Loading...
HomeMy WebLinkAbout20070298 Ver 1_More Info Letter_20070517w A r~ o~oF gPG Michael F. Easley, Governor William G. Ross Jr., Secretary ~ North Carolina Department of Environment and Natural Resources ~_ ~ Q ~ Alan W. Klimek, P.E. Director Division of Water Quality May 17, 2007 DWQ Project # 07 0298 Onslow County CERTIFIED MAIL: 7005 0390 0001 3200 5588 RETURN RECEIPT REQUESTED D. Ralph Huff III 2929 Breezewood Avenue #400 Fayetteville, NC 28303 Subject Property: Huff Property REQUEST FOR MORE INFORMATION Dear Mr. Huff: On February 15,2007, the Division of Water Quality (DWQ) received your application dated February 14, 2007 to fill approximately 0.49 acres of wetlands for a road crossing. Additional information was received on May 9, 2007. The DWQ has determined that your application was still incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Impact Justification (Avoidance and Minimization) The response to the impact justification requested by this Office was not adequate to address the avoidance and minimization criteria. The more northerly alignment of the entrance road would minimize wetland impacts and there is also an adjacent highground area that would be suitable for a sales office. The DWQ recommends that if the applicant prefers the entrance road at the center of the property, then instead of partially bridging the crossing for the entrance road, bridge the entire span and avoid the wetland impacts associated with the fill. Please redesign the project and revise the narrative accordingly. Please note that bridges and bottomless culverts need to be designed to meet DOT standards. 2. The draft declarations of covenants, conditions and restrictions for the site are for Goose Bay Plantation. Is this project related to or a part of the Goose Bay Plantation off of Turkey Creek Road? If so then the two need to be reviewed together as one complete project. Otherwise the covenant document needs to specific to the subdivision and notarized as previously requested (the covenant document received by DWQ had not been notarized). North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Servicel-87723-6748 One Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 fntemet: h2o.enr.state.nc.us NorthCarolina An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper ~aturallu Page Two D. Ralph Huff III DWQ Project # 07 0298 May 17, 2007 Please respond within three weeks of the date of this letter by sending this information to me in writing and 5 copies to Ian McMillan of the DWQ 401 Oversight and Express Office at 1650 Mail Service Center, Raleigh, NC 27699-1650. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call me at 910-797-7215 or Cyndi Karoly at 919-733- 1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Joanne Steenhuis Senior Environmental Specialist cc: Kim Williams -Land Management Group ~ri `~` ~;~taleigh` Brad Shaver - USACE Wilmington Regulatory Field Office Becky Fox -EPA Central Files WiRO