Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQCS00258_Regional Office Historical File Pre 2018 (3)
I I— J TOWN OF TROUTMAN HIGH PRIORITY / PROBLEM SEWER LINE 2013 Location Last Stoppage Inspected Jetted Technician New St. ROW 8 / 2012 4 / 2013 11 / 2013 TH 7 / 2013 9 / 2013 400 N. Eastway Dr 6 / 2011 1 / 2013 11 / 2013 TH 9 / 2013 Thomas St. ROW 3 / 2011 4 / 2013 11 / 2013 TH 7 / 2013 9 / 2013 Cedar Ln. ROW 2 / 2011 1 / 2013 11 / 2013 TH 7 / 2013 9 / 2013 Mill Village 9 / 2010 1 / 2013 12 / 2013 TH 9 / 2013 S00 Georgie St 7 / 2010 1 / 2013 12 / 2013 TH 9 / 2013 Food Lion / Bank 4 / 2010 1 / 2013 12 / 2013 TH 9 / 2013 Calvin / Wagner 11 / 2009 1 / 2013 12 / 2013 TH 9 / 2013 Patterson / New 6 / 2010 1 / 2013 12 /2013 TH St. 9 / 2013 i�Qcsv�'25IQ 0C sS 1I/�/I 704--5.7,q-X00 F1,.,;A - 3-1vo f to 3oF z 5 IiroJrnq'% /1�G As it6 3 Inspection Checklist eANOr P5 General Information 1. 2. 3. 4. 5. Number of Pump stations ` 5' SCADA system PS Telemetry PS Audible and Visual only Generators Permanent a. Frequency tested wo Generators Portable .3 A. Quick -connect plugin. PS OL4 / A" I tY o:IJcv.-�aw�,h cT1� b 77 B. Frequency tested ol— �y % o �.Ls�f "r 1�5/-re,_� V_ yPump stations served by --by-satre-generators' 6. ORC_ A A c.L i Pl" `°� B-ORC 8,'..4y CS- ?oi+-52 o© s0 C z '20 'IC2-'7t.-S(J Sewer Use drdanance L.,-' Enforcements Last Yea FOG Program 7 v V1CLll✓ a ti �c-t� I �� (P `r � �i �. s s! scc1. �a'R Inspections V-1 Public ED How Annual Report Date -;,of 6, Root Control Program p �fi �,��'� s e V1 I�'.� , <,:, f ; sf� r a of ,,.,, I c, f CIP Budget $ IJ7ev000 for 201 S Documentation of All _�,*M 14 <r 44, 1. Line Cleaning (10%) ; 16- �' D 6 9 -if788 �� �p7- 3�' �j, 2. High priority lines' (6 mos)I�e t 6 r�y��� ��.- + �%9 aye: A o "9f,o�:L�,;P<;•�.'1ac`'�•isF` .-Y•7 -a�.��,,,7iw��e4stem observation annual 3.vSyI sC.,04 2. J aY/y � l H No:v Ils 4.46W mowing /' -'� O r1 L✓�(.I J Y J �.�� �1��•�"/.7VAl��A4��`ir�G ��lvd'G ,AA fJ•I��' -' V�"/f� •�,r`"�r�-1l� NS� �`�LI En tcl A�C�[ , Review logs for PS O&M W,1-(<1 4 o-('s —10 tAmf Reportable Spills jvno Repeat Location/Cause �ts+ Non reportable spills I yryr- o rc'S d I I J Customer complaints f 7 j Spare parts inventory �a y� ;,M. `f*s a I l r A ,,es� LJ"� �✓f L,M--ap of system % complete Pump Station Inspection Checklist Name 5. � .,,,� VV0 p o/ No of Pumps 1 `� 2� Address Operational l 2 Capacity of each (gpm) 1 2 Runtime hour meter reading average 1. 2 Housekeeping, - Secure ..// Accessible Identification Signage Inspection Schedule Daily Weekly Wet Well — Floats Free of debris High water float _ �-; y,� m ✓� .1 v+�a� .✓a l �P sc� �:lcl ri -�a.. Telemetry s v --t Audio -Visual SCADA Alarm system tested for communications Emergency power Generator Portable Quick -connect Onsite Fuel tank . F ,, J , Gallons per hour usage rate Testing schedule Automatic Bypass pumping configured Overflow piping Manhole upstream Inspection Logs Collection System Inspection Checklist S' oles- Lines- Right Of Way- Aerials 1. Manhole location or address ���=' u10 Cover present -gent 66d cover above grade - vent screened Visible signs of overflow "' F Sinkholes and depressions Good condition properly seated / Bypass structures or pipes present � Invert in good condition Size 1 inches Pipe capaci l/3/a diameter. Line free flowing and unrestricted ✓ _ J Excessive grease, roots, or sand J 2. Right of Way - location or name of outfall in Accessible Free of sinkholes or depressio I/ No evidence of leakage Free of non -utility motorized traffic 3. Aerials - High Priority lines Exposed line of ductile material Water crossings and supports in good condition Level of debris on or behind line Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) PA Pump Station Inspection Checklist Name ` j �/j ` ,,7 No of Pumps 1 ' 2 Address Housekeepin Secure / Accessible Identification Signage L" Inspection Schedule Daily Weekly p/ Operational l t/ 2 Capacity of each (gpm) 1 2 Runtime hour meter reading average 1 2 Wet Well — Floats F f d b' -- --v 0 A�, ,�z. .�.._� z al s �, i-r -1110 9!�7 ree o ens High water float Telemetry / f Audio -Visual. �/✓ v =-'� ��, ,� SCADA Alarm system tested for communications �J Emergency power Generator Fuel tank . Testing schedule Bypass pumping configured Overflow piping Manhole upstream Inspection Logs otaQuick-connect` Ons'rte Ga bper hour usage rate Automatic Collection System Inspection Checklist Manholes- Lines- Right Of Way- Aerials 1. Manhole location or address A ; -/A/(; 0 Cover present - vent and cover above grade - vent screened Visible signs of overflow n/ Sinkholes and depressions Good condition properly seated Bypass structures or pipes present Invert in good condition Size -inc s Pipe capaci 1% '/2 3/a diameter. Line free flowing and unrestricted Excessive grease, roots, or sand 2. Right of Way - location or name of outfall line Accessible Free of sinkholes or depressions No evidence of leakage Free of non -utility motorized traffic 3. Aerials - High Priority lines Exposed line of ductile material Water crossings and supports in good condition Level of debris on or behind line Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) 3 Name Address Pump Station Inspection Checklist IM , 0 V; I �' No of Pumps 1 �" 2 Housekeeping Secure Jam/ Accessible Identification Signage Inspection Schedule Daily Weekly Operational 2 Capacity of each (gpm) 1 2 Runtime hour meter reading average 1� 2 G �Piq'1 e-CCL� A��.2s� Wet Well — Floats Free of debris High water float Telemetry t/ i Audio -Visual y,, 6 1✓, �. �� ,— �t �i c% J , �� SCADA Alarm system tested for communications . W CP .r.4 v` Emergency power Generator Portable Quick -connect Onsite ' Fuel tank . t/ Gallons per hour usage rate Testing schedule Automatic Bypass pumping configured Overflow piping Manhole upstream Inspection Logs Collection System Inspection Checklist Manholes- Lines- Right Of Way- Aerials 1. Manhole location or address Cover present - vent and cover above grade - vent screened Visible signs of overflow Sinkholes and depressions .� Good condition properly seated Bypass structures or pipes present Invert in good condition Size inches Pipe capacity'' Y. % diameter. Line free flowing and unrestricted Excessive grease, roots, or sand 2. Right of Way - location or name of outfall line Accessible Free of sinkholes or depressions No evidence of leakage ;� Free of non -utility motorized traffic 3. Aerials - High Priority lines Exposed line of ductile material r Water crossings and supports in good condition Level of debris on or behind line Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) 0 Name Address Pump Station Inspection. Checklist No of Pumps 1 2� Housekeeping Secure / Accessible tc/ j Identification Signage_l/ Inspection Schedule Daily . Weekly Wet Well — Floats Free of debris - High water float. Telemetry Audio -Visual S CADA Alarm system tested for communications Operational 1 2V Capacity of each (gpm) 1 2 Runtime hour meter reading average l 2 Emergency pow r Generator Portable Quick-connect—=nsite Fuel tank T� [ ( Gallons per hour usage rate Testing schedule Automatic J Bypass pumping configured C, Fi f ✓' Overflow piping Manhole upstream Inspection Logs Collection System Inspection Checklist Manholes- Lines- Right Of Way- Aerials s 1. Manhole location or address Cover present - vent and cover above grade - vent screened Visible signs of overflow Sinkholes and depressions Good condition properly seated �~ Bypass structures or pipes present Invert in good condition Size _inc es Pipe capacity 1/4 %2 3/4 diameter. Line free flowing and unrestricted Excessive grease, roots, or sand 2. Right of Way - location or name of outfall line 4—o Accessible ✓ Free of sinkholes or depressions No evidence of leakage Free of non -utility motorized traffic 3. Aerials - High Priority lines �I -4 Cj Exposed line of ductile material Water crossings and supports in good condition t/J Level of debris on or behind linevq Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) 11S ��C' 1��� l_hc�✓I�s C� l.vr 11 tdf�d'anw kcsj.,; � -, �/� G-r.y r.,�°� -- cvu.��i yn� rrcic►'1 ��oa"�' to '�'o-s� --T_ � ✓',�- :1 tt C/� '—c41AJ`+�'lyc1'ic�H �l N�orK . �j�%ys�c"'ov'a�lan d✓ ro S�Jv� p � F 16 -4 Chetr��S F,t+ `�dYS oYk�•.O dleelM(� tvcc'�� 41-Z all v,r © c -.A _.M ass S•f ✓ oI� �,��� ,�, �,� (/ .J 1 �ot1�V' 1 v'w� �.�C( SrJ •�lS ..� �p r"�`t ✓I .ai �i `f'w,! 9 ;o 0 -- P100 " W QC 5,00 2 5� .h hN t3 Tvw v, 14c,. c7J Zr /5 dHp��x General Information Inspection Checklist 1. Dumber of Pump stations 61A 0/ 3 2. SCADA system PS 3. 'Telemetry PS 4. Audible and Visual only 5. Generators Permanent I I a. Frequency tested Generators Portable s� n �; •, s r �'� ✓ '� A. Quick -connect plugin �L PS D. Frequency tested 1/ Pump stations served _by same generator. 6. Csz ORC A 4.— L-' Fo ""1�-®1�C �4 ., �1;, c- , f l ; 17 �r CS-2 5-2- — 6C'V Sim-�6o 0 Sewer Use Ordinance bl�"— Enforcements Last Year T FOG Program -E-4-,- �nG-"y � r�p /nti�hC/ "4 at4 �.e'lS� 7 ✓ �L � S �/ � ��PCt C ,/V y q �1 � � ei� / Inspections j J ) Public ED How -- Annual Report Date�— Foot Control Program ✓CIP l get Fears Documentation of `Z 1. Line Cleaning (10%) t 7� 2 ; > 6 0 y}Iej Hi hpriority lines (6 mos) 3� �%a-4.m- r f 21' r I i � 4A0 -2� �7 System observation annual 4- h /. n �- Yz�coY $ o �✓1 a�a-ZB q,- 4. ROW mowing �-x at e1i 1 4o}5 I Review logs for PS O&M h rs • (} G: �C qN/LNeM 0✓y' �s! a'� � .�/ Q f i w'� G � 2_G�C � f�0) wA j 1 CIS t7:c C!!7 Ya✓G �SY� ✓n�✓ti V G1_�� L �� �til�,t L �Nt�l7 �� jNs�"r'�/�(jA.�Ci �.. y-N.D� p.0 �'• i+il.�HN�Arii4l�FV' j^I.0 oln in o».)/7�I fJ d1/�, �f�tl��/ BSI I � ��YerITY aldr✓` J'v/�-.�jlleo i/<.:f.iyJ 1 �l%N�u'�%11�d .�90e0 d� � `��''IVY'�or'Tcil�•� b2eportable Spills / 3r✓s-`l/7114 - :5(,?— Soo+ter S L- 1"'-( SOH. C-.7,r bt.l,l,iw, ,•,xlf,-y 4/9 2/1 L+ - g'ovo�5-o0O M ;It V 1 11 A) — 4 S lZtV13e,44=-,,M Si riot✓� �i.b:.ss &CV 21; / 3/J2.— gOo�3op J'4. S�� N S't, v Repeat Location/Cause VI1- V Ikon reportable spills VI VC/ustomer complaints yfs� a Spare parts inventory 'z map of system % complete r 2rl.�- g. r mar+�of.v .S ci -k ice" N N N n c •' j �/ O t�i.G �ct✓�) `�` of 1 S co j7 V1G .i � 1 rcre>✓S�c_/o .r'�rYac.Yjw d^S�e»��, liie�-f rct c.r �.r�r��nc%p' 76dn�s — S 17r Sc1 Yd 17s71 b,1/p/.eq'1 anp-,-Jv.-,,(j' -(vr4 SS© rxSscSSd+',eh� d ram= Address Lh, i 5 Tn al of Pump Station Inspection Checklist Jq ve.4 No of Pumps 1 2 MY--,- V, Operational 1 2 v' Capacity of each (gpm) 1 2 Runtime hour meter reading average 1 2 Housekeeping Secure / Accessible Identification Signage -- i Inspection Schedule Daily Weekly ✓�-�/�� ,.�� �/ �,� /�/ohtT/�%Y N16tr,yo rit61/�`i•a� S Wet Well — Float 7 Free of debris High water float — n o Telemetry era hof Audio isual SCADA Alarm system tested for communications ,• w� mot i �1 u. � ;J [� „v�,'f�v- �O Ga�cS� �t'ccwvK �Lµol��fy:s� Emergency power nerator Portable Quick -connect Fuel tank Gallons per hour usage rate Testing schedule a is 3o N„�J, Bypass pumping configured Overflow piping Manhole upstream Inspection Logs !/ 1 Collection System Inspection Cheeklist M oles- Lines-f RightJOf Way- Aerials 1. Manhole location or address /l 1� "Oe Cover present - vent and cover above grade - vent screened Visible signs of overflow Sinkholes and depressions tj Good condition properly seated L.---- Bypass structures or pipes present 1/ Invert in good condition b_%Size 2,0 inches Pipe capacity 1/4 1/2 3/4 diameter. Line free flowing and unrestricted L— yo Excessive grease, roots, or sand � 2. Right of Way - location or name of outfall line Accessible ; / ' '{� G 1 4- Free of sinkholes or depression No evidence of leakage Free of non -utility motorized traffic 3. Aerials - High Priority lines z Exposed line of ductile material Water crossings and supports in good condition ✓� n �, Level of debris on or be 'nd line h s— Free of damage Right of Way mowing records ii Visual inspection of off street lines General observation of system (annual) Pump Station Inspection Checklist WIM Address Housekeeping ✓ Secure �- Accessible ✓ Identification Signage Inspection Schedule Daily Wet Well — Floats ✓ Weekly ✓ No of Pumps 1 2 Operational 1 V/ 2 X Capacity of each (gpm) 1 2 Runtime hour meter reading average 1 2 Free of debris — -A d 4. t+— High water float�,4 11{ N{ Telem so Audio -Visual SCADA / Alarm system tested for communications I/ Emergency power enerator Portable Quick -connect Onsite Fuel tank Gallons er hour usage rate Testing schedule utomati _ Bypass pumping configured `�%� Overflow piping Manhole upstream Inspection Logs Collection System Inspection Checklist Manholes- Lines- Right Of Way- Aerials 1. Manhole location or address Cover present - vent and cover above grade - vent screened Visible signs of overflow Sinkholes and depressions Good condition properly seated Bypass structures or pipes present Invert in good condition Size inches Pipe capacity 1/4 %2 3/a diameter. Line free flowing and unrestricted Excessive grease, roots, or sand 2. Right of Way - location or name of outfall line Accessible Free of sinkholes or depressions No evidence of leakage Free of non -utility motorized traffic 3. Aerials - High Priority lines Exposed line of ductile material Water crossings and supports in good condition Level of debris on or behind line Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) Pump Station Inspection Checklist Name r- AV No of Pumps 1 2 Address Operational 1 2 Capacity of each (gpm) 1 2 - Runtime hour meter reading average 1. 2 Housekeeping Secure Accessible 1/ Identification Signage Inspection Schedule Daily Weekly L/ Wet Well - Floats Free of debris High water float - p �, f i y�( Telemetry - 5�-, Audio -Visual •-- k �� SCADA Alarm system tested for communications 1 j �1 •- , :[ ✓.p 6 cv o` 1 t� J') � �i.� y)� c�' R v..., S W o ri Emergency power Generator ortabl uick-connec `J ' nsite r Fuel tank qans per hour usage rate Testing schedule Automatic Bypass pumping configured Overflow piping Manhole upstream Inspection Logs Collection System Inspection Checklist Manholes- Lines- Right Of Way- Aerials 1. Manhole location or address Cover present - vent and cover above grade - vent screened Visible signs of overflow Sinkholes and depressions Good condition properly seated Bypass structures or pipes present Invert in good condition Size inches Pipe capacity'/4 %2 3/4 diameter. Line free flowing and unrestricted Excessive grease, roots, or sand 2. Right of Way - location or name of outfall line Accessible Free of sinkholes or depressions No evidence of leakage Free of non -utility motorized traffic 3. Aerials - High Priority lines Exposed line of ductile material Water crossings and supports in good condition Level of debris on or behind line Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) Pump Station Inspection Checklist Name — G Address Housekeeping Secure Accessible / Identification Signage v Inspection Schedule Daily Wet Well - Floats Weekly Free of debris v High water float _ �, w (.:/ K/1" - , - - A TelemVL.�- 4- s f Audio -Visual SCADA Alarm system tested for communications -- 0Af► Elms{ a�q � s wor k-e- p No of Pumps 1 2� Operational 1 2 ✓ Capacity of each (gpm) 1 2 - Runtime hour meter reading average 1 2 Emergency power ` G_ neraior--� Portable Quick -connect <� Onsite Fuel tank Gallons per hour usage rate Testing schedule Automatic — 30, , , , - t - Tu em s_ yS Bypass pumping configured h g 4-�, f �, Overflow piping Manhole upstream 1 "/0 Inspection Logs` ( ��"i' ✓� z �`o s sin •� IZ �an 5 r CoUeetgon System Inspection Checklist Manholes- Lines- Right Of Way- Aerials 1. Manhole location or address Cover present - vent and cover above grade - vent screened Visible signs of overflow m Sinkholes and depressions Good condition properly seated Bypass structures or pipes present Invert in good condition Size inches Pipe capaci 1/a 1/2 3/a diameter. Line free flowing and unrestricted j/ Excessive grease, roots, or sand Ll� 2. Right of Way - location or name of outfall line Accessible Free of sinkholes or depressions No evidence of leakage Free of non -utility motorized traffic 3. Aerials - High Priority lines Exposed line of ductile material Water crossings and supports in good condition Level of debris on or behind line Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) Inspection Checklist General Information 1. -Number of r uuip stuLioun 2. SCADA system.PS o4 3. Telemetry PS 4. Audible and Visual only o- 5. Generators Permanent /O a. Frequency tested w�, T O"Pl Generators Portable 14 A. Quick -connect plugin B. Frequency tested 0 Pump stations served PS by same generator. 6. ORC A � l.: mA B-ORC � � G CS - Sewer Use Ordinanca— Enforcements Last Year. FOG Program (w+A�s"S t is Inspections Public ED How CIP Budget. Years Documentation of 1. Line Cleaning (10%) i 2. High priority lines (6 mos) 3. System observation annual 4. ROW mowing 3�Lms� Review logs for PS O&M 11-1 Review PS logs information 95 I\T reportable spills �./� �' � � 3 � � � � � r � � `1_ 3 Pump Station Inspection Checklist Name: fh�s5 S Sf Address: # Pumps - 2 Working - Run Time - Weather: YES NO Signage: Housekeeping: Secure: Wet Well Floats: Debris: Working High Water Float: Te SCADA.- AudioNisual: r Is alarm system tested, How often: Inspection Logs: Emergency Power: Type: Portable O site Fuel - ScheduleNender - Ouick Connect: Testing Schedule: Backflow: Overflow Piping: Bypass Pumping: Inspection Schedule: .I. Q Comments/ Observations: Pump Station Inspection Checklist Name: Address: # Pumps - 2 Working - (�b Run Time — Weather-cle' — YES NO Signage: Housekeeping: l Secure: Wet Well Floats: ^^ (c11 Debris: Working High Water Float: Telemetry: SCADA: Audio/Visual: / Is alarm system tested, How often: Inspection Logs: Emergency Power: Type: Portable Orisi Fuel - Schedule/Vender - Ouick Connect: Testing Schedule: WeQS L�� Backflow: OverflowPiping' Bypass pin Inspection Schedule: Comments/ Observations: Nt'p-ju c', (`la7aCeSU���L r Pump Station Inspection Checklist Name: Address: # Pumps - 1 2 Working - Run Time — Weather: YES NO Signage: Housekeeping: Secure: Wet Well Floats: Debris: Working High Water Float: Telemetry: SCADA: Audio/Visual: Is alarm system tested, How often: Q�� Inspection Logs. Emergency Power: Type: Portable Onsite Fuel - Schedule/Vender - Ouick Connect: Testing Schedule: Backflow: Overflow Piping: Bypass Pumping: Inspection Schedule: Comments/ Observations: Pump Station Inspection Checklist Name: Qja.& Address: # Pumps - 2 Working - Run Time - Weather: YES NO Signage: �f Housekeeping: Secure: Wet Well Floats: Debris: Working High Water Float: / Telemetry: SCADA: Audio/Visual: J // Is alarm system tested, How often: U`c Inspection Logs: l Emergency Power: Type: o e Onsite Fuel - Schedule/Vender - Ouick Connect: Testing Schedule: A `-t j Backflow: Overflow Piping: Bypass Pumping: Inspection Schedule: Comments/ Observations: SA S. &Jn<< (WC� S Pump Station Inspection Checklist Name: ' Address: # Pumps - 2 Working - •� Run Time — Weather: YES NO Signage: Housekeeping: Secure: Wet Well Floats: Debris: Working High Water Float: s Telemetry: SCADA: Audio/Vis al: �?1Z--� wpr f'< <a U 5.>n. Jork/— Is alarm system tested, How often: Inspection Logs: Emergency Power: Type: rfa Onsite Fuel - Schedule/Vender - Ouick Connect: Testing Schedule: aN Backflow: Overflow Piping: Bypass Pumping: Inspection Schedule: 2 —3 C-, w-wJL Comments/ Observations: { Fro A-cLi 0Ay k'Or-- Pump Station Inspection Checklist Name: Address: # Pumps - 1 2 Working - �] Run.Time - Weather: YES NO Signage: Housekeeping: Secure: Wet Well Floats: Debris: ` Working High Water Float: Telemetry: SCADA. AAoNisual: W U Is alarm system tested, How often: Inspection Logs: Emergency Power: (� Type: Portable Fuel -1 ScheduleNender - Ouick Connect: Testing Schedule: Backflow: Overflow Piping: Bypass Pumping: Inspection Schedule: Comments/ Observations: Collection System Inspection Checklist Manholes- Lines- Right Of Way- Aerials Olt 14 0,Lc�u Manhole location or address Gas 6ro�a� per- . . Cover present -vent and cover above grade -vent screened l Visible signs of overflow .� f Sinkholes and depressions ✓� Good condition properly seated / Bypass structures or pipes present✓ lnvert in good condition Size inches Pipe capacity'/4 1/2'/4 diameter. Line free flowing and uniestiicted Excessive grease, roots, or sand Right of Way - location or name of outfall line Accessible Free of sinkholes or depressions No evidence of leakage Free of non -utility motorized traffic Aerials - HighFriority_line's Exposed line of ductile material ood condition. dater crossings_and supports in g Level of debris on or behind line Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) Collection System Inspection Checklist Manholes- Lines- Right Of Way- Aerials r 3� U r` 1 Manhole location or address 3:ku--,' �b Cover present - vent and cover above grade - vent screened � r Visible signs of overflow - Sinkholes and depressions / Good condition properly seated Bypass structures or pipes present Invert in good condition Size inches Pipe capacity VA '/2 3/4 diameter. Line free flowing and unrestricted Excessive grease, roots, or sand Right of Way - location or name of outfall line Accessible Free of sinkholes or depressions No evidence of leakage Free ofnon-utility motorized traffic Aerials - HighPriority.lines Exposed line of ductile material Water crossings acid supports in good condition. Level of debris on or behind line Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) Collection System Inspection Checklist Manholes- Lines- Right of Way- Aerials Manhole location or address &A4 Cover present -vent and cover above grade - vent screened Visible signs of overflow Sinkholes and depressions Good condition properly seated Bypass structures or pipes present iSize -3 inches Pipe capacity'/, 1/2 3/, diameter. Invertn good condition Line free flowing and unrestricted Excessive grease, roots, or sand Right of Way - location or name of outfall line SkC , 0 M Accessible Free of sinkholes or depressions No evidence of leakage Free of non -utility motorized traffic Aerials- HighPrioritylines Exposed line of ductile material good condition. dater crossings.and supports in g Level of debris on or behind line Free of damage Right of Way, mowing records Visual inspection of off street lines General observation of system (annual) Inspection Checklist General Information 1. 1rumDer orTum_ stationsf r l� 2. SCADA system PS cy 3. Telemetry PS 4. Audible and Visual only o 5. Generators Permanent a. Frequency tested �J�e 4 oy Generators Portable A. Quick -connect plugin G"', PS B. Frequency tested VX,-k1 Pump stations served by same generator. 6. � ORCjr Y B-ORC Q,tw�y C•� (� ��� CS- Sewer Use Ordinance — Enforcements Last Year r, FOG Program Inspections — ik ik� Public ED How CIP Budget. S Years Documentation of CZ t\ 1. Line Cleaning (10%)-- I 11 2. High priority lines (6 mos) S t,,—s y� 3. System observation annual 4. ROW mowing MW Review logs for PS O&M M-4-' Review PS logs information Non reportable spills Customer complaints Spare parts inventory T.T___ r__._a_._._ 100 04 nnmr�lnfn Map Vl system iv Collection System Inspection Checklist Manholes- Lines- Right Of Way- Aerials Manhole location or address �_I\- Cover present - vent and cover above grade - vent screened Visible signs of overflow--- Sinkholes and depressions Good condition properly seated Bypass structures or pipes present, -,-- Invert in good condition Size v inches Pipe capacity 1/4 / 3/4 diameter. Line free flowing and unrestricted Excessive grease, roots, or sand Right of Way - location or name of outfall line %' '3 S r/ 5L Accessible Free of sinkholes or depressions No evidence of leakage Freeof non -utility motorized traffic :- J." Aerials - High Priority lines rt'` s5 cad S Exposed line of ductile material = _ -" ._ Water crossings and supports in good condition. Level of debris on or behind line _ Free of damage' Right of Way mowing records Visual inspection of off street lines - General observation of system (annual)--- Collection System Inspection Checklist Manholes- Lines- Right Of Way- Aerials Manhole location or address <�, err Lrj Cover present - vent and cover above grade - vent screened Visible signs of overflow Sinkholes and depressions Good condition properly seated,i- ` Bypass structures or pipes present--''� Invert in good condition Size inches Pipe capacity 1/2 3/4 diameter. Line free flowing and unrestricted Excessive grease, roots, or sand Right of Way - location or name of outfall line,�,,�.- Accessible �- Free of sinkholes or depressions No evidence of leakage G_ ---- — Free of non -utility motorized traffic Aerials - High Priority lines cp—s sr- (A,;,3 e-- Exposed line of ductile material Water crossings and supports in good condition. Level of debris on or behind line Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) 0 Collection System Inspection Checklist rt, Manholes- Lines- Right Of Way- Aerials Manhole location or address Cover present - vent and cover above grade - vent screened Visible signs of overflow Sinkholes and depressions Good condition properly seatedd'— Bypass structures or pipes presenty Invert in good condition Size Y-� inches Pipe capacity'/4 1?, 3/4 diameter. Line free flowing and unrestricted Excessive. grease, roots, or sand Right of Way - location or name of outfall line`_��'�-- Accessible Free of sinkholes or depressions No evidence of leakage �! Free of non -utility motorized traffic Aerials - High Priority lines C. _*n Lc"- ( "i Z Exposed line of ductile material Water crossings and supports in good condition. - Level of debris on or behind line-----� Free of Right of way mowing records Visual inspection of off street lines General observation of system (annual) Collection System Inspection Checklist Manholes- Lines- Right Of Way- Aerials Manhole location or address pi Cover present - vent and cover above grade - vent screened Visible signs of overflow Sinkholes and depressions - - Good condition properly seatecT-- Bypass structures or pipes - inches Pipe ca acit tl� 1/z 3/4 diameter. Invert in good condition Size �� P P � - Line free flowing and unrestricted Excessive. grease, roots, or sand Right of Way - location or name of outfall line Accessible Free of sinkholes or depressions No evidence of leakage Free of non -utility motorized traffic Aerials - High Priority lines Exposed line of ductile material Water crossings and supports in good condition. Level of debris on: or behind line Free of damage Right of Way mowing records Visual inspection of off street lines General observation of system (annual) • Pump Station Inspection Checklist Name: SRun Address: # Pumps - 1 (25 Working - 1 Time - Weather: .V YES NO Si na e: Housekeeping: r.. Secure: Wet Well Floats: Debris: Working High Water Float: Telemetry: SCADA: Audio/Visual: Is alarms stem tested, How often: Inspection Logs: Emergency Power: Type: Portable 0nsii_e Fuel - ScheduleNendet - (2)�q1; L Ouick Connect: Testing Schedule: Backflow: Overflow Piping: Bypass Pumping: Inspection Schedule: '3y Comments/ Observations: . Pump Station Inspection Checklist Name: Address: # Pumps - 1 Working - 1 Run Time - Weather: YES NO Si na e: Housekeeping: Secure: Wet Well Floats: J Debris: �~ Working High Water Float: Telemetry: SCADA: AudioNisual: Is alarms stem tested, How often: Inspection Logs: Emergency Power: Type: Portable Onsite) Fuel - ScheduleNendef - Quick�Connect: Testing Schedule: tit.,,) Backflow: Overflow Piping: Bypass Pumping: Inspection Schedule: }x �,�,.ec, L, , Comments/ Observations: Pump Station Inspection Checklist Name: rn�l1 I i Address: . # Pumps - 1 2 Working - Run Time - Weather: YES NO Si na e: Housekeeping: -Secure.