Loading...
HomeMy WebLinkAbout20120077 Ver 1_Stormwater Info_20120531Del Webb 0,�;7 - 2,9 - ZVI ? Prepared for: Randy King ® Pulte Homes 1225 Crescent Green Drive - Suite = 250 Cary, NC 27518 (919) 816-1146 Table of Contents Narrative Preliminary BMP Sizing Calculations Required Maps and Information Narrative Del Webb STORM WATER IMPACT ANALYSIS General Description Del Webb will be an approximately 296 -acre community south of Leesville Road east of the intersection with Doc Nichols Road. The tracts that will make up the development are currently in the county but will be annexed. The properties are zoned Rural Residential and the land use is a mixture of agricultural, residential, and vacant. The entire project is in the Neuse river basin and the majority of the site is not in a watershed protection district. Approximately 8 acres in the northern portion of the site drains to the F /J -B Watershed Protection District. All impervious surface added in this portion of the site will be directed away from the F /J -B in post - development. There are multiple streams located onsite and FEMA 100 -year floodplain is associated with a few reaches. The development for the site will consist of single - family homes, a clubhouse area, and associated streets and parking. The community will be a dense residential development. Water Quality The development is greater than 42% impervious; therefore, 40% of the required nitrogen and phosphorous removal is required onsite. The required onsite nitrogen and phosphorous removal will be provided by multiple BMP's located throughout the site. All of the required phosphorus removal will be provided by the onsite BMP's, but further nitrogen reduction will be provided through a purchase of offset credits. The total post - development nitrogen and phosphorous export for the site will not exceed 2.2 Ib /ac /yr and 0.50 Ib /ac /yr respectively. BMP's Two types of BMP's will be located throughout the site to attenuate the peak flow rate of their contributing watershed's and or provide nutrient removal. Twelve water quality ponds will have surface areas large enough to accomplish 85% TSS removal, as calculated using the surface area multipliers, based on average depth and the impervious percentage of their drainage basins. The water quality ponds will utilize low flow orifices that will slowly draw down the temporary pool over a period of 2 -5 days. Level spreaders are designed at the outfall of each BMP and are sized for the 10 -year rainfall runoff. Each level spreader will discharge to an engineered filter strip at a slope of less than 5% that will be planted with grass and maintained in perpetuity. Rainfall runoff in excess of the 10 -year event will bypass the level spreaders by means of the water quality ponds' emergency spillways for all ponds except for WQ #9. Runoff in excess of the 10 -year rainfall event outflow from WQ #9 will bypass it's level spreader by means of a flow splitter box where it will be directed to a separate outfall with a plunge pool upstream of the buffer. Two level spreaders have been designed to provide diffuse flow of the runoff from their contributing drainage basins into a stream buffer. The level spreaders were designed so that their lengths are greater than 10 feet times the peak flow resulting from the 1 -inch per hour rainfall runoff from their watershed, as calculated using the rational method. The level spreaders will discharge to an engineered filter strip at a slope of less than 5% that will be planted with grass and maintained in perpetuity. A flow splitter will be utilized upstream of the level spreader to bypass all flows exceeding the 1 " /hr rainfall event to an existing natural draw. Conclusion Multiple BMP's located throughout the site will be utilized to accomplish the required onsite nitrogen and phosphorous removal as well as provide peak flow detention for the 1 -, 2 -, and 10 -year rainfall events. Nitrogen offset credits will be purchased to mitigate the additional nitrogen export to reduce the total site nitrogen exports