---• N N �l N A — N w sO 67.0 CCN it, — N Vi A N — O ti J w N w .-. O 0 V ww N — ti 00 J ti Vi A O Oci) 7\ & Jtj (oZo pw , , 444 '-a aa 4440 � › Y .tg OOOo ZZ2 CC C N � C U4 N n n C 9n ' O N N O N O N N N O N N O N N i t( O N N O N N N N 'OO O - G G' O O N O O N O N OOO O O O O O OO O O O O O O OOO OOO O Date Rainfall Stream Bed Elevation Stream Stage Elevation Bankfull Elevation Sensor Depth Table 10.Verification of Stream Flow Stony Fork Restoration Site, DMS Project#97085 Gauge Camera Maximum Maximum Reach Dates Achieving Consecutive Dates Achieving Consecutive Days Days T 1 January 1 —April 5; 152 June 3—November 1 TlA January 1 —April 5; 152 January 1 —July 1 183 June 3—November 1 T2 January 1 —April 5; 152 January 1 —February 22 53 June 3—November 1 T3 January 1 —April 5; 152 June 3—November 1 *Camera obscured or malfunctioned for most of the year Table 11. Stream Flow Criteria Attainment Stony Fork Restoration Site,DMS Project#97085 Greater than 30 Days of Flow/Max Consecutive Days Reach MY-Ol MY-02 MY-03 MY-04 MY-05 MY-06 MY-07 2019 2019 2020 2021 2022 2023 2024 T1 Yes/60 Yes/152 (Gauge) T1 (Camera) TlA Yes/182 Yes/152 (Gauge) TlA Yes/46 Yes/183 (Camera) T2 Yes/85 Yes/152 (Gauge) T2 Yes/84 Yes/53 (Camera) T3 Yes/55 Yes/152 (Gauge) T3 Yes/55 (Camera) *Camera obscured or malfunctioned for most of the year Stony Fork Restoration Site KCIAssociates of NC,PA DMS Project#97085 75 2020-MY02 Stony Fork Restoration Site Hydrograph T1 Stream Flow Gauge 205 - - 5.0 January 1,2020 - 4.0 w © Gauge malfunction - 3.0 4. et E. / W 204 - m a AO hil 4i4144# 96 Days 0. , 152 Days , 1 2.0 E ca - c I I 1.0 203 I.1I I,Ii4 � . i i _ Ilr � 1 . kl I. jil1 _. _i I. lit dill III , Ii II 0.0 O\ — N w N W 00 N . — N N — N N -.l N . — N w VD — N O\ — N N — N N -.l N . — N w VD — N O\ — N cn . N r-- O ,. �l O\ W N — O �D 01 (J W N r-- ,y 00 J ,y th . — O ,,D O\ tr W N r-� Cr �l cn . o ZZ0 C7C7C7 `" w 0 '71 'II 44 ,-a aa6- 444 `, > Y . OOOo ZZ2 CIC7 ,- c n '� O N N O N N O N N N O N N N '1 '1 O N N O N N N 'i '7? UV O N N O N N N N C C N n n VD V—D O O 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Date Rainfall Sensor Elevation Flow Elevation Stream Flow(Camera) Stream Stage Elevation Stream Bed Elevation Stony Fork Restoration Site Hydrograph T1-A Stream Flow Gauge 204 5.0 January 1,2020 Gauge malfunction 4.0 II hIIMM AM 203 per .11 c N - 3.0 a 96 Days Camera obscured 152 Days 7: 1 ► 4 ► E. W Po .r an .. c% Cir 2.0 E 2 202 - CID I 1.0 201 lilli. I Li 1 _ 1 1,1 .1 ] iii III lr _.1 I L 0.0 Q -'- AN LW N— —N OW �0 —I Cr,' ? W— NN N N iN —� c.nN -1' — N W— \O (7'0 NJ O," —' . N — NO �N CO� N . w N W— `O 0 0 JN T u— AN o t7C ` 11a , , 41n od ZZd ; c � '7 D444 ' YY 444S YYY nrfOOO ZZ00 CCn nn p CCNPhhN ' " `C ' 'C N h hnNO ,! N t a ' `GG `GN O N N Cr? CT CI? N N N OOOO OONNNOOOO O CA OOOOOOO `O O O O O O O IV O O O O O O OO O O O Date Rainfall Stream Stage Elevation Stream Bed Elevation Sensor Depth Flow Elevation Stream Flow(Camera) Stony Fork Restoration Site Hydrograph T2 Stream Flow Gauge 191 - - 5.0 January 1,2020 4.0 190 w c Gauge malfunction - 3.0 a Camera malfunction W E. 189 - /a a A. �' Nl 1fy 2.0 JLA) 1 : E a IP116.6141,111114 PO° A.. 41414 C/) IONA". NA, IiI4V4)414"11\144VI 188 r1.111441111. , 96 Days 1 - , I 1152 Days ► I I 1 1.0 . L 1. iIt . . _.� E I L L t I 187Il'iIli' k I i 0.0 O1 t— N WN N W oo J QN1 .. — N N -- N ,N — 0 NV — N W— '.yO — JN mti — .N N 1— O NO l O\ cNn . — NN W 'D — NJ 9 1 — V. ti , '� n ON � tiO C C C n n -, O N N N t `< N N N N i . . Nr.) NN N N N OOO N ON O N N N O NO O OOOOOOOOOO OOOOO OOO OOO !No) OOOO� Date Rainfall Sensor Depth Stream Stage Elevation Stream Bed Elevation Flow Elevation Stream Flow(Camera) Stony Fork Restoration Site Hydrograph T3 Stream Flow Gauge 210 - 5.0 January 1,2020 209 - 4.0 Camera malfunct on w c 208 - 3.0 ea Gauge malfunction W / / 14%6°01,14,1414„an 77612. .. ct c 207 - 2.0 .. E et I 96 Days 152 Days I I I I 1 I 206 — I I 1.0 ispil a, — N W — N W 00 — N ? '-- N N — N N - '-- N . — N W �p —' N 9, --' N N — N N - --' N A --' N W ,.0 — N a, — N cn A N '-' O L. J a� W N ' O `O a1 c.n W N — ti 00 J ,'� c.n ? O �O a� cn w N 1 00 J cn A o Z Z d t7 l7 C7 p " w e cgc czo : 4 4 4 'a Y Y p 4' 4 4' S c c c Y Y Y 2, K rf, c O O O o Z Z d t7 t7 _ G C n n n n N i 'Yits, N C C N �t h h N "a "� `C `G ` `G N Y O N N trQ trQ trQ N 'Y '7 N g g N C C N c2i c2i `O O O O O O O O O O O O O O O N N N O O O O O O O O O O O O co O O O O O O O O O O O O Date Rainfall Stream Stage Elevation Stream Bed Elevation Sensor Depth Flow Elevation Stream Flow(Camera) APPENDIX F Additional Information Stony Fork Restoration Site KCI Associates of NC,PA DMS Project#97085 80 2020-MY02 ISO 9001:2008 CERTIFIED ENGINEERS • PLANNERS • SCIENTISTS • CONSTRUCTION MANAGERS K C J 4505 Falls of Neuse Rd.,Suite 400•Raleigh,NC 27609 •Phone 919-783-9214•Fax 919-783-9266 February 12, 2021 Jerry Parrish and Lisa Parrish 4141 Elevation Road Benson, NC 27504 RE: Conservation Easement Encroachment Dear Mr. and Mrs. Parrish I am writing to inform you that at a recent visit to the site(February 9,2021),4-wheeler tracks were noted entering the conservation easement from your property. These tracks entered the easement from the path along the eastern edge of your property and continued for about 400 feet before exiting the easement