- Wet Well Floats: _ Debris. - Working High Water Float: Telemet : SCADA: by A'udio/Visual: Is alarms stem tested, How often: l.J Inspection Logs: Emergency Power: r Type: Portable n'sitFuel - ScheduleNendef - c� Ouick Connect: Testing Schedule: �J Backfl.ow:~-- Ovey-flo_w-P pin I Bypass gimping l" Inspection Schedule: 3x WL� Comments/ Observations: Pump Station Inspection Checklist Name: ( I � �s1( �-.,� Address: # Pumps - 1 "�2 Working - 1 �� Run Time - Weather: YES NO Si na e:~ Housekeeping: Secure: Wet Well Floats: "~r Debris: Working High Water Float: Telemetry: SCADA: Audio/Visual: Is alarms stem tested, How often: (.. Inspection Logs: _ Emergency Power: Type: Portable onsite-` Fuel,± ScheduleNendef- Ouick Connect: Testing Schedule.-,(,—) Backflow: Overflow Piping: Bypass Pumping: Inspection Schedule: Comments/ Observations: A I Pump Station Inspection Checklist Name: Address: # Pumps - 1 Working - 1 Run Time - Weather: YES NO Si na e: Housekeeping: Secure. - Wet Well Floats: Debris: Working High Water Float: Telemetry: S CA DA: Audio/Visual.- Is alarms stem tested, How often: - Inspection Logs: Emergency Power: Type: orta Onsite Fuel - Schedule/Vender - Ouick Co ct: --�'— Testing Schedule: Backflow: Overflow Piping: Bypass Pumping: Inspection Schedule: Comments/ Observations: . 41 4J NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins ei me Governor Directorl`Sec etary` Mr. David Saleeby, Town Manager Town of Troutman Post Office Box 26 Troutman, North Carolina 28166 SUBJECT: Dear Mr. Saleeby: May 7, 2009 Town of Troutman MAY 1 2 2009 s UL;�''y� s .. DWG -Surface eater Proiled,lon Sewer Improvements . Approval of the Funding Application for American Recovery and Reinvestment Act of 2009 Project No. 2W370580-04 The subject project was submitted for funding under the American Recovery and Reinvestment Act of 2009 (ARRA). Some ARRA conditions are different than base Clean Water State Revolving Fund (CWSRF) projects — please carefully read this entire letter. The review for completeness and adequacy of the funding application including the project engineering report and construction documents submitted for consideration of funding under the ARRA has been concluded by the Construction Grants & Loans Section (Section) of the North Carolina Division of Water Quality. Therefore, said documents are hereby approved. A Determination of Minor Construction Activities for the project is attached for your files. A loan offer will be transmitted to you separately, contingent upon approval by the Local Government Commission at their May 5, 2009 or May 14, 2009 meetings. Eligibility for Revolving Loan funding is determined as follows: Eligible Modification of the Massey Street Pump Station, consisting of construction of a smaller wet -well structure; sewer rehabilitation consisting of replacement of approximately 400 linear feet of 8-inch gravity sewer, relining (cured -in -place piping) of approximately 771 linear feet of 8-inch gravity pipe, replacement of approximately 10 manholes, rehabilitation of 2 manholes, and reconnection of service laterals within and up to the existing right-of-way. Non Eligible Any installation of sewer service laterals outside the right-of-way. 1633 Mail Service Center, Raleigh, North Carolina 27699-1633 One Location: 2728 Capital Blvd. Raleigh, North Carolina 27604 NorthCarolina Phone: 919-73 1 FAX: 919-715 62291 Customer Service: 1 877 623-6748 Nahmally Internet: vuww.ncwatecwaterquality.orgAn Equal Opportunity 1 Affirmative Action Employer f Mr. David Saleeby, Town Manager May 7, 2009 Page Two In the event that received bids exceed the amount established through the funding offer, and local funds are not adequate to award contract(s), it will be necessary to consider all alternatives including redesign, re -advertising, and rebidding. Please note that the specifications must include the special provisions of the ARRA (i.e., buy American, Davis -Bacon wage requirements, job reporting) in addition to the regularly required SRF Special Conditions. Job reporting requirements have not been established by the US EPA at this time, but will likely include jobs created oryetained, hours worked, type of jobs, etc. Attached is one (1) copy of the Project Bid Information (Authority to Award) which is to be completed after bids have been received, and submitted to Mr. Mark Hubbard, P.E., Upon review and approval of this information, the Section will authorize the Recipient to award contracts. All elements required for a complete Bid Information package must be submitted to ensure a timely review by the Section. In accordance with a goal of the ARRA, contracts are expected to be executed by June 171h. If these dates cannot be met, you must contact the Section with a detailed explanation and proposed alternative deadlines. Upon execution of contracts and issuance of Notice to Proceed, a bound set of contract documents must be submitted to the Section for approval. Funds cannot be dispersed until executed contracts are approved. While rejection of all bids is possible, such action may be taken only with prior Section concurrence, and only for good cause. In the event that progress on the approved ARRA CWSRF project is not made in accordance with the loan agreement, construction contracts, or other pertinent requirements reimbursements may be withheld or suspended indefinitely. Funds not requested for reimbursement in a timely manner may also be reallocated to other ARRA ready -to -go projects on the final State project list. Once the project costs are established, final awards may be adjusted downward in the case of low bids. Five percent contingency is included in the final amount to accommodate change orders and amendments to the engineering contract. In no case will awards be increased. Neither the State nor Federal Government, nor any of its departments, agencies or employees is or will be a parry to the invitation to bids, addenda, any resulting contracts or contract negotiations/changes. Your project is subject to the one-year performance certification requirements. By this, you are required on the date one year after the completion of construction and initial operation of the subject treatment facilities, to certify, based on your consulting engineer's advisement, whether or not such treatment works meet the design performance, specifications and the permit conditions and effluent limitations. In accordance with the Federal Regulations, the Recipient is required to assure compliance with the OSHA safety regulations on the subject project. In complying with this regulatory responsibility, the Recipient should, by letter, invite the Bureau Chief, Education Training and Technical Assistance Unit, NC OSHA Division, 1101 Mail Service Center, Raleigh, NC 27699- Mr. David Saleeby, Town Manager May 7, 2009 Page Three 1101 at (919) 807-2890, to participate in the Preconstruction Conference to assure that proper emphasis is given on understanding and adhering to the OSHA regulations. It is the responsibility of the Recipient and the Consulting Engineer to insure that the project plan documents are in compliance with Amended N. C. G. S. 133-3 (ratified July 13, 1993). The administrative review and approval of these plans and specifications, and any subsequent addenda or change order, do not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. Any addenda to be issued for subject project plans and specifications must be submitted by the Recipient for review/approval action by the Section. It is mandatory for project facilities to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractors' responsibilities shall be in complying with these Acts. A goal of 8% of the contract price is established for Minority Business Enterprise (MBE) participation in this project, and a goal of 5% of the contract price is established for Women's Business Enterprise (WBE) participation in this project. The Recipient and Bidders shall make a good faith effort to assure that MBE's and WBE's are utilized, when possible, as sources of goods and services. The good faith effort must include the following affirmative steps: (a) including small, minority, and women's businesses on solicitation lists; (b) assuring that small, minority, and women's businesses are solicited whenever they are potential sources; (c) dividing total requirements, when economically feasible, into small tasks or quantities to permit maximum participation by small, minority, and women's businesses; (d) establishing delivery schedules, and (e) using the services of the Small Business Administration and the Minority Business Development Agency of the U.S. Department of Commerce. Please note that the solicitation efforts should include documentable follow-up phone calls. The Recipient shall comply with the provisions of 40 CFR, Part 7, Subpart C - Discrimination Prohibited on the Basis of Handicap. Two (2) copies of any change order must be promptly submitted by the Recipient to the Section. If additional information is requested by the Section, a response is required within two (2) weeks, or the change order will be returned without further or final action. One (1) set of plans and specifications identical to the approved set must be available at the project site at all times. Upon completion of the project construction, the Recipient shall submit a letter confirming that the project has been constructed in accordance with the plans and specifications approved by the Section. "As -built" plans will need to be submitted with any changes clearly documented on the plans if the above confirmation cannot be made. C Mr. David Saleeby, Town Manager May 7, 2009 Page Four If there are any questions concerning this matter, please do not hesitate to contact Kim H. Colson, P.E. at (919) 715-6212 or Mark Hubbard, P.E. at (919) 715-6224. Sincerely, GAP ��• gsz'4��-e-Q Daniel M. Blaisdell, P.E., Section Chief Construction Grants & Loans Section Attachments: Determination of Minimum Construction Activity Bid Information Form I OVNIUN cc: Benjamin B. Thomas, P.E., West Consultants, PLLC, Morganton, NC OSHA Bureau Chief, Wanda Lagoe DWQ Mooresville Regional Office Daniel Blaisdell, P.E. Mark Hubbard, P.E. Jennifer Haynie CIG SRF I Determination of Minor Construction Activity North Carolina Division of Water Quality Construction Grants and Loans Section Project Applicant: Town of Troutman Date: April 29, 2009 Project Number: 2W370580-04 Estimated Project Cost: $ 237,595 Estimated Funding Amount: $ 237,595 Project Description: The proposed project consists of sewer rehabilitation including the replacement of approximately 400 linear feet of 8-inch gravity sewer, relining (CIPP) approximately 771 linear feet of 8-inch gravity pipe, replacement of approximately 10 manholes, rehabilitating (raising) 2"manholes, and modification of the Massey Street Pump Station, consisting of construction of a smaller wet -well structure. The above named applicant intends to apply for assistance from the State Revolving Fund program associated with the American Recovery and Reinvestment Act of 2009 to construct the wastewater facilities described above. The North Carolina Division of Water Quality (DWQ) has conducted a review of the project in accordance with the procedures (NCAC 15A Subchapter 1 C) for conformance with the North Carolina Environmental Policy Act. The DWQ has determined that this project is a minor construction activity, and that the preparation of additional environmental documents is not required. This determination shall become effective upon its distribution by DWQ. This determination can be revoked at any time adverse information is made available. The documentation to support this decision will be on file with the North Carolina Department of Environment and Natural Resources, Division of Water Quality, Construction Grants and Loans Section, and is available for public review at www.nccgl.net. Comments concerning this decision may be addressed to Mr. Kim H. Colson; P.E., Assistant Chief, Construction Grants and Loans Section, Division of Water Quality, 1633 Mail Service Center, Raleigh, North Carolina 27699-1633, or he may be reached by phone at (919) 715-6212. Sincerely, �P. /3 Daniel M. Blaisdell, P.E., Chief Construction Grants and Loans Section Division of Water Quality PROJECT BID INFORMATION Previously referred to as the "Part B" in State programs. Previously referred to as the "Project Review and Cost Summary" in Federal programs JAWARD RECIPIENT INFORMATION( Name Project Number Address Attach the following supplemental information and submit with this form: (a) Tabulations of all bids received (sealed by engineer). (b) Copies of the bid(s) and bid bond the applicant wishes to accept. (c) Resolution of tentative award. (d) Engineer's recommendation of award letter. (e) Proof of advertisement (f) MBE/WBE Requirements: State Programs ■ Include affidavits A, B, C or D as required. ■ Submit certification of subcontract awards to minority business firms with documentation to comply with G.S. 143-128.2. (Complete attached form) Federal Programs (SRF and STAG) ■ Documentation of Contractor's "good faith" effort to procure MBE/WBE subcontractors. ■ Certification regarding debarment, suspension and other responsibility matters for each prime and subcontractor. DDITIONAL INFORMATIO i Addenda All addenda must be submitted to CG&L for approval prior to opening bids. Changes to the scope of the project may require a permit modification. Site Certificates (2) Submit if not previously submitted or if changes have occurred. Additional Items • Land Costs (State Loans & Grants Only) Submit form if seeking payment. • A/E Contracts — Submit for approval if seeking payment. • Sewer Use Ordinance, User Charge System and Sewer budget (SRF Only) Payments stop at 90% of total project costs if not approved. • 4700 Form (SRF Only) • Submit proof of adequate resident inspection (resume of inspector). - ii� -..t 4., Cn, tT—'...•` 7 -.t�.."Y � F �t /�f{� SFi> ,Z A'Y' ti`-t' S � twitL�t'f1� �{✓G fi`..` ky#t S✓yPa+^+�y � � �,r^<�„��+ .pay rt� si�� ie�'}`�{�.+�x.� Y.dFY4.:�., �r��'v .:.4 .... ,.3 a_. ..'i `A' .k� r. S.k {„�_ �.'e`�.taa...�l+rl. � A�•Sjy, y'i .. '6'ac..:ti "ii.r� �.2�..,13�L .:§�i '.�. 5k;...'�`'�.'b�r�� 4"-st f a"t `c. List contractor names below: TOTAL ELIGIBLE 1. $ $ 2. 3. 4. 5. EQUIPMENT -AND MATERIALS (*� TECHNICAL SERVICES attach contract LEGAL ADMINISTRATIVE CONTINGENCY 5% of construction OTHER (specify) REAL PROPERTY ACQUISTION COSTS CLOSING COSTS ,✓ �, 2 r i e ti` di �x_.q� 'FS k , *,�v �,�LS`,k 2Tra 7 <<t��'1¢r +,,, r-.sa5'�'%�� .".z�.'�. s�t,.5.��1 � �t :i <:,. "':y�r�lm '� �` �yh7). �"` �b "'"i �y �._'t" ti,� �J�ne Y. u`x•�,•',j :�f�+�'tfb» qr y_ . List funds that are available for this project: AMOUNT CASH $ GENERAL OBLIGATION BONDS REVENUE BONDS OTHER (specify) FEDERAL LOAN/GRANT (specify agency) b STATE LOAN STATE GRANT r TO'�AL $ 4i The undersigned representative of the Recipient certifies that the information contained above and in any attached statements and material in support thereof is true and correct to the best of his or her knowledge. Signature of Authorized Representative Name and Title (type or print) Date . . I INSTRUCTIONS FOR SUBMITTING PROJECT BID INFORMATION FORM This information must be submitted as soon as possible after construction bids are opened. For STAG and State projects send to: Don Evans Construction Grants and Loans Section 1633 Mail Service Center Raleigh, NC 27699-1633 Page 1 For SRF Projects send to: Mark Hubbard, PE Construction Grants and Loans Section 1633 Mail Service Center Raleigh, NC 27699-1633 Enter all requested information such as, Name, Address, and Project Number. Documentation listed from (a) to (f) must be submitted. Addenda should be submitted before bids are opened with enough time for CG&L to approve them (7 days). Site information should be attached if not previously submitted. Page 2 PROJECT COST SUMMARY (1) Enter the contractor's company or corporate name. Enter the amount of the bid or bids the applicant wishes to accept. (2) If equipment or materials are to be or have been purchased outside the construction contracts, enter the estimated or actual costs as applicable. (3) If not previously submitted, attach copies of any engineering contracts or agreements. Formal agreements are required for disbursement of funds. (4) Contingency is limited to 5% of the total construction bid amount. (5) Appraisals and a copy of the Deed are required for disbursement of real property costs. (6) Closing costs are not eligible for reimbursement under the SRF. They are 1.5% for State Grants, 2% for SRF Loans and 2.5% for State Loans. REVENUE SOURCES FOR PROJECT CONSTRUCTION (1) Enter the amount of general obligation bonds and revenue bonds authorized but not yet sold for this project. (2) Enter the amount of the grant, if any, offered by Federal or State Agency(s) and list name of agency(s). (3) Enter the amount of the loan or grant offered. (4) Total funds available must equal or exceed the Total Project Cost. The form must be signed by the applicant's authorized representative. RECIPIENT„ THE TOWN DOES HEREBY CERTIFY THAT IT HAS MET THE REQUIREMENTS OF G.S. 143-128.2 IN REFERENCE TO MINORITY BUSINESS CONTRACTS FOR THIS CONSTRUCTION PROJECT. THE CONTRACTOR HAS MET THE GOALS ESTABLISHED BY RESOLUTION OF THE TOWN AND THE FOLLOWING CONTRACTS MEET THE REQUIREMENTS ADOPTED BY THE TOWN: signature of authorized representative name of authorized representative PLEASE LIST CONTRACTORS AND MINORITY SUBCONTRACTORS: �r CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTINUE IF MORE THAN THREE CONTRACTS THE TOWN DOES HEREBY CERTIFY THAT IT HAS MET THE REQUIREMENTS OF G.S. 143-128.2 IN REFERENCE TO MINORITY BUSINESS CONTRACTS FOR THIS CONSTRUCTION PROJECT. THE CONTRACTOR HAS MET THE GOALS ESTABLISHED BY RESOLUTION OF THE TOWN AND THE FOLLOWING CONTRACTS MEET THE REQUIREMENTS ADOPTED BY THE TOWN: signature of authorized representative name of authorized representative PLEASE LIST CONTRACTORS AND MINORITY SUBCONTRACTORS: �r CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTINUE IF MORE THAN THREE CONTRACTS } 4 Ag= AA NCDENR North Carolina Department of Environment and Natur e�s,�}.tr Division of Water Quality t.7� ; tty Beverly Eaves Perdue Coleen H. Sullins D;ee e� ara , Governor Director Secretary` May 7, 2009 MAY 1 2 2009 Ms. Deanna Rios, Assistant Finance Director City of Hickory Post Office Box 398 ®ir Q�luo f aco Water Fr oled4 �n Hickory, North Carolina 28603 SUBJECT: City of Hickory Cripple Creek Interceptor. Replacement Approval of the Funding Application for American Recovery and Reinvestment Act of 2009 Project No. 2W370389-19 Dear Ms. Rios: The subject project was submitted for funding under the American Recovery and Reinvestment Act of 2009 (ARRA). Some ARRA conditions are different than base Clean Water State Revolving Fund (CWSRF) projects — please carefully read this entire letter. The review for completeness and adequacy of the funding application including the project engineering report and construction documents submitted for consideration of funding under the ARRA has been concluded by the Construction Grants & Loans Section (Section) of the North Carolina Division of Water Quality. Therefore, said documents are hereby approved. A Determination of Minor Construction Activities for the project is attached for your files. A loan offer will be transmitted to you separately, contingent upon approval by the Local Government Commission at their May 5, 2009 or May 14, 2009 meetings. Eligibility for Revolving Loan funding is determined as follows: Eligible Sewer replacement of existing 21-inch terra cotta outfall with approximately 14,112 linear feet of 24-inch gravity sewer along the existing alignment from 6"' Street NW south.traversing Cripple Creek to the Moose Club Pump Station, and all necessary appurtenances within and up to the existing right-of-way. Non Eligible Any installation of sewer service laterals outside the right-of-way. 1633 Mail Service Center, Raleigh, North Carolina 27699-1633 �T1�11t, 1 Location: 2728 Capital Blvd _Raleigh, North Carolina 27604 One 1 �i 0Cai 0111121 Phone: 919-733-6900 \ FAX: 919-715-6229 \ Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity \ Affirmative Action Employer �/ Ms. Deanna Rios, Assistant Finance Director May 7, 2009 Page Two. In the -event that received bids exceed the amount established through the funding offer, and local funds are not adequate.to award contract(s), it will be necessary to consider all alternatives.including redesign, re -advertising, and rebidding. Please note that the specifications must include the special provisions of the ARRA (i.e., buy American, Davis -Bacon wage requirements, job reporting) in addition to the regularly required SRF Special Conditions. Job reporting requirements have not been established by the US EPA at this time,. but will. likely include jobs created, or -•retained, hours worked, type of jobs, etc. Attached is one (1) copy of the Project Bid Information (Authority to Award) which is to be completed after bids have been received, and submitted to Mr. Mark Hubbard, P.E., Section Chief, Construction Grants and Loans � Upon review and approval of this information, the Section will authorize the Recipient to.award contracts. All elements required for a complete Bid Information package must be submitted to ensure a timely review by the Section. In accordance with a Goal of the ARRA, contracts are expected to be executed by June 17`h. If these dates cannot be met, you must contact the Section with a detailed explanation and proposed alternative deadlines. Upon execution of contracts and issuance of Notice to Proceed, a bound set of contract documents must be submitted to the Section for approval. Funds cannot be dispersed until executed contracts are approved. While rejection of all bids is possible, such action may be taken only with prior Section concurrence, and only for good cause. In the event that progress on the approved ARRA CWSRF project is not made in accordance with the loan agreement, construction contracts, or other pertinent requirements reimbursements may be withheld or suspended indefinitely. Funds not requested for reimbursement in a timely manner may also be reallocated.to other ARRA ready -to -go projects on the final State project list. Once the project costs are established, final awards may be adjusted downward in the case of low bids. Five percent contingency is included in the final amount to accommodate change orders and amendments to the engineering contract. In no case will awards be increased. Neither the State nor Federal Government, nor any of its departments, agencies or employees is or will be a party to the invitation to bids, addenda, any resulting contracts or contract negotiations/changes. Your project is subject to the one-year performance certification requirements. By this, you are required on the date one year after the completion of construction and initial operation of the subject treatment facilities; to certify, based on your consulting engineer's advisement, whether or not such treatment works meet the design performance, specifications and the permit conditions and effluent limitations. In accordance with the Federal Regulations, the Recipient is required to assure compliance with the OSHA safety regulations on the subject project. In complying with this regulatory. responsibility, the Recipient should, by letter, invite the Bureau Chief, Education Training and Technical Assistance Unit, NC OSHA Division, 1101 Mail Service Center, Raleigh, NC 27699- -.1 Ms. Deanna Rios,'Assistant.Finance_Director May 7, 2009 Page Three 1101 at, (919) 807-2890, to participate in the Preconstruction Conference to assure that proper emphasis is given on understanding and adhering to the OSHA regulations. It is the responsibility of the Recipient and the Consulting Engineer to insure that the project plan documents are in compliance with Amended N. C. G. S. 133-3 (ratified July 13, 1993). The administrative review and approval of these plans and specifications, and any subsequent addenda or change order, do not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. Any addenda to be issued for subject project plans and specifications must be submitted by the Recipient for review/approval action by the Section. It is mandatory for project facilities to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractors' responsibilities shall be in complying with these Acts. A goal of 8% of the contract price is established for Minority Business Enterprise (MBE) participation in this project, and a goal of 5% of the contract price is established for Women's Business Enterprise (WBE) participation in this project. The Recipient and Bidders shall make a good faith effort to assure that MBE's and WBE's are utilized, when possible, as sources of goods and services. The good faith effort must include the following affirmative steps: (a) including small, minority, and women's businesses on solicitation lists; (b) assuring that small, minority, and women's businesses are solicited whenever they are potential sources; (c) dividing total requirements, when economically feasible, into small tasks or quantities to permit maximum participation by small, minority, and women's businesses; (d) establishing