HomeMy WebLinkAbout20140090 Ver 8_U-2579B Mitigation_Temp_Sites 3A and 3B - Year 2 Report_20210222 Channel Mitigation Monitoring Sheets I,II,III,AND IV Monitoring Data Record Project Title: U-2579B COE Action ID: SAW-2008-03183 Stream Name: Permit Sites 3A and 3B DWR Number: 2014-0090v2 City, County and other Location Information: Temporary impact Sites 3A and 3B are located at the intersection of the Winston-Salem Northern Beltway and US 158 (Reidsville Road) Date Construction Completed: Streambank reforestation completed in March 2019 Monitoring Year: (2 ) of 2 Ecoregion: Southern Outer Piedmont 8-digit HUC unit 03040101 USGS Quad Name and Coordinates: Walkertown 36.148420°, -80.153487' Rosgen Classification: E4 and E4b Length of Project: Site 3A: 424 linear ft. and Site 313: 194 linear ft. Urban or Rural: Urban Watershed Size: 0.26 sq. miles Monitoring DATA collected by: M. Green and M. Ingram Date: 8-25-20 Applicant Information: Name: NCDOT Roadside Environmental Unit Address: 1425 Rock Quarry Road Raleigh,NC 27610 Telephone Number: (919) 615-6733 Email address: ml_rgreen&ncdot.gov Consultant Information: Name: Address: Telephone Number: Email address: Project Status: Complete Monitoring Level required by COE and DWR (404 permit/401 Cert.): Level II Restoration Plan States: NCDOT will visually monitor using Level II monitoring (i.e. vegetation success and stability). We will initiate twice yearly visual monitoring for stability and percent vegetative cover for one year after the water is released into the newly restored channels. Section 1. PHOTO REFERENCE SITES (Monitoring at all levels must complete this section) Total number of reference photo locations at this site: A total of 10 photos were taken from 5 photo point locations and 1 additional overview photo of the site. Dates reference photos have been taken at this site: 8-29-19, 8-25-20 Individual from whom additional photos can be obtained (name, address, phone): Other Information relative to site photo reference: A site map is included with this report showing the photo point locations. Section 2. PLANT SURVIVAL Attach plan sheet indicating reference photos. Identify specific problem areas (missing, stressed, damaged or dead plantings): Estimated causes, and proposed/required remedial action: ADDITIONAL COMMENTS: March 2019: Streambank reforestation was completed August 2019: Year 1 Monitoring noted Black Willow and Silky Dogwood live stakes were surviving aloniz the streambank and Green Ash, Sycamore, Willow Oak, Water Oak and River Birch trees were surviving within the planted buffer. August 2020: Year 2 Monitoring noted Black Willow and Silky Dogwood live stakes were surviving along the streambank and Green Ash, Sycamore, Willow Oak, Water Oak and River Birch trees were surviving within the planted buffer. Other vegetation noted included lespedeza, jewelweed, cattails, soft rush, red maple, goldenrod, fennel, briars, elderberry,woolgrass, tulip poplar, and various grasses. NCDOT proposes to discontinue monitoring the planted vegetation. If required to complete Level I and Level 2 monitoring only stop here; otherwise, complete section 3. Section 3. CHANNEL STABILITY Visual Inspection: The entire stream project as well as each in-stream structure and bank stabilization/revetment structure must be evaluated and problems addressed. Report on the visual inspection of channel stability. Physical measurements of channel stability. /orphology will not be required. Include a discussion of any deviations from as-built and an evaluation of the significance of these deviations and whether they are indicative of a stabilizing or destabilizing situation. Sites 3A and 313 temporary impact streams are stable for the Year 2 evaluation. No instability was noted along the streams. A wrack