near the end of Sherrill Farm Drive. The Conservation Easement is associated with a stream restoration project and the purpose of this project was to restore portions of Stony Fork(the stream near your property) and several feeder streams to mitigate the impacts to streams associated with development projects in the area. As such, the use of motorized vehicles within the easement is prohibited. Specifially, Section II, Item B of the recorded conservation easement states: Motorized Vehicle Use. Motorized vehicle use in the Conservation Easement Area is prohibited except within a Crossing Area(s) or Road or Trail as shown on the recorded survey plat. I have included a copy of the recorded survey plat for your reference. Additionally, the easement line is clearly marked with signage along its length, including in the area of 4-wheeler access.We appreciate your efforts to abide by the terms of the easement and to help resolve this issue. If you would like further assistance in ensuring there is no unauthorized access to the easement or have any other questions, please feel free to contact me. Regards, Tim Morris Senior Environmental Scientist KCI Technologies Inc. 4505 Falls of Neuse Road, Suite 400 Raleigh, NC 27609 tim.morris@kci.com Office 919.278.2511 Cell 919.793.6886 www.kci.com THE MOST INCREDIBLE THING WE'VE ENGINEERED IS OUR TEAM W W W.KCI.COM OWNER CERTIFICATION (CE #1&6) SPO FILE NO. 51-CD OWNER CERTIFICATION (CE #4) SPO FILE NO. 51-CF OWNER CERTIFICATION (CE #5) SPO FILE NO. 51-CE NOTES: �JP101'I F� 1. THIS PLAT DOES NOT REPRESENT A BOUNDARY SURVEY OF THE PARENT TRACTS.THE PARENT O I HEREBY CERTIFY THAT I AM THE OWNER OF THE PROPERTY SHOWN AND I HEREBY CERTIFY THAT I AM THE OWNER OF THE PROPERTY SHOWN AND I HEREBY CERTIFY THAT I AM THE OWNER OF THE PROPERTY SHOWN AND TRACT BOUNDARIES ADJACENT TO THIS EASEMENT ARE NOT CHANGED BY THIS PLAT. DESCRIBED HEREON,WHICH IS LOCATED IN THE SUBDIVISION JURISDICTION DESCRIBED HEREON,WHICH IS LOCATED IN THE SUBDIVISION JURISDICTION DESCRIBED HEREON,WHICH IS LOCATED IN THE SUBDIVISION JURISDICTION BOUNDARY INFORMATION SHOWN HEREON WAS DERIVED FROM DEEDS AND MAPS OF �� *SITE* RECORD IN JOHNSTON COUNTY AND MONUMENTATION FOUND IN THE FIELD. OF THE COUNTY OF JOHNSTON AND THAT I HEREBY ADOPT THIS OF THE COUNTY OF JOHNSTON AND THAT I HEREBY ADOPT THIS OF THE COUNTY OF JOHNSTON AND THAT I HEREBY ADOPT THIS SUBDIVISION PLAN WITH MY FREE CONSENT,ESTABLISH MINIMUM SETBACK SUBDIVISION PLAN WITH MY FREE CONSENT,ESTABLISH MINIMUM SETBACK SUBDIVISION PLAN WITH MY FREE CONSENT,ESTABLISH MINIMUM SETBACK 2. DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES IN U.S.SURVEY FEET