to 2.2 lb/ac/yr. The onsite BMP's will serve to reduce the post - development phosphorus export to below the allowable limit of 0.50 Ibs /ac /yr. Methodology • Drainage basins were delineated using 2 -foot contours for offsite areas and 1 -foot contours onsite. Contours displayed on the drainage maps are 10 -foot and 5 -foot contours for onsite and offsite respectively to increase readability of the maps. Onsite topography is from survey data and offsite topography is from City of Durham Aerial Topography, 1995. • United States Geological Survey Map is the Southwest Durham Quadrangle. • The FEMA Map associated with the site is Map # 3720076900J, effective date May 2, 2006, Panel 0769J. • Peak flows are determined using the NRCS Method, as described in TR -20, in HydroCAD Version 7.1. NRCS Curve Numbers are based upon cover condition and soil type as described below. • Soil data to determine curve numbers in the watershed are from USDA Durham County Soil Map # 33. • Cover conditions for each watershed was determined based on digital maps obtained from the City of Durham, survey information, aerial photography. • Time of concentration calculations were determined using the TR -55 method for sheet flow, shallow concentrated flow, lake flow, and channel flow • The routing analysis for the dry pond was accomplished using HydroCAD Version 7.1 which utilizes the storage- indication method. Preliminary BMP Sizing Calculations 1 121 - WQ #1 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #1 - Required Surface Area Drainage Area to Basin = 12.88 acres Impervious Area to Basin = 6.65 acres Impervious Percentage = 520 Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 5070 Site % impervious 527o Upper Boundary 6070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 2.06 2.06 2.06 2.12 2.12 2.12 2.40 2.40 2.40 SA /DA = 2.12 Surface Area Required = 11,869 sf Surface Area Provided = 31,407 sf Matt Jones, El 1/25/2012 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ# 1 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #1 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Runoff Volume Simple Me Drainage Area (A) = 12.88 Impervious Area = 6.65 Impervious Fraction (IA) = 0.52 Rainfall Depth (RD) = 1.00 Rv = 0.51 Storage = KS *Stageb KS = 31083.00 b = 1.0755 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 24063 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.79 Contour Average 360.79 ft Contour 361.00 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (co 360.0 0.0 31407 0 0 0 362.0 2.0 34265 32836 65672 65672 364.0 4.0 37174 35720 71439 137111 366.0 6.0 40156 38665 77330 214441 Runoff Volume Simple Me Drainage Area (A) = 12.88 Impervious Area = 6.65 Impervious Fraction (IA) = 0.52 Rainfall Depth (RD) = 1.00 Rv = 0.51 Storage = KS *Stageb KS = 31083.00 b = 1.0755 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 24063 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.79 ft Elevation Required to Detain WQ Volume = 360.79 ft Actual Orifice Elevation = 361.00 ft Temporary Pool Volume Provided = 31083 cf Temporary Pool Surface Area Provided = 33430 sf Matt Jones, El 1/25/2012 1121 - WQ #1 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #1 - Drawdown Orifice Sizing Orifice Diameter= 2.50 in Area of Orifice = 0.03 sf Orifice Invert = 360.00 ft KS = 31083.00 b = 1.0755 CD= 0.6 CW = 3.0 g = 32.2 ft /s2 Matt Jones, El 1/25/2012 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 361.00 31083 0.155 360.91 28143 0.148 0.151 2940 19415 360.82 25225 0.139 0.143 2918 20358 360.74 22330 0.130 0.135 2895 21476 360.65 19461 0.121 0.126 2869 22829 360.56 16622 0.111 0.116 2839 24519 360.47 13816 0.099 0.105 2805 26717 360.38 11050 0.087 0.093 2766 29755 360.29 8333 0.072 0.079 2718 34383 360.21 5677 0.058 0.065 2656 40901 360.12 3108 0.025 0.042 2569 61498 Step Increment = 0.09 ft End Goal = 3108.30 cf Maximum Orifice Flow = 0.15 cfs Drawdown Time = 3.49 days 1 121 - WQ #2 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #2 - Required Surface Area Drainage Area to Basin = 38.3 acres