delivery schedules, and (e) using the services of the Small Business Administration and the Minority Business Development Agency of the U.S. Department of Commerce. Please note that the solicitation efforts should include documentable follow-up phone calls. The Recipient shall.comply with the provisions of 40 CFR, Part 7, Subpart C - Discrimination Prohibited on the Basis of Handicap. Two (2) copies of any change order must be promptly submitted by the Recipient to the Section. If additional information is requested by the Section, a response is required within two (2) weeks, or the change order will be returned without further or final action. One (1) set of plans and specifications identical to the approved set must be available at the project site at all times. Upon completion of the project construction, the Recipient shall submit a letter confirming that the project has been constructed in accordance with the plans and specifications approved by the Section. "As -built" plans will need to be submitted with any changes clearly documented on the plans if the above confirmation cannot be made. Ms. Deanna Rios, Assistant Finance Director May 7, 2009 Page Four If there are any questions concerning this matter, please do not hesitate to contact Kim H. Colson, P.E. at (919) 715-6212 or Mark Hubbard, P.E. at (919) 715-6224. Sincerely --Daniel M. Blaisdell, P.E., Section Chief Construction Grants & Loans Section Attachments: Determination of Minimum Construction Activity Bid Information Form KHC:KOP cc: G. Cecil Clark, P.E., Clark and Associates, Hickory, NC OSHA Bureau Chief, Wanda Lagoe DWQ Mooresville Regional Office Daniel Blaisdell, P.E. Mark Hubbard, P.E. Jennifer Haynie CIG SRF J Determination of Minor Construction Activity North Carolina Division of Water Quality Construction Grants and Loans Section Project Applicant: City of Hickory Date: April 29, 2009 Project Number: 2W370389-19 Estimated Project Cost: $ 3,100,000 Estimated Funding Amount: $ 1;938,000. Project Description: The proposed project consists of replacing an existing 21-inch terra cotta outfall with a 24-inch PVC pipe and installing same adjacent to Cripple Creek and Horseford Creek, an impaired stream, following the existing alignment. The above named applicant intends to apply for assistance from the State Revolving Fund program associated with the American Recovery and Reinvestment Act of 2009 to construct the wastewater facilities described above. The North Carolina Division of Water Quality (DWQ) has conducted a review of the project in accordance with the procedures (NCAC 15A Subchapter 1 C) for conformance with the North Carolina Environmental Policy Act. The DWQ has determined that this project is a minor construction activity, and that the preparation of additional environmental documents is not required. This determination shall become effective upon its distribution by DWQ. This determination can be revoked at any time adverse information is made available. The documentation to support this decision will be on file with the North Carolina Department of Environment and Natural Resources, Division of Water Quality, Construction Grants and Loans Section, and is available for public review at www.nccgl.net. Comments concerning this decision may be addressed to Mr. Kim H. Colson, P.E., Assistant Chief, Construction Grants and Loans Section, Division of Water Quality, 1633 Mail Service Center, Raleigh, North Carolina 27699-1633, or he may be reached by phone at (919) 715-6212. Sincerely, 13 Daniel M. Blaisdell, P.E., Chief Construction Grants and Loans Section Division of Water Quality J- PROJECT BID INFORMATION Previously referred to as the "Part B" in State programs Previously referred to as the "Project Review and Cost Summary" in Federal programs AWARD RECIPIENT INFORMATIOaj Name Project Number Address Attach the following supplemental information and submit with this form: (a) Tabulations of all bids received (sealed by engineer). (b) Copies of the bid(s) and bid bond the applicant wishes to accept. (c) Resolution of tentative award. (d) Engineer's recommendation of award letter. (e) Proof of advertisement . (f) MBE/WBE Requirements: State Programs Include affidavits A, B, C or D as required. ■ Submit certification of subcontract awards to minority business firms with documentation to comply with G.S. 143-128.2. (Complete attached form) Federal Programs (SRF and STAG) ■ Documentation of Contractor's "good faith" effort to procure MBE/WBE subcontractors. ■ Certification regarding debarment, suspension and other responsibility matters for each prime and subcontractor. DDITIONAL INFORMATION Addenda All addenda must be submitted to CG&L for approval prior to opening bids. Changes to the scope of the project may require a permit modification. Site Certificates (2) Submit if not previously submitted or if changes have occurred. Additional Items • Land Costs (State Loans & Grants Only) Submit form if seeking payment. • A/E Contracts — Submit for approval if seeking payment. • Sewer Use Ordinance, User Charge System and Sewer budget (SRF Only) Payments stop at 90% of total project costs if not approved. • 4700 Form (SRF Only) • Submit proof of adequate resident inspection (resume of inspector). List contractor names below: TOTAL ELIGIBLE 1. $ $ 2. 3. 4. 5. EQUIPMENT AND MATERIALS TECHNICAL SERVICES attach contract LEGAL ADMINISTRATIVE CONTINGENCY 5% of construction OTHER (specify) REAL PROPERTY AC UISTION COSTS CLOSING COSTS p List funds that are available for this project: I AMOUNT 11 CASH $ GENERAL OBLIGATION BONDS REVENUE BONDS OTHER (specify) FEDERAL LOAN/GRANT (specify agency) b STATE LOAN STATE GRANT TOTAL - $ The undersigned representative of the Recipient certifies that the information contained above and in any attached statements and material in support thereof is true and correct to the best of his or her knowledge. Signature of Authorized Representative Name and Title (type or print) Date J INSTRUCTIONS FOR SUBMITTING PROJECT BID INFORMATION FORM This information must be submitted as soon as possible after construction bids are opened. For STAG and State projects send to: Don Evans Construction Grants and Loans Section 1633 Mail Service Center Raleigh, NC 27699-1633 Page 1 For SRF .Projects send to: Steve Tsadwa Construction Grants and Loans Section 1633 Mail Service Center Raleigh, NC 27699-1633 Enter all requested information such as, Name, Address, and Project Number. Documentation listed from (a) to (f) must be submitted. Addenda should be submitted before bids are opened with enough time for CG&L to approve them (7 days). Site information should be attached if not previously submitted. Page 2 PROJECT COST SUMMARY (1) Enter the contractor's company or corporate name. Enter the amount of the bid or bids the applicant wishes to accept. (2) If equipment or materials are to be or have been purchased outside the construction contracts, enter the estimated or actual costs as applicable. (3) If not previously submitted, attach copies of any engineering contracts or agreements. Formal agreements are required for disbursement of funds. (4) Contingency is limited to 5% of the total construction bid amount. (5) Appraisals and a copy of the Deed are required for disbursement of real property costs. (6) Closing costs are not eligible for reimbursement under the SRF. They are 1.5% for State Grants, 2% for SRF Loans and 2.5% for State Loans. . REVENUE SOURCES FOR PROJECT CONSTRUCTION (1) Enter the amount of general obligation bonds and revenue bonds authorized but not yet sold for this project. (2) Enter the amount of the grant, if any, offered by Federal or State Agency(s) and list name of agency(s). (3) Enter the amount of the. loan or grant offered. (4) Total funds available must equal or exceed the Total Project Cost. The form must be signed by the applicant's authorized representative. PI80.�ECT.TITLE THE TOWN DOES HEREBY CERTIFY THAT IT HAS MET THE REQUIREMENTS OF G.S. 143-128.2 IN REFERENCE TO MINORITY BUSINESS CONTRACTS FOR THIS CONSTRUCTION PROJECT. THE CONTRACTOR HAS MET THE GOALS ESTABLISHED BY RESOLUTION OF THE TOWN AND THE FOLLOWING CONTRACTS MEET THE REQUIREMENTS ADOPTED BY THE TOWN: signature of authorized representative name of authorized representative PLEASE LIST CONTRACTORS AND MINORITY SUBCONTRACTORS: J. CONTRACT: AMOUNT . MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTRACT: AMOUNT $ MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTINUE IF MORE THAN THREE CONTRACTS ' A !JiA NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality 'e Beverly Eaves Perdue Coleen H. Sullins M1 De ' Governor Director 1 Ewa ti` 5 fet y May 7, 2009 MAY 1 2 2009 Mr. Jim Palenick, City Manager City of Gastonia P. O. Box 1748 _ Gastonia, North Carolina 28053 ®6���� ii,,aEn SUBJECT: City of Gastonia Sewer Pipe Lining at Catawba Creek Pump Station Approval of the Funding Application for American Recovery and Reinvestment Act of 2009 Project No. 2W370744-04 Dear Mr. Palenick: The subject project was submitted for funding under the American Recovery and Reinvestment Act of 2009 (ARRA). Some ARRA conditions are different than base Clean Water State Revolving Fund (CWSRF) projects — please carefully read this entire letter. The review for completeness and adequacy of the funding application including the project engineering report and construction documents submitted for consideration of funding under the ARRA has been concluded by the Construction Grants & Loans Section (Section) of the North Carolina Division of Water Quality. Therefore, said documents are hereby approved. A Determination of Minor Construction Activities for the project is attached for your files. A loan offer will be transmitted to you separately, contingent upon approval by the Local Government Commission at their May 5, 2009 or May 14, 2009 meetings. Eligibility for Revolving Loan funding is detennined as follows: Eligible Rehabilitation of approximately 371 linear feet (19 of 24-inch with cured -in -place pipe (CIPP) gravity sewer, rehabilitation of 17 vertical feet of existing vault, replacement of pipe bends, installation of one (1) doghouse manhole, removal and replacement of pavement, roadways, driveways and curbs, sedimentation and erosion control devices, and associated appurtenances necessary for a complete system within and up to the existing right-of-way. 1633 Mail Service Center, Raleigh, North Carolina 27699-1633 1�TOne 1 Location: 2728 Capital Blvd. Raleigh, North Carolina 27604 NorthCarollna Phone: 919-733-69001 FAX: 919-715-62291 Customer Service: 1-877-623-6748 Internet: www.ncwatergdality.org Naturallff An Equal Opportunity 1 Affirmative Action Employer r, Mr. Jim Palenick, City Manager May 7, 2009 Page Two --Non Eligible �. Any installation of sewer service laterals outside the right-of-way. In the event that received bids exceed the amount established through the funding offer, and local funds are not adequate to award contract(s), it will be necessary to consider all alternatives including redesign, re -advertising, and rebidding. Please note that the specifications must include the special provisions of the ARRA (i.e., buy American, Davis -Bacon wage requirements, job reporting) in addition to the regularly required SRF Special Conditions. Job reporting requirements have not been established by the US EPA at this time, but will likely include jobs created or retained, hours worked, type of jobs, etc. Attached is one (1) copy of the Project Bid Information (Authority to Award) which is to be completed after bids have been received, and submitted to Mr. Mark Hubbard, P.E., Assistant Section Chief, Construction Grants and Loans Section by June loth for review. Upon review and approval of this information, the Section will authorize the Recipient to award contracts. All elements required for a complete Bid Information package must be submitted to ensure a timely review by the Section. In accordance with a goal of the ARRA, contracts are expected to be executed by June 17th. If these dates cannot be met, you must contact the Section with a detailed explanation and proposed alternative deadlines. Upon execution of contracts and issuance of Notice to Proceed, a bound set of contract documents must be submitted to the Section for approval. Funds cannot be dispersed until executed contracts are approved. While rejection of all bids is possible, such action may be taken only with prior Section concurrence, and only for good cause. In the event that progress on the approved ARRA CWSRF project is not made in accordance with the loan agreement, construction contracts, or other pertinent requirements reimbursements may be withheld or suspended indefinitely. Funds not requested for reimbursement in a timely manner may also be reallocated to other ARRA ready -to -go projects on the final State project list. Once the project costs are established, final awards may be adjusted downward in the case of low bids. Five percent contingency is included in the final amount to accommodate change orders and amendments to the engineering contract. In no case will awards be increased. Neither the State nor Federal Government, nor any of its departments, agencies or employees is or will be a party to the invitation to bids, addenda, any resulting contracts or contract negotiations/changes. Your project is subject to the one-year performance certification requirements. By this, you are required on the date one year after the completion of construction and initial operation of the subject treatment facilities, to certify, based on your consulting engineer's advisement, whether or not such treatment works meet the design performance, specifications and the permit conditions and effluent limitations. Mr. Jim Palenick, City Manager May 7, 2009 Page Three In accordance with the Federal Regulations, the Recipient is required to assure compliance with the OSHA safety regulations on the subject project. In complying with this regulatory responsibility, the Recipient should, by letter, invite the Bureau Chief, Education Training and Technical Assistance Unit, NC OSHA Division, 1101 Mail Service Center, Raleigh, NC 27699- 1101 at (919) 807-2890, to participate in the Preconstruction Conference to assure that proper emphasis is given on understanding and adhering to the OSHA regulations. It is the responsibility of the Recipient and the Consulting Engineer to insure that the project plan documents are in compliance with Amended N. C. G. S. 133-3 (ratified July 13, 1993). The administrative review and approval of these plans and specifications, and any subsequent addenda or change order, do not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. Any addenda to be issued for subject project plans and specifications must be submitted by the Recipient for review/approval action by the Section. It is mandatory for project facilities to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractors' responsibilities shall be in complying with these Acts. A goal of 8% of the contract price is established for Minority Business Enterprise (MBE) participation in this project, and a goal of 5% of the contract price is established for Women's Business Enterprise (WBE) participation in this project. The Recipient and Bidders shall make.a good faith effort to assure that MBE's and WBE's are utilized, when possible, as sources of goods and services. The good faith effort must include the following affirmative steps: (a) including small, minority, and women's businesses on solicitation lists; (b) assuring that small, minority, and women's businesses are solicited whenever they are potential sources; (c) dividing total requirements, when economically feasible, into small tasks or quantities to permit maximum participation by small, minority, and women's businesses; (d) establishing delivery schedules, and (e) using the services of the Small Business Administration and the Minority Business Development Agency of the U.S. Department of Commerce. Please note that the solicitation efforts should include documentable follow-up phone calls. The Recipient shall comply with the provisions of 40 CFR, Part 7, Subpart C - Discrimination' Prohibited on the Basis of Handicap. Two (2) copies of any change order must be promptly submitted by the Recipient to the Section. If additional information is requested by the Section, a response is required within two (2) weeks, or the change order will be returned without further or final action. One (1) set of plans and specifications identical to the approved set must be available at the project site at all times. Upon completion of the project construction, the Recipient shall submit a letter confirming that the project has been constructed in accordance with the plans and specifications approved by the Section. "As -built" plans will need to be submitted with any changes clearly documented on the plans if the above confirmation cannot be made. Mr. Jim Palenick, City Manager May 7, 2009 Page Four If there are any questions concerning this matter, please do not hesitate to contact Kim H. Colson, P.E. at (919) 715-6212 or Mark Hubbard, P.E. at (919) 715-6224. . Sincerely, Daniel M. Blaisdell, P.E., Section Chief Construction Grants & Loans Section Attachments: Determination of Minimum Construction Activity Bid Information Form KHC:AR cc: Rusty Bost, P.E., City of Gastonia, Gastonia, NC OSHA Bureau Chief, Wanda Lagoe DWQ Mooresville Regional Office Daniel Blaisdell, P.E. . Mark Hubbard, P.E. Jennifer Haynie CIG SRF Determination of Minor Construction Activity North Carolina Division of Water Quality Construction Grants and Loans Section Project Applicant: City of Gastonia Date: April 29, 2009 Project Number: 2W370744-04 Estimated Project Cost: $ 308,532 Estimated Funding Amount: $ 308,532 Project Description: The proposed project consists of installation of 371 linear feet of 24- inch CIPP liner in a 24-inch corroded class A concrete pipe that has suffered extensive corrosion from hydrogen sulfide, at the Catawba Creek Pumping Station. The project includes rehabilitation of the main inflow vault, replacement and lining of 24-inch bends in the pipe, temporary by-pass pumping or piping during the construction, and replacement of incidental driveway and sidewalks necessary to complete the project. The above named applicant intends to apply for assistance from the State Revolving Fund program associated with the American Recovery and Reinvestment Act of 2009 to construct the wastewater facilities described above. The North Carolina Division of Water Quality (DWQ) has conducted a review of the project in accordance with the procedures (NCAC 15A Subchapter 1 C) for conformance with the North Carolina Environmental Policy Act. The DWQ has determined that this project is a minor construction activity, and that the preparation of additional enviromnental documents is not required. This determination shall become effective upon its distribution by DWQ. This determination can be revoked at any time adverse information is made available. The documentation to support this decision will be on file with the North Carolina Department of Environment and Natural Resources, Division of Water Quality, Construction Grants and Loans Section, and is available for public review at www.nccgl.net. Comments concerning this decision may be addressed to Mr. Kim H. Colson, P.E., Assistant Chief, Construction Grants and Loans Section, Division of Water Quality, 1633 Mail Service Center, Raleigh, North Carolina 27699-1633, or he may be reached by phone at (919) 715-6212. Sincerely, Daniel M. Blaisdell, P.E., Chief Construction Grants and Loans Section Division of Water Quality PROJECT BID INFORMATION Previously referred to as the "Part B" in State programs Previously referred to as the "Project Review and Cost Summary" in Federal programs ! WARD RECIPIENT INFORMATIO Name Project Number Address BID INFORMATION Attach the following supplemental information and submit with this form: (a) Tabulations of all bids received (sealed by engineer). (b) Copies of the bid(s) and bid bond the applicant wishes to accept. (c) Resolution of tentative award. (d) Engineer's recommendation of award letter. (e) Proof of advertisement (f) MBE/WBE Requirements: State Programs ■ Include affidavits A, B, C or D as required. ■ Submit certification of subcontract awards to minority business firms with documentation to comply with G.S. 143-128.2. (Complete attached form) Federal Programs (SRF and STAG) ■ Documentation of Contractor's "good faith" effort to procure MBE/WBE subcontractors. ■ Certification regarding debarment, suspension and other responsibility matters for each prime and subcontractor. ilADDITIONAL INFORMATIO Addenda All addenda must be submitted to CG&L for approval prior to opening bids. Changes to the scope of the project may require a permit modification. Site Certificates (2) Submit if not previously submitted or if changes have occurred. Additional Items • Land Costs (State Loans & Grants Only) Submit form if seeking payment. • A/E Contracts — Submit for approval if seeking payment. • Sewer Use Ordinance, User Charge System and Sewer budget (SRF Only) Payments stop at 90% of total project costs if not approved. • 4700 Form (SRF Only) • Submit proof of adequate resident inspection (resume of inspector). �lyy ! 1 L •\ 1y31.y F'�. t 1yy L Sa 2 F}' 3 T �.i } f t.`� i h:�' �(' N _ci4. �'} - r 4 P',.yN i?tT'S `t+}%f,5 .€ List contractor names below: TOTAL ELIGIBLE 1. $ $ 2. 3. 4. 5. EQUIPMENT AND MATERIALS SLTBTOTAI TECHNICAL SERVICES (attach contract) LEGAL ADMINISTRATIVE CONTINGENCY (5% of construction) OTHER (specify) REAL PROPERTY ACQUISTION COSTS CLOSING COSTS ' �TOTAL List funds that are available for this project: I AMOUNT 11 CASH $ GENERAL OBLIGATION BONDS REVENUE BONDS OTHER (specify) FEDERAL LOAN/GRANT (specify agency) b STATE LOAN STATE GRANT TOTAL $ The undersigned representative of the Recipient certifies that the information contained above and in any attached statements and material in support thereof is true and correct to the best of his or her knowledge. Signature of Authorized Representative Name and Title (type or print) Date INSTRUCTIONS FOR SUBMITTING PROJECT BID INFORMATION FORM This information must be.submitted as soon as possible after construction bids are opened. For STAG and State projects send to: Don Evans Construction Grants and Loans Section 1633 Mail Service Center Raleigh, NC 27699-1633 Page 1 For SRF Projects send to: Mark Hubbard, PE Construction Grants and Loans Section 1633 Mail Service Center Raleigh, NC 27699-1633 Enter all requested information such as, Name, Address, and Project Number. Documentation listed from (a) to (f) must be submitted. Addenda should be submitted before bids are opened with enough time for CG&L to approve them (7 days). Site information should be attached if not previously submitted. Page 2 PROJECT COST SUMMARY (1) Enter the contractor's company or corporate name. Enter the amount of the bid or bids the applicant wishes to accept. (2) If equipment or materials are to be or have been purchased outside the construction contracts, enter the estimated or actual costs as applicable. (3) If not previously submitted, attach copies of any engineering contracts or agreements. Formal agreements are required for disbursement of funds. (4) Contingency is limited to 5% of the total construction bid amount. (5) Appraisals and a copy of the Deed are required for disbursement of real property costs. (6) Closing costs are not eligible for reimbursement under the SRF. They are 1.5% for State Grants, 2% for SRF Loans and 2.5% for State.Loans. REVENUE SOURCES FOR PROJECT CONSTRUCTION (1) Enter the amount of general obligation: bonds and revenue bonds authorized but not yet sold for this project. (2) Enter the amount of the grant, if any, offered by Federal or State Agency(s) and list name of agency(s).: (3) Enter the amount of the loan or grant offered. (4) Total funds available must equal or exceed the Total Project Cost. The form must be signed by the applicant's authorized representative. 