LINES,AND DEDICATE ALL STREETS,ALLEYS,PARKS AND OTHER SITES AND LINES,AND DEDICATE ALL STREETS,ALLEYS,PARKS AND OTHER SITES AND LINES,AND DEDICATE ALL STREETS,ALLEYS,PARKS AND OTHER SITES AND UNLESS OTHERWISE NOTED. EASEMENTS TO PUBLIC OR PRIVATE USE AS NOTED. EASEMENTS TO PUBLIC OR PRIVATE USE AS NOTED. EAS TS TO PUBLIC OR PRIVATE USE AS NOTED. -,N o 3. AREA COMPUTED BY COORDINATE METHOD. Q / 4. THE BASIS OF THE MERIDIANS AND COORDINATES FOR THIS PLAT IS THE NORTH CAROLINA 9 s D, 5 �t /w//�S/� /0+` . •I 7 --�' 0 raug� w /e.'�•' STATE PLANE COORDINATE SYSTEM,NORTH AMERICAN DATUM 1983(HAD 83),BASED ON �pce P.(ll (� Ea,serifeae -it_ s DIFFERENTIAL GPS OBSERVATIONS PERFORMED IN OCTOBER 2016.ALL DISTANCES ARE a Y( GARY T'BE ON 1 DATE DAN L MEDLIN JR. DATE SHERRI { RM LLC DATE GROUND UNLESS OTHERWISE NOTED. fill) US N1 l 5. DEED REFERENCES:AS SHOWN HEREON. , {/4 4?t 1a1 DATE17 1011211 1 6. SUBJECT PROPERTIES KNOWN AS TAX NUMBER:AS SHOWN HEREON. 2005. I DA W.BENSON CATHRYN Z.MEOILIN DTE 7. SUBJECT PROPERTIES PARTIALLY LIE WITHIN THE AREA DESIGNATED AS ZONE"X", OWNER CERTIFICATION (CE #2)SPO FILE NO. 51-CH BASED ON FEDERAL FLOOD INSURANCE RATE MAP 3720164100J EFFECTIVE DECEMBER 2, //• ,"7 8. NO UNDERGROUND UTILITY LOCATING PERFORMED DURING THE COURSE OF THIS / I HEREBY CERTIFY THAT I AM THE OWNER OF THE PROPERTY SHOWN AND ,4Z-5541/141°1 --. /A• SURVEY. DESCRIBED HEREON,WHICH IS LOCATED IN THE SUBDIVISION JURISDICTION WILLIAM R.MEDLIN DATE mA., , OF THE COUNTY OF JOHNSTON AND THAT I HEREBY ADOPT THIS 9. THE STATE OF NORTH CAROLINA,ITS EMPLOYEES AND AGENTS,SUCCESSORS AND ASSIGNS, VICINITY MAP SUBDIVISION PLAN WITH MY FREE CONSENT,ESTABLISH MINIMUM SETBACK RECEIVE A PERPETUAL RIGHT OF ACCESS TO THE EASEMENT AREA OVER THE PROPERTY AT ////�► REASONABLE TIMES TO UNDERTAKE ANY ACTIVITIES TO RESTORE,CONSTRUCT,MANAGE, \ (NOT TO SCALE) LINES,AND DEDICATE ALL STREETS,ALLEYS,PARKS AND OTHER SITES AND �� �(�/ MAINTAIN,ENHANCE,AND MONITOR THE STREAM,WETLAND AND ANY OTHER RIPARIAN EAS MENTS TO PUBLIC OR PRIVATE USE AS NOTED. BONNIE MEDLIN DATE RESOURCES IN THE EASEMENT AREA,IN ACCORDANCE WITH RESTORATION ACTIVITIES OR A /tt/, LONG-TERM MANAGEMENT PLAN AS DESCRIBED IN SECTION 111-A OF THE CONSERVATIONotriiNV5,011661 . EASEMENT AGREEMENT LINE LENGTH BEARING L1 467.40 N68'30'11"E F ISHA BETH BLACKMON DATE G /o/7//? L2 58.52 S43'08'24"W DEVAN BARBOURII DATE L3 30.01 N72'45'S8'E PT" NORTHING EASTING 1 618047.77 2141051.73 r 2 617918.86 Z140698.76 OWNER CERTIFICATION (CE #3)SPO FILE NO. 51-CG i` /'�I 1-7 EASEMENT LINE TABLE 3 617980.9835 2140655.93 60 LINE LENGTH BEARING4 _ DEVAN BARBOUR,IV DA E El 375.77 S69'56'15'W 5 618045.11 2140654.99 E2 