Loading...
HomeMy WebLinkAboutNCC191691_Modification Review_20210223Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 2/18/2021 4:20:49 PM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 2/23/2021 5:33:26 PM (Construction COC ADD TO FILE Review- NCC191691) p This revision will be added as a Mod to existing COC NCC191691. Verified with Duke Energy (J. Dishmon) on 212312021 that NOI 41155 (assigned COC NCC210322 but not yet issued) can be cancelled instead. • The task was assigned to Georgoulias, Bethany. The due date is: February 23, 2021 5:00 PM 2/18/2021 4:20 PM Y . Ta4M1 NORTH CAPOLINA EnYlrenmemf& Qnalay Certificate of NCC191691 Coverage (COC) Enter the Certificate of Coverage N nber (Use capital letters) No.* Information associated with this permit: Project Name Cape Fear Beneficial Ash Address 500 CP&L Drive, Moncure, NC County Chatham Latitude 35.5876 Longitude-79.0327 Permittee Listed Duke Energy Progress, LLC Legally Responsible John Smith Individual NC Reference No. NCG01-2019-1691 E&SC Plan ID Original NOI Tracking No. CHATH-2019-005 15439 Date COC Issued* 09/09/2019 Prior Rescission This field will populate only if COChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed r Multiple Reasons (List) Addional Nbre inforrration (e.g., new Site Contact details). If lots are being added, please include specific lot nunbers. Explanation A revision for this permit was issued 1/12/2021 with a new NCC210322. Project Name on revision is Cape Fear Ash Beneficiation Facility. We were sent a reminder of a issuance fee. I need to confirm that there is not a fee for revisions and the revision has not be rescinded. The annual fee for NCC191691 has been paid. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting upload Supporting Lbcurrentation (%vised I&SC Approval, (lose -Out Doc, etc.) Documentation CHATI-k2019-005_20210112_LODbD (002).pdf 258.43KB COC for CHATH-2019-005 Revision.pdf 182.92KB Mast be RYformat North Carolina General Statute 143-215.6B (i) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). rJ I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* John Smith Title * Project Director Organization* Duke Energy Progress, LLC Date * 02/18/2021 Email Address* bobby.smith@duke-energy.com En -ail for confirmation Telephone Number* 704-382-4738 Contact number if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email Joyce.Dishmon@duke-energy.com (Optional) Additional email for confirmation Original Permittee bobby.smith@duke-energy.com Email Original Site Contact wallsh@zachrygroup.com Email Review Date 02/23/2021 Rescinded Since Submitted? Request Date 20210218 Formatted Review Date 20210223 Formatted