HomeMy WebLinkAbout20120626 Ver 1_401 Application_20120612?® 1 2062 ® North Carolina Wildlife Resources Commission MEMORANDUM TO FROM SUBJECT Gordon Myers Executive Director June 20 2012 Cyndi Karoly NCDWQ Tasha McCormick USACE Mark Fowlkes NCWRC SUN 2 2 2012 wc+� n 8ta!u Permit application for Boone Fork stream rehabilitation and habitat enhancement site Caldwell County North Carolina The North Carolina Wildlife Resources Commission ( NCWRC) is submitting the enclosed plan for 778 linear feet of stream enhancement on Boone Fork Deep Creek and an Unnamed Tributary to Boone Fork Catawaba County for your approval for a 401/404 permit (Nationwide Permit number 27 NCDWQ # 3399) The project is being implemented through a partnership with the U S Forest Service National Wild Turkey Federation and NCWRC and is located within Grandfather Ranger District Pisgah National Forest The $570 Pre Construction Notification Application fee required by NCDWQ has been electronically transferred (electromc warrant # 57349) The email notification for the transfer is enclosed Also enclosed are the U S Forest Service Decision Notice and Finding of No Significant Impact and the Agent Authorization letter A copy of the plan has been submitted to the NCWRC for their review If I can bL of any further assistance please let feel free to contact me at 336 527 1547 or by email at mark fowlkes @ncwildlife org Thank you for reviewing this plan in a timely manner CC Brian Mcrae NCWRC 7 F\ s Mailing Address Division of Inland Fisheries 1721 Mail Service Center Raleigh NC 27699 1721 Telephone (919) 707 0220 Fax (919) 707 0028 � &FaRY, C5%ti$1 Z ® North Carolina Wildlife Resources Commission Gordon S Myers, Executive Director June 18 2012 / . I A ELECTRONIC FUND TRANSFER REQUEST VENDOR EIN 56 6000372 ) 4' NC Division of Water Quality T 401 Wetlands Certification Unit Attn Ian McMillan 1650 Mail Service Center ' JUN _ 2" 7 Raleigh NC 27699 9650 f AMOUNT $570 00 PURPOSE Application fee for Section 401 water quality certification permit for Boone Fork stream rehabilitation and habitat enhancement site Caldwell County RAIf j 41 PERMIT, &ME T =69t! sTRc-AM Rte. 0,ALbW6LL 0WW y ACCOUNTICENTER 535890 :� 2141 `111 1801 SPECIAL INSTRUCTIONS To allow Water Quality to identify this transfer, please enter 401 Cert in the RCGL field and WRC — Boone Fork stream rehabilitation and habitat enhancement site in the memo field of the transfer system Please notify Christian Waters and Mark Fowlkes (mark fowlkes @ncwddlife org) Division of Inland Fisheries when the transfer has occurred so we may include a confirmation of the transaction as proof of payment with the permit application The Division of Water Quality requires this as a part of the application package REQUESTED BY M Kyle Brggs DATE 18 -Jun 12 ol APPROVED BY DATE Mmling Address Division of Inland Fisheries 1721 Mail Service Center Raleigh NC 27699 1721 Telephone (919) 707 0220 Fax (919) 707 0028 Jun 19, 2012 8 10 07 AM OCP AP DOCUMENT PAYMENT GENERAL INFORMATION DPG NEXT FUNCTION ACTION HISTORY _ 06/19/2012 08 10 03 BROWSE PAY ENTITY 17PT VEND /EMP NBR 566000372 40 VEND /EMP SHORT NAME DENR DOCUMENT NBR BOONEFORK061812 DOCUMENT DATE 06/18/2012 PAYMENT NBR 001 PRTL PYMT NBR 000 IND AMOUNT SALES TAX /VAT SALES TAX 2 SALES TAX 3 FREIGHT ADDITIONAL COST GROSS INVOICE PAYMENT AMOUNT AMOUNT PAID PAYMENT TERMS PAYMENT DATE PAYMENT ROUTE CD FACTOR NUMBER REASON CODE /DESC VAT INCLUSIVE N EXPENSE IND GL EFFECTIVE DATE 06/18/2012 EXTRACT DATE ACCRUAL CANC DATE 570 00 CURRENCY CODE 570 00 DISCOUNT TYPE NOT TAKEN 570 00 DISCOUNT TAKEN PAYMENT STATUS PAID NET PAY IMMEDIATELY PAYMENT REF NBR 0000057349 06/18/2012 PAYMENT TYPE ELECTRONIC HANDLING CODE ONE INVC PER PYMT YES BANK ACCT PYMT CD IGO NI -0 Office w A -r r 20120626 Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 Page 1 of 12 PCN Form — Version 1 3 December 10 2008 Version Pre - Construction Notification PCN Form A Applicant Information t 1 Processing 1a Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit 1 b Specify Nationwide Permit (NWP) number NW 27 or General Permit (GP) number 1 c Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program El Yes ®No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Boone Fork Stream Rehabilitation and Habitat Enhancement 2b County Caldwell 2c Nearest municipality / town Mulberry 2d Subdivision name N/A 2e NCDOT only T I P or state project no 3 Owner Information JUN 2 2 2012 3a Name(s) on Recorded Deed U S Forest Service National Forests in North Carole a 3b Deed Book and Page No LACNK Not listed Date 1 / 1900 ylfetlande P QU�'�L ITy 3c Responsible Party (for LLC if applicable) Kristin Bad NSF NC Forest Supervisor 3d Street address 160 A Zdlicoa St 3e City state zip Asheville NC 28801 3f Telephone no 828 257 4214 3g Fax no 828 257 4263 3h Email address Page 1 of 12 PCN Form — Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ® Other specify Contact person for the U S Forest Service 4b Name Brady N Dodd 4c Business name (if applicable) U S Forest Service National Forests in North Carolina 4d Street address 160 A Zillicoa St 4e City state zip Asheville NC 28801 4f Telephone no 828 257 4214 4g Fax no 828 257 4263 4h Email address bdodd @fs fed us 5 Agent(Consultant Information (if applicable) 5a Name Mark Fowlkes 5b Business name (if applicable) North Carolina Wildlife Resources Commission 5c Street address PO Box 387 5d City state zip Elkin NC 28621 5e Telephone no 336 527 1547 5f Fax no 336 527 1547 5g Email address mark fowlkes @ncwildlife org Page 2 of 12 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) Parcel ID# 022411 NCPIN 280316415 lb Site coordinates (in decimal degrees) Latitude 36 006703 Longitude 81 614914 (DD DDDDDD) ( DD DDDDDD) 1c Property size 43 380 67 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to proposed project Boone Fork 2b Water Quality Classification of nearest receiving water Class B HQW 2c River basin Catawba Page 3 of 12 PCN Form — Version 1 3 December 10 2008 Version 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The Boone Fork enhancement site is located on the U S National Forest The land is managed for timber and recreational purposes There is a forest service campground adjacent to the lower portion of the site Relic impacts from historic agricultural and logging practices have impacted Boone Fork Deep Cove Creek and an unnamed tributary (UT) to Boone Fork Thirteen sites on Boone Fork totaling 528 If have been identified with eroding stream banks and degraded aquatic habitat The U S Forest Service determined the culvert on Deep Cove Creek in the Boone Fork campground is impeding fish passage Four relic log culverts and 150 If of eroding stream banks on an intermittent UT to Boone Fork are causing excess sedimentation in the Boone Fork Pond Public Fishing Area In addition bank scour has occurred behind Boone Fork Pond outfall pipe See attached Boone Fork stream rehabilitation and habitat enhancement plan for more details 3b List the total estimated acreage of all existing wetlands on the property No wetlands were identified within the Boone Fork Stream rehabilitation and habitat enhancement site 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property Approximately 898 If of prennial and intermittent streams are being proposed for enhancement at the Boone Fork stream enhancement site Total linear feet of stream on the U S Nation Forest property is unknown 3d Explain the purpose of the proposed project The purpose of the project is to remiediate the historic impacts by stabilizing stream banks improving aquatic habitat and fish passage 3e Describe the overall project in detail including the type of equipment to be used All proposed enhancements are described in further detail in the attached Boone Fork stream rehabilitation and habitat enhancement plan The stream channel s design dimensions are based on the mountain and piedmont regional hydraulic geometry curve data for riffles and onsite conditions Eroding stream banks and habitat will be enhanced on the thirteen sites totaling 528 If of stream on Boone Fork Stream banks will be reshaped a bankfull bench will be created and in stream structures (J hook cross vanes wood toe root wads etc ) installed in order to stabilize the stream banks and improve aquatic habitat To improve fish passage through the culvert on Deep Cove Creek we propose to decrease the water velocity through the culvert by raising the water elevation within the culvert A rock cross vane will be installed to raise the head of the riffle downstream of the culvert by approximately one foot The elevation of the stream channel will be stepped down to the existing stream channel elevation through two additional cross vanes The stream channel will be reshaped based on the regional hydraulic geometry curve values and onsite conditions Eroding stream banks on the UT to Boone Fork will be stabilized and aquatic habitat enhanced by removing the 4 existing culverts and reshaping 150 If of stream banks The bank behind Boone Fork Pond s outfall pipe will be stabilized by installing non woven filter fabric with a layer of rip rap on top Disturbed stream banks will be reshaped to 1 2 to 1 3 slopes and stabilized with coir fiber matting The clearing of riparian vegetation will be minimized and primarily limited to eroding stream banks Salvaged woody vegetation and sod mats will be used to re vegetate the disturbed stream banks wherever possible These areas also will be seeded with a temporary and permanent native riparian seed mix and mulched with straw Two hundred and fifty live stakes and 200 one gallon containerized trees and shrubs will be planted on disturbed stream banks Trees and shrubs will be planted in higher densities along the outside of meander bends and at structures During construction heavy equipment (track hoe) will only access the stream when absolutely necessary For this project it is anticipated that most of the track hoe work can be accomplished from