65.59 N06'51'27"W I HEREBY CERTIFY THAT I AM THE OWNER OF THE PROPERTY SHOWN AND E3 35.52 S84'07'59"W 6 617943.80 2140523.95 DESCRIBED HEREON,WHICH IS LOCATED IN THE SUBDIVISION JURISDICTION E4 64.76 N00'32'02"W 7 617889.94 2140454.29 OF THE COUNTY OF JOHNSTON AND THAT I HEREBY ADOPT THIS E5 165.63 S5217'28"W 8 618081.96 2140410.12 SUBDIVISION PLAN WITH MY FREE CONSENT,ESTABLISH MINIMUM SETBACK E6 88.06 S5217'28"W 9 618166.23 2140835.92 LINES,AND DEDICATE ALL STREETS,ALLEYS,PARKS AND OTHER SITES AND E7 197.03 N12'57'14"W 10 618314.72 2141045.83 EASEMENTS TO PUBLIC OR PRIVATE USE AS NOTED. ES 434.06 N78'4817'E 11 617971.92 2140573.54 E9 257.12 N54'43'26'E 12 617954.42 2140575.64 w M/ .y E10 267.02 S01'15'58"E 13 618799.06 2141035.12 Ell 82.49 ��•�1+ `, TlivirP4r4L...- 1 D tat 1 .I- .06 2141164.37 E12 17.62 SO6'51'27'E 15 618515.46 2141390.56 JERRY W.PARRI$H DATE 1. El 52.77 57823'16"W 16 618409.15 2141410.46 r El 751.47 NO115'58"W 17 618378.47 2141673.38 idel; 8.. friF / / E15 129.25 N90'00'00"E 18 618291.95 2141671.72 / // Et6 362.76 S38'34'31"E 19 618219.05 2141486.62 // / E17 108.15 S10'36'O6"E 20 618185.21 2141713.34 IS PARRISH DATE i /j/ E18 264.70 S83'20'39"E 21 618196.91 2141676.29 El 86.54 S01'05'46"W 22 620140.32 2142411.62 / /1 E20 666.35 S68'30'11'W 23 619921.50 2142408.96 R�P� //// I 01.0 E22 114.57 S21118'117"E 25 620186.80 2142229.93 fl° .35 ,rOB/ E23 38.86 N72'28'27"W 26 620179.48 2142328.94 E�E�3o�1:°�// E25 218.84 500'41'45"W 28 619025.87 2143013.98 G5R E26 218.16 N59'50'04"W 29 618852.71 2142812.35 �/ / E27 155.96 NO3'31'19"E 30 618677.61 2142591.14 4 /...' / 4 E26 99.28 S85'46'28"E 31 618367.78 2142424.75 E29 91.49 S64'39'20"E / / 32 618333.62 2142375.63 .7" // E30 245.32 589'02'47"E 33 618339.64 2142258.03 OA ?...a E31 265.78 S49'20'40"W 34 618372.04 2142182.32 / % t milli* E32 282.13 S51'38'12'W / /'' 35 618540.]9 2142339.90 E33 351.68 52814'09"W // / E34 59.84 S55'11'21"W 618826.0136 2142521.09 / / E35 117.75 N8T04'13"W 37 618367.94 2142085.59 REBECCA CLIFTON 38 618329.34 2142142.31 / / PIN 16 4100-39-8527 E36 82.35 N66'49'37"W .£ED BOOK 3381,iiiiiPAGE 37 E37 230.44 N43'08'24"E 39 618285.21 2142245.41 / E38 338.41 N32 22'18'E 40 618282.22 2142303.88 \\ E39 320.77 N50'31'26"E 41 618050.94 2142138.52 ` "WV E40 112.15 S66'49'37'E 42 618373.72 2141714.16 / ,A, 43 618248.77 2142066.80 / GARY r BENSON E41 58.55 SST04'13"E ,Ie PIN 16,100-29-9157 44 620068.22 2142563.85 xED BOOK„30,PAGE 674 E42 284.31 S35'33'51"W 45 619884.08 2142653.59 E43 445.87 N72'28'27"W E44 41.06 S83 20'39'E 46 619744.57 2142903.14 I I ., L E45 374.12 S70'29'22"E 47 619459.80 2143155.07 I I`1 '-- ``111. E46 110.43 N43'08'24'E 48 619495.27 214334i.76 `! 