Impervious Area to Basin = 19.02 acres Impervious Percentage = 50% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 5070 Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 2.05 2.05 2.05 2.06 2.06 2.06 SA /DA = 2.05 Surface Area Required = 34,181 sf Surface Area Provided = 56,196 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #2 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #2 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume Runoff Volume Simple Me Drainage Area (A) = 38.30 Impervious Area = 19.02 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Storage = KS *Stageb KS = 54496.00 b = 1 1.1156 thod Acres Acres Inch (Rv = 0.05 +0.9 *IA Runoff Volume (V) = 1 69090 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.24 ft Contour Average Actual Orifice Elevation = 371.30 ft Contour Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (so (so (co (cf) 370.0 0.0 56196 0 0 0 372.0 2.0 62949 59573 119145 119145 374.0 4.0 69996 66473 132945 252090 376.0 6.0 77340 73668 147336 399426 378.0 8.0 84981 81161 162321 561747 Storage Volume Runoff Volume Simple Me Drainage Area (A) = 38.30 Impervious Area = 19.02 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Storage = KS *Stageb KS = 54496.00 b = 1 1.1156 thod Acres Acres Inch (Rv = 0.05 +0.9 *IA Runoff Volume (V) = 1 69090 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.24 ft Elevation Required to Detain WQ Volume = 371.24 ft Actual Orifice Elevation = 371.30 ft Temporary Pool Volume Provided = 73026 cf Temporary Pool Surface Area Provided = 62668 sf Matt Jones, El 11/16/2011 1 121 - WQ #2 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #2 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 4.00 in 0.09 sf 370.00 ft 54496.00 1.1156 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 371.30 73026 0.447 371.19 65951 0.424 0.436 7076 16235 371.07 58953 0.400 0.412 6998 16978 370.96 52040 0.374 0.387 6913 17858 370.85 45222 0.346 0.360 6819 18928 370.73 38508 0.316 0.331 6713 20270 370.62 31915 0.283 0.299 6594 22027 370.51 25460 0.245 0.264 6455 24487 370.39 19172 0.199 0.222 6288 28320 370.28 13094 0.147 0.173 6078 35087 370.17 7303 0.067 0.107 5791 54112 Step Increment = 0.11 ft End Goal = 7302.64 cf Maximum Orifice Flow = 0.44 cfs Drawdown Time = 2.94 days 1 121 - WQ #3 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #3 - Required Surface Area Drainage Area to Basin = 3.21 acres Impervious Area to Basin = 1.59 acres Impervious Percentage = 50% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 5070 Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 2.04 2.04 2.04 2.06 2.06 2.06 SA /DA = 2.04 Surface Area Required = 2,859 sf Surface Area Provided = 7,336 sf Matt Jones, El 1/25/2012 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual. Julv 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #3 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #3 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (ft) Runoff Volume Simple Mi Drainage Area (A) = 3.21 Impervious Area = 1.59 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Storage = KS *Stageb KS = 7218.10 b = 1.1237 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 5777 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.82 Contour Average 398.82 ft Contour 398.90 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (co 398.0 0.0 7336 0 0 0 400.0 2.0 8457 7897 15793 15793 402.0 4.0 9643 9050 18100 33893 404.0 6.0 10896 10270 20539 54432 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (ft) Runoff Volume Simple Mi Drainage Area (A) = 3.21 Impervious Area = 1.59 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Storage = KS *Stageb KS = 7218.10 b = 1.1237 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 5777 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.82 ft Elevation Required to Detain WQ Volume = 398.82 ft Actual Orifice Elevation = 398.90 ft Temporary Pool Volume Provided = 6412 cf Temporary Pool Surface Area Provided = 8006 sf Matt Jones, El 1/25/2012 1 121 - WQ #3 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #3 