the top of the bank All construction materials including rock root wads logs and erosion control materials will be stockpiled at a central location at the site To limit disturbance of soils all equipment will travel along existing USFS roads and identified travel corridors Disturbance of soils will be limited to only what work can be accomplished and stabilized on a daily basis As a structure is completed the site will be sloped stabilized with sod mats or re seeded Any stockpiled soils or disturbed areas on steep slopes will have erosion control fencing installed as needed Page 4 of 12 PCN Form — Version 1 3 December 10 2008 Version 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments ❑ Yes ❑ No ® Unknown 4b If the Corps made the jurisdictional determination what type of determination was made? ❑ Preliminary ❑ Final 4c If yes who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company U S Forest Service Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain Page 5 of 12 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary 1a Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) (if known) DWQ —non 404 other) (acres) or Temporary W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) intermittent DWQ — non 404 width (linear or Temporary (INT)? other) (feet) feet) (T) S1 ®P ❑ T Remove 4 culverts and UT to Boone ❑ PER ® Corps 4 60 enhance stream Fork ® INT ® DWQ S2 ® P ❑ T Stabilization /enhancement UT to Boone Fork ❑ PER ® INT ® Corps ® DWQ 4 150 S3 ®P ❑ T Stabilize outfall UT to Boone ❑ PER ® Corps 4 10 Fork ® INT ® DWQ S4 ® P ❑ T Enhancement Boone Fork ® PER ❑ INT ® Corps ® DWQ 1317 528 S5 ®P ❑ T Improve fish passage Deep Cove ® PER ❑ Corps 12 30 through culvert Creek ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 778 31 Comments Page 6 of 12 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact (if applicable) Type of impact Waterbody type Area of impact (acres) number — Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then com lete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes No If yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction Page 7 of 12 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ® Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason for Buffer Zone 1 impact Zone 2 impact Permanent impact Stream name mitigation (square feet) (square feet) (P) or required? Temporary T 131 ❑P ❑T El Yes ❑ No B2 ❑P El Yes ❑ No B3 ❑P ❑Yes ❑ No 6h Total buffer impacts 61 Comments The site is not on the Catawba River and is outside of the nparfan buffer rule D Impact Justification and Mitigation 1 Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Only areas with active bank erosion channel instability and poor habitat will be targeted for enhancement work with the use of heavy equipment The use of in stream structures will be minimized Work within the existing channels was preferred over excavating new channels The length and location of new haul roads were minimized by using existing U S Forest Service roads and campground parking areas 1b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques During construction heavy equipment will only access the stream when absolutely necessary It is anticipated that most track hoe work can be accomplished from the top of the bank The enhancement work will be completed in the dry to minimize sediment getting in the stream channel The clearing of riparian vegetation will be minimized and primarily limited to eroding stream banks All disturbed areas will) be covered with temporary and permanent seed mixes straw mulch and coir matting to reduce erosion Only the amount of stream bank that can be stabilized by the end of the work day will be disturbed All staging areas and soil stockpile areas will be on high ground and surrounded by silt fencing Equipment will be inspected and maintained to prevent any pollutants from leaking into surface waters Additional sediment and erosion control practices will be implemented when needed 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation bank 2c If yes which mitigation option will be used for this project? ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity Page 8 of 12 PCN Form — Version 1 3 December 10 2008 Version 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 9 of 12 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why Comments ❑ Yes E] No 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 00% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why We are proposing to enhance stream banks and aquatic habitat on streams within a U S National Forest This project does not involve the addition of impervious development will disturb less than one acre of land and therefore a Stormwater Management Plan is not required This project is not subject to the NWPs that require submittal of a Stormwater Management Plan 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? Caldwell County ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties 4a Which of the following state implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 10 of 12 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) 1a Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter ) ® Yes ❑ No Comments See attached Mulberry Decision Notice and Finding Of No Significant Impact 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 26 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in El Yes No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility N/A Page 11 of 12 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? 5c If yes indicate the USFWS Field Office you have contacted El Raleigh ® Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFS NEPA process NC Wildlife Resources Commission and NC Natural Heritage program (NCNHP) GIS data 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? USFS NEPA process NC Wildlife Resources Commission and NC Natural Heritage program (NCNHP) GIS data 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? U S Forest Service Archeologist reviewed the project and determined there would be no impacts A visual assessment of the site was completed Any impacts to cultural resources would have been addressed on site See attach Mulberry Decision Notice and Finding Of No Significant Impact 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes ® No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Caldwell County FEMA NFIP maps Mark Fowlkes NCWRC June 20 2012 Applicant/Agent s Printed Name Date App Agent s Signature (Agents signature is valid only if an authorization letter from the applicant is provided Page 12 of 12 PCN Form — Version 1 3 December 10 2008 Version ® Noith Carolina Wildlife Resources Commission 0 24 Ap ►►12012 AGENT AUTHORIZATION FORM The undersigned iesponstble patty for the properties identified below, hereby authoiiies the North Cat ohna Wildlife Resources Commission to act as the agent to obtaining pe►mits needed to conduct a stream restoration piolect for the United States Forest Service on the identified property in Caldwell County, N C Specifically, the Commission may act as the agent in obtaining all necessary permits fiornn all units of goveinnnent including but not limited to, the United States Army Corps of Engrnce►s and the State of Not th Carolina, which arc needed to accomplish this project Responsible Party K ►tstin Ball, NFsNC Forest Supetvrsoi Address U S Forest Service 106 A Zrllrcoa Street Asheville, NC 28801 Phone Number 828 257 4269 Ptoperty Location and PIN # Pa►cel ID# 022411, NCPIN 280316415 Signatu►e Date Marla ►g Addy ess Division of Inland fisheries 1721 Marl Service Center Raleigh NC 27699 1721 Telephone (919) 707 0220 Fax (919) 707 0028 l r I � United States Forest National Forests in North Carolina 109 E Lawmg Dr Department of Service Pisgah National Forest Nebo NC 28761 9827 Agriculture Grandfather Ranger District 828 652 2144 File Code 1950 1 Date September 27 2007 Dear Interested Citizen I have signed the Decision Notice (DN) and Finding of No Significant Impact ( FONSI) for the Mulberry Project Environmental Assessment (EA) within the Grandfather Ranger District Caldwell County The DN discusses in detail my decision and rationale for reaching it Copies of the DN and FONSI are enclosed The August 2007 Preliminary Analysis (PA) has been modified and clarified to correct typographic errors and address issues and concerns raised by members of the public during the 30 day notice and comment period and to be more responsive to new information The September 2007 EA is the result of this effort and is available on our web site (http / /www cs unca edu /nfsnc /nepa /nepa htm) or upon request This decision is subject to appeal pursuant to 36 CFR 215 11 A written appeal including attachments must be postmarked or received within 45 days after the date this notice is published in The McDowell News The Appeal shall be sent to National Forests in North Carolina ATTN Appeals Deciding Officer 160 Zillicoa Street Suite A Asheville North Carolina 28802 Appeals may be faxed to (828) 257 4263 Hand delivered appeals must be received within normal business hours of 8 00 a m to 4 30 p m Appeals may also be mailed electronically in a common digital format to appeals southern north carolina @fs fed us Those who provided comments or otherwise expressed interest in a particular proposed action by the close of the comment period may appeal this decision (as per the recent The Wilderness Society v Rey ruling) Appeals must meet content requirements of 36 CFR 215 14 For further information on this decision contact Greg Van Orsow Project Leader Grandfather Ranger District at 828 652 2144 or Michael Hutchins Pisgah National Forest NEPA Coordinator at 828 682 6146 Thank you for your continued interest in management of the Pisgah National Forest Sincerely la //ory W 7 &4& ae JOY W MALONE District Ranger Enclosure Caring for the Land and Serving People Pn led on Recycled Pape USDA Mulberry Decision Notice United States Department of And Agriculture Southern