HomeMy WebLinkAbout20120361 Ver 1_DCM Permit_20120509L
Perm;
NER (Express Permit Program)
STATE OF NORTH CAROLINA
Denarti :_r_t of E zvironment and Natural Resources
and
Coastal Resources Commission
r
Ver"Mtt
fc:
Permit Number
43 -12
X Majo Development in an Area of Environmental Concern
pursuant to NCGS 113A -118
Excavation and /or filling pursuant to NCGS 113 -229
Issued to Ronald & Roxanne Reed & Dale & Chuc Pruna,1025 Meridan Dr, Sneads Ferry, NC 28460
Authorizing development in Onslow County at adi. to Charles Creek, at 1025 and 1021 Meridian Drive.,
in Sneads Ferry, NC, as requested in the permittee's application dated 3/1/12 and revised 3/23/12, including attached
workplan drawing dated 3/8/12.
This permit, issued on May 9, 2012 is subject to compliance with the application (where consistent with the permit), all
applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines,
or civii action; or may cause the permit to be null and void.
Dockini! Facilities
1) Unless specifically altered herein, this permit authorizes only the access piers and docking facilities,
all as expressly and specifically set forth in the permit application and workplan drawings. No other
structure(s), whether floating or stationary, shall become a permanent part of these docking facilities
without permit modification. No non -water dependent uses of structures shall be conducted on/in, or
over public trust waters without permit modification. Contact a representative of the Division at
(910) 796 -7215 prior to the commencement of any such activity for this determination.
(See Attached Sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2015
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
X
Deed / Pruna
Permit # 43 -12
Page 2 of 3
ADDITIONAL CONDITIONS
%) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
7 permitted activity without having it transferred to a third party.
3) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
4) Any portion of the permitted access piers built over Coastal Wetlands shall not exceed six feet in width
and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of
the decking.
5) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at, or adjacent to, the authorized facilities.
6) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts
of the structure(s) and the adjacent property owner's riparian access corridor, which is determined by
drawing a line parallel to the channel, or deep water, then drawing a line perpendicular to the channel
line that intersects with the shore at the point where the upland property line meets the water's edge.
7) This permit authorizes a maximum of two (2) formalized canoe /kayak/personal watercraft slips. Any
request for slips designated to accommodate larger vessels or request to add additional slips shall require
a modification of this permit.
8) This permit does not authorize the placement of any tie pilings in association with this structure.
9) The authorized project is located within a primary nursery area (PNA). Therefore, in accordance with
T15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation
within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat propellers, is
not authorized. This prohibition shall be applied and enforced throughout the entire existence of the
permitted structure.
General
10) This permit shall not be not be assigned, transferred, sold, or otherwise disposed of to a third party
without the written approval of the Division of Coastal Management.
11) This permit does not authorize the excavation or filling of any wetlands or open water areas, even
temporarily.
12) The permittee shall schedule a pre - construction conference with a representative from the Division of
Coastal Management at (910) 796 -7215, prior to initiation of work.
Reed / Pruna
3
f
NOTE:
NOTE:
Permit # 43 -12
Page 3 of 3
ADDITIONAL CONDITIONS
This permit does not eliminate the need to obtain any additional state, federal_ or local permits,
approvals or authorizations that may be required.
The U.S. Army Corps of Engineers authorized the proposed project under General Permit
No. 197800056, which was issued on January 1, 2011 (SAW- 2012- 00741).
NOTE: The permittee is advised that any development or land disturbing activity that is considered non -
water dependent is not authorized within 30 feet of the normal high water level unless
specifically exempted by Coastal Resource Commission (CRC) regulations in place at the time
of such development.