'RECIPIENT ", "PROJECT=TITLE _ PROJECT THE TOWN DOES HEREBY CERTIFY THAT IT HAS MET THE REQUIREMENTS OF G.S. 143-128.2 IN REFERENCE TO MINORITY BUSINESS CONTRACTS FOR THIS CONSTRUCTION PROJECT. THE CONTRACTOR HAS MET. THE GOALS ESTABLISHED BY RESOLUTION OF •THE TOWN AND THE FOLLOWING CONTRACTS MEET THE REQUIREMENTS ADOPTED BY THE TOWN: signature of authorized representative name of authorized representative PLEASE LIST CONTRACTORS AND MINORITY SUBCONTRACTORS: �r CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTINUE IF MORE THAN THREE CONTRACTS A��� �LA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullinsre Governor Director S' May 7, 2009 The Honorable Donald E. Duncan, Jr., Mayor MAY 1 2 2009 City of Conover 101 1st Street East Post Office Box 549 , ; , Conover, North Carolina 28613 DW-i�f�' ` ° S-°' e SUBJECT: City of Conover 2009 ARRA NE Outfall and Associated Sewer System Rehabilitation and Replacement Project Approval of the Funding Application for American Recovery and Reinvestment Act of 2009 Project No. 2W370436-05 Dear Mayor Duncan: The subject project was submitted for funding under the American Recovery and Reinvestment Act of 2009 (ARRA). Some ARRA conditions are different than base Clean Water State Revolving Fund (CWSRF) projects — please carefully read this entire letter. The review for completeness and adequacy of the funding application including the project engineering report and construction documents submitted for consideration of funding under the ARRA has been concluded by the Construction Grants & Loans Section (Section) of the North Carolina Division of Water Quality. Therefore, said documents are hereby approved. A Determination of Minor Construction Activities for the project is attached for your files. A loan offer will be transmitted to you separately, contingent upon approval by the Local Government Commission at their May 5, 2009 or May 14, 2009 meetings. Eligibility for Revolving Loan funding is determined as follows: Eligible Cleaning and TV investigation of approximately 18,500 linear feet of sewer pipe and service laterals; sewer rehabilitation to include point repairs of approximately 420 linear feet of 8-inch gravity sewer, 36 linear feet of 10-inch gravity sewer, 36 linear feet of 12-inch gravity sewer, and 36 linear feet of 15-inch gravity sewer; point repairs to existing 4-inch and 6-inch service laterals; replacement of 1, 235 linear feet of 8-inch gravity sewer; replacement of 635 linear feet of 12-inch gravity sewer; rehabilitation to existing manholes; rehabilitation (using cured -in -place pipe lining) of 700 linear feet of 8-inch gravity sewer, 50 linear feet of 10-inch gravity sewer, 150 linear feet of 1633 Mail Service Center, Raleigh, North Carolina 27699-1633 Location: 2728 Capital Blvd. Raleigh, North Carolina 27604 Phone: 919-733-69001 FAX: 919-715-62291 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturally The Honorable Donald E. Duncan, Jr., Mayor May 7, 2009 Page Two 12-inch gravity sewer, and 100 linear feet of 15-inch gravity sewer, and reconnection of service laterals within and up to the existing right-of-way. Non Eli ig ble Any installation of sewer service laterals outside the right-of-way. In the event that received bids exceed the amount established through the funding offer, and local funds are not adequate to award contract(s), it will be necessary to consider all alternatives including redesign, re -advertising, and rebidding. Please note that the specifications must include the special provisions of the ARRA (i.e., buy American, Davis -Bacon wage requirements, job reporting) in addition to the regularly required SRF Special Conditions. Job reporting requirements have not been established by the US EPA at this time, but will likely include jobs created or retained, hours worked, type of jobs, etc. Attached is one (1) copy of the Project Bid Information (Authority to Award) which is to be completed after bids have been received, and submitted to Mr. Mark Hubbard, P.E., Upon review and approval of this information, the Section will authorize the Recipient to award contracts. All elements required for a complete Bid Information package must be submitted to ensure a timely review by the Section. In accordance with a goal of the ARRA, contracts are expected to be executed by June 17`h. If these dates cannot be met, you must contact the Section with a detailed explanation and proposed alternative deadlines. Upon execution of contracts and issuance of Notice to Proceed, a bound set of contract documents must be submitted to the Section for approval. Funds cannot be dispersed until executed contracts are approved. While rejection of all bids is possible, such action may be taken only with prior Section concurrence, and only for good cause. In the event that progress on the approved ARRA CWSRF project is not made in accordance with the loan agreement, construction contracts, or other pertinent requirements reimbursements may be withheld or suspended indefinitely. Funds not requested for reimbursement in a timely manner may also be reallocated to other ARRA ready -to -go projects on the final State project list. Once the project costs are established, final awards may be adjusted downward in the case of low bids. Five percent contingency is included in the final amount to accommodate change orders and amendments to the engineering contract. In no case will awards be increased. Neither the State nor Federal Government, nor any of its departments, agencies or employees is or will be a party to the invitation to bids, addenda, any resulting contracts or contract negotiations/changes. Your project is subject to the one-year performance certification requirements. By this, you are required on the date one year after the completion of construction and initial operation of the subject treatment facilities, to certify, based on your consulting engineer's advisement, The Honorable Donald E. Duncan, Jr., Mayor May 7, 2009 Page Three whether or not such treatment works meet the design performance, specifications and the permit conditions and effluent limitations. In accordance with the Federal Regulations, the Recipient is required to assure compliance with the OSHA safety regulations on the subject project. In complying with this regulatory responsibility, the Recipient should, by letter, invite the Bureau Chief, Education Training and Technical Assistance Unit, NC OSHA Division, 1101 Mail Service Center, Raleigh, NC 27699- 1101 at (919) 807-2890, to participate in the Preconstruction Conference to assure that proper emphasis is given on understanding and adhering to the OSHA regulations. It is the responsibility of the Recipient and the Consulting Engineer to insure that the project plan documents are in compliance with Amended N. C. G. S. 133-3 (ratified July 13, 1993). The administrative review and approval of these plans and specifications, and any subsequent addenda or change order, do not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. Any addenda to be issued for subject project plans and specifications must be submitted by the Recipient for review/approval action by the Section. It is mandatory for project facilities to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractors' responsibilities shall be in complying with these Acts. A goal of 8% of the contract price is established for Minority Business Enterprise (MBE) participation in this project, and a goal of 5% of the contract price is established for Women's Business Enterprise (WBE) participation in this project. The Recipient and Bidders shall make a good faith effort to assure that MBE's and WBE's are utilized, when possible, as sources of goods and services. The good faith effort must include the following affirmative steps: (a) including small, minority, and women's businesses on solicitation lists; (b) assuring that small, minority, and women's businesses are solicited whenever they are potential sources; (c) dividing total requirements, when economically feasible, into small tasks or quantities to permit maximum participation by small, minority, and women's businesses; (d) establishing delivery schedules, and (e) using the services of the Small Business Administration and the Minority Business Development Agency of the U.S. Department of Commerce. Please note that the solicitation efforts should include documentable follow-up phone calls. The Recipient shall comply with the provisions of 40 CFR, Part 7, Subpart C - Discrimination Prohibited on the Basis of Handicap. Two (2) copies of any change order must be promptly submitted by the Recipient to the Section. If additional information is requested by the Section, a response is required within two (2) weeks, or the change order will be returned without further or final action. One (1) set of plans and specifications identical to the approved set must be available at the project site at all times. Upon completion of the project construction, the Recipient shall submit a letter confirming that the project has been constructed in accordance with the plans and r The Honorable Donald E. Duncan, Jr., Mayor May 7, 2009 Page Four specifications approved by the Section. "As -built" plans will need to be submitted with any changes clearly documented on the plans if the above confirmation cannot be made. If there are any questions concerning this matter, please do not hesitate to contact Kim H. Colson, P.E. at (919) 715-6212 or Mark Hubbard, P.E. at (919) 715-6224. Sincerely, Daniel M. Blaisdell, P.E., Section Chief Construction Grants & Loans Section Attachments: Determination of Minimum Construction Activity Bid Information Form KHC:KOP cc: Ryan W. Hagar, P.E., WK Dickson & Co., Inc., Hickory, NC OSHA Bureau Chief, Wanda Lagoe DWQ Mooresville Regional Office Daniel Blaisdell, P.E. Mark Hubbard, P.E. Jennifer Haynie CIG SRF Determination of Minor Construction Activity North Carolina Division of Water Quality Construction Grants and Loans Section Project Applicant: City of Conover Date: April 29, 2009 Project Number: 2W370436-05 Estimated Project Cost: $ 1,727,025 Estimated Funding Amount: $ 1,727,025 Project Description: The proposed project consists of (1) cleaning and TV investigation of approximately 18,500 linear feet of sewer pipe and service laterals; (2) sewer rehabilitation to include point repairs of approximately 420 linear feet of 8-inch gravity sewer, 36 linear feet of 10-inch gravity sewer, 36 linear feet of 12-inch gravity sewer, and 36 linear feet of 15-inch gravity sewer; (3) point repairs to existing 4-inch and 6-inch service laterals; (4) replacement of 1, 235 linear feet of 8-inch gravity sewer; (5) replacement of 635 linear feet of 12-inch gravity sewer; (6) rehabilitation to existing manholes; and (7) rehabilitation (using cured -in -place pipe lining) of 700 linear feet of 8- inch gravity sewer, 50 linear feet of 10-inch gravity sewer, 150 linear feet of 12-inch gravity sewer, and 100 linear feet of 15-inch gravity sewer. The above named applicant intends to apply for assistance from the State Revolving Fund program associated with the American Recovery and Reinvestment Act of 2009 to construct the wastewater facilities described above. The North Carolina Division of Water Quality (DWQ) has conducted a review of the project in accordance with the procedures (NCAC 15A Subchapter 1 C) for conformance with the North Carolina Environmental Policy Act. The DWQ has determined that this project is a minor construction activity, and that the preparation of additional environmental documents is not required. This determination shall become effective upon its distribution by DWQ. This determination can be revoked at any time adverse information is made available. The documentation to support this decision will be on file with the North Carolina Department of Environment and Natural Resources, Division of Water Quality, Construction Grants and Loans Section, and is available for public review at www.nccgl.net. Comments concerning this decision may be addressed to Mr. Kim H. Colson, P.E., Assistant Chief, Construction Grants and Loans Section, Division of Water Quality, 1633 Mail Service Center, Raleigh, North Carolina 27699-1633, or he may be reached by phone at (919) 715-6212. Sincerely, Daniel M. Blaisdell, P.E., Chief Construction Grants and Loans Section Division of Water Quality PROJECT BID INFORMATION Previously referred to as the "Part B" in State programs Previously referred to as the "Project Review and Cost Summary" in Federal programs 1AWARD RECIPIENT INFORMATIONIi Name Address Project Number i ID INFORMATIO Attach the following supplemental information and submit with this form: (a) Tabulations of all bids received (sealed by engineer). (b) Copies of the bid(s) and bid bond the applicant wishes to accept. (c) Resolution of tentative award. (d) Engineer's recommendation of award letter. (e) Proof of advertisement (f) MBE/WBE Requirements: State Programs ■ Include affidavits A, B, C or D as required. ■ Submit certification of subcontract awards to minority business firms with documentation to comply with G.S. 143-128.2. (Complete attached form) Federal Programs (SRF and STAG) ■ Documentation of Contractor's "good faith" effort to procure MBE/WBE subcontractors. ■ Certification regarding debarment, suspension and other responsibility matters for each prime and subcontractor. DDITIONAL INFORMATIO Addenda All addenda must be submitted to CG&L for approval prior to opening bids. Changes to the scope of the project may require a permit modification. Site Certificates (2) Submit if not previously submitted or if changes have occurred. Additional Items • Land Costs (State Loans & Grants Only) Submit form if seeking payment. • A/E Contracts — Submit for approval if seeking payment. • Sewer Use Ordinance, User Charge System and Sewer budget (SRF Only) Payments stop at 90% of total project costs if not approved. • 4700 Form (SRF Only) • Submit proof of adequate resident inspection (resume of inspector). 1� �-k 1's { :i. 4 � ii.+. � ^� �ir1a ,*st"" ��5 y-^t� iW ?7�� xlr � {�Y 1 is F �i" fi 5 ✓ L� �i+f S4 ;SN q � '`°' 2� �„� �i,.i �" .� �S�'� � ?x'r i "i,,Y i � t a' ,,� 7.7 � rV } ;., wt�' F'#•i�d 4 A r` 5,. �f "Y`&.y��."'§�ri' tl.Ps . � .. , . � ,- a.�-n,.. ..;-.ei. no_. .. .� ....5._.T�. �, v^'�.`Ya..T'. Y....J �nYv` •I. Y»_:.r Ali er��.r.-.� ., .T'�.t:t�l cD.�..... �, s,�.,. ,-..�J. :V-1T.2�`�. ,,,�2 ',.P,� �w s' � �E€ w >5-�,-�-. M�. .Y..'3_-�L `� i�.-. c"i List contractor names below: TOTAL ELIGIBLE 1. $ $ 2. 3. 4. 5. EQUIPMENT AND MATERIALS TECHNICAL SERVICES attach contract) LEGAL ADMINISTRATIVE CONTINGENCY 5% of construction OTHER (specify) REAL PROPERTY ACQUISTION COSTS CLOSING COSTS Q $ Q W R'�OUI2C`�5)�02NPRO.I,T �Oil'TRNI;TIO�T k? $� > '��f ,,.6 ._1i!.Y List funds that are available for this project AMOUNT CASH $ GENERAL OBLIGATION BONDS REVENUE BONDS OTHER (specify) FEDERAL LOAN/GRANT (specify agency) b STATE LOAN STATE GRANT t 'TOTAL The undersigned representative of the Recipient certifies that the information contained above and in any attached statements and material in support thereof is true and correct to the best of his or her knowledge. Signature of Authorized Representative Name and Title (type or print) Date INSTRUCTIONS FOR SUBMITTING PROJECT BID INFORMATION FORM This information must be submitted as soon as possible after construction bids are opened. For STAG and State projects send to: Don Evans Construction Grants and Loans Section 1633 Mail Service Center Raleigh, NC 27699-1633 Page 1 For SRF Projects send to: Mark Hubbard, PE Construction Grants and Loans Section 1633 Mail Service Center Raleigh, NC 27699-1633 Enter all requested information such as; Name, Address, and Project Number. Documentation listed from (a) to (f) must be submitted. Addenda should be submitted before bids are opened with enough time for CG&L to approve them (7 days). Site information should be attached if not previously submitted. Page 2 PROJECT COST SUMMARY (1) Enter the contractor's company or corporate name. Enter the amount of the bid or bids the applicant wishes to accept. (2) If equipment or materials are to be or have been purchased outside the construction contracts, enter the estimated or actual costs as applicable. (3) If not previously submitted, attach copies of any engineering contracts or. agreements. Formal agreements are required for disbursement of funds. (4) Contingency is limited to 5% of the total construction bid amount. (5) Appraisals and a copy of the Deed are required for disbursement of real property costs. (6) Closing costs are not eligible for reimbursement under the SRF. They are 1.5% for State Grants, 2% for SRF Loans and 2.5% for State Loans. REVENUE SOURCES FOR PROJECT CONSTRUCTION (1) Enter the amount of general obligation bonds and revenue bonds authorized but not yet sold for this project. (2) Enter the amount of the grant, if any, offered by Federal or State Agency(s) and list name of agency(s). (3) Enter the amount of the loan or grant offered. (4) Total funds available must equal or exceed the Total Project Cost. The form must be signed by the applicant's authorized representative. =PR0,JECT;le10. THE TOWN DOES HEREBY CERTIFY THAT IT HAS MET THE REQUIREMENTS OF G.S. 143-128.2 IN REFERENCE TO MINORITY BUSINESS CONTRACTS FOR THIS CONSTRUCTION PROJECT. THE CONTRACTOR HAS MET THE GOALS ESTABLISHED BY RESOLUTION OF THE TOWN AND THE FOLLOWING CONTRACTS MEET THE REQUIREMENTS ADOPTED BY THE TOWN: signature of authorized representative name of authorized representative PLEASE LIST CONTRACTORS AND MINORITY SUBCONTRACTORS: CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTINUE IF MORE THAN THREE CONTRACTS RA WDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 17, 2009 Mr. David Saleeby, Town Manager AUG 1 9 7 Town of Troutman Post Office Box 26 Troutman, North Carolina 28166 SUBJECT: Pre ConstrMu-w4iog,; Town of Troutman, Iredell County Sewer & Manhole Rehab. Projects No. 2W 370 580-04 Dear Mr. Saleeby: A Preconstruction conference was conducted on July 29, 2009 at 2:00 p.m. for subject project at Town Hall, 400 North Eastway Drive. Attached is the agenda presented by the undersigned representative from the Construction Grants & Loans Section. Please review the report and then file for your records. For the record, regularly scheduled progress meetings will be scheduled for 4`h Thursday each month at 2:30 p.m. for the duration of the project. Contract Completion date for the project is Nov. 27, 2009 with a substantial completion date of Oct. 30, 2009. If you have any questions about this matter, please email me at gerald.horton@ncdenr.1zov or call me at (919) 715-6219. Sincerely, GerWrtn, PE, Project Engineer Construction Inspection Group G1V1l/gIvII cc: Benjie Thomas, PE, West Consultants F2ob I c$ebs Moots i11eyRRe nao F WQ +Off ce? CG&L - Mark Hubbard, PE H;1f7.. '� :" 1'i"i'P - Construction Grants and Loans Section One 1633 Mail Service Center Raleigh NC 27699-1633 NorthCarolina Phone: 919-733-6900 / FAX: 919-715-6229 / Internet: www.nccgl.net naturally An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Troutman, NC Sewer & Manhole Rehab Page 2 of 5 Pre construction meeting of July 29, 2009 Pre -Construction Meeting List of Attendees: Attendees : David Saleeby Steve Shealy Benjie Thomas, PE John Abernethy, Jr. Ben Alter Gerald W. Horton Town of Troutman, Town Manager Troutman, Finan. Dir. West Consultants West Consultants Gilbert Engineering Co. NC Construction Grants & Loans 704 528-7600 704 528-7600 704 433-5661 828 413-7383 704 902-5228 919 715-6219 Authorized Representatives: Loan or Grant Recipient: David Saleeby, Town Manager State: Mark Hubbard, PE, Gerald Horton, PE, NC-DENR, DWQ, CG&L Consulting Engineer: West Consultants, Benjie Thomas Inspector: John Abernethy, Jr. Date and Time of next (first) Progress meeting: Thurs. Sept. 3 2:30 p.m. at Town Hall Description of Eligible work o Sewer rehabilitation consisting of replacement of approximately 400 linear feet of 8-inch gravity sewer, o relining (CIPP) of approximately 771 linear feet of 8-inch gravity pipe, o replacement of approximately 10 manholes, o rehabilitate (raise) 2 manholes, and o modification of the Massey Street Pump Station, consisting of construction of a smaller wet -well structure Contract Gilbert Engineering Co., PO Box 828, Statesville, NC 28687-0828, Lic # 999 Unlimited:Unclassified Contract Amount: $211,495 (contract amount and eligible amount); Supt. — ? Notice to Proceed issued July 29 effective July 30 for a completion date of Nov. 30, 2009 and a construction period of 120 days; Liquidated damages $ 500 / day Loan Budget, Eligible Amount Gilbert Engineering Co. $ 211,495 Contingency $ 6,100 Technical Services $ 20,000 Total Eligible Costs $ 237,595 No reimbursement payments can be made until the contract documents have been approved, the initial promissory note is executed, and the disbursement accounts are established. Comments, observations and concerns discussed at the meeting: 1. Reader is also referred to Engineer prepared Pre -Construction minutes. 2. CG&L strongly recommended all parties make their own route and site video and/or photography to document pre -construction conditions. 3. CG&L advised that contractor shall maintain records indicating compliance with the Davis Bacon Act and "buy American". 4. CG&L reminded Owner and contractors that a project sign is required. -i Troutman, NC Sewer & Manhole Rehab Page 4 of 5 Pre construction meeting of July 29, 2009 o records of testing of materials, soils, concrete, equipment, and o pending or executed change orders for completeness and accuracy. 4. The Division of Water Quality (DWQ) requests that all equipment and materials on job site be properly stored, stockpiled, and protected. Improper storage of materials and equipment may result in recommendation to reduce reimbursement amount. The job site(s) shall be maintained in an acceptable manner. 5. Safe working conditions should be maintained at all times. CIG will discuss potential or apparent safety violations, which may be life endangering or threatening of serious injury. If warranted or deemed necessary, CIG will take prompt action including notifying State and OSHA regional representatives of any noted conditions. It remains the Contractor's sole responsibility to maintain safe working conditions and activities. 6. Results of the inspection will be discussed at the job site during or upon completion of the inspection. 7. Formal copies of the inspection report will be sent to the STAG Grant Recipient, the Engineer and to other parties, only if so requested. 8. CIG asks to be notified when the Engineer or Owner plan to schedule a pre final and/or the final inspection(s). CG&L requests a copy of punch list(s). In order to close out the project CG&L must conduct a final inspection. CHANGE ORDERS DWQ "approval" of change orders means the State determines the Grant or Loan eligibility thereof. The Loan or Grant Recipient (Owner) should notify DWQ prior to commencement of any change order work which change the scope of the project, except for emergency situations. Approval of each change order is the responsibility of the Owner and Contractor. Records of change orders should be available for review at any time and CG&L requires being one original of all executed change orders and supporting information so CG&L may determine eligibility for the loan or grant. However, approval of change orders by CG&L is not necessary on STAG projects. CG&L does however request copies of all change orders on STAG projects. Owner is advised that occasionally EPA requests the State review the change order(s) for efficacy and determine if justified. RECIPIENT's (OWNER) AND ENGINEER's RESPONSIBILITY 1. The Owner and Engineer should become familiar with their responsibilities as deemed in the Code of Federal Regulations Part 40 CFR. 2. Loan and/or grant conditions must be met and loan or grant objectives achieved. 3. For STAG (State and Tribal Assistance Grant) projects, the Owner shall submit Quarterly Project Progress reports and separate Quarterly MBE/WBE reports. Progress Project Quarterly report format and mailing information is attached. An electronic version is available on CG&L's web site. Project Progress Quarterly reports are to be submitted to CG&L, however the MBE/WBE quarterly reports are to be submitted directly to EPA as agreed to by Owner upon acceptance of the STAG Grant offer. Owner should refer to that documentation. OWNER PAYMENT REQUEST 1. Before first reimbursement request will be processed, the Owner must provide NC CG&L executed engineering contract(s) and executed Construction contract(s). 2. Owner should provide the NC CG&L inspector with Schedule(s) of Values (SOV) and Construction (Progress) Schedule for each construction contract. Schedule of Values should correlate with Bid items or construction costs as applicable. Providing the SOV in electronic format, excel or other spreadsheet would be appreciated. 3. Owner should submit all payment requests on form SF271 to the NC CG&L section with backup Troutman, NC Sewer & Manhole Rehab Page 3 of 5 Pre construction meeting of July 29, 2009 5. The approved set of contract drawings should be furnished to the Owner, inspector, and to contractor's superintendent. A set of drawings shall be marked up as authorized changes occur and as hidden site conditions are discovered. The marked up drawings are to be used in preparing record (as -built) drawings. These marked -up drawings shall be maintained and shall be made available for review by State inspectors at all tunes at the work site. Should record drawings not be kept up to date or made available for review, CG&L may consider withholding reimbursement until the matter is resolved. 6. CG&L Hereby requests acknowledges receipt of half size set of all project drawings be provided to the CG&L inspector. 7. At meeting CG&L requested being notified when a pre -final and the final inspection will occur. CG&L asks that it be provided punch list(s) generated. 8. Prior to commencement of work, contractor shall submit a "Construction Progress Schedule" (i.e. Bar graph, CPM, etc.) showing a breakdown of the principal features of construction correlating to the contract costs. Construction schedule(s) shall be prepared in a format such that the percentage of work completed and the work scheduled for completion at any given date may be determined or estimated. 9. Owner shall submit an itemized cost breakdown; that is, a "Schedule of Values" for each contractor, which shall serve as the basis of reimbursement payments for contractor's monthly estimates and progress payments. This office requests one copy only of each of these two schedules. These may be emailed and the Schedule of Values is preferred in electronic spreadsheet format or Excel. 10. The Owner confirmed at the meeting that all addenda have been submitted to CG&L for approval and that approval was received on both contracts. 11. CG&L advised that OSHA, wage rates and other bulletins must be posted at job site. 12. CG&L presented highlights of remaining items in this Pre Constriction inspection report. 13. Engineer asked that contractor keep Owner and Engineer informed on scheduling especially when starting on man hole rehab. 14. Owner asked contractor to coordinate the Massey St. P. Sta. work with Owner, refer to sheet 8. ROLE OF THE CONSTRUCTION INSPECTION GROUP (CIG) 1. Conduct periodic inspections of the project. 2. Review change orders for necessity and reasonableness to determine eligibility for loan funding. 3. Purpose: a. To ensure that the overall objectives of the loan or grant are realized. b. To monitor administration of the loan and/or grant to ensure the project is executed in accordance with State regulations and loan and/or grant conditions. c. To ensure contract compliance and construction in accordance with NC DENR approved contract documents. d. To advise and offer assistance to the loan and/or grant Recipient. CIG (Construction Inspection Group) INSPECTIONS 1. Prior notice will be given; however, unannounced inspections may also be conducted. 2. Inspections will be concerned with administrative matters and construction matters/activities. 3. During inspections, CIG may wish to review, observe and/or discuss: o files and status of shop drawings, submittals, o inspector's field reports, o status of record (as -built) drawings, o status of: Requests for Information (RFIs), Requests for Proposals (RFPs) o revised construction schedules, Troutman, NC ,r Sewer & Manhole Rehab Page 5 of 5 Pre construction meeting of July 29, 2009 documentation as needed to support the pay request. Forms may be obtained at CG&L web site http://www.nccgl.net/ 4. Owner should be aware of the following payment milestones: a. Before first reimbursement can be made, Contract Documents must be approved. b. Prior to 90% Disbursement - All tax must be reported. c. Before final reimbursement - Engineer's Certification of Completion must be received. 