Region Finding Of No Significant Impact Forest Service September Grandfather Ranger District Pisgah National Forest 2007 Caldwell County North Carolina S Mulberry Creek Decision Notice & Finding of No Significant Impact Mulberry Project USDA Forest Service Grandfather Ranger District Pisgah National Forest Caldwell County North Carolina Decision and Rationale Decision Based upon my review of the alternatives I have decided to select a modified Alternative C (Selected Alternative) of the Mulberry Project Environmental Assessment (September EA - see Section 12 Chapter 1) on the Grandfather Ranger District Pisgah National Forest and the Project Design Features listed in Section 2 4 Appendix A and Appendix F of the EA The Selected Alternative is within the Lower Mulberry Forest Plan Analysis Area (AA) and specifically within Compartments 2 5 7 16 21 and 23 (project area) The modification is to Stand 6 and is a 1 acre exclusion to meet Forest Plan standards The Selected Alternative will Harvest about 274 acres using the two age regeneration harvest prescription (average minimum of 15 30 ft2 basal area retained per acre) The ten harvest units range in size from about five acres to 40 acres with the average size about 28 acres Perform road maintenance on the existing roads that access the area Utilize and reconstruct about 18 miles of existing old woods roads (unauthorized roads) and develop about 2 0 miles of new temporary roads to access harvest stands Following harvest activities the 18 rules of old woods roads will be placed on the Forest s transportation system as authorized (system) roads stabilized (i a shaped waterbarred and seeded) and accessed for motorized administrative use only —they will be available for future access needs The new temporary roads will be disked seeded and permanently closed (about 15 acres of temporary roads will serve as permanent wildlife linear openings) 0 Selectively apply herbicides to control /manage non native invasive plant species along roads 0 Selectively apply herbicides and use hand tools to ensure successful regeneration of a variety of native tree species in harvested areas especially oaks by controlling competing vegetation 0 Designate at least 50 acres of small patch old growth communities within Compartments 3 18 20 and 21 (224 total acres designated) 0 Apply erosion control measures to protect water quality These measures will be for all activities including roads and log landings 0 Perform stream rehabilitation on 1/2 mile of Boone Fork Branch along the drainage above and below the Boone Fork Reservoir and at the crossing on Deep Cove and Forest Service Road 2055 Rehabilitation on Boone Fork Branch will include placing about 16 rock and log vanes Rehabilitation above and below the reservoir includes sloping back stream banks planting trees/ shrubs along stream banks and placing rock below the culvert below the reservoir Rehabilitation at the crossing on Deep Cove includes modifying the crossing to allow fish passage (a more detailed description is located in the project record) Daylight along either side of a portion of Forest Service Road (FSR) 189 (Spencer Branch Road) to allow more sunlight to reach the roadbed by harvesting trees within fifteen feet either side of the road (so the road would dry out more quickly thus reducing rutting) The entire six mile length of the road will not be daylighted - only those Decision Notice & Appendix H 2 Mulberry Creek Project portions where sunlight does not adequately reach the roadbed 0 Develop a 2 acre wildlife field from a log landmg in Unit 11 to native grasses and forbs to enhance wildlife food sources Plant an old variety apple trees in log landings after harvest is completed to enhance wildlife food sources in the area There may be opportunities to plant advanced oak seedlings in Units 5 9 and 12 MonitorinQ The following monitoring will be implemented for the Selected Alternative 1) National objectives include reducing impacts from invasive species and improving the effectiveness of treating selected invasive species on the Nation s forests and grasslands Survey areas would be established to monitor control efforts Survey areas would be established before control treatment checked during treatment and within nine months after treatment A post treatment evaluation report would be completed and filed in the project file (Purpose is to monitor effectiveness of treatments) My decision is based on a review of the project record that shows a thorough review of relevant scientific information a consideration of responsible opposing views and the acknowledgment of mcomplete or unavailable information scientific uncertainty and risk Rationale The Forest Plan Amendment 5 (1994) designated the Mulberry Project AA as Management Areas (MA) 2A 3B and 18 MA 2A places an emphasis on [v]isually pleasing scenery for forest visitors Roads are generally open with the adjacent forest land managed to provide that pleasing visual experience Timber production is permitted but modified to meet visual quality objectives (Forest Plan page III 63) MA 3B places an emphasis on [a] sustainable supply of timber with few open roads while permitting road construction for resource management and to manage habitat of mixed ages of forests primarily for wildlife species such as wild turkey deer and other animals requiring similar environments (Forest Plan page Ill 71) Embedded within MAs 2B and 3B is MA 18 which [c]onsists of the aquatic ecosystem riparian ecosystem and closely associated plant and animal communities and is actively managed to protect and enhance where possible the distinctive resource values and characteristics dependent on or associated with these systems (Forest Plan page III 179) The purpose and need for the proposal is listed below (see also Section 13 Chapter 1) There is a need to develop between 4 / 14 / early successional (0 10 year age class) wildlife habitat in the project area because there is currently one percent 0 10 year wildlife habitat The purpose of the two age harvesting is to develop additional early successional wildlife habitat in the project area and increase the amount of hard mast producing tree species (oaks and hickories) The Mulberry area is the next area the Grandfather Ranger District has identified to ensure each compartment is scheduled for management analysis at a 10 year interval There is a need to control /manage populations of invasive exotic plants such as princess tree tree of heaven Japanese plume grass and others because they have been found in the project area The purpose of the herbicide treatment of mvasive /exotic plants is to reduce potential for spread of them in the project area There is a need to improve water quality and fish habitat along and within stream reaches because sedimentation and erosion have been found in the project area and a culvert restricts fish passage The purpose of rehabilitating stream channels and providing fish passage is to improve water quality stream bank stability and fish habitat There is a need to designate small patch old growth communities in Compartments 3 18 20 and 21 because no small patch old growth communities are currently designated in them The purpose of designating small patch communities in Compartments 3 18 20 and 21 prior to harvesting is to ensure there is a network of old growth communities across the Forest There is a need to develop about three acres of permanent grass /forb wildlife habitat in the project area because there is currently 24 acres of permanent grass /forb wildlife habitat The purpose of the about two acre Decision Notice & Appendix H 3 Mulberry Creek Project wildlife field and 15 acre linear opening is to develop about 27 acres of permanent grass /forb wildlife habitat in the project area further moving the project area towards the desired condition of 43 acres I believe the Selected Alternative achieves the project s Purpose and Need as well as Forest Plan direction and standards and will move the resources in the project area towards the Forest Plan s desired future condition The project analysis also considered public concerns (see also Appendix H Response to Comments Received During the Mulbemj Project 30 day Notice & Comment Period) In reaching my decision I carefully weighed the effects analyses of the alternatives analyzed in detail the public comments I received on the proposal and the Agency s response to comments The Mulberry Project Interdisciplinary Team (IDT) conducted field surveys database queries and other localized analysis in order to determine effects the alternatives analyzed in detail could have on the area s ecology including threatened endangered and sensitive species During their analyses the IDT took a hard look at past present and reasonably foreseeable future actions that could be combined with expected effects from the Mulberry proposal I believe they provided me sufficient analyses and conclusions to make a reasoned decision The Selected Alternative will harvest about three percent of the 8 653 acre Lower Mulberry AA My decision is based on a review of relevant scientific information as contained in the project record I believe the effects analyses support my decision and are based on the best available science Other Alternatives In addition to the Selected Alternative I considered one other alternative in detail Alternative A - No Action A comparison of these alternatives can be found in Section 2 5 Chapter 2 Alternative A - No Action Under Alternative A current management plans such as existing wildlife management wildfire suppression general road maintenance and recreation would continue to guide management of the project area (see Section 2 21 Chapter 2) I did not select this alternative for several reasons This alternative would not have developed early successional habitat conditions for wildlife species used herbicides to control /manage non native invasive plants designated small patch old growth performed