4 i E47 168.44 S64'39'20"E 49 619630.96 2143a93.25 E48 204.84 S25 58'57'E 50 619643.78 2143534.56 E ; 51 619620.64 2143542.21 E49 285.89 S60'4T36'E E50 380.21 S4129'53"E 52 619545.21 2143642.64 Val,, 34 '€ I ' E51 190.03 N7914'36"E 53 61947639 2143657.58 I: r� E52 203.38 N48'08'53'E 54 619316.56 2143450.05 y E53 43.25 N72'45'58"E 55 619183.57 2143134.42 ", \ E54 24.38 S1818'00"E 56 619055.62 2143048.63 ' 1 E55 125.76 S53'08'51"E 57 619059.36 2142789.71 E56 70.38 S12'05'25"E 58 619301.46 2142982.28 I ` E57 261.95 S52'23'53"W 59 619580.70 2142808.84 I I tg ,; E58 342.50 567'09' "W 60 619689.43 2142591.99 rear"w PARRISn z E59 154.05 S33 50'4040"W 61 619652.67 2143563.22 I I PIN 164100-19-159B r 1 6 DEED Boar 1147,PAGE 287 ''';a' „,' E60 258.94 N89'10'23"W 62 619684.92 2143667.17 I I �' E61 309.35 N38'29'57"E 63 619521.39 2143720.69 I I !I 4 ;'�`gx E62 328.72 N31 50'39"W 64 619494.46 2143751.85 N T E63 242.58 Nfi3'22'20"W 65 619482.04 2143687.05 I 51� SHERRILL FARM.LW '&�, N� I,, PM 16acD-28-7593 E64 295.56 N3815'39'W 66 619562.48 2143669.82 I 1 GARY rNOMAs BENsaN , r: a DEED BOOK 4702,PAGE 505 Efi5 1 D8.84 N72'45'58"E 67 619638.99 2143567.74 P/N/6113701 PA e45 I,,04C1i I t, CONSERVATION DEED soar 37or PAGE 909 9'Pg �1 E66 172.06 S18'07'18"E ' m 1 1 Iz1� ah �¢` �` EASEMENT E67 41.18 S49 09'47"E O €t1g E68 65.98 S79'09'08"W g n I 1 A-;` �r1 I I`' E69 82.27 N12 05'25"W c. y I t INkftelf o • h 1 a SEE SHEET 2 E70 127.58 N53008'51"W 1 I m �" "I I' '"I 1,,I/ r 0 6 t '/I a1 E71 14.40 N1818'00"W lsl: 1 ,-- - - -- FINAL PLAT I,JAMES M.GELLENTHIN,HEREBY DECLARE THAT THIS MAP WAS DRAWN -., N/F CONSERVATION EASEMENT UNDER MY SUPERVISION FROM A SURVEY MADE UNDER MY SUPERVISION, 1 • ecONN R MEDLIN IN& THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY INDICATED,AS BONNIE a M7-23 1 PIN r6 2357 FOR DRAWN FROM INFORMATION AS SHOWN HEREON: THAT THE RATIC),AS 11 I I I I,4E DEED 4834 PAGE 637 PRECISION AS CALCULATED IS GREATER THAN 1:10,000;THAT TMI?MA A R O E47,7 MAxaE x eouN HEIRS 1 �FAnsnA BEN B AcxMaN STATE OF NORTH CAROLINA DOES REPRESENT AN OFFICIAL BOUNDARY SURVEY(OF THf�I?ASff�NEN I,,- DEED BOOr1-07P GE 147 1 DEEPRY D B1647OOK 3358,7PAGE 941 DEPARTMENT OF ENVIRONMENTAL QUALITY AREA)AND HAS BEEN PREPARED IN ACCORDANCE WITH 6''S./.71p S S /•''•., 4/ % V 11 AMENDED.WITNESS MY ORIGINAL SIGNATURE,REGIST D,N11 i 0�9 y . DIVISION OF MITIGATION SERVICES AND SEAL THIS 25TH DAY OF SEPTEMBER,2017 S. PROJECT NAME: STONY FORK RESTORATION PROJECT SEAL : '' DMS PROJECT#: 97085 !L!