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 1.00 in 0.01 sf 398.00 ft 7218.10 1.1237 0.6 3.0 32.2 ft /s` Matt Jones, El 1/25/2012 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 398.90 6412 0.024 398.82 5788 0.023 0.024 624 26270 398.74 5171 0.022 0.023 617 27303 398.66 4562 0.021 0.021 609 28501 398.59 3962 0.019 0.020 600 29918 398.51 3372 0.018 0.019 590 31631 398.43 2793 0.016 0.017 579 33769 398.35 2227 0.015 0.015 566 36554 398.27 1677 0.013 0.014 550 40421 398.19 1146 0.010 0.011 531 46398 398.12 641 0.007 0.009 504 57912 Step Increment = 0.08 ft End Goal = 641.22 cf Maximum Orifice Flow = 0.02 cfs Drawdown Time = 4.15 days 1 121 - WQ #4 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #4 - Required Surface Area Drainage Area to Basin = 3.85 acres Impervious Area to Basin = 1.75 acres Impervious Percentage = 45% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 457o Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 1.91 1.91 1.91 2.06 2.06 2.06 SA /DA = 1.91 Surface Area Required = 3,203 sf Surface Area Provided = 10,490 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #4 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #4 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume Runoff Volume Simple Mi Drainage Area (A) = 3.85 Impervious Area = 1.75 Impervious Fraction (IA) = 0.45 Rainfall Depth (RD) = 1.00 Rv = 0.46 Storage = KS *Stageb KS = 10568.00 b = 1 1.2184 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 6416 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.66 Contour Average 384.66 ft Contour 384.70 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 384.0 0.0 10490 0 0 0 386.0 2.0 14238 12364 24728 24728 388.0 4.0 17408 15823 31646 56374 390.0 6.0 20893 19151 38301 94675 Storage Volume Runoff Volume Simple Mi Drainage Area (A) = 3.85 Impervious Area = 1.75 Impervious Fraction (IA) = 0.45 Rainfall Depth (RD) = 1.00 Rv = 0.46 Storage = KS *Stageb KS = 10568.00 b = 1 1.2184 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 6416 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.66 ft Elevation Required to Detain WQ Volume = 384.66 ft Actual Orifice Elevation = 384.70 ft Temporary Pool Volume Provided = 6843 cf Temporary Pool Surface Area Provided = 11911 sf Matt Jones, El 11/16/2011 1 121 - WQ #4 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #4 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 1.00 in 0.01 sf 384.00 ft 10568.00 1.2184 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 384.70 6843 0.021 384.64 6142 0.020 0.021 701 33680 384.58 5455 0.019 0.020 687 34686 384.52 4783 0.018 0.019 672 35844 384.46 4128 0.017 0.018 655 37202 384.40 3491 0.016 0.016 637 38828 384.34 2874 0.014 0.015 617 40835 384.28 2280 0.013 0.014 594 43417 384.22 1713 0.011 0.012 567 46947 384.17 1178 0.009 0.010 535 52290 384.11 684 0.007 0.008 494 62194 Step Increment = 0.06 ft End Goal = 684.32 cf Maximum Orifice Flow = 0.02 cfs Drawdown Time = 4.93 days 1 121 - WQ #5 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #5 - Required Surface Area Drainage Area to Basin = 18.3 acres Impervious Area to Basin = 8.68 acres Impervious Percentage = 47% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 4776 Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 1.98 1.98 1.98 2.06 2.06 2.06 SA /DA = 1.98 Surface Area Required = 15,746 sf Surface Area Provided = 25,756 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #5 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #5 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume Runoff Volume Simple Me Drainage Area (A) = 18.30 Impervious Area = 8.68 Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Rv = 0.48 Storage = KS *Stageb KS = 25747.00 b = 1 1.0955 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 31679 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.21 Contour Average 375.21 ft Contour 375.30 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 374.0 0.0 25756 0 0 0 376.0 2.0 29559 27658 55315 55315 378.0 4.0 32514 31037 62073 117388 380.0 6.0 35551 