stream restoration activities in Boone Fork Branch daylighted along Forest Service Road 189 nor developed a wildlife field and linear wildlife habitat I believe active management at this time and in this location is important to achieving Forest Plan objectives Alternatives Not Considered Section 2 3 of the EA disclosed three alternatives I considered but eliminated from detailed study along with rationale for why they were not considered Since they were not considered in detail in the EA they were not considered in the range of alternatives for my decision Public Involvement The proposal was listed in the National Forests in North Carolina s April and July 2007 Schedule of Proposed Actions The proposal was provided to over 120 members of the public and other agencies for comment during scoping that was initiated on May 15 2007 In addition as part of the public involvement process the agency hosted an open house meeting in Collettesville North Carolina on July 10 2007 A post card was mailed to over 120 members of the public informing them of the open house meeting a press release explaining the open house meeting was provided to local newspapers and notices were placed in numerous businesses public areas and local residents in the surrounding area Twenty members of the public provided comments on the proposal during scopmg and at the July 10 2007 open house A 30 day Notice and Comment period pursuant to 36 Code of Federal Regulation (CFR) 215 5(b)(2)(i) was initiated when a legal notice was placed in the August 16 2007 edition of The McDowell News The scopmg package and August 2007 Preliminary Analysis were placed on the Forest s website The September 2007 EA is available upon request and is also on the Forest s website Decision Notice & Appendix H 4 Mulberry Creek Project Finding of No Significant Impact After considering the environmental effects described in the PA I have determined that these actions will not have a significant effect on the quality of the human environment considering the context and intensity of impacts (40 CFR 1508 27) Thus an environmental impact statement will not be prepared I base my finding on the following 1 Impacts that may be both beneficial and adverse A significant effect may exist even if the Federal agency believes that on balance the effect will be beneficial My finding of no significant environmental effects is not biased by the beneficial effects of the action (Section 12 Chapter 1) 2 The degree to which the proposed action affects public health or safely/ There will be no significant effects on public health and safety and implementation will be in accordance with project design features and for herbicide use will adhere to Material Safety Data Sheets and Product Labels (Section 2 4 Chapter 2 Section 3 4 Chapter 3 and Appendix F) 3 Unique characteristics of the geographic area such as proximity to historic or cultural resources park lands prime farmlands wetlands wild and scenic rivers or ecologically critical areas There will be no significant effects on unique characteristics of the area because there are no park lands prune farmlands wetlands wild and scenic rivers or ecologically critical areas in the project area nor are there local law or requirements unposed for the protection of the environment (Section 312 Chapter 3) 4 The degree to which the effects on the quality of the human environment are likely to be highly controversial Controversy with this element is related to scientific controversy about effects of the project I believe the degree of effects on the quality of the human environment are not expected to be highly controversial because this project is similar in design and intensity to others that have taken place on the Grandfather Ranger District in the past and effects of those similar past actions are well known— there have been no unexpected impacts when anticipated and observed effects have been compared I believe my decision does not significantly affect old growth communities because no Forest Plan designated old growth communities or initial inventory old growth communities would be harvested 224 acres would be designated as small patch old growth communities and would not be scheduled for future harvest and 1083 acres ( >12 /) in the Mulberry Project AA averaging greater than 101 years are not scheduled for harvesting with the Selected Alternative I find the 224 acres of small patch old growth communities the Selected Alternative will designate in the Mulberry Project AA more than meets the Forest Plan s old growth strategy standards and would not significantly affect old growth attributes and associated wildlife Forest Plan standards are to designate at least 50 acres of small patch old growth communities in the four compartments - the Selected Alternative will designate 24 additional acres (Sections 31 2 321 333 342 352 362 374 38 39 310 2 3 11 2 and 312 2 Chapter 3) 5 The degree to which the possible effects on the human environment are highly uncertain or involve unique or unknown risks We have considerable experience with the types of activities to be implemented The effects analysis shows the effects are not uncertain and do not involve unique or unknown risk (Sections312 321 333 342 352 362 374 38 39 3102 3112 and3122 Chapter 3) 6 The degree to which the action may establish a precedent for future actions with significant effects or represents a decision in principle about a future consideration The action is not likely to establish a precedent for future actions with significant effects because the project is site specific and effects are expected to remain localized and short term (Sections 312 321 333 342 352 362 374 38 39 3102 3112 and 312 2 Chapter 3) 7 Whether the action is related to other actions with individually insignificant but cumulatively significant impacts Significance exists if it is reasonable to anticipate a cumulatively significant impact on the environment Significance cannot be avoided by terming an action temporary or by breaking it down into small component parts Analyses disclosed for Decision Notice & Appendix H 5 Mulberry Creek Project each resource that cumulative impacts are not expected to be measurable long term or could combine with impacts of other past ongoing or reasonably foreseeable future actions in the AAs (Sections 31 2 5 3 21 334 342 352 362 375 38 39 3102 3112 and 312 2 Chapter 3) The degree to which the action may adversely affect districts sites highways structures or objects listed in or eligible for listing in the National Register of Historic Places or may cause loss or destruction of significant scientific cultural or historical resources The action will have no effect on districts sites highways structures or objects listed in or eligible for listing in the National Register of Historic Places (NHRP - Section 3 6 Chapter 3) The action will also not cause loss or destruction of significant scientific cultural or historical resources (Section 3 6 Chapter 3) A heritage report was completed for this project on August 28 2007 that identified 20 Class III archeological sites - no Class I or II archaeological sites were found Class III sites are not eligible to the NRHP and subsequently do not require protection from ground disturbing activities The North Carolina State Historic Preservation Office informed the project archaeologist on September 14 2007 that the proposal was cleared to proceed The degree to which the action may adversely affect an endangered or threatened species or its Habitat that has been determined to be critical under the Endangered Species Act of 1973 A Biological Evaluation (BE Appendix A) was completed for this project on July 23 2007 that concluded for threatened and endangered (T &E) species The proposed action will not affect (directly indirectly or cumulatively) any proposed or listed Federal T&E species The BE concluded for sensitive botanical species This proposal may impact individuals (Alternative C) of the S species Hexastylis contracta These impacts will not lead towards federal listing or loss of Forest viability The BE concluded for sensitive wildlife species There are no known direct impacts to populations of Diana fnhllanj as a result of the proposed action because the species is not known to occur in the wildlife AA There are both positive and negative indirect impacts to potential habitat as a result of the proposed action and past or foreseeable future activities because of loss of habitat The positive and negative indirect impacts to this species potential habitat are not considered significant because the proposed action is expected to benefit the Diana fritillary s potential habitat across the wildlife AA throughout the next ten years As a result the proposed action is not likely to cause a trend toward federal listing or loss of viability for this species across the wildlife AA and Forest The BE concluded for sensitive aquatic species No risk to population viability of any aquatic Sensitive species across the Forest would occur as a result of the implementation of the Mulberry Project The project would have no effect on Sensitive aquatic species or their habitat The US Fish and Wildlife Service (USFWS) concluded on September 17 2007 [w]e concur with your assessment that none of the proposed alternatives will affect federally listed endangered or threatened species or critical habitat Thus the requirements of section 7(c) of the Act are fulfilled (Section 3 9 Chapter 3 and Appendix A) 10 Whether the action threatens a violation of Federal State or local law or requirements imposed for the protection of the environment The action will not violate Federal State and local laws or requirements for the protection of the environment Applicable laws and regulations were considered in the EA The action is consistent with the Nantahala and Pisgah National Forests Land and Resource Management Plan Amendment 5 (Sections 1 1 1 12 and 13 Chapter 1) Findings Required by Other Laws and