line was visible within the floodplain indicating a bankfull event had occurred. NCDOT proposes to discontinue monitoring channel stability at the Sites 3A and 3B temporM impact streams. Date Station Station Station Station Station Inspected Number Number Number Number Number Structure Type Is water piping through or around structure? Head cut or down cut resent? Bank or scour erosion resent? Other problems noted? Bankfull 8-25-20 event Section 4.DEBIT LEDGER The restoration of Sites 3A and 3B was used entirely to compensate for temporary impacts on the U-2579B project. There were no stream mitigation credits generated from the restoration of the impacted area. E�✓'_ ..e may` �_ 'i r� \ M' ra'.:., 1 �l V OX Xr 'gyp' orY� 'F , e An t i1 X � • 1 1 Sites 3A and 3B i r t \ y .��� •'io w° v ,�,V`M-„M�1lr:1��i�.'�'17w:'"..!,�,., ..•ia. - PP#4 Upstream PP#4 Downstream ( ��• '*`�� .i 'S r; d — f' PP#5 Upstream PP#5 Downstream L { III _x d F r M Bankfull event-Wrack line evidence Overview taken from US 158 August 2020 r f r f f f r r r { - r { ; r r f r f r i f - r f ! ! f ! w # / f r f r r r f - f - r rf BEGIN r SITE 3A pm• y -' r r rx ! - r• _ { f z • r r r x T r rr { f! ry • r 1ru r + f f co r 't Tl r f!f f r ;5d"C INSTALLED rf Q PROP,8"SEWER PIPL • ,` DU G TEMPORARY ROAD ff • Y1 ETOLIR CONSTRUCTION, r • T BE REMOVED PRIOR TO f r PROP.4 OIA UTILITY REAM RESTORATION r f � MANHOLE � r�x ("IIVIFIe.S, � • f rr rr tom' i.F oa 1 PROPOSED STEP POOL. r f RICK SEE DETAIL SHEET 6, • r r Cm (TYP.OF 6) • f {r r f NFVO41)IA f ! W r PROP06EID RIFFLE • LJ GIL ITV VANHOLE ff rfr WITH ROCK SILL. ! r SEE DETAIL SHEET 6, jr r TM.OP 26) • v 9L p� f fr �• rrr f! f � �� rrrf1} A rf � r PROP.A'DIA'JTILITY MANHOLE r END SITF3A- frf --_ IMANHOLET 1� REMOVED v---`- r CMP INSTALLED ! r! LL ' DURING TEMPORARY ROAD r r f ' ~f NEW CULVERT A 4 r•r END SITE 36 TYl O D�OUR iV0P PRIVrTIQN AND WINGWALL / r!r •• • y STREAM RESTORATION ,f ,f d r~ • NEWV8'SEWER PI PE ' * ACTIVITIES, r ! EXISTING r ;� {, r!f STREAM rr NEW-0'DIAUTILTY c} � W r ��v� _ - 0 -I 0' 24' d4' m — 0• k(ANHOLE - ! { r- -- -1 r n • TYPE II PLANTING,ZONE TO !f `frf wkAl'iIC SC:A_L W p BE EXCLUDED INSIDE UTILITY � ~�- r � �- CROSSING AR EAS.SEE SHEET 4, r n r BEGIN SITE 9B >- a "PLANTING PLAN"FOR EiCACT 6"SANITARY 3#1NkR r f { 0 r rr PLAN ING Z0NE-4YOLIT. LINE TO RE REMOVED fr rf LU 0 z • CON TRACTOR TO !{ LL to r•r TEMPORARY ROAD TO BE �¢ TAKE CARE NOT TO r{ r LEGEND: � 0- � INSTALLED FOR THE Y1 DETOUR. IDAMAGE SEVUER PIPE ! rr ROAD TO BE REMOVED PRIOR TO AT RIFFLE CRO$SI NG r f�Cr rr STREAM RESTORATION ACTIVITIES. rr {r ff ROCKSILL------------------------------ O 0 O O F �H LL rrr f • ffr _ rfi !f ��4 r{ STEP POOL--------------------------- 0 - f 4 f r f t # r PROPOSED STREAM------------------. r r r r a ! f f r r• rl SITE PLAN f rfr FP: Photo Point Locations f EmEr 2 9F P f r BEGIN SITE 9A 4o 0 PROP.8r SEWER PIPE cc PROP.4'61A UTILITY MANHOLE In aw CD Na74'CIA od U-11_ITY MANHOLE n PROP.a'DIA UTILITY w TYPE I PLANTING ON LY hWNNO.r INSIDE SEWER LINE CROSSING AREAS�X WIDE) J g END SITE 3A ---_ s J/ W t LL `•\ n r L END SITE 38 ' LllrnW J NEWS' 24` 4 in I.- q SEVIER PIPE GRAPHIC SCALE W (] _ NEWdV DIA UTIL17Y = — MANHOLE BEGIN N SITE 3B < p UL � cn i PLANTING LEGEND: Lu a L ai 0 2 ❑ < TfP-1 PLANTINGZONE ______________ Z Q NpTE; TYPE II PLANTING ZONE -------------- Z LL ALL LIME STAKES AND BARE ROOT TREES MUST NOTE: BE INSTALLED DURING THE DORMANT SEASON -4 RNY dCifi SEE SHEETS FOR PANTING SPECIES °^k C,VT$+ic (NOVEMBER$-MARCH 24). AND INSTALLATION SPEC IFICATIONS. PLANTING PL" inccr n 8r h - +yam yY / ♦Y _ AN- 5 * �I f•, .max r f. pwr low ro - 74 U 2 79BSites .Land r. t ' a ', IL -43 v~ od r rj f r■4 F #r . f A. vp v jkq A' � '��� Y,�,' "• .� �•`. F n �j -'� /tea ,. IL Goo I Earth _ w @2018Google • ` .'x mI i`r...