34033 68065 185453 Storage Volume Runoff Volume Simple Me Drainage Area (A) = 18.30 Impervious Area = 8.68 Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Rv = 0.48 Storage = KS *Stageb KS = 25747.00 b = 1 1.0955 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 31679 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.21 ft Elevation Required to Detain WQ Volume = 375.21 ft Actual Orifice Elevation = 375.30 ft Temporary Pool Volume Provided = 34320 cf Temporary Pool Surface Area Provided = 28921 sf Matt Jones, El 11/16/2011 1 121 - WQ #5 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #5 - Drawdown Orifice Sizing Orifice Diameter= 2.50 in Area of Orifice = 0.03 sf Orifice Invert = 374.00 ft KS = 25747.00 b = 1.0955 CD= 0.6 CW = 3.0 g = 32.2 ft /s2 Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 375.30 34320 0.179 375.19 31034 0.171 0.175 3286 18767 375.07 27778 0.161 0.166 3256 19604 374.96 24555 0.152 0.157 3223 20588 374.84 21369 0.141 0.146 3186 21767 374.73 18224 0.130 0.135 3145 23219 374.62 15125 0.117 0.124 3099 25075 374.50 12081 0.103 0.110 3044 27574 374.39 9104 0.087 0.095 2978 31225 374.27 6210 0.067 0.077 2894 37402 374.16 3432 0.040 0.054 2777 51900 Step Increment = 0.11 ft End Goal = 3432.03 cf Maximum Orifice Flow = 0.18 cfs Drawdown Time = 3.21 days 1 121 - WQ #6 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #6 - Required Surface Area Drainage Area to Basin = 5.05 acres Impervious Area to Basin = 2.55 acres Impervious Percentage = 50% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 5070 Site % impervious 5070 Upper Boundary 6070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 2.06 2.06 2.06 2.08 2.08 2.08 2.40 2.40 2.40 SA /DA = 2.08 Surface Area Required = 4,569 sf Surface Area Provided = 5,211 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #6 Sizing.xls Above NP Volume Normal Pool Top of Berm Matt Jones, El 11/16/2011 1121 - Del Webb WQ #6 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Storage Volume Runoff Volume Simple M4 Drainage Area (A) = 5.05 Impervious Area = 2.55 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Storage = KS *Stageb KS = 5767.90 b = 1.3464 Ahod Acres Acres Inch (Rv = 0.05 +0.9 *IA) Runoff Volume (V) = 1 9247 cf (V = 3630 *Rp *Rv*A Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.42 Contour Average 383.42 ft Contour 383.50 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (cf) (cf) 382.0 0.0 5211 0 0 0 384.0 2.0 9455 7333 14666 14666 386.0 4.0 13170 11313 22625 37291 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Storage Volume Runoff Volume Simple M4 Drainage Area (A) = 5.05 Impervious Area = 2.55 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Storage = KS *Stageb KS = 5767.90 b = 1.3464 Ahod Acres Acres Inch (Rv = 0.05 +0.9 *IA) Runoff Volume (V) = 1 9247 cf (V = 3630 *Rp *Rv*A Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.42 ft Elevation Required to Detain WQ Volume = 383.42 ft Actual Orifice Elevation = 383.50 ft Temporary Pool Volume Provided = 9957 cf Temporary Pool Surface Area Provided = 8937 sf 1 121 - WQ #6 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #6 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 1.00 in 0.01 sf 382.00 ft 5767.90 1.3464 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 383.50 9957 0.032 383.38 8874 0.030 0.031 1082 34877 383.25 7825 0.029 0.030 1049 35409 383.13 6811 0.027 0.028 1014 36008 383.01 5834 0.026 0.027 977 36694 382.89 4898 0.024 0.025 936 37490 382.76 4006 0.022 0.023 892 38436 382.64 3162 0.020 0.021 844 39596 382.52 2373 0.018 0.019 789 41078 382.39 1647 0.016 0.017 726 43104 382.27 996 0.013 0.014 651 46206 Step Increment = 0.12 ft End Goal = 995.65 cf Maximum Orifice Flow = 0.03 cfs Drawdown Time = 4.50 days 1 121 - LS #7 Sizing.xls Level Spreader Flow and Length 1121 - Del Webb LS #7 Calculations Composite C Value Calculation Matt Jones, El 11/16/2011 Cover Condition C Value E92 Portion of Total Area Weighted C Value Impervious (Streets) 0.95 0.58 0.55 Open HSG 'D' 0.35 0.42 0.15 Total 2.21 Total 0.70 Composite