Regulations My decision to implement the Selected Alternative is consistent with the intent of the long term goals and objectives Iisted on pages III 1 and III 2 of Forest Plan Amendment 5 The project was designed to meet land and resource management plan standards and incorporates appropriate land and resource management plan guidelines (Sections 1 1 1 12 and 13 Chapter 1) Administrative Review and Contacts This decision is subject to appeal pursuant to 36 CFR 21511 Pursuant to 21513 and the recent Decision Notice & Appendix H 6 Mulberry Creek Project The Wilderness Society v Rey ruling those who provided comments or otherwise expressed interest in the proposal by the close of either of the two formal Notice and Comment periods may file an appeal on this decision Appeals must meet content requirements of 36 CFR 21514 A written appeal including attachments must be postmarked or received within 45 days after the date this notice is published in The McDowell News the Grandfather Ranger District s newspaper of record as per 215 5(b)(2)(i) The appeal shall be sent to National Forests in North Carolina ATTN Appeals Deciding Officer 160 A Zillicoa Street Asheville North Carolina 28801 Hand delivered appeals must be received within normal business hours of 8 00 a m to 4 30 p in Appeals may be faxed to (828) 2574263 or mailed electronically in a common digital format to appeals southern north carolina@fs fed us JOY W MALONE District Ranger Grandfather Ranger District Pursuant to 215 7(2)(n) the legal notice in the newspaper of record is the exclusive means for calculating the tune to file an appeal [21515(a)] those wishing to appeal should not rely upon dates or timeframe information provided by any other source For further information on this decision contact Greg Van Orsow at 828 652 2144 or Michael Hutchins at 828 682 6146 Implementation Date As per 36 CFR 215 9 if no appeal is received implementation of this decision may occur on but not before the 5th business day following the close of the appeal filing period (215 15) If an appeal is filed implementation may occur on but not before the 15th business day following the date of appeal disposition Decision Notice & Appendix H 7 9/2 ?/0? Date Mulberry Creek Project APPENDIX H — RESPONSE TO COMMENTS FOR THE AUGUST 2007 MULBERRY PROJECT PRELIMINARY ANALYSIS General Discussion Pursuant to 36 Code of Federal Regulations (CFR) 215 6(a)(1)(i) and 215 6(a)(1)(iv) a formal 30 day Notice and Comment period for the Mulberry Project Environmental Assessment (EA) began August 16 2007 and ended on September 17 2007 Pursuant to 36 CFR 215 5 the legal notice initiating the 30 day Notice and Comment period was placed in The McDowell News the Grandfather s newspaper of record Following the formal 30 day Notice and Comment period three comments were submitted The comments that were submitted had the following two themes contained within them Restoration Support for Proposal To meet requirements at 36 CFR 215 6(b) the Agency listed each theme with the comment received on it followed by the Agency sresponse Restoration Comment Received A) There is money raised from the logging of the non native white pines This money could be used to restore streams promote ivildlfe habitat or perhaps repair campgrounds Please conduct restoration as part of the Mulberry Project am an avid hiker nature photographer and naturalist I think that biodiversity is the most important need for the forest service to satisfy Aaencv Response A) Harvest generated funds can be used under the Knudsen Vandenberg (KV) act to perform required reforestation as well as some additional restoration activities Implementation of other restoration activities is dependent on the amount of funds available following reforestation related activities Support for Proposal Comments Received A) Based on our review of your recent letter and the information provided therein we still support the Mulberry Project as indicated in our June 4 2007 comments Although two (2) units have been removed from the project we still support the project We continue to support USFS decisions that enhance wildlife habitat diversity and that provide sound forest stewardship B) [w]e concur with your assessment that none of the proposed alternatives will affect federally listed endangered or threatened species or crihcal habitat Thus the requirements of section 7(c) of the Act are fulfilled Agency Responses A) Comment is noted The two units were dropped to ensure protection of a Regional Foresters sensitive plant (Hexastylis contracta) B) Comment is noted Decision Notice & Appendix H 8 BOONE FORK STREAM REHABILITATION AND HABITAT ENHANCEMENT PLAN ON BOONE FORK AND AN UNNAMED TRIBUTARY TO BOONE FORK CALDWELL COUNTY, NORTH CAROLINA Prepared in Partnership with the National Wild Turkey Federation and the United States Forest Service North Carolina Wildlife Resources Commission June 2012 Introduction The National Wild Turkey Federation (NWTF) has a Stewardship Agreement with the U S Forest Service (USFS) to provide logging upland and aquatic habitat improvements around the USFS Boone Fork campground Catawba River Basin Caldwell County North Carolina (Figures 1 and 2) Stream rehabilitation is needed in the Boone Fork watershed (Figure 2) because of excessive levels of stream bank erosion in sections of Boone Fork and an unnamed tributary and fish passage concerns at one culvert on Deep Cove Creek Aquatic habitat improvement will include enhancing degraded stream banks and aquatic habitat at 13 areas along a'' /z mile stretch of Boone Fork a North Carolina Wildlife Resources Commission (Commission) designated wild trout water improving fish passage at one culvert on Deep Cove Creek removing 4 culverts and stabilizing approximately 150 linear feet (If) of eroding stream bank on an unnamed tributary (UT) to Boone Fork above the Boone Fork Pond Public Fishing Area (PFA) and stabilizing the outfall pipe from the pond The entire project is located on Commission managed game lands The NWTF partnered with the Commission to provide stream enhancement design permitting and construction oversight Project Goals /Objectives The goals of the project are to rehabilitate the stream channel and improve aquatic habitat fish passage and riparian area on 778 if of stream around the USFS Boone Fork campground In order to meet these goals the project objectives include but are not limited to the following 1 Enhance degraded stream banks and aquatic habitat at 13 areas along a' /2 mile stretch of Boone Fork 2 Improve fish passage at one culvert on Deep Cove Creek 3 Removing 4 culverts and stabilize approximately 150 If of eroding stream bank on an UT to Boone Fork above the hatchery supported Boone Fork Pond PFA 4 Stabilizing the outfall pipe from the reservoir 5 Plant native trees shrubs and herbaceous ground cover on all disturbed stream banks and plant to provide long term bank stability stream shading and cover and food for wildlife Survey Methodology Representative riffle and pool cross sections were measured on Boone Fork at Site 10 and Site 6 and a longitudinal profile was surveyed on Deep Cove Creek (Figure 3) Survey data were taken using standard stream survey techniques described in Harrelson et al (1994) A laser level was used to survey the stream s cross section dimension and profile Bankfull was determined using field indicators that included a scour line along the bank channel benches and the existing floodplain The bankfull stage obtained from these measurements was evaluated using the North Carolina mountain and piedmont regional curve information (Harman et al 1999) Cross section data were used to classify the stream based on existing morphological features of the stream channel and valley type (Rosgen 1994 1996) Site conditions were analyzed and the project design developed using RIVERMorph stream assessment and restoration software Version 4 1 1 (RSARS 2007) Directions From 140 in Hickory travel north on US 321 to Lenoir turn left on Main Street (approximately 0 3 mile) turn right Valway Road (approx 1 3 miles) turn left at NC 90 and stay to it for 4 1 miles turn right on Mulberry Creek Road and stay on it for 4 7 miles turn right on Boone fork Road travel approximately l 9 miles to the Boone Fork PFA Existing Conditions The project is located in the Catawba River basin piedmont physiographic region Caldwell County (Hydrologic Unit Code 030501010503 NCDWQ sub basin 03083 1) The stream reaches within the project boundaries are classified as Class B High Quality Water by the North Carolina Division of Water Quality ( NCDWQ) Class B waters are deemed suitable for aquatic life propagation and primary recreation ( NCDWQ 2010) High quality water is excellent water quality based on biological and physical /chemical characteristics through NCDWQ monitoring They are not on the 303(d) list of impaired streams ( NCDWQ 2010) The Boone Fork watershed upstream of the confluence with Deep Cove Creek is 0 9 square mile and downstream of the confluence the watershed area is approximately 1 7 square miles (Figure 2) Deep Cove Creek s watershed is approximately 0 8 square mile (Figure 2) The UT to Boone Fork at the bank stabilization site is approximately 0 1 square mile (Figure 2) Boone Fork and Deep Cove Creeks are identified as perennial streams on the USGS map while the UT to Boone Fork is an intermittent stream Land cover in the watersheds is predominately forest with some areas recently being logged Additionally there are a few USFS roads in the watershed and a primitive campground Stream impacts appear to be a result of historic agriculture and logging practices The active stream bank erosion resulted in downstream aggradation and stream channel widening that further degrading habitat Riparian buffers are largely intact and expansive except where the campground is adjacent to Boone Fork Riparian buffers along the campground range from 20 ft to 100 ft Thirteen sites totaling 528 if of stream with