5. Loan and or Grant Agreement/Amendments and all conditions placed on them, if applicable, must be satisfied prior to reimbursements. 6. The Contractor's pay request should coincide with the items on the bid form or approved schedule of values. 7. Do submit / report sales tax with each pay request. The sales tax report should indicate the time period that is covered. The reimbursement amount will be reduced by the sales tax amount at the 90% milestone. The sales tax is included in the Owner's loan or grant amount. Therefore, the Owner should be prepared to cover this amount until they receive a disbursement or reimbursement. If the contractor makes no purchases and has no sales tax to report for the period, regardless, the sales tax report should be submitted and indicate "No sales tax to report this period." 8. If requesting reimbursement / payment for materials stored on site, invoice(s) must be provided to document material cost. Such materials shall be stored safely and securely on site or in a bonded locafion(s). An affidavit from the Engineer may be requested by CG&L for items stored at a bonded location. ENVIRONMENTAL PROTECTION The Owner is advised that the protection of the environment is a loan or grant requirement. It is for Owner, Contractor(s), Engineer and other participating entities to comply with all environmental pollution control programs established by the Local jurisdiction, the State, and the EPA. This includes, but is not limited to: 1. Protection of existing trees, shrubs, and grass. 2. Dust control of haul roads, excavation areas, work areas, and borrow areas. 3. Submission of, adherence to, and compliance with the erosion and sedimentation control plan approved by the applicable State or local agency. 4. Continued proper conveyance and treatment of Owner's wastewater during construction. 5. Proper disposal of all solid and hazardous wastes encountered or generated as part of the project. 6. Notifying the NC Division of Water Quality (DWQ) field office in Mooresville, NC, telephone: ( 704 663-1699 ) to report an oil spill, sewer spill, or other environmental emergency caused by any party. The responsible party shall take the initiative to report the matter promptly and to initiate containment and cleanup activities. 7. Because this is an environmental project, it is expected that the Contractor(s) and sub contractors collect and properly dispose of litter, trash and debris generated by workmen on the project or on the site and along routes of the work. < END Preconstruction Report > �v DIVISION OF WATER QUALITY November 29, 2005 Memo To: Z. Chen, Project Manager Construction Grants and Loans From. Rex Gleason, P.E. Prepared By: Michael Parker )V51 Subject: Town of Troutman Sewer Interconnect with Town of Mooresville Iredell County Per your memo dated October 15, 2005, this Office has reviewed the subject preliminary engineering report submitted by the Town of Troutman (the Town) regarding a proposed sewer interconnect with the Town of Mooresville that will provide the Town with the necessary sewer capacity to accomodate the anticipated growth expected to occur in the next 20 years. Presently, the Town is sending all wastewater to the City of Statesville. The contractual agreement between the Town and Statesville allows the Town to discharge up to .455 MGD of wastewater into Statesville's collection system (current flows average 0.265 MGD). Based on projected 20-year sewer capacity needs, the Town will be generating an estimated 0.846 MGD of wastewater, which is almost double what Statesville and the Town have contracted for. Population projections for the Troutman area indicate that the Town's population will more than triple in the next 20 years, and additional development planned within the Town's sewer service area will further increase demand on wastewater disposal. For this reason, the Town has begun the process of examing all available options for future sewer capacity. Ideally, the Town could increase the amount it sends to Statesville, which would be the simplest way to solve the Town's future capacity concerns. Unfortunantly, Statesville is in a position where expansion at the City's Fourth Creek WWTP is questionable due to impairment and low 7Q 10 flow of the receiving stream. The Town has also considered constructing its own WWTP, however, this option was explored extensively several years ago prior to the Town entering into the sewer agreement with Statesville. At that time, it was discovered that there was not a suitable receiving stream available to the Town in which to discharge. The Town then approached the Town of Mooresville, who currently has available capacity in their WWTP that would take care of the Town's current needs. Mooresville has also begun the process of expanding it's WWTP, and could include the projected 20-year flow from Troutman in their expansion plans. This interconnect would allow for Troutman to continue at their present growth rate, utilize existing treatment capacity in non -impaired waters, and allow the Town to maintain the option of sending wastewater to either Mooresville or Statesville depending on conditions at either facility. Troutman is anticipating the addition of an ammonia nitrogen limit being imposed by Statesville in the near future, but is not anticipating such from Mooresville. Such being the case, this Office has no objection to the Town's constructing a sewer interconnect with the Town of Mooresville. Page Two If you have any questions regarding this matter, please advise. /mlp cc: Barbara Sifford hAgenkogtmemo.doc Permit Issued Effect Expired Number Owner Name - Facility Name Owner Tvoe Permit Tvoe County Date Date Date Primary Reviewer Reqion W00019199 Town of Mooresville - Upper Rocky River Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 08/02/02 08/02/02 kristin.miguez Mooresville Sewers/Dogwood Street Sewer Municipal Sewer Extensions WQ0021108 Town of Mooresville - Wastewater Facilities, Mount Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 03/11/02 03/11/02 kristin.miguez Mooresville Mourne Force Main Municipal Sewer Extensions WQ0021795 Town of Mooresville - Wastewater Facilities, West Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 11/08/02 11/08/02 kristin.miguez Mooresville Branch Reeds Creek Municipal Sewer Extensions WQ0015286 Town of Mooresville - Williamson Road Sewerline Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 07/16/03 07/16/03 sylvia.barbour Mooresville Extension Municipal Sewer Extensions W00020256 Town of Troutman -Autumn Creek Subdivision Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 09/17/01 09/17/01 kristin.miguez Mooresville Municipal Sewer Extensions r W00021877 t Town of Troutman - Barium Seasons Village Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell - \L --- - - 11/22/02 - 11I22/02 s - kristin.miguez Mooresville Municipal Sewer Extensions W00024769 Town of Troutman - Charles Center Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 01/12/05 01/12/05 sonja.basinger Mooresville Municipal Sewer Extensions WQ0021876 Town of Troutman - Dogwood Estates, Phase I Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 11/22/02 11/22/02 kristin.miguez Mooresville Municipal Sewer Extensions WQ0020223 Town of Troutman - Eastern Heights Phase 2 Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 08/27/01 08/27/01 kristin.miguez Mooresville Municipal Sewer Extensions W00020624 Town of Troutman - Jacob's Woods Subdivision Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 11/30/01 11/30/01 kristin.miguez Mooresville Municipal Sewer Extensions WQ0021978 Town of Troutman - Kenneth Bealer Homes, Lots 1-6 Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 11/22/02 11/22102 kristin.miguez Mooresville Municipal Sewer Extensions W00020383 Town of Troutman - Pleasant Garden Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 09/28/01 09/28/01 kristin.miguez Mooresville Municipal Sewer Extensions WQ0022336 Town of Troutman - Quail Hollow Subdivision Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 02/24/03 02/24/03 marie.doklovic Mooresville Municipal Sewer Extensions WQ0029063 Town of Troutman - Troutman Industrial Park Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 07/08/05 07/08/05 dee.browder Mooresville Municipal Sewer Extensions WQ0017823 Town of Troutman - Troutman Town Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 03/22/00 03/22/00 kim.colson Mooresville Municipal Sewer Extensions W00018792 Town of Troutman - Troutman Town -Barium Lane Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 09/07/00 09/07/00 kristin.miguez Mooresville Municipal Sewer Extensions WQ0017155 Town of Troutman - Troutman Town -South Trace Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 08/06/99 08/06/99 kristin.miguez Mooresville Sub Municipal Sewer Extensions WQ0015168 Town of Troutman - Troutman Town -US Hwy 21 Util Government - Gravity Sewer Extension, Pump Stations, & Pressure Iredell 03/08/99 03/08/99 kim.colson Mooresville Municipal Sewer Extensions WQ0004108 Tricor - Tricor-Sewer Non -Government Gravity Sewer Extension, Pump Stations, & Pressure Iredell 09/28/90 09/28/90 kim.colson Mooresville Sewer Extensions W00021583 Tsumas Family Limited Partnership - Morrison Non -Government Gravity Sewer Extension, Pump Stations, & Pressure Iredell 08/12/02 08/12/02 kristin.miguez Mooresville Executive Suites Sewer Extensions W00013800 Underhill Corp - Underhill Corp -Underhill Vill Non -Government Gravity Sewer Extension, Pump Stations, & Pressure Iredell 05/02/97 05/02/97 kristin.miguez Mooresville Sewer Extensions WQ0015791 Venture Properties III, LLC - Venture Properties I Non -Government Gravity Sewer Extension, Pump Stations, & Pressure Iredell 09102/98 09/02/98 kristin.miguez Mooresville LLC-Stap Sewer Extensions WQ0019358 Village At Lake Norman Ph 1 - Village At Lake Non -Government Gravity Sewer Extension, Pump Stations, & Pressure Iredell 02/19/01 02/19/01 kristin.miguez Mooresville Norman Ph 1 Sewer Extensions W00003565 Vintage Dev Cc - Vintage Dev Co-Femcliff Est Non -Government Gravity Sewer Extension, Pump Stations, & Pressure Iredell 07/11/90 07/11/90 kim.colson Mooresville Sewer Extensions W00008658 W G S Inc - W G S Incorporated -Windsor Wds Subd Non -Government Gravity Sewer Extension, Pump Stations, & Pressure Iredell 01/11/94 01/11/94 kim.colson Mooresville Sewer Extensions WQ0019447 Wachovia Bank Na - Wachovia Bank Na-Brawley Non -Government Gravity Sewer Extension, Pump Stations, & Pressure Iredell 02/19/01 02/19/01 kristin.miguez Mooresville Corn Sewer Extensions 13 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins ee R e6r� y r zs Governor Director„nL secretary"`Y°°-' May 15, 2009 MAY 19 2009 Mr. David Saleeby, Town Manager Town of Troutman Post Office Box 26 Troutman, North Carolina 28166 SUBJECT: Town of Troutman Sewer Improvements Approval of Addenda Nos. 1 and 2 American Recovery and Reinvestment Act of 2009 Project No. 2W370580-04 Dear Mr. Saleeby: Reference is made to Addenda Nos. 1 and 2, received May 14, 2009, from the engineer for revisions to the subject project. The proposed addenda, as described in the attachments, have been reviewed by this office, and are hereby approved, and eligible for funding in accordance with the loan offer and conditions thereof. The approval of these addenda does not constitute any change in the amount of your loan for this project. It is the responsibility of the recipient and the consulting engineer to insure that the project plan documents are in compliance with Amended N.C.G.S. 133-3 (ratified July 13, 1993). The administrative review and approval of addenda do not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. Adequate time must be allowed for the potential bidders and this office to receive and act on addenda prior to the receipt of bids for subject project. A copy of the approved addenda is attached for your files, and one (1) copy retained for our files. 1633 Mail Service Center, Raleigh, North Carolina 27699-1633 One Location: 2728 Capital Blvd. Raleigh, North Carolina 27604 NorthCarolina Phone: 919-733-69001 FAX: 919-715-62291 Customer Service: 1-877-623-6748 n n / Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative A�yt�t+�llf �/ Action Employer �/ Mr. David Saleeby, Town Manager Page 2 May.15, 2009 Should you have any questions regarding this matter, please do not hesitate to contact Ken Pohlig, P.E. at (919) 715-6221. Sincerely, &0 /� 5� Seth Robertson, P.E., Supervisor Design Management Unit Construction Grants & Loans Section kp/sr Attachment cc: Benjamin B. Thomas, P.E., West Consultants, PLLC, Morganton, NC . DW_Q Mooresvilie_Regional_Office� Mark Hubbard, P.E. Ken Pohlig, P.E. ARRA File t 4 WEST - CONSULTANTS me 405 South Sterling Street, Morganton NC 28655 828 433 5661 / Fax 828 433 5662 / westcons@bellsouth.net ADDENDUM NO. 1 r , MAY 14 2009 t}. ►..'. .:, , r.' This ADDENDUM NO. 1 is being issued April 29, 2009, to all parties who hold a set of CONTRACT DOCUMENTS on the project entitled: TOWN OF TROUTMAN SEWER IMPROVEMENTS AMERICAN REINVESTMENT & RECOVERY ACT FUNDING IREDELL COUNTY, NORTH CAROLINA This ADDENDUM NO. 1 shall become part of the CONTRACT DOCUMENTS and its receipt acknowledged on the BID DOCUMENTS at the time of bidding. ARRA Special Conditions: In accordance with the American Recovery and Reinvestment Act of 2009 (ARRA), the following requirements apply to this project and the Contractor shall comply with each one: A. Prevailing Wages Section 1606 of the ARRA contains the following language: "Notwithstanding any other provision of law and in a manner consistent with other provisions in this Act, all laborers and mechanics employed by contractors and sub contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to this Act shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code. With respect to the labor standards specified in this section, the Secretary of Labor shall have the authority and functions set forth in Reorganization Plan Numbered 14 of 1950 (64 Stat . 1267; S U. S. C.App.) and section 3145 of title 40, United States Code. " Current wages for assumed types of laborers are included herein. Contractor shall be required to pay prevailing wages at time of Contract and based on actual labor category used. B. American Iron, Steel, and Manufactured Goods Section 1605 of the ARRA requires that none of the appropriated funds may be used for the construction, alteration, maintenance, or repair of a public building or public work unless all of the iron, steel, and manufactured goods used in the project is produced in the United States unless (a) a waiver is provided to the recipient by EPA or (b) compliance would be inconsistent with United States Pagel of 2 TOWN OF TROUTMAN SEWER IMPROVEMENTS AMERICAN REINVESTMENT & RECOVERY ACT FUNDING Addendum No. 1 IREDELL COUNTY, NORTH CAROLINA April 29, 2009 obligations under international agreements. In order to receive a waiver, the State must send a written request to the Administrator. A decision will be made based on the following criteria: 1. The requirement is inconsistent with the public interest for purposes of the project for which a waiver has been requested, 2. Iron, steel, and necessary manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality or, 3. Inclusion of iron, steel, and manufactured goods produced in the United States will increased the overall cost of the project by more than 25 percent. If a waiver is granted by the Administrator, EPA will publish such waiver, with a sufficient explanation, in the Federal Register. EPA will provide additional guidance on this provision as it becomes available. C. Reporting States will be required to report no less than weekly on the uses offunds provided by the ARRA. The CWRSF Benefit Reporting database (formally known as one - pagers) and the Drinking Water Project Tracking System, will be used to gather information regarding key project characteristics and milestones, as shown in Attachment 4. Project data should be entered in to the reporting systems as soon as agreements are signed with assistance recipients. The purpose of these requirements is to ensure Agency and State compliance with the requirements to track data in section 1512 of the ARRA. EPA will compile the data on a weekly basis, as required by OMB, for publication at recovery.gov. Therefore, the Contractor shall provide information to the Owner as may be requested, on.a weekly basis. Such information may include, but not be limited to, the current number of employees and hours worked. ADDENDUM NO. 1 Issued this 29th day of April, 2009 AySf:B:.BCpp+ Per C A Z"Y ty ,� W " Benjamin B. Thomas PE 20757, oRn West Consultants, PLLC'a® Morganton, North Carolina o� ��8��9�OP6844g"� 4 /kj Page 2 of 2 WWEST 405 South Sterling Street, Morganton NC 28655 CONSULTANTS P«< 828 433 5661 / fax 828 433 5662 / westcons@bellsouth.net, a Ny4Y 1 2009 ADDENDUM NO. 2 This ADDENDUM NO. 2 is being issued May 8, 2009, to all parties who hold a set of CONTRACT, u � r DOCUMENTS on the project entitled: TOWN OF TROUTMAN SEWER IMPROVEMENTS AMERICAN REINVESTMENT & RECOVERY ACT FUNDING IREDELL COUNTY, NORTH CAROLINA This ADDENDUM NO. I shall become part of the CONTRACT DOCUMENTS and its receipt acknowledged on the BID DOCUMENTS at the time of bidding. Water will be available for product application at no charge from fire hydrants on the Owner's system. Contractor must provide and use backflow preventer. 2. Section 07310 Protective Coating and Lining for Manholes: a.. Technical Specification Section 07310.7 shall allow microsilicate. b. Technical Specification Section 07310.11 —Corrosion protection shall be epoxy and shall be 100% solids. The epoxy shall have the following properties: compressive strength of 8800 psi, flexural strength of 12,400 psi, and tensile strength of 7700 psi. The epoxy coating shall be Madewell Mainstay DS-5, Tnemec equal, Sherwin Williams equal, Sprayroq equal, or other approved equal. BID FORM: The BID FORM has been revised to add a separate item for the epoxy corrosion protection. Bid Item No. 12 shall not include the corrosion protection. Bid Item No. 13 shall be for epoxy corrosion protection of manholes that are relined. No manholes are to be coated with epoxy that are not also relined. However, the Owner may elect to omit epoxy corrosion protection from some relined manholes. SRF Standard Conditions: The Office of Economic Recovery and Investment has requested that additional provisions be included in projects funded by the American Reinvestment & Recovery Act Funding of 2009 to clarify the process required to meet the requirements of the DBE Program. These Conditions shall replace the existing SRF Special Conditions issued with the Contract Documents. ADDENDUM NO. 2 Issued this 80' day of May, 2009 Benjamin B. Thomas, PE West Consultants, PLLC Morganton, North Carolina /kj QeR,�p42A35S9?E�,CeAY �` -„ 757 i G0 9 t0® Pr u c t •�fl � �Ii�b]9�a q`$ C 09' o6 fiv d�eed�. ae es av se rsaFs Page 1 of 1 t BID FORM BM Submitted by TOWN OF TROUTMAN SEWER IMPROVEMENTS IREDELL COUNTY, NORTH CAROLINA West Consultants, PLLC Project Aro. 09044 TABLE OF ARTICLES Arlrlendain No.1, dater! rtlay 8, 2009 (Insert Company Name) Page Article1 —Bid Recipient......................................................................................................................................................................2 Article2 — Bidder's Acknowledgernents..............................................................................................................................................2 Article3 — Bidder's Representations....................................................................................................................................................2 Article4 — Further Representations...................................................................................................................................................... 3 Article5 — Basis of Bid.........................................................................................................................................................................4 Article6 — Time of Completion............................................................................................................................................................ 5 Article7 — Attachments To This Bid....................................................................................................................................................5 ArticleS — Defined Terms.................................................................................................................................................................... 5 Article 9 - Bid Submittal.........:...................I.................... 6 ................................................................................................................. FJCDC C410 Suggested Bid Form for Construction Contracts Copyright t 2002 National Societe of Professional F,ngiaeers for EJCDC. All rights reserved. 00410 - 1 Arldenthim No. I, dated May 8, 2009 ARTICLE I — BID RECIPIENT 1.01 This Bid is submitted to: Tower of Troutman PO Box 26 400 Eastivay Drive Troutman, NC 28166 1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents. ARTICLE 2 _ BIDDER'S ACKNOWLEDGEMENTS 2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including Nvithout limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner. ARTICLE 3 — BIDDER'S REPRESENTATIONS 3.01 In submitting this Bid, Bidder represents that: A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged. Addendum No, Addendum Date B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work. C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work. D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in SC-4.02, if any, and (2) reports and drawings of Hazardous Environmental Conditions that have been idenpfied in SC-4.06, if any. E. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto. F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents. EJCDC C410 Suggested Bid Form for Construction Contracts Copyright O 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00410 - 2 Adden(luni No. I, dated May 8, 2009 G. Bidder is aware of the general nature of work to be perfonned by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents. H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents. 1. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the Nwitten resolution thereof by Engineer is acceptable to Bidder. J. The Bidding Documents are generally sufficient to indicate and convey understanding of all'terms and conditions for the performance of the Work for which this Bid is submitted. K. Bidder Aill submit written evidence of its authority to do bushiness in the state where the Project is located not later than the date of its execution of the Agreement. ARTICLE 4 = FURTHER REPRESENTATIONS 4.01 Bidder further represents that: A. this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner. EJCDC C410 Suggested Bid Form for Construction Contracts Copyright 0 2002 National Society o£Professional Engineers for EJCDC. All rights reserved. 00410 - 3 e Arldenrlunt No. 1, dated May 8, 2009 ARTICLE 5 — BASIS OF BID 5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s): Item Quantity Unit Unit Price Total Bid 1 8" PVC Sanitary Sewer 380 LF $ $ 2 8" DIP Sanitary Sewer 20 LF $ $ 3 Cured In Place Pipe (CIPP) 771 LF $ $ 4 Replace 4" Sewer Service to R/W (Pipe Only) 7 EA $ $ 5 4" Clean Out (To be Installed for Each Tap Within the Proposed Work Area) 38 EA $ $ 6 8" X 4" Sanitary Sewer Service Saddles 15 EA $ $ 7 8" X 4" DIP Wye 3 EA $ $ 8 Replace Manhole 10 EA $ $ 9 Locate and Raise Manholes 2 EA $ $ 10 Massey Street Wet Well Modifications (includes removal and disposal of all debris and solids in existing wetwell) 1 LS $ $ 11 Aerial Stream Crossing Piers Replacement 1 LS $ $ 12 Manhole Relining 256 VF $ $ 13 Corrosion Protection - Epoxy 256 VF $ $ 14 Replace 4" Service Lateral (MH #21, Sheet 7) 40 LF $ $ Total Bid S 'NOTE: Costs for all mobilization, fertilizing, seeding, and mulching, landscaping, ctilvu•t atadlence replacements, and stone foundation conditioning, if any, shall be included in the various bid items. No separate payment will be inade for these items. Unit Prices have been computed in accordance with Para, aph 11.03.B of the General Conditions. Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract Documents, EJCDC C410 Suggested Bid Form for Construction Contracts Copyright 02002 National Society or Professional Engineers for EJCDC. All rights reserved. 00410 - 4 Adrlefultun No. 1, dated rV1ajo 8, 2009 ARTICLE 6 — TIME OF COMPLETION 6.01 Bidder agrees that the Work will be substantially complete within 90 calendar days after the date when the Contract Tunes commence to run as provided in Paragraph 2.03 of the General Conditions, and will be completed and ready for final payment in accordance with Paragraph 14.07.13 of the General Conditions within 120 calendar days after the date when the Contract Times commence to run. 6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Times. ARTICLE 7 — ATTACHMENTS TO THIS BID 7.01 The following documents are attached to and made a condition of this Bid: A. Required Bid security. B. "Affidavit A —Listing of Good Faith Efforts" or "Affidavit B — Intent to Perform Contract with Own Workforce" C. Identification of Minority Business Participation, if applicable. D. For building contracts: A list of proposed Subcontractors for Heating, Ventilating, and Air Conditioning; Plumbing; and Electrical. E. For any Subcontractors proposed to perform more than 25% of the total work, provide a list of such Subcontractors with the following information as a minimum: Name, address, telephone number, license type and number, five references, experience history, and a list of current projects. ARTICLE 8 — DEFINED TERMS 8.01 The terns used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions. EJCDC C410 Suggested Bid Form for Construction Contracts Copyright!) 