Loading...
HomeMy WebLinkAbout20120523 Ver 1_Staff Comments_20120615Lucas, Annette From Lucas Annette Sent Friday June 15 2012 9 23 AM To Turlington Chad Cc Lucas Annette Subject 12 0523 RiverbrnokP — Phases II IV Attachments 12 0523 Riverbrooke — Phases II IV docx Chad I have asked them to provide a SW plan at this point I cannot see a good reason to issue them a conditional I have spoken w= }h Nicole Thomson a* S&EC abou* it and I think he understands Thanks Annette Annette M Lucas PE Environmental Engineer NCDENR I DWQ I Wetlands and Stormwater Branch 1650 Mail Service Center Raleigh NC 27699 1650 (Mail) 512 N Salisbury St Raleigh NC 27604 1 9th Floor (Location & Parcels) Phone (919) 807 6381 1 Fax (919) 807 6494 1 Email Annette Lucas(c),ncdenr gov Website http / /portal ncdenr org/web /wq/swp/ws /401 A Before printing this email please consider your budget and the environment E mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties 12 0523 Riverbrooke — Phases II IV AML comments June 15 2012 Per the requirements of GC 3890 this project must provide a Stormwater Management Plan for review and approval by the DWQ Please include an SNIP that removes a minimum of 85 percent TSS and 30 percent TN from the stormwater generated by this project For each proposed BMP please provide a completed BMP Supplement Form with all the required items GC 3890 is available at the following web site http //portal ncdenr org/c /document library/get file9uuid= 9e7c74e6 1036 44dd b70f 8e93 e7ef6fbe &groupId =3 8364 The BMP Supplement Forms are available at the following web site http //portal ncdenr org/web/wq/ws/suibmp manual