C Value = 0.70 1 in /hr Ratinal Flow Calculation Intensity = 1.00 in /hr Rational Flow Equation Q=C xIxA cfs Q = 0.70 x 1.00 x 2.21 = 1.55 cfs Total Flow to Level Spreader = 1.55 cfs Level Spreader Length Calculations Level Spreader Length Multiplier = 10 ft /cfs Length of Level Spreader Required = 15 ft Length of Level Spreader Provided = 50 ft 1121 - Del Webb Level Spreader #7 Flow Splitter Peak Flow = 1.55 cfs Pipe to Level Spreader Invert = 390.00 feet WSE = 390.90 feet Diameter of Pipe to Level Spreader = 8.00 inches Discharge Coefficient (Cd) = 0.60 g = 32.20 ft /s /s Submerged Area (a) = 0.35 ft2 Effective Head (h) = 0.90 feet Q = Cd *a *�2 *g *h Orifice Flow (Q) = 1 1.59 cfs Bypass Weir Elevation = 390.90 1 121 - WQ #8 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #8 - Required Surface Area Drainage Area to Basin = 29.2 acres Impervious Area to Basin = 17.33 acres Impervious Percentage = 59% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 5070 Site % impervious 5970 Upper Boundary 6070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 2.06 2.06 2.06 2.38 2.38 2.38 2.40 2.40 2.40 SA /DA = 2.38 Surface Area Required = 30,245 sf Surface Area Provided = 61,138 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #8 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #8 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume Runoff Volume Simple Me Drainage Area (A) = 29.20 Impervious Area = 17.33 Impervious Fraction (IA) = 0.59 Rainfall Depth (RD) = 1.00 Rv = 0.58 Storage = KS *Stageb KS = 60508.00 b = 1 1.0953 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 61917 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.02 Contour Average 359.02 ft Contour 359.10 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 358.0 0.0 61319 0 0 0 360.0 2.0 68377 64848 129696 129696 362.0 4.0 75754 72066 144131 273827 364.0 6.0 83441 79598 159195 433022 Storage Volume Runoff Volume Simple Me Drainage Area (A) = 29.20 Impervious Area = 17.33 Impervious Fraction (IA) = 0.59 Rainfall Depth (RD) = 1.00 Rv = 0.58 Storage = KS *Stageb KS = 60508.00 b = 1 1.0953 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 61917 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.02 ft Elevation Required to Detain WQ Volume = 359.02 ft Actual Orifice Elevation = 359.10 ft Temporary Pool Volume Provided = 67166 cf Temporary Pool Surface Area Provided = 66879 sf Matt Jones, El 11/16/2011 1 121 - WQ #8 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #8 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 4.00 in 0.09 sf 358.00 ft 60508.00 1.0953 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 359.10 67166 0.406 359.00 60736 0.384 0.395 6430 16272 358.91 54365 0.362 0.373 6371 17084 358.81 48058 0.337 0.349 6307 18055 358.71 41822 0.311 0.324 6235 19248 358.62 35667 0.282 0.296 6155 20766 358.52 29603 0.250 0.266 6064 22795 358.42 23646 0.213 0.232 5957 25723 358.33 17818 0.187 0.200 5828 29096 358.23 12153 0.111 0.149 5664 37961 358.13 6717 0.049 0.080 5437 67845 Step Increment = 0.10 ft End Goal = 6716.61 cf Maximum Orifice Flow = 0.40 cfs Drawdown Time = 3.18 days 1 121 - WQ #9 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #9 - Required Surface Area Drainage Area to Basin = 49.95 acres Impervious Area to Basin = 23.82 acres Impervious Percentage = 48% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 487o Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 1.98 1.98 1.98 2.06 2.06 2.06 SA /DA = 1.98 Surface Area Required = 43,162 sf Surface Area Provided = 101,403 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1121 - WQ #9 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #9 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Contour Elevation (ft) Stage (ft) Contour Surface Area (sf) Average Contour Surface Area (sf) Incremental Volume (cf) Cumulative Volume (cf) 410.0 0.0 101403 0 0 0 412.0 2.0 109678 105541 211081 211081 414.0 4.0 118237 113958 227915 438996 416.0 6.0 127073 122655 245310 684306 418.0 8.0 136174 131624 263247 947553 4200 . 