-'•A'r L-3860 , 1 z = SPO FILE NO. 51-CD, 51-CE, 51-CF, 51-CG, 51-CH No AROLINA REGISTRATION NUMBER L-38>SO,:Z ELEVATION TOWNSHIP, JOHNSTON COUNTY ' `� ''O NORTH CAROLINA JAMES M. GELLENTHIN c•:/N • �' S ''., S U R J; �` STATE OF NORTH CAROLINA c JOHNSTON COUNTY / ? DATE: SCALE: SHEET: ''''/.....1 EI0` ‘````` STATE OF NORTH CAROLINA FILED FOR REGISTRATION AT II 3J •i.2 4 THIS PLAT IS EXEMPT FROM THE DEFINITION OF A AUGUST 16, 2017 N/A 1 OF 2 I,JAMES M.GELLENTHIN,PROFESSIONAL LAND SURVEYOR.NO.L-3860 NS ON 9,0 ) SUBDIVISION WITHIN THE ZONING JURISDICTION OF THE CERTIFY TO THE FOLLOWING AS REQUIRED IN G.S.47-30(F)(11): VIEW OFFICER of!` D 6�r 20 / ? IN THE JOHNSTON COUNTY PLANNING DEPARTMENT.THAT THE SURVEY IS OF ANOTHER CATEGORY,SUCH AS THE O O NT ,CERTIFY THAT THE MAP REGISTER OF DEEDS OFFICE KCI ASSOCIATES OF N.C. RECOMBINATION OF EXISTING PARCELS,A COURT ORDERED SURVEY,OR OR PLAT WHICH THIS CERTIFICATION IS AFFIXED OTHER EXCEPTION TO THE DEFINITION OF SUBDIVISIO . MEETS ALL STATUTORY REQUIREMENTS FOR RECORDED IN BOOK 8 lJ PAGE ENGINEERS, SURVEYORS AND PLANNERS ECORDING. O • l ,4 e / /7 6-4-- '/JI�3 I - ��� E / ! JOHNe ON COUNTY-PLANNER K C 4505 FALLS OF NEUSE ROAD, FLOOR 4 w � Y )a)�3�l7 BY ✓IjSa NO AROLIN REGISTRATION NUMBER L-3860 REVI W OFFICER DATE • / ASSOCIATES OF R83-921 NC 27607 JAMES M. GELLENTHIN f 6 1 REVISED:9/7/17 NOR C 076 CAROLINA PHONE (919) 783-9214 * FAX (919) 783-9266 0 DETAIL NCGS(MO AH LANG E dr�ON IT BEND (AH4769) / ir N.62706759 E.2,134,119.26 CSF:0.99987437 / 101g1 °.° s e�€�€€ r ra 11€ €�+ �x$1S pfs1 w{ray €s& �'Ix Yr srgr� rr ,,� 40 IP -p rl �P.� x S€"`�"c Ps 8 I I �„$6 `F. y'W,€+4 48K 1 $€P t€S r Gca / O 1, 1 �� ��o i' I�IE€ i61=I � r, P ����� r¢��6������`i 3 f l F� � 1�������� � �� I��.. � ) / / / �S � S f Y+e a 8si,c & q pF€ y .E `11°i� A .. F 4�P 4'I 7 B. 6 1✓s4 r�8 .g .3,k / k"J . °�, a ` <g , £, taipt-. 0 � i 0 /' / / P.O.C. 6't . ,,14 r (J CE 5 CE 6 :.ik!. Viv lit i .;j:47,7,:, .9sC�11:1; `�..4� 1„'S $'4e,a �tl,;1;ill ill il:joi �. d 1,4 '�'t l!!1:7:10,1, &�� I ',5 , :'i � ,,., ;7i,°'.irx ,i-. .a t1i, „i.b AT G0 P ry l�l�l€4`` ;,;,; m Ell `�� ��`I�;IP� '�;� E O. E: III 3$ 5R /1 IRE40 / j ,;,�'` CE2 PET `' + / 3,792 SF FIB LEGEND #7 0.09AC CEMETERY Y ./.. / / �o DISTURB / ,../ "' • EXISTING PK NAIL NA- FA / / QQ EXISTING IRON T/SNA BE7N BLACKMON / P/N 164100-07-4699 1110 5/8"*30" REBAR SET W/3.25" ALUMINUM DEED BOOK 3358, PAGE 941 11111 CAP WITH STATE SEAL C� FIP Itt1101y O CALCULATED POINT / oo O EXISTING MONUMENT "' NEW CONSERVATION EASEMENT FOR / / "DIVISION OF MITIGATION SERVICES' P.O.B. POINT OF BEGINNING l N/F P.O.C. POINT OF COMMENCEMENT / / REBECCA C CLIFTON PIN 164100-39-8527 / DEED BOOK 3381, PAGE 37 P.O.B. / FIP FIB CE 5A \ #25 f E28 #f CE 6A a I I 111 w I' / -....-_,.