Loading...
HomeMy WebLinkAbout20120317 Ver 1_DCM Permit_20120606r .,.. '.;.,rr:,.r�.r.. , .. .- .....•rYrw: -r: ,� o-.a:a �r . �. o-; �r. � .ara+.00-s•c. <.,,,,Y•.o..�xw >+,� - :.,,_,_ �:a- r.. -_r : �.,� ra'.oan.r:...: •,.: - -... ,. .pr .�.:rn.•wyi'.. 5+rY:• ✓NS• /M•'- s.�,.. .r,.rYi A•?i Y- • -�..: �.;-.. .r:*,o-•,. i r 1';::'!'"l'.i ',.i�:i5 �Cr�Y,1i i`•i �...'.GeC STATE OT' &'IR, TI C_ -,_ O l ;' i.r %hrl.rL�li�.f 1, �: 1. Ln7i �)11.��.' •).i(7 :�L�l Cai i.�^'.,''1'.1)iG..7 .i. Coastal Rl�,- lV. X Develornl t i an Area of Envi� or.;; rental Concern persuai.t to N"_ GS l 13-k-1 18 Excavation and'or iiiling pursuant to NC GS 113 -229 Issued to N1 and `yI Land Development Inc., 166 Center Street, Jacksonville, NC 28546 Authorizing development in Carteret County at adj. to the White Oak River, at Wetherington Landing Road, in Stella , as requested in the permittee's application dated 2/16/12. including the attached drawings (4), 1 dated revised 2/16/12, 2 dated revised 3- 15 -12, and 1 dated revised 1/25/12 This permit, issued on June 6, 2012 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) In accordance with 15A NCAC 07H.0208(b)(06)(E), the observation platforms located on both pier A and pier B are not authorized. Marina 2) The marina shall display a sign showing the location of the pumpout facility, including other appropriate waste disposal information, at the entrance and exit from the main piers. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered 1)ereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2015 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Braxton • . ` avis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee t err rr ��•arrr «c�.r-� >s rrrrr +^a��»••¢rro-a•trsoo-ae- ;wa•+a �!�;orrrs�.w -+.. :s.. :� ;..y.•rsr r, c. s. v.,. so,: w. o�u :•+.s:,�n..r- .•,..r <.;,�+r. -��, •- :,+.,., ,�.,,.;.ra :a,w. ; •,�:+- :- sa�r-�r�.w- ots•o-sua. ••r.ro �.�y;.>.a 3 M and N! Land Development lne. Permit " 62-12 page 2 of 4 �• R LL •r No sewage. t., 11 t' e aq � i t p.at,,:-1 �'i ill b,L + : :5� iJ. i � c�� � :. 1 s +7t; ti _ _ 'c �l r try � or �:_, r .., � . �� at � t..,.e � i_. � .� ,._ �.e filar. -a. ;may sewage dls.._. at t i .:a:...a s'r_:'! be �� ..ol :fwd . v; l�ii on of this fe:' .'ii f :, �.t .lc :the eriill7�° 1S resporisi?�ie. T�i.s rUili'' it: J :I : ha li i;r', ar_)1.et -:1 e io _' ^_'• :i I'1- irouahot t t'h F~. _.. e,-,.. nC cf thy: pPt-r?itted stplctX:. 4) Unl:;ss specifically a rmr-d herein, this per :«pit authorizes only the docl +:s, piers, and other s.ructures and uses located in or over the water that are expressly and specifically set forth in the permit application. No v+?ler structure, whether floating or stationary, shall b;:come a permanent part of this marina facility without permit modification. No non -water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 5) The authorized structure shall not extend more than' /4 of the width of the waterbody, as measured from the waterward edge of the marsh on both sides of the water body immediately in front of the individual piers. 6) All portions of the access pier /walkway located over Coastal Wetlands shall not exceed a width of 6 ft. and shall be elevated a minimum of 3 feet above the marsh substrate as measured from the bottom of the decking. 7) As depicted on the attached workplan drawing Sheet 4 of 4 dated revised 1/25/12, any portion of the permitted pier B located over the tidal canal shall be elevated at least 5 feet above the normal high water level. 8) The authorized covered platform shall not be enclosed. Any material used on the sides shall not obstruct view and must be permeable to air and water. Screen or wire on the sides along with benches and knee walls are permitted. Lattice is specifically excluded from being used under this authorization. 9) The roof of the covered platform shall not be designed for second story use. 10) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 11) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 12) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 13) This permit authorizes 10 slips at each pier for a total 20 formalized docking spaces. r ......>M ',:.. r.-... �} i.. �: ry'! C:`. iYn .....:..:.:... n. .. M -0^}{�F.}.].}G;E+.drM'.S.Y!}•.�> .... y.. w�.; r�: N:.;. •;..:^r�- .;.,y,.: {.}Y•'...M:ti fr•r?.Y4..:+^?.vr.'t5 -ii ...:•PG:j:..; • ri•Y}+'.: .• f.: �.s. . -.. ;..'.;: .S,r: M.:ti+: X.:..,q.; {yJ.y. a„� } •r _a1 a.�lrlNM Lan Develpznent Inc. l' 52 -1: 14 f D { rr��P' f q .r,-: d t,) E;, .'ll• _ . ' - -- .d. :. >.�i r. ._ i, - .A.. .,':�.- .. L +t ~ 80'-4 ' - r i� _ 1?.._...i r•- 1L'ai ".d, the pL.1Ti:.. e Shall silp ly a (. _ C)_ t LC C i�+ 1iS� 1!CC Oi t'�e Fase� lent. .. _ a C TJanj Dev-, o U_ent 15) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities f associated with the development of the above referenced property, including 4 feet wide earthen pathways, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and /or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 808 -2808 for this determination. Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. 16) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 17) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). General 18) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural wort: or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 19) No Coastal Wetlands shall be excavated or filled, even temporarily. 20) The permittee and /or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. Nf and i*vl Land Development Inc. Perrn;t 4 E26-12 Fage 4 of 4 J ADD7T;'jNA T., f� jjTJ�INJ Thisir_',;7-nit does ncteiiniina',,- the nzed, to­ol- or au '.-orlzatlol-.3 'L-iat ri.ay '-�e requIred. ii� -1 j ri, _iCi m2nagt:­,,,­ approvals frwna the NN.C. D' S;. Fature etvelopment o�' the per 111ittit'- may c-, this per, it. Contact a representative of the Division at (252' 808-28uS prior to t.-e commenc.-ment of anv such activity for this determination. The perr.):M -e is ,.ether advised t'.,at inzriv non-water dependent activities are not authorized within 330 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No. 12 0317 which was issued on 4/19/12. The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW- 2007-04091.