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00410 - 5 I ARTICLE 9 — BID SUBMITTAL 9.01 This Bid submitted by: If Bidder is: An Individual Name (typed or printed): By: Doing business as: A Partnershin (Individual 's signature) Addendum No.1, dated dray 8, 2009 (SEAL) Partnership Name: (SEAL) By: (Signature of genera! partner — attach evidence of authority to sign) Name (typed or ptinted): A Corporation Corporation Name: State of Incorporation: Type (General Business, Professional, Service, Limited Liability): By: (Signature — attach evidence of authority to sign) Name (typed or printed): Title: Attest: (Signatu•e of Corporate Secretar}) Date of Qualification to do business in (CORPORATE SEAL) [State Where Project is Located] is 1 1 EJCDC C410 Suggested Bid Form for Construction Contracts Copyright V 2002 National Society of Professional Engineers for F,JCDC. All rights reserved. 00410 - G (SEAL) e 1 Addenduni No.], dated May 8, 2009 A Joint Venture Name of Joint Venturer: First Joint Venturer Name: By: (Signature of fir st joint venture partner — attach evidence of authority to sign) Name (typed or printed): Title: Second Joint Venturer Name: By: (SEAL) (SEAL) (Signature of second joint venture partner — attach evidence of authority, to sign) Name (typed or printed): Title: (Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.) Bidder's Business address: Phone: Facsimile: Submitted on 20 State Contractor License No. (If applicable) EJCDC C-410 Suggested Bid Form for Construction Contracts Copyright 2002 National Society of Professional Engineers for EJCDC. All rights reserved. 00410 - 7 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES MOORESVILLE REGIONAL OFFICE DIVISION OF WATER QUALITY July 26, 1999 Mr. Tom Addley Town of Troutman PO Box 26 Troutman, North Carolina 28164-0026 Subject: Collection System Spill Response And O&M Plan Review Troutman NPDES Permit No. NCO026832 Iredell County, NC Dear Mr. Addley: Mooresville Regional Office staff have completed a review of the Spill Response and Operation and Maintenance Evaluation Plans. The information will be used in determining the adequacy of operation of the subject collection system in the event of bypasses. Beginning July 1, 1999 all sewage bypasses must be reported in accordance with the following procedures: Wastewater Collection System bypasses must be reported to the Water Quality Section of the Mooresville Regional Office (see attached list) during regular business hours (8:00 am through 5:00 pm, Monday through Friday, excluding holidays) by telephone within 24 hours of first knowledge of the bypass. A wastewater bypass in any amount which reaches surface waters or a bypass to the land greater than 1,000 gallons must be reported. 2. Sampling of the impacted stream(s) consisting of dissolved oxygen, pH, and conductivity must be conducted upstream, at the point of entry to the stream, and downstream of the bypass when the spill reaches surface waters. The data must be reported on the Sewage Spill Response Evaluation Form within five (5) working days. The report should be sent to the Water Quality Section of the Mooresville Regional Office (address at the bottom of this letter). 3. The responsible parry must immediately notify the North Carolina Wildlife Resources Commission at (919) 733-3391 should the bypass cause a fish kill. 919 NORTH MAIN STREET, MOORESVILLE, NORTH CAROLINA 28115 PHDNE 704-663-1699 FAX 704-663-6040 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/1 O% POST -CONSUMER PAPER Spill Response and O&M Plans Page 2 4. A wastewater bypass that is the result of vandalism must be reported to this Office within 24 hours of first knowledge (see Number 1 above). Pictures of the.vandalism and/or a copy of the police report should be included with the written report (see Number 2 above). Be advised that a minimum civil penalty of four thousand dollars ($4,000) may be assessed against the responsible party who does not report a sewage bypass in a timely manner as described above. Should you have any questions concerning our review or any of the above requirements, please contact Mr. G.T. Chen or Mr. John Lesley of this Office. Sincerely, D. Rex Gleason, P.E. Water Quality Regional Supervisor Cc: Jeff Poupart, Non -Discharge Compliance Group Central Files Iredell County Health Department JL/GTC Mooresville Regional Office Division of Water Quality Water Quality Section (704) 663-1699 Name Extension Number . G.T. Chen 207 Mike Parker 223 Charley Swartz 226 Samar Bou-Ghazale 225 Barry Love 228 Wes Bell 229 Linda Love 231 Robert Scheller 263 John Lesley 230 Richard Brid eman 264 *Allen Johnson 232 Ellen Hufftnan 233 * Rex Gleason 204 * contact only if other staff are unavailable t; Facility Name: Troutman WWTP Permit Number: NC0026832 Contact: G. T. Addley, (704) 582-7600 Criteria Requirement Evaluation Points Evaluation Points Total for Gravity Sewer for Pump Station Points I Map of Collection System Yes = 5; (No = 0) Yes = 4; (No = 0) 9 Annual visual inspection of all lines Conducted = 10 Conducted = 9 2 not visible from normal public access. 19 Regular visual inspection of high Not conducted = 0 Not conducted = 0 prioirty areas 3 Right of way maintenance to allow Adequate = 5 Adequate = 4 9 system accessibility Inadequate = 0 Inadequate = 0 4 Schedules/conducts line cleanings Yes = 5; (No = 0) Yes = 4; (No = 0) 9 5 Spare parts inventory & list of Yes = 5; (No = 0) Yes = 4; (No = 0) 9 contrators 6 Up -to date maintenance, inspection Yes = 5; (No = 0) Yes = 4; (No = 0) 9 and equipment testing records 7 Maintains trouble location log (Yes = 10); No = 0 (Yes = 9); No = 0 0 8 Adopt sewer use ordinance Yes = 2; (No = 0) Yes = 2; (No = 0) 4 9 Follow sewer use ordinance Yes = 3; (No = 0) Yes = 2; (No = 0) 5 10 (Pump station only) Monthly test N/A Yes = 4; (If reliability & 4 back-up equipment and/or reliability back-up power req.'s do systems not apply) (No = 0) I 1 (Pump station only) Pump stations N/A Yes = 4; (No = 0) 4 inspect 3-times/week for systems without telemetry or once a week for systems with telemetry Total O/M Program Score 91 2. Starting 07/01/99, minimum semi-annual inspection of all high priority line (e.g. aerial lines, aerial crossings, stream crossings, siphons and streambank lines, etc.) In addition to the annual inspection of all lines not visible from the normal public access. 11. Beginning 07/01/00, pump stations shall be inspected daily if telemetry is not used. Beginning 07/01/01, pump stations shall be inspected once every 24 hrs if telemetry is not used. 'A1 TOWN OF TROUTMAN SANITARY SEWER OVERFLOW (S.S.O.) CLEANUP AND PUMPING PROCEDURES AS ADOPTED BY: WASTEWATER COLLECTIONS TOWN OF TROUTMAN, SYSTEM OPERATOR G.THOMAS ADDLEY Department of Public Works Operations Division MEMO TO: All Town of Troutman Operations Personnel FROM: G.T. Addley, Collection System Operato�Y , Date: September 22, 1997 - -SUBJECT: Sanitary Sewer -Overflow S.S.O. Operations Division Response - - - Procedures 1) Sanitary Sewer Overflows endanger our environment and potentially the health of any citizens, or employees that come into contact with an S.S.O. Unchecked S.S.O.'s can result in significant penalties from State and Federal environmental regulatory agencies as well. The procedures below were designed to protect our environment, citizens, and employees from an S.S.O. event. These procedures apply to Town of Troutman, Operations personnel. 2) Upon discovery of an S.S.O. an initial response will be made by the "on call person" on the Wastewater crew. Upon arrival, the "on call person" will make an immediate assessment to determine if a S.S.O, event has taken place. If an event has taken place, or is in progress, the on call person will attempt to eliminate the source of the S.S.O. and contact the Town of Troutman's collection system operator. 3) The Collection System Operator, or his alternate will respond to the location without delay. Upon arrival, the Collection System Operator will make an assessment of the S.S.O. and determine what is required to mitigate the event and establish a course of action for clean-up and restoration of S.S.O. site. 4) If a blockage has occurred and overflow is in progress the Collection System Operator will: Contact a Public Works Personnel needed for assisting in corrective action including: Jetting Lines, Excavation, Bypass Pumping, or any repair. 5) The Collection System Operator will record all events as per the Town of Troutman's "S.S.O. Clean-up Procedures Instruction dated September 19, 1997 and will be the primary contact to -VAWx County and State of North Carolina authorities. J-1c` OCILL Collection System Operator G.T. Addley PURPOSE: The purpose of this document is to protect the citizens of Troutman, North Carolina and the Environment by establishing written procedures for responding to Sanitary Sewer Overflows (S.S.0). This procedure applies to all Public Works employees that in the course of their work may deal with S.S.O's. These procedures will be reviewed at least semi- annually, or whenever revised guidance from county, state or federal authorities dictate a revision is necessary. ON ASPHALT OR CONCRETE 1) Set up containment at or near the storm drainage system; do not let the spill _ _enter the storm drainage system 2) Put up tape, black on red "Danger Do Not Enter," around the S.S.O. area. 3) Spread line on spillage and sand (or equivalent material) to a depth of 1 inch. Let this stand for 1 hour and sweep up. If moisture or grease is still present, repeat procedure. 4) After removing the contaminated material, wash down the area with high water pressure and Clorox. Pump this back into the sewer system. Transport wet sand to drying beds at the Old Public Works site and dispose of (after drying) at the County Landfill. 5) If this spill goes into the storm drainage system, refer to creek procedure. IN CREEK OR STREAM 1) Take conductivity readings of creek in order to determine the proper placement of dam. The dam needs to be constructed near a manhole or at a location which is accessible to the jet/vacuum truck. Placement of the dam should be at a point where the lowest conductivity reading is measured if possible. Build the dam using dirt that is capable of handling creek and hydrant water without dam failure. Station two pumps at the dam that are capable of handling creek flow. Use one pump for backup. Have backhoe at site with extra material at all times so dam can be rebuilt if a breach occurs. There will be two workers at the pump site at all times during pumping operations. Pump effluent from the dam into the manhole. 2) Put up warning tape, black on red "Danger Do Not Enter," from the S.S.O. site to the pump site on both sides of the creek in populated areas. In unpopulated areas restrict access where there is any chance of humans coming in contact with the S.S.O. 3) Take fecal coliform samples at the S.S.O. site, 100 feet above the S.S.O. site, and at 400 foot downstream intervals until reaching the pump site. Bring the samples to the Waste Water Treatment Plant. Pull samples every 24 hours until readings of 500 colonies/ml, or less are obtained. 4) Flush stream with water from a sufficient number of hydrants to remove waste product from the creek. Continue to pump and flush stream until all fecal coliform tests come back 500 colonies/ml or less. Pull samples every 24 hours until this reading is obtained. Pull samples 100 feet above the S.S.O. site, and at 400 feet intervals until reaching the pump site. Notify water treatment plant when starting and stopping of stream- flushing. - - 5) If Rip Rap is in creek, wash down with high water pressure until there is no waste residue remaining on, or within the Rip Rap structure. 6) If sludge is in creek, broom creek bottom and sides until there is no waste residue remaining. 7) If creek flows into a body of water used for recreation, and or drinking, notify the affected county and local officials as soon as the problem is discovered. If this happens, refer to pond, lake procedure. IN POND OR LAKE 1) Put up warning tape, black on red "Danger Do Not Enter," on the shoreline at the contaminated area. 2) In a pond, collect fecal coliform samples and Dissolved Oxygen (D.O.) readings around the entire circumference. Set up pumping operations below the dam. 3) In a large lake, collect fecal samples 2 feet off the bottom. D.O. readings are to be done 1 foot under the surface. Take equal sampling amounts around the circumference of the structure. 4) When the first sampling results come in, contact the Public Works Director for appropriate action if the fecal coliform counts are greater than 8,000 colonies/ml. 5) Continue pumping until 500 colonies/ml or less are obtained in the structure. 6) Keep monitoring fecal coliform counts until the North Carolina Department of Water Quality or the Iredell County Public Health Department says that monitoring is no longer required. OUTFALL 1) Put up warning tape, "Danger Do Not Enter," around the S.S.O. site. 2) In -open area, lime (powder) heavily -and till.- -Repeat procedure.- Seed- _ - and then put down straw. 3) In an area where there is undergrowth or small trees, wash area with large amounts of water. Push into creek towards the pump site. Do this until no waste remains. Wait for 12 or 24 hours then lime the area heavily. Do not get lime in the creek. Do not lime when the weather forecast is predicting rainfall. IN CITIZEN'S YARD 1) Till the area whenever possible. Apply lime, seed, and straw. 2) If not able to till, apply lime and two inches of topsoil and mix thoroughly. Lime again lightly, then seed, and cover with straw. S.S.O. REPORTING PROCEDURES 1) Upon discovery of a possible S.S.O. site during normal duty hours, notify the Collection System Operator at the telephone numbers below: G.T. Addley (704) 528-1027, Home (828) 312-0458, Cell or A.J. Barghothi (704) 924-7408,Home (828) 312-0462,Cell 2) After normal duty hours contact G.T. Addley on pager number 838-9221. In the event that he cannot be reached, contact A.J. on his cell phone at 312-0462. In the event that these individuals cannot be reached, call the Communications Center at 878-3100. 3) S.S.O. Contact Monitors will be the primary interface between the Town of Troutman and the State of North Carolina Department of Water Quality and the Iredell County Health Department on all S.S.O. matters. 4) S.S.O. Contact Monitors will report overflows from any sewer line or _pump station, -or the bypass of any wastewater treatment system or any component thereof. This requirement applies in the following cases according to the Collection System Enforcement Guidance. COLLECTION SYSTEM ENFORCEMENT GUIDANCE ( Numbers Correspond to Flow Chart) 1) The reporting threshold shall be 1,000 gallons for spills on the ground which do not reach surface waters. The report must occur within 24 hours of knowledge of the spill. The following spills must be reported immediately (or within 24 hours of first knowledge): a) spills that reach surface waters (i.e. any spill that reaches any water already present in a conveyance, stream, ditch, etc...) b) spills greater than 1,000 gallons on the ground regardless of whether they are contained. • The 1,000 gallon threshold applies only to spills on the ground that are captured, fully contained and removed quickly, ensuring that no wastewater reaches surface waters. Municipalities must keep records of all spills for a period of three years and those records must be available for review by DWQ staff upon request. • Volume estimations shall be expressed as a range, rather than a specific amount (e.g. 0-1,000 gallons and 1,001-2,500 gallons, as opposed to exactly 25 gallons). 2) Any spill that reaches surface waters must be reported. A spill that reaches any water that was already present in a conveyance, stream, ditch, etc. is considered to have reached surface waters. In addition, spills which reach a conveyance or ditch and can not be captured and contained are considered to have reached surface waters. S.S.O. TELEPHONE CONTACT NUMBERS State of North Carolina Division of Water Quality - - - State of North Carolina - - - - - - - Division of Emergency Management (For after hour spills that reach a waterway) Iredell County Emergency Health Division Town Administrator A.J. Barghothi Director of Public Works Tom Addley (704)663-1699 1-800-858-0638 (704) 878-5300 (828) 312-0462 (704) 528-1027 (704) 878-4195 Sec. 1. Purpose. AN ORDINANCE TO REGULATE, RESTRICT AND LIMIT, IN THE INTEREST OF .THE PUBLIC HEALTH AND SAFETY, THE DEPOSIT OR DISCHARGE OF CERTAIN SUBSTANCES INTO ANY SANITARY SEWER NOW MAINTAINED AND/OR OWNED BY OR WHICH MAY BECOME THE PROPERTY OF OR WHICH MAY BE LEASED TO THE TOWN OF TROUTMAN, COUNTY OF IREDELL, STATE OF NORTH CAROLINA. WHEREAS, the Federal Water Pollution Control Act Amendments of .1972, PL 92-500 (hereinafter referred to as the "Act") have resulted in an unprecedented program of cleaning up our Nation's waters; WHEREAS, the Town -of Troutman has already made and will continue to make a substantial financial investment in its wastewater treatment system to achieve the goals of the Act; and WHEREAS, the Town of Troutman seeks to provide for the use of its wastewater treatment system by industries served by it without damage to the physical facilities, without impairment of their normal function of collecting, treating and discharging domestic wastewater, and without the discharge by this Town's wastewater treatment system of pollutants which would violate the discharge allowed under its National Pollutant Discharge Elimination System (NPDES) permit and the applicable rules of all governmental authorities with jurisdiction over such discharges. NOW, THEREFORE, be Alderman of the Town Carolina as follows: Sec. 2. Definitions. it ordained and enacted by the Town Board of of Troutman, County of Iredell, State of North (a) "Approving Authority" shall be the Mayor of the Town of Troutman. (b) "Biochemical Oxygen Demand" (BOD) means the quantity of oxygen utilized in the biochemical oxidation of organic matter under standard laboratory procedure in five (5) days at 20°C, expressed in terms of weight and concentration (milligrams per liter) . (c) "COD" (Chemical Oxygen Demand) means the quantity of equivalent oxygen utilized in the chemical oxidation of organic matter as measured by standard laboratory methods, as set out herein, expressed in milligrams per liter. (d) "Cooling Water" means the water discharged from any use such as air conditioning, cooling or refrigeration, during which the only pollutant added to the water is heat. (e) "Compatible pollutant" means BOD, suspended solids, pH and fecal coliform bacteria, and such additional pollutants as are now or may be in the future specified and controlled in this Town's NPDES permit for its wastewater treatment works where said works have been designed and used to reduce or remove such pollutants. (f) "Domestic wastes" means liquid wastes (i) from the non- commercial preparation, cooking, and handling of food, or (ii) containing human excrement and similar matter from the sanitary conveniences of dwellings, commercial buildings, industrial facilities, and institutions. (g) "Excessive Radiation Dose" shall be a dose of radiation in excess of the maximum dose. (h) "Garbage" means solid wastes from the domestic and commercial preparation, cooking, and dispensing of food, and from the handling, storage, and sale of food. (i) "Hearing Authority" means the mayor, - town -attorney, and superintendent of wastewater treatment plants or their duly appointed deputies' agents or representatives. U) "IOD" (Immediate Oxygen Demand) means the quantity of oxygen utilized by an industrial waste in excess of that normally attributable to sewage as measured by using standard laboratory methods, asset out herein, expressed in milligrams per liter. (k) "Incompatible pollutant" means any pollutant which is not a "compatible pollutant" as defined in this section. (1) "ICR" is the Industrial Cost Recovery system developed by the Town in accordance with applicable Federal regulations. (m) "Industrial wastewater" .means the liquid wastes from industrial, manufacturing, trade, or business establishments, as distinct from domestic wastes. (n) "Infiltration" is the water entering a sewer system, including sewer service connections, from the ground, through such means as, but not limited to, defective pipes, pipe joints, connections or manhole walls. Infiltration does not include, and is distinguished from, inflow. (o) "Inflow" is the water discharged into a sewer system, including service connections from such sources as, but not limited to, roof leaders, cellar, yard and area drains, foundation drains, cooling water discharges, drains from springs and swampy areas, manhole covers, cross connections from storm sewers and combined sewers, catch basins, storm waters, surface run-off, street washwaters, or drainage. Inflow does not include, and is distinguished from, infiltration. (p) "Major Contributing Industry" means any industry whose flow exceeds 25,000 gallons per day or who is subject to pretreatment requirements for the removal of incompatible pollutants as defined in section k. (q) "Maximum Permissible Dose" shall be a dose of radiation to any part of the body, internal or external, or both, that in the light of present knowledge, is not expected to cause appreciable bodily injury to a person at any time during his lifetime. 2 (r) "National Pollutant Discharge Elimination System" (NPDES) means the program for issuing, conditioning and denying permits for the discharge of pollutants from point sources into the navigable waters, the contiguous zone, and the oceans pursuant to section 402 of the Act. (s) "NH " (Nitrogen as Ammonia) shall mean the initial product in the decompositiol of nitrogenous organic matter as measured by using standard laboratory methods, as set out herein, expressed in mg/1. (t) "PPM" means pats per million and is a mass to mass ratio expressed as milligram per 10 milligram. (u) "Person" means any individual, firm, company, partnership, corporation,. association, group, or society, and includes the State of North Carolina, and agencies, districts, commissions, and political subdivisions created by, or pursuant to, state law. (v) "pH" means the logarithm of the reciprocal of the concentration of hydrogen ions in grams per liter of solution. (w) "Pretreatment" means application of physical, chemical, and biological processes to reduce the amount of pollutants -in or to alter the nature of the pollutant properties of wastewater prior to discharging such wastewater into the publicly owned wastewater treatment system. (x) "Pretreatment standards" means all applicable federal rules and regulations implementing section 307 of the Act, as well as any nonconflicting state or local standards. In cases of conflicting standards or regulations, the more stringent thereof shall be applied. (y) "Properly shredded garbage" means the wastes from the preparation, cooking, and dispensing of food that have been shredded to such degree that all particles will be carried freely under the flow conditions normally prevailing in public sewers, with no particle greater than one-half (1/2) inch in any dimension. (z) "Receiving stream" means a body of water, stream, or watercourse receiving or formed by the discharge of waters from the wastewater treatment plant. (aa) "Sanitary sewer" means a sewer intended to receive domestic sewage and industrial waste, except that of the type expressly prohibited by this article, without the admixture of surface and storm water. (bb) "Shall" means mandatory; "May" means permissive. (cc) "Significant industrial user" means any industrial user of the Town's wastewater treatment system whose flow exceeds the lesser of (i) 25,000 gallons per day, or (ii) one (1) percent of the design capacity of the treatment plant receiving the wastewater. (dd) "Storm sewer or storm drain" means a sewer which carries only storm or surface waters and drainage. 