----. ' ?g w, 22 6 , 1 / 44 #44 lam • N/F IIII Mill i #24` f r"';' GARY T BENSON 1 `: PIN 164100-29-9457 a' DEED BOOK 1430, PAGE 674 CE SA • ,.- 36,783 SF ,#4s • I CE 68 I I € F�9 12,749 5� ,.. #46 P. . 0.29AC I CE 6B �, cn 3f1\E1 #62 c 1 r r 6z #s0 /61 E6 "` f k 1 1 ' ?& I- E r F #49 8,i.I?yeC114. fn I o • ili ui0°m ,i . egg �S ,,,.. 371,931 SF K1�` h �� .. ,-; 'FL:. . -#54 8.54AC s ,r a 3s a �� . 8 4v�O�,r i, •, •:: ;#55 I ;; P.O.B. CE 5B\#57 rt - �h cb ;l a��� fEL ���1111111111 $89 02'47"E #56 S89.02'47"E ���� `� C A 4 0 ���'�, I 1 370.53' (TIE) #27 .- \ 11 3 w #28 i078.87'(TIE) FIB FIP 0��•'F E S S /3 1' �; 1 .7,3.;,:3 p 9 N/F JERKY W. PARRISH j CESB 4P • ,,!,,;` 1 .;,'1 z 1 I PIN 164100-19-1598 - °Q P o 148,176SF _ * . ................................... EA DEED BOOK 1147, PAGE 287 5 0 3.40AC rn � I kI #2s L- 6 #13 E15 #�4 #36 77'7 Fi SHERRIL N/F ARM, LLC �� •1�. 30 .,���''• C E L;``��. +,' a 6g8;4Yr�# ./11111111\ N/F PIN 164100-28-7593 1 . ` GARY THOMAS BENSON - DEED BOOK 4702, PAGE 505 kit!.tt4.4 fix', P/N 164100-08-6845 r .E.4. #35 DEED BOOK 3701 PAGE 909 #15 \ C � "+are of North Card=ina,Johnston Co. m 1 �� I k� g station at //:3.3':211i M. A #'6. Elf; #, ,, 15 0 + r Cr *bpi.-1 20__LP__in the 4 #42 Po.e. #34 ` ` ` 41 � � #31 ReatrArDttaL FINAL PLAT III CE SC \ Fos . _ $d.� yl3 1 3a ''4.? 1{Cu�t�d�,. 5 Pane CONSERVATION EASEMENT La #39 `4' . b CE? r1 #43 ' ' MC FOR C �� 1 r1 rr re;YI " r #40 C \ \ 118,4205f 13£EE 0 f - #19 . ,\1 1! f 19 tll '— STATE OF NORTH CAROLINA C W 2.72 ACf ::0�:It: + . e`>: / E24° a £' E Y ,3 o / Lw ;Ift.!!!!!!.!:10.:".71.,F=...1.,: O •11000p � DEPARTMENT OF ENVIRONMENTAL QUALITY 62 Po.e. DIVISIONOFMITIGATIONSERVICES� \ ,,.,,:::!,, �jI `' -'� cE 4 CE4 451:5714#1.1. PROJECT NAME: STONY FORK RESTORATION PROJECT•,:;:.1.:: #8 ; , t":i #i 10,696 SF CE SC 44 ' 41 /�IRF 0.25 AC DMS PROJECT#: 97085 a 6 ; I �;I\ • ,,' ;,•i.;i•ii4:-,:i5], :::, • �, ° gs 108,065SF SPO FILE NO. 51-CD, 51-CE, 51-CF, 51-CG, 51-CH .e, �t P.O.B. N/F 2.48AC ELEVATION TOWNSHIP, JOHNSTON COUNTY -��_ CE 1 WILLIAM R MEDLIN & NORTH CAROLINA PET , 4 CE 3 BONNIE J MEDLIN DATE: SCALE: SHEET: CEMETERY CE 2 P.D.C. PIN 164 100-1 7-2357 DO NOT SEE DEED 4834 PAGE 637 AUGUST 16, 2017 1" = 250' 2 OF 2 DISTURB DETAIL IIPPr 3,792 SF EllEE N/F 1 ' 0.09AC =��giii KCI ASSOCIATES OF N.C. MAX/NE K. MEDLIN, HEIRS 1 N/F PIN 164100 07-3890 \ FIP FATISHA BETH BLACKMON GRAPHIC SCALE ENGINEERS, SURVEYORS AND PLANNERS DEED BOOK 1025, PAGE 147 �� PIN 164 100-07-4699 % DEED BOOK 3358, PAGE 941 250 l!siew !!!.° 125 250 500 K C I 4505 FALLS OF NEUSE ROAD, FLOOR 4 NORTHASSOCIATES C-07 CAROLINA RALEIGH, N* 27607 1 INCH = 250 FEET PHONE (919) 783-9214 FAX (919) 783-9266 C-0764