eroding stream banks and poor aquatic habitat have been identified on Boone Fork (Sites 1 — 13 Figures 3 6) A description of the sites can be found in Table 1 The sites range from 15 if to 80 if in length At most sites the stream bank is eroding at the toe of the slope below the tree root zone Therefore the trees are not providing adequate bank stability Boone Fork s riffle cross section bankfull width at Site 6 was 22 2 ft bankfull mean depth was 0 96 ft bankfull maximum depth was 2 0 ft and cross sectional area was 21 3 ft2 (Figure 4) The riffle s width /depth ratio was 23 0 and the entrenchment ratio was 3 4 Broad level channel classification values indicate that Boone Fork at Site 6 is a C stream type The pool bankfull width and Site 10 was 22 7 ft bankfull mean depth was 18 ft bankfull maximum depth was 2 8 ft and cross sectional area was 39 93 ft2 (Figure 5) The pool s width /depth ratio was 12 9 and the entrenchment ratio was 3 3 The culvert on Deep Cove Creek (Site 14) has been deemed a barrier for fish passage by the USFS (Figures 3 and 8 and Table 1) The five foot diameter elliptical culvert is approximately 2 60 ft long and has a slope of 0 015 Water velocity through the culvert limits passage through the culvert by some fish (Brady Dodd USFS personal communication) Four old log culverts remain in the UT to Boone Fork (Sites 15 18) from historic logging operations (Figures 3 and 9) The culverts have caused stream channel erosion and downstream scour Additionally approximately 1501f of stream bank is eroding and the stream channel is filled with fine sediment (Site 19 Figures 3 and 10) The stream channel is below the tree root zone in areas with steep eroding stream banks The historic culverts and stream bank erosion have increased sedimentation in the Boone Fork Pond Bank scour is also occurring behind the outfall pipe to the Boone Fork Pond (Site 20 Figures 3 and 11) The outfall pipe is approximately 4 5 ft above the water elevation of the plunge pool this has created back eddies and bank scour that has eroded the bank Proposed Improvements All proposed enhancements are described in Table 1 The stream channel s design dimensions are be based on the mountain and piedmont regional hydraulic geometry curve data for riffles (Table 2 Harman et al 1999) and onsite conditions Eroding stream banks and habitat will be enhanced on the thirteen sites on Boone Fork (Figures 3 — 6) The proposed pool at Site 6 on Boone Fork would have a design cross section bankfull width of 20 6 ft bankfull mean depth of 1 7 ft bankfull maximum depth of 2 7 ft and cross sectional area of 34 5 ft2 (Figures 3 4 and 6) The proposed pool s width /depth ratio would be 12 3 with an entrenchment ratio of 3 6 The proposed riffle at Site 10 would have a design bankfull width of 19 7 ft bankfull mean depth of 13 ft bankfull maximum depth of 2 1 ft and cross sectional area of 26 2 ft2 (Figures 3 5 and 6) The riffle s width /depth ratio would be 14 8 with an entrenchment ratio of 3 8 The riffle would still be classified as a C stream type To improve fish passage through the culvert on Deep Cove Creek (Site 14) we propose to decrease the water velocity through the culvert by raising the water elevation within the culvert (Figures 3 7 and 8) A rock cross vane will be installed to raise the head of the riffle downstream of the culvert by approximately one foot The elevation of the stream channel will be stepped down to the existing stream channel elevation through two additional cross vanes The stream channel will be reshaped based on the regional hydraulic geometry curve values and onsite conditions The eroding stream banks on the UT to Boone Fork (Sites 15 19) will be stabilized and aquatic habitat enhanced by removing the existing culverts reshaping the stream banks and installing rock and log vanes (Figures 3 9 and 10) The bank behind Boone Fork Pond s outfall pipe (Figure 3 and 11) will be stabilized by installing non woven filter fabric with a layer of rip rap on top Typical designs of the proposed in stream structures are shown in Appendix A All logs root wads and brush material used for structures will be harvested on site Disturbed stream banks will be reshaped to 1 2 to 1 3 slopes and stabilized with coir fiber matting The clearing of riparian vegetation will be minimized and primarily limited to eroding 3 stream banks Salvaged woody vegetation and sod mats will be used to re vegetate the disturbed stream banks wherever possible These areas also will be seeded with a temporary and permanent native riparian seed mix (Table 3) and mulched with straw Two hundred and fifty live stakes and 200 one gallon containerized trees and shrubs will be planted on disturbed stream banks (Table 4) Trees and shrubs will be planted in higher densities along the outside of meander bends and at structures Estimated quantities for equipment materials and supplies are listed in Table 5 Sediment and Erosion Control A Certificate of Plan Approval from the North Carolina Division of Land Resources Land Quality Section is not required for this project because only 0 5 acre of land will be disturbed However standard erosion and sediment control practices will be used (see details in Appendix A) During construction equipment will only access the stream when absolutely necessary For this project it is anticipated that most of the track hoe work can be accomplished from the top of the bank All construction materials including rock root wads logs and erosion control materials will be stockpiled at a central location at the site To limit disturbance of soils all equipment will travel along existing USFS roads and identified travel corridors Disturbance of soils will be limited to only what work can be accomplished and stabilized on a daily basis As a structure is completed the site will be sloped stabilized with sod mats or re seeded Any stockpiled soils or disturbed areas on steep slopes will have erosion control fencing installed as needed Once the banks are sloped they will be hand seeded with a native all purpose seed mix (10 lbs pure live seed per acre) that was prepared for this region and browntop millet (40 lbs per acre) or winter wheat/rye grain (120 lbs per acre) (Table 3) The surface of the sloped bank will be covered with sod mats salvaged from the site or with coir fiber erosion control matting These materials will be anchored in place with 18 in long hardwood stakes Spill Containment All equipment supplied by the contractor will be in good working order and will not be leaking any fluids that could contaminate the stream or property In case of an accidental spill of hazardous materials (hydraulic fluids gas oil) two Attack Pac emergency spill kits will be on site during construction Any spills of hazardous materials will be cleaned up immediately with contaminated soils disposed of according to state regulations Conclusion Completion of the proposed stream enhancement work will address the residual stream impacts from historical land use practices The light touch approach will minimize disturbance to the riparian area while improving aquatic habitat sediment transport and bank stability Improved fish passage on Deep Cove Creek will benefit both game and non game fish 4 Additionally the reduced sediment in Boone Fork pond will extend the life of the pond and improve angler opportunities References NCDWQ (North Carolina Division of Water Quality) 2010 Catawba River basmwide water quality plan Raleigh North Carolina Harman W A G D Jennings J M Patterson D R Clinton L O Slate A G Jessup J R Everhart and R E Smith 1999 Bankfull hydraulic geometry relationships for North Carolina streams Pages 401 408 in D S Olsen and J P Potyondy editors American Water Resources Association Wildland Hydrology Symposium Proceedings American Water Resources Association Middleburg Virginia Harrelson C C J P Potyondy and C L Rawlins 1994 Stream channel reference sites an illustrated guide to field technique General Technical Report RM 245 U S Department of Agriculture Forest Service Fort Collins Colorado Rosgen D L 1994 A classification of natural rivers Catena 22 169 199 Rosgen D L 1996 Applied river morphology Printed Media Companies Minneapolis Minnesota RSARS (RIVERMorph Stream Assessment and Restoration Software) 2007 Version 4 1 1 Professional edition Copyright 2002 2005 RIVERMorph LLC Louisville Kentucky Available www rivermorph com (August 2008) 5 Figure I.—Boone Fork stream rehabilitation project vicinity map, Caldwell County. Boone Fork Rd. rr WRYMa- UTtnBoone Fork Enhancement site Bootie Fork Enhancement Site NC-90 Legeed - Enhancement Site - Perennial Stream Lenoir - - - - -- Intermittent Stream Roads ti Municipal Boundries o o 1 2 NMNK==MNNNNNffMWMHes ............ Tvridnity Map US Forest Service Boone Fork Stream Rehibilitation Project Caldwell Coxmty, NC October 2011 0 Figure 2. —Boone Fork stream rehabilitation project watershed map, Caldwell County MOO n CCO _ StaEih e 1--Oft cf stream El"MFack Pond Modify Deep Cove crossing to pass aquatics Stabilize outlet pipe `Enhance 13 :sites along Boon F f AT1 0 N ALA i \ r t i ;�` Legend ,7 :j_ #° Enhancement Sites QWatershed Boundan Perennial Stream A. _._.... Intermittent Stream Q125 0-25 05 0.75 1 Watershed '-Map US Forest Ses ice Boone Fork Enhancement Site Caldwell CountY- \C June _'011 W Figure 3. —Boone Fork stream rehabilitation project component map, Caldwell County. S Site 18 � :Sit: 1 11 � - __P� t �i r. ±i, P, -;u .r i Site 13 Site to k- 4 Site 11 Site . 4 !F i Triad site 10 Ste 9 v` Site _ K * Enhancement Sites Site 5 . — L { Site ,4 Perennial Stream +.. Site o - - - intermittent Stream t � - R o X00 1.000 x 1,500 2000 _IL . ' Feet N Component 'Map US Forest Sen-ice Boone Fork Enhancement Site Caldwell County, \C June 2011 8 Figure 4.— Existing and design pool dimension cross - section for Site 6. 