3 (ee) "Storm Water" means any water flow occurring during or immediately following any form of natural precipitation and resulting therefrom. (ff) "Suspended solids" means the total suspended matter that floats on the surface of, or is suspended in, water, wastewater, or other liquids, and which is removable by laboratory filtering. (gg) "Unpolluted water" means water not containing any pollutants limited or prohibited by the effluent standards in effect, or water whose discharge will not cause any violation of receiving water quality standards. (hh) "User" means any person who discharges, or causes or permits the discharge of, wastewater into the Town's wastewater treatment system. (ii) "User classification" means a classification of users based on the Standard Industrial Classification (SIC) Manual prepared by the Office of Management and Budget. (jj) "Wastewater" means the liquid and water -carried industrial or domestic wastes from dwellings, commercial buildings, industrial facilities, and institutions, whether treated or untreated, together with any groundwater, surface water, and storm water that may be present, which is discharged into, or permitted to enter, the Town's wastewater treatment system. (kk) "Wastewater treatment system" (system) means any devices, facilities, structures, equipment, or works owned or used by the Town for the purpose of the transmission, storage, treatment, recycling, and reclamation of industrial and domestic wastes, or necessary to recycle or reuse water at the most economical cost over the estimated life of the system, including' intercepting sewers; outfall sewers; sewage collection systems; pumping, power, and other equipment, and their appurtenances; extensions, improvements, remodeling, additions, and alterations thereof; elements essential to provide a reliable recycled supply such as standby treatment units and clear well facilities; and the wastewater treatment plant site or -land which is used for ultimate disposal of residues resulting from such treatment. (11) Town is the Town of Troutman, County of Iredell, State of North Carolina. Terms not otherwise defined herein shall be as adopted in the latest edition of Standard Methods for the Examination of Water & Wastewater, published by the American Public Health Association, the American Water Works Association and the Water Pollution Control Federation. Sec. 3. Prohibited Use of Public Sewers. (a) Prohibitions on Wastewater discharge or deposit or cause or allow to the wastewater treatment system any following: Discharges. No person shall be, discharged or deposited into wastewater which contains the 0 C (1) Oils and Grease. Total fat, wax, grease or oil concentration of more than 100 mg/l, whether emulsified or not, or containing substances which may solidify or become viscous at temperatures between 320 and 150OF (00 and 65°C) at the point of discharge into the system. (2) Explosive Mixtures. Liquids, solids or gases which by reason of their nature of quantity are, or may be, sufficient either alone or by interaction with other substances to cause fire or explosion or be injurious in any other way to the sewerage facilities or to the operation of the system. At no time shall two successive readings on an explosion hazard meter, at -the point of discharge into the sewer system, be more than five percent (5 o) nor any single reading over ten percent (10 0) of the Lower Explosive Limit (LEL) of the meter. Prohibited materials include, but are not limited to, gasoline, kerosene, naphta, benzene, toluene, zylene , ethers, alchols , ketones, aldehydes, peroxides,. chlorates, perchalorates, bromates, carbides, hydrides and sulfides. (3) Noxious Material. Noxious or malodorous solids, liquids or gases, which, either singly or by interaction with other wastes, are capable of creating a public nuisance or hazard to life, or are or may be sufficient to prevent entry into a sewer for its maintenance and repair. (4) Improperly Shredded Garbage. Garbage that has not been ground or comminuted to such a degree that all particles will be carried freely in suspension tinder flow conditions normally prevailing in the public sewers, with no particle greater than one-half (1/2) inch in any dimension. (5) Radioactive Wastes. Radioactive wastes or isotopes of such half-life or concentration that they do not comply with regulations or orders issued by the appropriate authority having control over their use and which will or may cause damage or hazards to the sewerage facilities or personnel operating the system. (6) Solid or Viscous Wastes. Solid or viscous wastes which will or may cause obstruction to the flow in a sewer, or otherwise interfere with the proper operation of the wastewater treatment system. Prohibited materials include, but are not limited to, grease, unconuninuted garbage, animal guts or tissues, paunch manure, bones, hair, hides or fleshings, entrails, whole blood, feathers, ashes, cinders., sand, spent lime, stone or marble dust, metal, glass, straw, shavings, grass clippings, rags, spent grains, spent hops, waste paper, wood, plastic, tar, asphalt residues, residues from refining or processing of fuel or lubricating oil, and similar substances. (7) Excessive Discharge Rate. Wastewaters at a flow rate or containing such concentrations or quantities of pollutants that exceeds for any time period longer than fifteen (15) minutes more than five (5) times the average twenty-four (24) hour concentration, quantities or flow during normal operation and that would cause a treatment process upset and subsequent loss of treatment efficiency. 5 (8) Toxic Substarices. Any toxic substances in amounts Cexceeding standards promulgated by the Administrator of the United States Environmental Protection Agency pursuant to Section 307(a) of the Act, and chemical elements or compounds, phenols or other taste- or odor -producing substances, or any other substances which are not susceptible to treatment or which may interfere with the biological processes or efficiency of the treatment system, or that will pass through the system. (9) Unpolluted Waters. Any unpolluted water including, but not limited to, water from cooling systems or of stormwater origin, which will increase the hydraulic load on the treatment system. (10) Corrosive Wastes. Any waste which will cause corrosion or deterioration of the treatment system. All wastes discharged to the public sewer system must have a pH value in the range of (6) to (9) standard units. Prohibited materials, include, but are not limited to, acids, sulfides, concentrated chloride and fluoride compounds and substances which will react with water to form acidic products. (11) Any clothing, rags, textile remnants or waste, cloth, scraps, except fibers of scrap that will pass through a one-fourth (1/4) inch mesh screen or its equivalent in screening ability. (12) Any waters or wastes in which the suspended solids exceed three hundred (300) parts per million by weight. (13) Any waters or wastes in which the BOD exceeds three hundred (300) parts per million by weight. (14) Any waters or wastes in which the COD exceeds six hundred (600) parts per million by weight. (15) Any waters or wastes in which the IOD exceeds 5.0 parts per million by weight. (16) Any materials which form excessive amounts of scum or foam that may interfere with the operation of the waste treatment works or cause undue additional labor in connection with its operation. (17) Any liquid or vapor having a temperature higher than 150°F. (18) Any waters or wastes in which the total fixed solids exceed 1,500 mg/l. (19) Any waters or wastes in which the ammonia exceeds 15 mg/1. (20) Any waters or wastes containing amounts of chromium, zinc, nickel, copper, or other heavy metals which are in an ionic or chemically active state. 6 C C (21) Any waters or wastes containing cyanide or other such poisonous substances. (22) Any waters or wastes containing suspended solids of such character and quality that unusual attention or expense is required to handle such materials at the waste treatment plant. (23) Any given constituent of duration longer than average .twenty-four operation._ _ waters or wastes which, in concentration. of any in quantity of flow, exceeds for any period of fifteen (15) minutes more than five (5) times the (24) hour concentrations or flows during normal (24) Any water or wastes having an objectionable color which is not sufficiently removable in the existing sewage treatment plant processes to pass receiving stream standards. (b) Limitations on Wastewater Discharges.. No person shall discharge or convey, or permit or allow to be discharged or conveyed, to a public sewer any wastewater containing pollutants of such character or quantity that will: (1) Not be susceptible to treatment or interfere with the process or efficiency of the treatment system. (2) Constitute a hazard to human or animal life, or to the stream or water course receiving the treatment plant effluent. (3) Violate pretreatment standards, as promulgated by the United States Environmental Protection Agency or the State of North Carolina. (4) Cause the treatment plant to violate its NPDES permit or applicable receiving water standards. (c) Special Agreements. Nothing in this section shall be construed as preventing any special agreement or arrangement between the Town and any user of the wastewater treatment system -whereby wastewater of unusual strength or character is accepted into the system and specially treated subject to any payments or user charges as may be applicable. (d) No person shall discharge or cause to be discharged any storm water, surface water, ground water, roof runoff, or subsurface drainage into any sanitary sewer. No person shall connect, or cause to be connected, to the sanitary sewer system any pipe or conduit which will allow the discharge of the aforelisted inflow source into the sanitary sewer system. Sec. 4. Permissive Use of Public Sewers for Industrial Waste. t (a) Any person who shall hereafter discharge any industrial wastes into the Town's sanitary sewers or who desires to discharge any industrial wastes into such sewers shall make application to the Approving 7 Authority. Approval .will be granted such applicants for a two-year period when evidence is submitted by the applicant that the discharge of wastes will comply with this Ordinance and applicable State and Federal lawful requirements. (b) Storage Facilities. In order to promote equalization of flows over a 24 hour period, each person discharging a waste into the Town's sanitary sewers having the following average daily volumes over a period of his normal processing period in any one week shall construct and maintain at his own expense a suitable storage facility of- the corresponding minimum volumes: MINIMUM VOLUME OF STORAGE TANK. IN PERCENTAGE OF VOLUME OF WASTE DISCHARGED DAILY VOLUME OF WASTE AVERAGE GALLONS PER DAY DISCHARGED 0 - 20,000 0% 20,001 - 30,000 50% 30,001 - 40,000 60% 40,001 - 50,000 70% 50,001 - 60,000 80% 60,001 - 70,000- 90% 70,001 - and above 100% Such storage facility shall have its outlet to the sewer controlled by an approved device, the setting of flow rates being as directed by the Approving Authority. When the processing period is less than seven days in any week, the person discharging the waste shall arrange the discharge rate so that his storage facility shall be substantially full at the end of his processing period. The storage facility shall be discharged during the period of shut -down unless otherwise directed by the Approving Authority. Storage facility requirements may be waived by the Approving Authority in cases where.a constant rate of flow is discharged, provided: (1) That the normal operating day extends over a 24 hour period and the rate of waste flow and load discharged is such that in the opinion of the Approving Authority the installation of a storage tank would not improve sewer and treatment plant loading conditions. (2) That all other requirements of this Ordinance are fulfilled. (c) Control manhole. Any person discharging industrial wastes into the Town sanitary sewer shall construct and maintain a suitable control manhole to facilitate observation, measurements and sampling of all wastes including domestic sewage from the industry. The control manhole shall be constructed downstream from any treatment, storage or other approved works at a suitable and satisfactory location and built in a manner approved by the Approving Authority. (d) Measuring device. Where a storage tank is not required, the control manhole shall be equipped with a permanent type volume measuring device such as a nozzle, or other device approved by the Approving Authority. The manhole shall be installed by the person discharging the wastes at his own expense and shall be maintained by him so as to be safe, accessible and in proper operating condition at all times. (e) Plans. Plans for the construction of said storage tank, control manhole and controlling devices shall be approved by the Approving Authority prior to the beginning of construction. (f) Any waters or wastes discharged by any person, which have - - - - the following -characteristics, may be admitted into the sanitary sewers after the adoption of this Ordinance, when such discharge is approved in writing by the Approving Authority: (1) A BOD greater than 300 mg/l ; (2) or containing COD of more than 600 mg/1; (3) or containing suspended solids of more than 300 mg/l; (4) or containing ammonia of more than 15 mg/l; (5) or having other characteristics prohibited in Section 3. (g) All sewer users shall participate in the User Charge/Industrial Cost Recovery Provision as applicable. When the concentration of BOD, COD, suspended solids or .ammonia, in the industrial waste discharge to the Town's sanitary severs exceed the limits hereinbefore prescribed, a monthly surcharge shall be imposed upon the offending industrial user's sewage flow when the excess is calculated using the industrial plant water flow as hereinafter specified and the difference between the actual BOD, COD, suspended solids or ammonia concentration and the permissible limits of 300 mg/l, 600 mg/l, 300 mg/l, and 15 mg/l respectively. The sewer surcharge shall be established by the Town at a regular Board meeting of November for the following calendar year. This surcharge shall be invoked as herein provided in addition to the existing regular sewer service charge. The sewer surcharge shall be applied beginning with the December utility billing and during subsequent months during the calendar year. The surcharge shall reflect the total cost of treating the excess pounds of industrial waste including necessary cost of administration of the sewage plant and this Ordinance. In addition, each industrial user affected by the surcharge shall submit to the Approving Authority a current list of raw chemicals and other materials used in their manufacturing process. The method used to determine the surcharge amount shall consist of dividing the total audited budget cost for operating each component of the Town's sewage treatment plant which is affected by BOD, COD, SS, or NH , including the applicable administrative and plant debt service, for the preceeding fiscal year, by the total treatment plant design poundage of BOD, COD, suspended solids or ammonia. The Approving Authority shall make a report to the Board each quarter of all activities conducted under Section 4. w7 C (1) The surcharge shall be billed and payable monthly on a separate bill rendered to the proper users by the Town Water Department. Said bills will be sent through the United States mail notifying all users of the amount and date due. Failure to receive notice is not an excuse for nonpayment of bills. Users not having paid their bills within 15 days of date of billing will be delinquent. Notice shall be sent them through the United States mails and if after 10 days' notice, given as above, the bills _remain unpaid, _the water connection serving the premises will be severed and will not be turned on again until said bill is paid. In case a user discharging wastes into the Town sanitary sewer system does not procure his water supply from the Town of Troutman and becomes delinquent in his payment of the aforesaid surcharge, his connection with the Town sewer system will be severed and will only be reconnected at his expense. (h) All applications for the discharge of industrial wastes into the public sewers shall be made to the Approving Authority. Approval will be granted such applications when evidence is submitted by the applicant that the discharge of wastes into the public sewer will comply with this Chapter. (i) Grease, oil and sand interceptors shall be provided when, in the opinion of the Approving Authority, they are necessary for the proper handling of liquid wastes containing grease in excessive amounts, or any flammable wastes, sand or other harmful ingredients; except that such interceptors shall not be required for private living quarters or dwelling units. All interceptors shall be maintained by the Owner at his expense in continuously efficient operation at all times. (j) Notice shall be given the Approving Authority when normal industry will be interrupted for seventy-two (72) hours or longer and wastes will not be available for discharge, or when a change of process is contemplated or malfunction of the treatment facility occurs or is anticipated, which will alter demands on the municipal treatment facilities. "Normal operations" shall include allowance for legal holidays and other announced plant shutdowns. (k) Where preliminary treatment or holding facilities are provided for any purpose, they shall be maintained continuously in satisfactory and effective operation by the Owner at his expense, and there shall be no discharge of wastes requiring pretreatment either directly or indirectly to the Town's sewer system, without first notifying and obtaining approval from the Approving Authority. Sec. 5. User Charge: (a) User charge shall be the charge levied on all users including, but not limited to, persons, firms, corporations or governmental entities that discharge, cause or permit the discharge of sewage into the public sewerage facilities. 10 (b) The user charge shall reflect at least the costs of operation Cand maintenance (including replacement) of the public sewerage facilities. (c) Each user shall pay its proportionate cost(user charge) based on volume of flow. (d) The Approving Authority of the sewerage facilities shall review not less often than every two years the sewage contributions of users, the total costs of operation and maintenance (including replacement) of the sewerage facilities, and the user charge system. The Approving Authority shall revise the user charge, if necessary, to accomplish the following: (1) Maintain the proportionate distribution of operation and maintenance costs among all users as provided herein. (2) Generate sufficient revenue to pay at least the total operation and maintenance costs necessary to the proper operation and maintenance (including replacement) of the sewerage facilities. (e) All flow to the sewerage facilities not directly attributable to the users (i.e. infiltration/inflow) shall be distributed among all users of the sewerage facilities based upon the volume of flow of the users. (f) Each user shall be notified, at least annually, in conjunction with a regular bill, of the rate and that portion of the user charge which is attributable to operation and maintenance of the sewerage facilities. i - i Sec. 6. Powers and Authority for Inspection. (a) Tile Approving Authority and duly authorized employees of the Town shall be permitted to enter upon all properties for the purpose of inspection, observation, measurement, sampling and testing in accordance with the provisions of this Chapter. (b) All tests and analyses of the characteristics of waters and wastes to which reference is made in this Chapter shall be made in accordance with the procedure given in the latest edition of STANDARD METHODS FOR THE EXAMINATION OF WATER, SEWAGE AND INDUSTRIAL WASTES published by the American Public Health Association. Such tests and analyses shall be determined at the control manhole provided for in Section 4, or at the point of discharge of any waters or wastes at the site of their origin on the premises of any person discharging such wastes into the sanitary sewers. Sec. 7. Measurement and Flow. (a) The volume of flow used in determining the total discharge of industrial wastes shall be based upon: (1) Metered water consumption as shown in the records of meter readings maintained by the Town Water Department. In the event that a person discharging wastes into the public sewers produces evidence to the Approving Authority that more than 25 0 of the total annual volume of water used for all purposes does not reach the public C sewers, then an estimated percentage of total water consumption to be used in determining industrial waste discharge may be agreed upon between the Approving Authority and the person discharging such industrial wastes into the public sewer; (2) or, at the individual discharger's option, other flow measuring devices, which measure the actual volume of wastewater discharged to the sewer. Such devices shall be accessibly and safely located, and the measuring system as specified by the Town shall be installed in accordance with plans approved by the Approving Authority. -The -metering system- shall be installed and maintained at the Owner's expense according to arrangements that may be made with the Town. (b) Where any person discharging wastes to the sanitary sewers procures all or any part of his water supply from sources other than the Town of Troutman Water Department, the person discharging said waste shall install and maintain at his expense water meters of a type approved by the approving authority for the purposes of determining the proper volume of waste discharged to such sewers. Sec. 8. Determination of Character and Concentration of wastes. (a) Inspection. The industrial waste of each person discharging such wastes into the public sewers shall be subject to periodic inspection and a determination of character and concentration of such wastes shall be made monthly for all "major" contributors and annually or more often as may be deemed necessary by the Approving Authority or his authorized assistant for the "minor" contributors. Such inspection and tests shall also be made immediately after any process change which may affect the quantity of quality of the wastes discharged. The determination of "major" and "minor" contributor classifications shall be by the Approving Authority. (b) Samples. Samples shall be collected in such manner as to be representative of the actual quality of the waste. Laboratory methods used in the examination of such waste shall be those set forth in STANDARD METHODS as hereinbefore described, a copy of which is on file with the Town's Clerk for inspection by any interested parties. (c) Authority. The determination of the character and concentration of the industrial wastes by the Approving Authority or his duly appointed representatives shall be binding as a basis for charges. (d) Cost. Total costs incident to the supervision, inspection, sampling and analyzing of wastes shall be included in the surcharge made to persons discharging wastes into the Town sanitary sewers. Sec. 9. Protection From Damage. No person shall maliciously, willfully or negligently break, damage, destroy, uncover, deface or tamper with any structure, appurtenance or equipment which is a part of the sewage works. 12 Sec. 10. Control of Prohibited Wastes. (a) Regulatory Actions. If wastewaters containing any substance described in Section 3 of this Ordinance are discharged or proposed to be discharged into the sewer system of the Town or to any sewer system tributary thereto, the Approving Authority may. take any action necessary to: (1) Prohibit the discharge of such wastewater. (2) Require a discharger to demonstrate that in -plant modifications will reduce or eliminate the discharge of such substances in conformity with this Ordinance . (3) Require pretreatment, including storage facilities, or flow equalization necessary to reduce or eliminate the objectionable characteristics or substances so that the discharge will not violate these rules and regulations. (4) Require the person making, causing or allowing the discharge to pay any additional cost or expense incurred by the Town for handling and treating excess loads imposed on the treatment system. (5) Take such other remedial action as may be deemed to be desirable or necessary to achieve the purpose of this Ordinance. (b) Submission of Plans. Where pretreatment or equalization of wastewater flows prior to discharge .into any part of the wastewater treatment system is required, plans, specifications and other pertinent data or information relating to such pretreatment or flow -control facilities shall first be submitted to the Approving Authority for review and approval. Such approval shall not exempt the discharge of such facilities from compliance with any applicable code, ordinance, rule, regulation or order of any governmental . authority. Any subsequent alterations or additions to such pretreatment or flow -control facilities shall not be made without due notice to and prior approval of the Approving Authority. (c) Pretreatment Facilities Operations. If pretreatment or control of waste flows is required, such facilities shall be maintained in good working order and operated as efficiently as possible by the owner or operator at his own cost and expense, subject to the requirements of these rules and regulations and all other applicable codes, ordinances, and laws. (d) Admission to Property. Whenever it shall be necessary for the purposes of these rules and regulations, the Approvity Authority upon the presentation of credentials, may enter upon any property or premises at reasonable times for the purpose of (1) copying any records required to be kept under the provisions of this Ordinance, (2) inspecting any monitoring equipment or method, and (3) sampling any discharge of wastewater to the treatment works. The Approving Authority may enter upon the property at any hour under emergency circumstances. 13 (e) Protection from Accidental Discharge. Each industrial user shall provide protection from accidental discharge of prohibited materials or other wastes regulated by this Ordinance. Facilities to prevent accidental discharge of prohibited materials shall be provided . and maintained at the owner or operator's own cost and expense. Detailed plans showing facilities and operating procedures to provide this protection shall be submitted to the Approving Authority for review, and shall be approved by him before construction of the facility. Review and approval of such plans and operating procedures shall not relieve the industrial user from the responsibility to modify his facility as necessary to meet the requirements of this Ordinance. (f) Reporting of Accidental Discharge. 