96 95 94 93 92 0 �z w 91 W 90 89 88 0 10 20 30 40 Distance (feet) — Crow- section ■ Bankfull 0 50 60 • Water surface — x- Design / / do / -- —K. �( —X ZX 10 20 30 40 Distance (feet) — Crow- section ■ Bankfull 0 50 60 • Water surface — x- Design Figure 5.— Existing riffle dimension cross - section and design for Site 10. 95 94 93 92 G 0 91 90 89 88 0 10 20 30 40 50 60 Distance (feet) —+— Cross- section ■ Bankfull ♦ Water surface — >*- Design 10 \ \ 10 20 30 40 50 60 Distance (feet) —+— Cross- section ■ Bankfull ♦ Water surface — >*- Design 10 Figure 6.— Photographs of the thirteen enhancement sites on Boone Fork. Site 1: Looking down stream at 45 ft of eroding right stream bank. Proposed enhancements include installing a J -hook and reshaping the right stream bank. Nrte Z. Looking downstream at a 55 ft long riffle with poor habitat. Proposed enhancements include adding rocks and logs in the stream channel to increase habitat diversity. 11 Site 3: Looking downstream at 30 ft of eroding left stream bank. Proposed enhancements include reshaping the left stream bank and creating a bankfull bench. Site 4: Looking upstream at 45 ft of eroding left stream bank on the outside meander bend. Proposed enhancements include installing a toe wood structure on the left stream bank and shifting the channel to the right. 12 Site 5: Looking upstream at 43 ft of undercut right stream bank. Proposed enhancements include installing a log vane /J -hook and reshaping the right stream bank to create a bankfull bench. Site 6: Looking upstream at 50ft of eroding right stream bank on the outside of a tight meander bend. Proposed enhancements include installing a wood toe structure on the right bank, moving the stream channel to the left and reducing the radius of curvature of the meander bend. 13 Site 7: Looking upstream at 20 ft of eroding right stream bank. Proposed enhancements include installing a J- hook/toe wood structure on the right stream bank and creating a bankfull bench. cite u: Looking downstream at an over wide stream channel. Proposed enhancements include installing a log J -hook at the downstream end of the center bar and move the thalweg over to the right. 14 Site 9: Looking downstream at a 15 ft long shallow pool. Proposed enhancements include installing a log vane that is tied into the Tulip Poplar on the right stream bank. Site 10: Looking downstream at 80 ft of eroding right stream bank. Proposed enhancements include installing two log J- hooks, one at the upstream portion of the eroding stream bank and one 40 ft down from the first J -hook, reshaping the right stream bank and creating a bankfull bench. 15 Site 11: Looking downstream at 25 ft of eroding right stream bank. Proposed enhancements include installing a log J -hook that ties into the existing log and reshaping the right stream bank. Site 12: Looking downstream at 60 ft of eroding right stream bank. Proposed enhancements include installing a log J -hook at an existing Ironwood that ties into the rock seam, reshaping the right stream bank and creating a bankfull bench. 16 Site 13: Looking downstream at 40 R of eroding right stream bank. Proposed enhancements include installing a log J -hook at the small red maple at the beginning of the eroding stream bank and reshaping the right stream bank. Figure 7.— Existing and proposed longitudinal profile of Deep Cove Creek and the Forest Service Road 2055 Crossing. 92.0 91.5 91.0 .1 90.5 a 90.0 89.5 0 89.0 W 88.5 88.0 87.5 87.0 -� 0 Jf 20 40 60 80 100 120 Distance (feet) —+— Existing Profile ■ Culvert Water Surface — X- Design Design Water Surface 18 Figure 8.— Photograph of the Deep Cove Creek and Forest Service Road 2055 crossing. Site 14: Install a rock cross vane at the downstream head of the riffle, raising the stream channel elevation by approximately 1.0 ft. This will raise the water elevation in the culvert. Install two additional cross vanes downstream of first in order to tie back into the existing stream channel elevation. 19 Figure 9.— Photographs of the four culverts on an Unnamed Tributary to Boone Fork. Site 15: Remove the log culvert and restore dimension and profile of the UT. Site 16: Remove the log culvert and restore dimension and profile of the UT. 20 Site 17: Remove the log culvert and restore dimension and profile of the UT. Site 18: Remove the log culvert and restore dimension and profile of the UT. 21 Figure 10.— Photographs of eroding stream banks on an Unnamed Tributary to Boone Fork. Site 19: Looking upstream at 150 ft of eroding stream banks. Proposed enhancements include reshaping both stream banks, creating a bankfull bench and installing rock and log structures to improve aquatic habitat. Figure 11.— Photographs of the Boone Fork Pond Outfall. Site 20: Proposed stabilization includes placing filter fabric along the bank behind the outfall and armoring the bank with rip -rap. 22 C O U Cd ..O N Cd a� 'C O CL 0 N c� U Q R Y L Cd C d O Y A O -to Oq c° Y o o c e 3> � s N D 5 O to s bb O Y C D O o e n H �~ s 00 o 5 Cd C L ,C ^ cci H� cCd Y .R-+ � C o t) s n o Y c to to �"a °- n �s v o cw d ��. c > kn SO U O b O 3 .D 00.0 �d b c :d m m o$= Y s U cd 5 = U " o s .0 yN M M 0 C a c s > 2 c z U Y .0 -� Cd d 0 cd U > s cd y y LO .R+ N .^R+ U v on h i E o > O Y 5 i. U "o O O b4 O O a s C ou 5 v 2 U 7 L y N 'b .o C � s iv R h D L A -- 7 rA z tn en � 7 On N NN - 0000 N N M � V1 �o n 00 O, O2 cd H a v o2u s 0 5 3 � c � � g o � 5 � 0 O Q I > > 5 0 .O d > `C9 w b � 3 Y 0 � o > N s o 0 oA o cd � s cd y y y y 0 Q% s oCd c v c cc C > g O b a 2 y U L Cd N U 'b T Y c c .:i C on v 0 V N .Ni .M. M N 0 4~ 2 L O ?� cd d � s � -to C O 0 n N � s Own N 7 y QQ N O O O o w O �~ s 00 o V o s ao cci o N to �"a °- n �s v o cw C c ; -v sr R 0 ° C U c 2 R- y U 3 .D 00.0 �d b U d c cd s v to ro _ O o v O C C U 4. C p e on ^ G cd sbp b •.+ C prp.F�yy �� y C ed -0 p v O C tn en � 7 On N NN - 0000 N N M � V1 �o n 00 O, O2 cd H a v o2u s 0 5 3 � c � � g o � 5 � 0 O Q I > > 5 0 .O d > `C9 w b � 3 Y 0 � o > N s o 0 oA o cd � s cd y y y y 0 Q% s oCd c v c cc C > g O b a 2 y U L Cd N U 'b T Y c c .:i C on v 0 V N .Ni .M. M N L � s � Own N 7 y QQ N O O O U w O 0p N � a 4 s C U Cd 4. C p c on ^ s C o 0 0 s O Y 5 i. U U C's r1 w o Y o 20d30�eCY tw s Y U Cd O .0 3� o c U O s s d e s > on s Q R to Y ., op on C 3 c, 0 3 0 C's .b o a Y a5 y °s5 to C 55rx G N d bU`n w C O 3 _S4 O E cd h e as w -0 ,may Y W c o v1 c o °�_' Y Y i � cd cd s ai cn N 3 d U C d4 s o .� Y 8 w ° o v a� cl D s one' Ll zz 3 U G Y on U N Cd �0 0i .S Cg �vo tn en � 7 On N NN - 0000 N N M � V1 �o n 00 O, O2 cd H a v o2u s 0 5 3 � c � � g o � 5 � 0 O Q I > > 5 0 .O d > `C9 w b � 3 Y 0 � o > N s o 0 oA o cd � s cd y y y y 0 Q% s oCd c v c cc C > g O b a 2 y U L Cd N U 'b T Y c c .:i C on v 0 V N .Ni .M. M N Q § u � 0 \ \ § /Cd EL ( 2 5 k k �\ d > 3 « \ ( \ \ / \ 2 \ §t � , M / J j ƒ U \ \ § Q ; ƒ / / § § a ± c � \ k k � c a u k � ° - |» » » & / 2 In a R !2 S k \ { / k w � q \ E � ° ) ) ) 0 0 k k 0 0 2 ) § 5 + 0 \ \ \ � � � 0 00 ƒ 2 ) \ \ \ \ k 0 > a , k k \ \ \ \ / d 2 ) o L. j c c 0 2 7 2 7§\§ 0 f c 2 2 C a\ , c 2 , C 2 : 2 , C -0 2 = � � c \ A \ c C $ § 2 % k I > � } I § � 5 e % \ \ \ \ k a \ � � ) ) 2 cn �\ \ \ \ \ \ a � d -0 g > > > > ( ƒ \ 8 S S g • , 0 0 0 0 / \ § § g § s 2 7 q g e B Q ± 3 I |» » » & / 2 In a R !2 S k \ { / k w � q Table 2 — Mountain and piedmont regional hydraulic geometry curve values Dimension Parameter Watershed Area (square mile) 01 —08 09 17 Bankfull Cross sectional Area (ft) 44 179 194 299 Bankfull Width (ft) 5 1 123 129 169 Bankfull Mean Depth (ft) 08 1 5 1 8 181 Source Hannan et al 1999 Table 3 — Suggested seeding summary for sediment and erosion control Community Type Ri arian Acres 050 Species Name Common Name Stratumb Total Pounds` Density (lbs /ac Lolium multi orum Rye grain Herb 600. 600 Festuca rubra Creeping red fescue Herb 50 50 Bidens aristosa ° Tickseed sunflower Herb 05 10 Coreo sis lanceolata ° Lance leaved coreo sis Herb 05 10 Dichanthelium clandestinum Deertongue Herb 10 201 Elymus virginicus Virgina wild rye Herb 50 100 Panicum virgatum Switchgrass Herb 20 40 Polygon um pensylvanicum Pennsylvania smartweed Herb 05 10 Rubeckia hirta a Black eyed susan Herb 05 10 Subtotall 7501 Totall 7501 allorth Carolina Ecotype bStratum — Herbaceous Shrub Subcanopy & Canopy 'Total pounds of pure live seed Substitutions may occur due to seed availability 25 Table 4 — Planting summary for vegetation Planteg Zone 1 b Species Name Common Name Maximum Spacing Unit Typed Size Stratumf Indmdual Spacing Number of Stems Cornus amomum Siky dogwood 3 ft L 24 in Shrub a ft 200 Physocarpus opul fohus Nmebark 3 ft L 24 in Shrub 3 ft 150 Salta nigra Black willow 1 3 f I L 1 24 in I Shrub 3 ft 100 Saltx sertcea Stky willow 3 ft L 24 in Shrub 3 ft 140 Sambucus canadensts Elderberry 3 ft L 24 in Shrub 3 ft 200 Subtotal 790 Planting Zone 2b Species Name Common Name Maximum Spacing Unit Type Stratum Individual Spacing Number of Stems Alnus serrulata Tag alder loft P Shrub 6 ft 30 Betula m a River birch loft P Canopy ]Oft 20 Car tnus carohntana Ironwood loft P Subcano loft 20 Clethra acumtnata Sweet a erbush ]oft P Shrub loft 30 Ltndera benzotn Spice bush loft P Shrub loft 40 Ltrtodendron tuh t era Tub popular loft P Cano loft 20 Platanus occtdentalts Sycamore 10 ft P 1 gal Canopy loft 20 ercus rubra INorthem red oak 10 ft P 1 gal Canopy 10 ft 20 Subtotal 200 Total 990 Zone 1 — Live stakes used to stabilize cor mattmg. bZone 2 — Disturbed areas above the bankful elevation, including the floodplam d Unit Type — L = Live stake B = Ball & Burlap P = Potted or contamenzed material, R =Bare root, S = Seed Size — Length of Live stakes (n) Caliber size of B&B material (m ) Pot size (2 3gal) Height ofwoody material (ft) f Stratum —Herb Shrub Subcanopy & Canopy 26 Table 5 — Estimated equipment hours and materials and supplies Descnption Quantity 10 Unit Item 1 Boone Fork Bank Stabilization/Structure Construction 15 ton IA EQUIPMENT & LABOR 100 SY Track hoe w/ hydraulic thumb & operator 80 hours Mobilization (ITEM 1 & 2) 1 each Furnish & install pumps for pump around (1 5 cfs) 2 week 1B MATERIALS 100 each Furnish boulders for Rock & Log Vanes (36 plus) 80 ton Trees/logs for Log Vanes (on site source) 32 each Furnish & installed nonwoven geotextile 400 SY 1C EROSION & SEDIMENT CONTROL Coir matting (includes live staking) 470 SY Seed and mulch all disturbed soil 04 acres Furnish riparian woody plants (1 gal) 100 each Descnption Quantity Unit Item 2 Tributary to Boone Fork Bank Stabilization/Structure Construction 2A EQUIPMENT & LABOR Track hoe w/ hydraulic thumb & operator 20 hours Furnish & install pumps for pump around (0 1 cfs) 05 week 2B MATERIALS Furnish boulders for Vanes & culvert outlet (24 plus) 10 ton Furnish & installed class B rip -rap for culvert outlet 15 ton Furnish & installed nonwoven geotextile 100 SY 2C EROSION & SEDIMENT CONTROL Coir matting (includes live staking) 320 SY Seed and mulch for all disturbed soil 01 acres Furnish riparian woody plants (1 gal) 100 each 27 Appendix A.