'If, for any reason, a facility does not comply with or will be unable to comply with any prohibition or limitations in this Ordinance, the facility responsible for such discharge shall immediately notify the Approving Authority so that corrective action may be taken to protect the treatment system. In addition, a written report addressed to the Approving Authority detailing the date, time and cause of the accidental discharge, the quantity and characteristics of the discharge and corrective action taken to prevent future discharges, shall be filed by the responsible industrial facility within five (5) days of the occurrence of the noncomplying discharge. Sec. 11. Industrial Wastewater Monitoring and Reporting. (a) Discharge Reports. (1) Every significant industrial user shall file a periodic Discharge Report at such intervals as are designated by the Approving Authority. The Approving Authority may require any other industrial users discharging or proposing to discharge into the treatment system to file such periodic reports. (2) The discharge report shall include, but, in the discretion of the Approving Authority, shall not be limited to, nature of process, volume, rates of flow, mass emission rate, production quantities, hours of operation, concentrations of controlled pollutants or other information which relates to the generation of waste. In addition to discharge reports, the Approving Authority may require information in the form of Industrial Discharge Permit Application and self -monitoring reports (b) Records and monitoring (1) All industrial users who discharge or propose to discharge wastewaters to the wastewater treatment system shall maintain such records of production and related factors, effluent flows, and pollutant amounts or concentrations as are necessary to demonstrate compliance with the requirements of this Ordinance and any applicable State or Federal pretreatment standards or requirements.. (2) Such records shall be made available upon request by the Approving Authority. All such records relating to compliance with pretreatment standards shall be made available to officials of the U.S. 14 Environmental Protection Agency upon demand. A summary of such data indicating the industrial user's compliance with this Ordinance shall be prepared quarterly and submitted to the Approving Authority. (3) The owner or operator of any premises or facility discharging industrial wastes into the system shall install at his own cost and expense suitable monitoring equipment to facilitate the accurate observation, sampling, and measurement of wastes. Such equipment shall be maintained in proper working order and kept safe and accessible at all times. (4)- The- - monitoring equipment shall -be -located- and - maintained on the industrial user's premises outside of the building. When such a location would be impractical or cause undue hardship on the user, the Approving Authority may allow such facility to be constructed in the public street or sidewalk area, with the approval of the public agency having jurisdiction over such street or sidewalk, and located so that it will not be obstructed by public utilities, landscaping or parked vehicles. (5) When more than one user can discharge into a common sever; the Approving Authority may require installation of separate monitoring equipment for each user. When there is a significant difference in wastewater constituents and characteristics produced by different operations of a single user, the Approving Authority may require that separate monitoring facilities be installed for each separate discharge. (6) Whether constructed on public or private property, the monitoring facilities shall be constructed in accordance with the Approving Authority's requirements and all applicable construction standards and specifications. (c) Inspection, Sampling and Analysis. (1) Compliance Determination. Compliance determinations with respect to Section 3 prohibitions and limitations may be made on the basis of either instantaneous grab samples or composite samples of wastewater. Composite samples may be taken over a twenty-four (24) hour period, or over a longer or shorter time span, as determined necessary by the Approving Authority to meet the needs of specific circumstances. (2) Analysis of Industrial Wastewaters. Laboratory analysis of industrial wastewater samples shall be performed in accordance with the current edition of "Standard Methods," "Methods for Chemical Analysis of Water and Waste" published by the U.S. Environmental Protection Agency or the "Annual Book of Standards, Part 23, Water, Atmospheric, Analysis" published by the American Society for Testing and Materials. Analysis of those pollutants not covered by these publications shall be performed in accordance with procedures established by the North Carolina Department of Natural Resources and Community Development. 15 (3) Sampling Frequency. Sampling of industrial wastewater for the purpose of compliance determination with respect to Section 3 prohibitions and limitations will be done at such intervals as the Approving Authority may designate. However, it is the intention of the Approving Authority to conduct compliance sampling or to cause such sampling to be conducted for all major contributing industries at least once in every three months. Sec. 12. Industrial Discharge Permit System (a) Wastewater Discharge Permits Required. All significant industrial-- users proposing to connect or to discharge into -any -part of the wastewater treatment system must first obtain a discharge permit therefor. All existing significant industrial users connected to or discharging to any part of the Town system must obtain a wastewater discharge permit within one hundred twenty (120) days from and after the effective date of this Ordinance. (b) Permit Application. Users seeking a wastewater discharge permit (Attachment A) shall complete and file with the Approving Authority an application on the form prescribed by the Approving Authority, and accompanied by the applicable fee. In support of this application, the user shall submit the following information: (1) Name, address, and SIC number of applicant. (2) Volume of wastewater to be discharged. (3) Wastewater constituents and characteristics including, but not limited to, those set forth in Section 3 of this Ordinance as determined by a reliable analytical laboratory. (4) Time and duration of discharge. (5) Average and 60-minute peak wastewater flow rates, including daily, monthly and seasonal variations, if any. (6) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers and appurtenances by size, location and elevation. (7) Description of activities, facilities and plant processes on the premises including all materials and types of materials which are, or could be, discharged. (8) Number of employees, and hours of work. (9) Any other information as may be deemed by the Approving Authority to be necessary to evaluate the permit application. The Approving Authority will evaluate the data furnished by the user and may require additional information. After evaluation and acceptance of the data furnished, the Approving Authority may issue a wastewater discharge permit subject to terms and conditions provided herein. a (c) Permit Conditions. Wastewater discharge permits (Attachment B) shall be expressly subject to all provisions of this Ordinance and all other regulations, user charges and fees established by the Town. The conditions of wastewater discharge permits shall be uniformly enforced in accordance with this Ordinance, and applicable State and Federal regulations. Permit conditions will include the following: (1) The unit charge or schedule of user charges and fees for the wastewater to be discharged to the system. (2) The average and maximum wastewater constituents and characteristics. - - - (3) Limits on rate and time of discharge or requirements for flow regulations and equalization. (4) Requirements for installation of inspection and sampling facilities, and specifications for monitoring programs. - (5) Requirements for maintaining and submitting technical reports and plant records relating to wastewater discharges. (6) Daily average and daily maximum discharge rates, or other appropriate conditions when pollutants subject to limitations and prohibitions are proposed or present in the user's wastewater discharge. (7) Compliance schedules. (8) Other conditions to ensure compliance with this Ordinance. (d) Outside Connections. Any user owning or controlling premises located beyond the corporate limits of the Town of Troutman and desiring to install a plumbing system for the purpose of discharging domestic' sewage and/or industrial waste into the sanitary sewers of the Town may do so by complying with the requirements of this Ordinance and by paying an additional permit fee and a yearly sewer rental charge to be fixed by the Town Board. (e) Duration of Permits. Permits shall be issued for a specified time period, not to exceed one year. A permit may be issued for a period of less than (one) year, or may be stated to expire on a specific date. The terms and conditions of the permit may be subject to modification and change by the Approving Authority during the life of the permit, as limitations or requirements as identified in Section 3 are modified and changed. The user shall be informed of any proposed changes in his permit at least (30) days prior to the effective date of change. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance. (f) Transfer of a Permit. Wastewater discharge permits are issued to a specific user for a specific operation. A wastewater discharge a_ permit shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation. 17 (g) Revocation of Permit. Any user who violates the following conditions of his permit or of this Ordinance, or of applicable State and Federal regulations, is subject to having his permit revoked. Violations subjecting a user to possible revocation of his permit include, but are not limited to, the following: (1) Failure of a user to accurately report the wastewater constituents and characteristics of his discharge; (2) Failure of the user to report significant changes in operations, or wastewater constituents and characteristics; (3) Refusal of -reasonable access to the user's premises for the purpose of inspection or monitoring; or, (4) Violation of conditions of the permit. Sec. 13. New Sewer Construction. New sewers and new connections shall be properly designed and constructed in accordance with such guidelines as published by the Environmental Protection Agency (Reference 40 CFR Section 35.927-4) . Sec. 14.1. Enforcement Procedures. (a) Notification of Violation. Whenever the Approving Authority finds that any person has violated or is violating this Ordinance, or any prohibition, limitation or requirement contained herein, he may serve upon such 'person a written notice stating the nature of the violation and providing a reasonable time, not to exceed thirty (30) days, for the satisfactory correction thereof. (b) Show Cause Hearing. (1) If the violation is not corrected by timely compliance, the Approving Authority may order any person who causes or allows an unauthorized discharge to show cause before the hearing authority why service should not be terminated. A notice shall be served on the offending party, specifying the time and place of a hearing to be held by the hearing authority regarding the violation, and directing the offending party to show cause before said authority why an order should not be made directing the termination of service. The notice of the hearing shall be served personally or by registered or certified mail (return receipt requested) at least ten days before the hearing. Service may be made on any agent or.officer of a corporation. (2) The Hearing Authority may itself conduct the hearing and take the evidence, or may designate any of its members or any officer or employee of the legal department to: (i) Issue in the naive of the Hearing authority notices of hearings requesting the attendance and testimony of witnesses and the production of evidence relevant to any matter involved in any such hearings. (.- (ii) Take the evidence. (iii) Transmit a report of the evidence and hearing, including transcripts and other evidence, together with recommendations to the Hearing Authority for action thereon. (3) At any public hearing, testimony taken before the Hearing Authority or any person designated by it, must be under oath and recorded stenographically. The transcript. so recorded, will be made available to any member of the public or any party to the .hearing upon payment of the usual charges therefor. (4) After the Hearing Authority has reviewed the evidence, it may issue an order to the party responsible for the discharge directing that, following a specified time period, the sewer service be discontinued unless adequate treatment facilities, devices or other related appurtenances shall have been installed or existing treatment facilities, devices or other related appurtenances are properly operated, and such further orders and directives as are necessary and appropriate. (c) Legal Action. Any discharge in violation of the substantive provisions of this Ordinance or an Order of the Hearing Authority shall be considered a public nuisance. If any person discharges sewage, industrial wastes or other wastes into the Town treatment system contrary to the substantive provisions of this Ordinance of any Order of the Hearing Authority, the Town Attorney shall commence an action for appropriate legal and/or equitable relief in the Superior Court of this County. Sec. 14.2. Penalty; Costs. Any person who is found to have violated an Order of the Hearing Authority or who willfully or negligently failed to comply with any provision of this Ordinance, and the orders, rules and regulations issued hereunder, shall be fined not more than fifty (50) dollars for each offense. Each day on which a violation shall occur or continue shall be deemed a separate and distinct offense. Sec. 14.3. Saving Clause. If any provision, paragraph, work, section or article of this Ordinance is invalidated by any court of competent jurisdiction, the remaining provisions, paragraphs, words, sections, and articles shall not be affected and shall continue in full force and effect. Sec. 14.4. Conflict. All ordinances and parts of ordinances inconsistent or conflicting with any part of this Ordinance are hereby repealed to the extent of such inconsistency or conflict. HK Sec. 14. 5 . Maximum Restrictions. The effluent standards and limitations contained in this Ordinance shall be no more restrictive than the most nearly applicable federal effluent standards and limitations. In the event the effluent standards and limitations adopted in this Ordinance are more restrictive than the most nearly applicable federal effluent standards and limitations, then the said federal standards shall apply. Sec. 14.6. Effective Date. This Ordinance shall be in full force and effect on the day of U�GEmBr- rz 19 ?'o INTRODUCED THE ?7,2, day of 19 F'o FIRST READING: /2, P 19 p-Q SECOND READING: , 19. PASSED this Fr1, day of D c E,,, Q E2 19 7-6 AYES: 3 NAYS: 0 ABSENT: 1 NOT VOTING: t3 c TT y i 20 TOWN OF TROUTMAN P.O. BOX 26 TROUTMAN N.C. 28166 yck: ta+i 1 TOM ADDLEY '` 1 DIRECTOR OF PUBLIC WORKS TO DWQ, ENCLOSED YOU WILL FIND AN ARRANGEMENT OF OUR OPERATION AND MAINTENANCE PLAN/DOCUMENTS. HOPEFULLY THIS IS IN AN ACCEPTABLE FORMAT, IF NOT PLEASE LET US KNOW IMMEDIATELY OF ANY REQUIRED REVISIONS. ENCLOSED IS BASICALLY THE TOOLS WE WILL USE TO PROPERLY MONITOR OUR SYSTEM TO MAINTAIN A STATE OF READINESS. PLEASE NOTE THAT OUR SEWER USE ORDINANCE WILL BE UPDATED BY W.K. DICKSON ENGINEERS SOMETIME THIS FALL AS WELL AS A NEW MAP OF OUR COLLECTION SYSTEM IDENTIFYINGMANHOLE LOCATIONS AND I.D. NUMBERS.WE ARE CURRENTLY INVOLVED IN AN I/I STUDY AS WELL. THANK YOU FOR ALL YOUR SUPPORT OF SEMINARS AS WELL AS YOUR INVOLVEMENT OF TOWNS AND CITIES STATEWIDE. SINCERELY, TOM ADDLEY (DPW) OPERATION & MAINTENANCE EVALUATION 1. Is staff designated full-time for collection system operation and maintenance? Yes No 2. Do you have a list of 24 hour contacts?_ Yes No (If Yes, please attach) 3. Do you have an emergency equipment list? Yes No (if Yes, please attach) 4.. Staff distribution/time allocation: JU IS-199 Number Total staff employed hours/week ;J: r- Collection System (incl. part-time) Pump Stations ! /o 1/1 Correction _ _ Aal) X -)/C/< .1 :4 ca.-t- 5. Are map(s) of the collection system available? _'� Yes No Eve 6. Total number of pump stations: (.P (Please complete a Pump Station form for each station.) 7. Is a preventive maintenance program in effect? Yes If yes, does it include: a.'Maintaining logs/records b. Determining equipment/system malfunction rates c. Establishing schedules d. 1/1 evaluation e. Manhole inspection f. Sewer cleaning program g. Hydrogen sulfide monitoring and control h. Lift station operation i. Easement/right-of-way maintenance j. "Walking or visual observation of lines k. Spare parts inventory No (If Yes, please attach) _X Yes No Yes X No _ 4 Yes No X Yes No K Yes No Yes No Yes x No Yes No Yes No Yes. No Yes No B. Please describe what type of ongoing inspection program for the collection system exists: 9. Please describe the schedule for line cleaning: /Do do 10. Is there a sewer use ordinance? Yes _ No. , Is there a grease ordinance? - Yes _ No y /U 5, If yes, please identify the responsible party for ensuring the ordinance(s) is enforced. 22:k ,Ao�� (name of responsible person/agency). 11. Please describe any sewer use ordinance enforcement practices that exist: 9 SPILL RESPONSE PLAN EVALUATION 1. Do you have a current 24 hour contact list which includes phone numbers of key personnel and/or contractors?'Yes No (If Yes, please attach) 2. Do you have an qupment list which includes what functional equipment is available and where it is located? Yes No (If Yes, please attach) 3. Do you have the staff resources to make an on -site assessment of a spill with in two hours of notification of the spill? Yes No (If No, please explain below) 4. Please list your standard spill response procedures:Off' 5. Is your spill response plan readily available to all essential personnel? Yes No If No, please explain why: 6. Are all esserttl personnel familiar with the spill response plan and clearly understand its contents? y� Yes No If No, please explain why: Collection System Evaluation: 1. Please es`ti�ate how many miles of sewer line are in your collection system X <100mi. 100-500mi. 501-1,000mi. 2. How many pump stations are in your collection system? C9 3. Please list any problem areas within your collection system. Include exact location of problems. (e.g. Chronically surcharging manholes, pump stations which frequently fail, lines with severe Infiltration and Inflow, etc..) 4. Please rank the problems listed in No. 3 in order of importance. If possible, include an estimated date by which the problem will be appropriately addressed. 5. Please describe any ongoing efforts or plans to rehabilitate and/or renovate the collection system. Include exact location of ongoing or planned work. (e.g. Infiltration and Inflow studies, pump station upgrades, pipe replacement, etc..) 412 NOTE: Please attach any additional sheets and/or information if needed. MONTHLY PREVENTATIVE MAINTENANCE CHECKLIST GORMAN-RUPP T - SERIES ABOVE GROUND LIFT STATION PUMPS INITIALS • CHECK AIR FLOW INDICATOR, IF EQUIPPED TO ENSURE PROPER AIR FLOW -------------------- • CHECK OIL LEVEL IN BEARING AND SEAL CAVITIES ---=--------------- • CHECK BELTS,TENSION • CHECK AIR PUMP • CHECK AIR RELEASE VALVES • LUBE A.R.V.'S • EXERCISE ALL ISOLATION VALVES • CHECK BACKFLOW VALVES TOWN OF TROUTMAN 24 HR. CONTACT LIST NAME PAGER HOME CELL. WAYNE MILLS[CHIEF] 9280380 ERIC HENDERSON[TPD] 9280382 ANDY JONES[TPD] 9280383 JOE GENTLE[TPD] 9280384 BRANTLEY OSTWALT[TPD] 9380381 KEVIN DAVIS[TPD] 5826073 BUTCH BROWN[TPW] BRENT LILLY[TPW] 3509292 NATE WILLIAMS[TPW] 9280401 TOM ADDLEY [DPW,CSO] 8784195 A.J. BARGHOTHI[ADMIN] LOREN POWELL[MAYOR] BELL CONSTRUCTION[CONTRACTOR] CITY OF STATESVILLE[WATER/SEWER] 7-3 CITY OF STATESVILLE[WATER/SEWER].3-7 TOWN OF MOORESVILLE[WATER/SEWER]DAY TOWN OF MOORESVILLE[WATER/SEWER]EVE NCDENR MOORESVILLE PAUL JUDGE PWS EAGLE RENTALS STATESVILLE RENTALS SIGMON ENVIRONMENTAL TOWN ALARM SYSTEM TOWN SEWER PLANT TOWN HALL TEC UTILITIES[STEVE ROGERS] CITIES SUPPLY[BILLIE VESTAL] PIPELINE SUPPLY[DAYTON RUGG] RODDERS SUPPLY[MIKE BUTNER] HUGHES SUPPLY[BILL ROBERTSON] WK DICKSON ENGINEERING EMORY WILSON[BARRY HARMS] IREDELL CO.HEALTH DEPT IREDELL CO.ENV. HEALTH 8727839 2015502 873 8902 2015941 5286345 2015984 8712380 2015985 5289584 2016919 6630636 2016046 5280818 201 6054 6644701 2016082 8739946 2016084 5281027 2016103 9247408 3120462 528 4627 POLK 828 625 9266 8736378 8783417 8783406 6643705 6643311 663 1699 663 1699 8723621 873 1951 873 8954 CELL 902 3741 5287619 5287606 5287600 800 968 7088 H546 5890 800 672 7553 H336 463 5291 800 273 3688 803 547 7378 336 6813840 5964080 H8643758. 3345348 800 948 0823 8785300 8785305 MONTHLY PREVENTATIVE MAINTENACE CHECKLIST CANTEX/FAIRBANKS MORSE PUMP STATION DATE OF P.M. PERSON PERFORMING P.M. • IS VENTILATION FAN PROPERLY OPERATING • IS SUMP PUMP OPERATING PROPERLY • IS WET WELL CLEAR OF LARGE FLOATING SOLIDS AND GREASE BALLS • EXERCISE ALL ISOLATION VALVES AND ENSURE PROPER OPERATION OF CHECK VALVES • REPLACE SEAL CAVITY LUBRICANT FILTER • CHECK OPERATION OF PUMP STATION THROUGH ONE CYCLE, PER PUMP TO ENSURE PROPER OPERATION WASTEWATER COLLECTION SYSTEM QUARTERLY INSPECTION REPORT THE PURPOSE OF THIS FORMIS TO ENSURE THE CONDITION OF GRAVITY SEWERS AND FORCE MAINS NOT READILY VISIBLE BY PUBLIC AND ROUTINE DAILY ACTIVITIES. 1999 00A-t-TC- -Ly EMERGENCY EQUIPMENT LIST LOCATION GENERATION/STAND BY POWER 110 V. HONDA PORTABLE GENERATOR MASSEY ST SHOP 110 V. PORTABLE MILITARY GENERATOR MASSEY ST SHOP 240 V. 3 PH. ONAN TOWABLE GASOLINE MASSEY ST SHOP SHELTER 240 V. 3 PH. ONAN MILITARY PORTABLE DEISEL MASSEY ST SHOP LIGHTING PORTABLE LIGHT SET 110V. MASSEY ST SHOP PORTABLE LIGHT SET 110V. MASSEY ST SHOP PUMPS, HOSES 3" "MUD" DIAPHRAM PUMP GASOLINE MASSEY ST SHOP 3" CENTRIFUGAL TRASH PUMP GASOLINE MASSEY ST SHOP 2" CENTRIFUGAL SUMP PUMP 220V. 1 1/2" SUMP PUMP 110V. & 25' DISHARGE HOSE MASSEY ST SHOP 600 FT LAY FLAT DISCHARGE HOSE MASSEY ST SHOP REMEDIAL SUPPLIES STRAW BALES, 15 ON HAND MASSEY ST SHOP SHELTER LIME 50# BAGS, 4 ON HAND MASSEY ST SHOP BARRICADES,CONES ETC. MASSEY ST SHOP TOWN OF TROUTMAN SEWER TROUBLE LOG WORK NAME LOCATION DESCRIPTION DATE/TIME TIME CALL CALL RESPONSE COMMENTS ORDER ADDRESS OF OF OF OF OF RC'D ASSG'D TIME ACTION NUMBER CALLER PROBLEM PROBLEM PROBLEM CALL BY TO IN HRS. TAKEN GORMAN/RUPP T SERIES 3 " PUMP PARTS SPARE PARTS LIST PART # QTY. DESCRIPTION FS- 1748 6 O- RING 25113-033 4 DISCH. GASKET 13130 4 WEAR PLATE SHIM SET 37-J 3 IMPELLER SHIMS 11406 2 IMPELLER 11407-A 2 WEAR PLATE 12364-A 4 SEAL ASSY. 11876-A 2 SHAFT SLEEVE S-1748 4 SHAFT SLEEVE O RING S-250 1 BEARING S-1749 1 BEARING 51352 2 OIL SEAL S- 244 1 RETAINER 11557-A 2 FLAP VALVE PIN 10278 2 IMPELLER WASHER DM-1005 2 IMPELLER BOLT 10959-G 1 SEAL PLATE GASKET 11408-G 1 BEARING CAP GASKET 46411 4 FLAP VALVE 38571-717 1 80# COMP. SPRING 11412-G 3 A.R.V. GASKET 38676-404 3 A.R.V. DIAPHRAM PEABODY BARNES SPARE PUMP PARTS PART# DESCRIPTION QTY. 25331 O RING 7 16067 O RING 5 17713 O RING 10 25332 O RING 6 53936 O RING 7 52906 BRG LOCKWASHER 2 52905 LOCKNUT 2 29915 SLINGER 2 29317 O RING 2 52807 O RING 6 52806 O RING 3 52907 SHAFT SLEEVE 2 26051 O RING 9 18008 CK VLV GASKET 3 67500 CK VLV WEIGHT 2 52782 SHIM SET 1 52783 SHIM SET 1 24998 SHAFT SEAL 2 52935 BRG SINGLE 3 29860 BRG DOUBLE 3 24997 OIL SEAL 8 DAILY SEWER GLEANING REPORT DATE OPERATOR ASSISTANT STREET NAME IMANHOLE # FROM (MANHOLE # TO (FOOTAGE I# OF PASSES Sewer Manhole Inspection Form Manholes are significant contributors of I/I into wastewater collection systems. Therefore, it is important to perform detailed Sewer Manhole (SMH) Inspections and properly document defects so that an accurate rehabilitation program can be designed. The attached form is a tool to be used in accomplishing this goal. ■ Fill out the SMH specific information on the top of the front page of this form. ■ Accurately illustrate the direction of flow in the SMH in the figures provided. ■ List the cover size, SMH size, drop connection, area around SMH, depth of SMH from rim -and depth of wet ring from rim. ■ For each pipe entering or exiting the SMH, provide the information listed in the lower center of this form. Assign a letter to each line starting with "A' being the effluent line and proceeding clockwise. ■ Explain any defects observed and list the Photo Number, if any. Types of defects would include: • Number of defects in any one manhole section • Rating manhole as illustrated on the Manhole Overflow Rating System Form ■ On the top of the back page, list the MH ID. and the initials of the person reviewing the form. ■ In the left-hand column of the back page of this form, answer items 1.0 through 7.0 accordingly, Item 8.0 should be filled out by Operation Managers using the Recommendation Codes provided at the bottom of the form. ■ In the right-hand column of the back page, answer Items 1.0 through 9.0 accordingly with the Condition, Infiltration, and Inflow Codes provided on the bottom of the form. raj C 0 r,,. Manhole Depth from Rim: Pipe Size Material A. B. C. D. E. Explanation of Defects: Manhole Inspection Report Manhole _ Vlini-System Date Time Location District — Inspector Weather. Cover Size 24" 30" Other Area Around Manhole Manhole Size 4' 5' Other Paved: Satisfactory Drop Y/N Cracked Missing Pavement Vegetation Growth Unpaved: Satisfactory Eroded Depth to Wet Ring: from Rim: From/To MH# Invert Depth Debris Depth Condition (fr. Rim) (fr. invert) Photo Number: 1.0 Location A Roadway C Alley B Roadside D Easement Above inches BY Back yard Grade FY Front yard Below inches E Other u nnannoie material BRK Brick CON Poured Concrete FIB Fiberglass MSK Manhole Block POL Polyethylene PRC Precast Concrete Other 3.0 Surcharge A No Evidence B Evidence of Surcharge Height above Invert It. 4.0 Clarity of Flow A Normal Sewage Appearance B Clear Water Appearance C No Flow 5.0 Flow A Steady E Stagnant B Pulsing F Sluggish C Turbulent G No Flow D Surcharging .0 Ability to Quantify Ill A Very Difficult C Good B Poor D Excellent E 7.0 Ponding Ponding YIN _ inches ti.0 Hecommenclatlons Recommendation Codes nvv.c--- uy. -1.0 Cover # of Pickholes # of Vent Holes _ Condition Codes Inflow Code 2.0 Frame Condition Codes Inflow Code - 3.0 Chimney Condition Codes Inflow Code Material 4.0 Cone Condition Codes Inflow Code Material 5.0 Wall Condition Codes Inflow Code Material 6.0 Bench Condition Codes Inflow Code Material 7.0 ChannellInvert Condition Codes Inflow Code Material 8.0 Base Condition Codes Inflow Code_ Material 9.0 Steps S Safe U Unsafe M Missing Condition Codes A Satisfactory E Cracks 1 Broken M Needs Raising a Sulfide Corrosion U Bad Invert B Misaligned F Medium Deterioration J Missing N Obstructed R Mineral Deposits C Poor Filling G Material Missing K Light Deterioration O Bad Pipe Connection S Roots D Loose or Worn H Severe Separation L Heavy Deterioration P Silted/Debris Buildup T Snags Recommendation Codes Infiltration Codes A No Action Required F Improve Drainage A No Evidence of Infiltration F Observed Infiltration (2-3 gpm) B Rebuild or Line Manhole G Repair Pavement B Evidence of Prior Infiltration G Observed Infiltration (3-4 gpm) C Reset Frame and Cover H GearvRemove Debris from Invert C Observed Infiltradon (0-.5 gpm) H Observed Infiltration (4-5 gpm) D Point Repalr of VI Source I Repay Channel D Observed Infiltration (.5-1 gpm) I Observed Infatratlnn (>S ppm) E Seal or Install Leak Resistant Cover J Replace Extension Ring E Observed Infiltration (1-2 gpm) Inflow Codes M No Evidence of Inflow O Medium Inflow Source N Small Inflow Source P Large Inflow Source • GENERATOR LOAD TESTING CHECKLIST DATE: GENERATOR: TESTED BY: DATE GENERATOR LAST TESTED: DATE GENERATOR LAST SERVICED: WHERE IS GENERATOR BEING TESTED: ® WHAT IS GENERATOR BEING TESTED ON: WHAT PHASE: WHAT VOLTAGE: WHAT AMPERAGE: MINUTES TESTED: IS TEST ACCEPTABLE: EQUIPMENT MAINTENANCE WORKSHEET DATE: EQUIP. BEING SERVICED: TYPE OF SERVICE:* PERSON PERFORMING SERVICE: PARTS USED: SUPPLIES USED: IS SERVICE COMPLETED: IS FOLLOW UP NEEDED: IF SO WHAT?: DATE/HRS.NEXT SERVICE NEEDED: NOTES: " TYPES OF SERVICE; REPAIR ROUTINE PREVENTATIVE LUBRICATION