— Proposed In- Stream Structures and Planned Erosion and Sediment Control Practices. Figure A.1.— Typical log vane detail showing plan and cross - section views. 118 TO 114 OF END OF LOGS BURIED IN / STREAM BED WITH BOULDERS ON TOP AT f Thisareat be Log Vane Detail BED ELEVATION � a° filledwitht e $ - .r tops and �`' fabric & _ tream roc erfabri A LOGS PLACED AT A 20-300 to ANGLE FROM BANK AND AT A2 -6 % SLOP E FROM AT _ OR BELOW BANKFULL ELEVATION Constructed pool p PROTECTED BANK A Bankfull elevation NONWOVEN ,TEXTILE FABRIC _ PLACED RIVER ROCK LOGS TOPS OF TREES 1 BURIED UNDER Constructed RIVER ROCK 28 Figure A.2.— Typical log J -hook vane detail showing plan and cross - section views. NOTE: There should be no gaps between the rocks in the cross -vane. On Boone Fork and Deep Cove Creek, boulders should have an average dimension of 36 x 24 x 18 inches. On the UT to Boone Fork, boulders should have an average dimension of 30 x 18 x 12 inches. HEADER ROCKS 118 TO V4 OF END OF LOGS BURIED IN STREAM BED WITH BOULDERS ON TOP AT PLACE RIVER ROCK Thit are to e BED ELEVATION ALONG BANK filled! wi tre 6 " 'R top$ u der -hook Vane strea rock Detail over bric ' A 03 W A LOGS PLACEDATA20 -300 FOOTER I 13 ANGLE FROM BANK AND AT ROCKS — A 2 — 6% SLOPE FROM AT — OR BELOW BANKFULL n _ ELEVATION Constructed pool A X Bankfull elevation NONWOVEN GEOTEXTILE FABRIC PLACED RIVER ROCK LOGS • TOPS OF TREES s� BURIED UNDER Constructed �My _ RIVER ROCK 29 f i PROTECTED BANK Figure A.3.— Typical rock J -hook vane detail showing plan and cross - section views. NOTE: There should be no gaps between the rocks in the cross -vane. On Boone Fork and Deep Cove Creek, boulders should have an average dimension of 36 x 24 x 18 inches. On the UT to Boone Fork, boulders should have an average dimension of 30 x 18 x 12 inches. A ROCK J -HOOK VANE DETAIL PLM I c 0 � corm C. FOOTER I �� ROCK ` Rock J -hook Vane Typical X NON WOVEN Detail / \ FABRIC TILE \ \\ FABWC m:aya A' We C:PS PLLr=WRH BOUffR9 TOu 1- ROCK FROM ON RRE ROC( `NBl CO. B2ED F+ YINNI�C�PS ?v.' HEADER ROCK °a �9�e bSRMYII wi&1f A' We C:PS PLLr=WRH BOUffR9 TOu 1- ROCK FROM ON RRE ROC( `NBl CO. B2ED F+ YINNI�C�PS Figure A.4.— Typical cross -vane showing plan and cross - section views. NOTE: There should be no gaps between the rocks in the cross -vane. On Boone Fork and Deep Cove Creels boulders should have an average dimension of 36 x 24 x 18 inches. On the UT to Boone Fork, boulders should have an average dimension of 30 x 18 x 12 inches. Arm slope range 2 - Figure A5.— Typical root wad structure showing plan and cross section views. NOTE: Footer logs should be >8 in, diameter and installed below the streambed. Root wads should be 8 -14 ft long and >10 in. diameter. Large boulders should be placed in gaps between root wads. Fill materials from the site should be placed behind the root wads and boulders, covered with an erosion control mat and seeded and trees planted on top of the bench. 32 Figure A.6.— Typical wood toe structure showing plan and cross section views. Stabilization of Vertical Banks on outside Meander Bend Twr .d., run Construction of Bankfull Bench using TOE WOOD /SOD MAT DETAIL lei 'I'" EXCAVATED BANK MATERIAL CONSTRUCTION ITEMS AND SEQUENCE • Excavate high bank to construct a 2:1 slope from bankfull to terrace elevation Excavate & construct toe wood bench and new channel pool feature based on reference pool dimensions • Place trees/logs/tops on toe wood bench & in toe of bank below low flow • Place willow cuttingstbundles on toe wood • Excavate sod mats (using a front end loader) or shrub transplants (e.g. alder, willows and place on toe wood up to bankfull elevation • Seed bank with native grass seed Cover sod mat and sloped bank with coir erosion control matting Plant willow /silky dogwood /elderberry cuttings into relocated sod mat and bank to help "pin" sod into bank FOOTER 33 .r i) SOD MAT Low flow - ------- --Elevation- -- - -- TOEYMDOD - _--- _ -- ------ Pre_00056uctian Channel Bottom " " - Channel Batton B" Docw NFW Hy*a Figure A.7.— Pump- around detail drawing and specifications. The pump- around operation will be set up, as needed, for dewatering a work area that can be completed within one day. The pump- around equipment will be removed from the channel at the end of each work day. Enhancement work will only be done during normal base flow conditions. The operation must be able to pump 1.5 cfs on Boone Fork and Deep Cove Creek and 0.1 cfs on the unnamed tributary to Boone Fork. STILLING BASIN OR PLAN VIEW SEDIMENT BAG DISCHARGE HOSES t / FLOW SEDIMENT DIKE PUMPS SHOULD DISCHARGE ONTO A STABILIZED BANK OR DISSIPATOR (MADE OF RIP RAP, SANDBAGS, OR OTHER APPROVED MATERIAL) QENLEAL__NOTES dewa 4ering Pump Z- INTAKE HOSE CLEAN WATER DIKE,/ WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY SECTION A —A (STREAM DIVERSION ( PUMPS IMPERVIOUS - -. SHEFTING BASE FLOW + 1 WORK AREA FOOT '(2 FOOT !T MINIMUM) CROSS SECTION OF SANDBAG DIKE INTAKE HOSE FLOW SUMP -HOLE OR POOL (12" TO 18" DEEP 2- DIA.) 1. INSTALL PUMP AND TEMPORARY FLEXIBLE HOSE AT THE UPSTREAM END OF CONSTRUCTION AREA. 2. INSTALL STILLING BASIN OR EQUIP FLEXIBLE HOSE WITH 'THE SEDIMENT BAG IF NEEDED. STABILIZE PIPE OUTLET TO PROTECT BANK AGAINST SCOUR AND EROSION. 3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING FOR THE STREAM DIVERSION. 4. PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS. DEWATER THE WORK AREA INTO THE STILLING BASIN OR EQUIP HOSE WITH THE SEDIMENT BAG. DEWATERED AREA SHALL EQUAL TO ONE DAY'S WORK. 5. PERFORM STREAM RESTORATION WgRK ACCORDING TO PLANS. 6. REMOVE ANY ACCUMULATED SILT BEFORE REMOVAL OF IMPERVIOUS DIKES. REMOVE ALL EQUIPMENT INCLUDING DIKES. (DOWNSTREAM IMPERVIOUS DIKE FIRST). 7. ALL GRADING AND STABILIZATION MUST BE COMPLETED IN ONE DAY WITHIN THE PUMP -- AROUND AREA (WITHIN THE IMPERVIOUS DIKES). THE IMPERVIOUS DIKE LOCATIONS AS SHOWN ON THE PLANS SHOW ONLY THE UPPER AND LOWER EXTENT OF WORK ON THE STREAM SEGMENT. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATION OF THE IMPERVIOUS DIKES PLACEMENT FOR EACH DAY'S WORK. 8. REMOVE STILLING BASIN(S) IF APPLICABLE. STABILIZE DISTURBED AREA WITH SEED AND MULCH, AS SOON AS PRACTICAL. 34 Figure A.6.—Continued. SEDIMENT BAG SrojmENT FILTER BAG ----F-XISTING GROUNI) STREAM PUMP HOSE, CLA55 A RIPRAP OR NO. 5 OR NO. 57 rOARSf AGGREGAlL (8'.YHICK) OQRS INSTALL SFIAMFWT BAG ON A SLOOE SO INCOMING WATER FLOWS DOWNHILL THROUGH BAG WITHOUT CREA11W MORE EROSION. TO INCREASE TW FFFJCIf-NCY Or FILTRATION, PLACE THE BAG ON A GRAVEL BED IN ORDER TO MAXIMIZE WATER FLOW THROUGH THE SURFACE, AREA OF THE BAG. Z. BAG IS FULL, WHEN it NO LONGER CAN EFFICIENTLY FILTER SEDIMENT OR ALLOW WATFR TO PASS AT A REASONABLE RATE. FLOW RATES WILL VARY DEPENDING ON THE SIZE OF SEDIMENT BAG THE TYPE AND AMOUNT OF SFDIMrNT DISCHARUD INTO THE BAG, THE TYPE OF GROUND, ROCK OR OTHER SUBSTANCE UNDER THE BAG AND THE rjFGRFE OF THE SLOPE ON WHICH THE BAG LIES. AVOID USF OF 'EXCESSIVE i I-OW RATES OR OVERT-ILLING WITH SLa11MENT '10 PREVENT BAG RUPTURE OP I'AILUPF OF THE ROSE AT IACHMLNI­ STRAPS. 3. DISPOSE SEDIMfNl BAG AS DINT -GILD BY THE DESIGNER.W ALLOWfl),BAG MAY BE CUT OPEN AND THE CONTENTS 5FFOFD AFTER REMOVING ViSIBIA! I ALIRIC. 35 Figure A.7.— Erosion control matting installation details and specifications. j backfiu General Notes: 1. Apply temporary and permanent seed mixture, fertilizer, and lime to disturbed soils. 2. Apply mulch at a rate of one to two tons per acre. No more than 25% of the ground surface should be visible after application. 3. Anchor mulch using 700 g/m2 coir matting to resist wind and runoff 4. To secure the matting, bury the upslope end in a trench no less than six inches deep, cover with soil, and tamp firmly. Do not stretch the matting during application. 5. Use 24 in wood stakes across the top, spacing every 3 feet around the edges and bottom. Each strip of matting should be staked down in the middle every three feet using live stakes and or biostakes. 6. Where two strips are laid side by side the adjacent edges should be overlapped three inches and staked together. M Figure A.7. —Coir matting (700 g /m2) specifications SKB India Co. - Erosion Control Products - Coir Matting CF -700 Mat (700g team - 20.5oz) This medium weight matting is used for specific areas that require stronger matting and tighter weave to hold 1:2 slopes, or the bottoms of excessive watercourse pipe outflows, swale bottoms, stabilization of slope tops and stream embanlanents. Durability depends on conditions, usually is biodegradable in 2+ years. Size: Approx. Weight: 6.511 w x 164ft 1 = 120sq yd (2m x 50m = 100sgm) 1501bs (68kg) IOft w x 164ft I--- 180sq yd (3m x 50m = 150sgm) 2251bs (IO2kg) 13ft w x 164ft 1 = 240sq yd (4m x 50m = 200s(Im) 300lbs (136kg) 'Contact For Yricinq Page I of I Wt.- 700g/sgm - 20.5oz % open area - 48% (calculated) Test Method -ASTMD 3776 for wt. Recommended slope - >1:2 Wet Tensile Strength - 14881bs /ft 71 Recommended flow - 12.0fps Test Method ASTMD 4595 for Wet Tensile Strength Recommended Shear Stress - 4.5lbs /sq ft "C" Factor - 0.002 37