10.0 1 145534 1 140854 1 281708 1 1229261 422.0 1 12.0 1 151151 1 148343 1 296685 1 1525946 Storage Volume Storage = KS *Stageb KS = 96578.00 b = 1.1028 Runoff Volume (V) = 1 86886 cf (V = 3630 *Rp *Rv *A) Water Quality Volume Stacie Calculation Stage Required to Detain WQ Volume = 0.91 ft Elevation Required to Detain WQ Volume = 410.91 ft Actual Orifice Elevation = 411.00 ft Temporary Pool Volume Provided = 96578 cf Temporary Pool Surface Area Provided = 106506 sf Matt Jones, El 11/16/2011 Runoff Volume Simple Method Drainage Area (A) = 49.95 Acres Impervious Area = 23.82 Acres Impervious Fraction (IA) = 0.48 Rainfall Depth (RD) = 1.00 Inch Rv= 0.48 (Rv = 0.05 +0.9 *IA) Runoff Volume (V) = 1 86886 cf (V = 3630 *Rp *Rv *A) Water Quality Volume Stacie Calculation Stage Required to Detain WQ Volume = 0.91 ft Elevation Required to Detain WQ Volume = 410.91 ft Actual Orifice Elevation = 411.00 ft Temporary Pool Volume Provided = 96578 cf Temporary Pool Surface Area Provided = 106506 sf Matt Jones, El 11/16/2011 1 121 - WQ #9 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #9 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 5.00 in 0.14 sf 410.00 ft 96578.00 1.1028 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 411.00 96578 0.584 410.91 87291 0.551 0.568 9287 16365 410.82 78095 0.515 0.533 9196 17247 410.74 68999 0.477 0.496 9096 18322 410.65 60013 0.436 0.457 8985 19671 410.56 51152 0.390 0.413 8861 21442 410.47 42432 0.339 0.365 8720 23921 410.39 33877 0.301 0.320 8555 26764 410.30 25521 0.205 0.253 8356 33083 410.21 17416 0.122 0.163 8105 49702 410.12 9658 0.055 0.088 7758 88073 Step Increment = 0.09 ft End Goal = 9657.80 cf Maximum Orifice Flow = 0.57 cfs Drawdown Time = 3.64 days 1 121 - WQ #10 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #10 - Required Surface Area Drainage Area to Basin = 15.99 acres Impervious Area to Basin = 7.58 acres Impervious Percentage = 47% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 4776 Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 1.97 1.97 1.97 2.06 2.06 2.06 SA /DA = 1.97 Surface Area Required = 13,752 sf Surface Area Provided = 24,297 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ# 10 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #10 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume Runoff Volume Simple Me Drainage Area (A) = 15.99 Impervious Area = 7.58 Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Rv = 0.48 Storage = KS *Stageb KS = 23859.00 b = 1 1.1779 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 27666 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.13 Contour Average 389.13 ft Contour 389.20 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 388.0 0.0 24297 0 0 0 390.0 2.0 29985 27141 54282 54282 392.0 4.0 36051 33018 66036 120318 394.0 6.0 42414 39233 78465 198783 Storage Volume Runoff Volume Simple Me Drainage Area (A) = 15.99 Impervious Area = 7.58 Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Rv = 0.48 Storage = KS *Stageb KS = 23859.00 b = 1 1.1779 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 27666 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.13 ft Elevation Required to Detain WQ Volume = 389.13 ft Actual Orifice Elevation = 389.20 ft Temporary Pool Volume Provided = 29575 cf Temporary Pool Surface Area Provided = 29030 sf Matt Jones, El 11/16/2011 1 121 - WQ #10 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #10 - Drawdown Orifice Sizing Orifice Diameter= 2.50 in Area of Orifice = 0.03 sf Orifice Invert = 388.00 ft KS = 23859.00 b = 1.1 779 CD= 0.6 CW = 3.0 g = 32.2 ft /s2 Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 389.20 29575 0.172 389.10 26608 0.164 0.168 2967 17694 388.99 23690 0.155 0.159 2918 18329 388.89 20826 0.146 0.150 2864 19069 388.79 18020 0.136 0.141 2806 19948 388.68 15278 0.125 0.130 2741 21021 388.58 12610 0.113 0.119 2669 22375 388.48 10024 0.100 0.107 2586 24171 388.38 7536 0.086 0.093 2488 26744 388.27 5168 0.067 0.076 2368 30957 388.17 2957 0.044 0.056 2211 39765 Step Increment = 0.10 ft End Goal = 2957.47 cf Maximum Orifice Flow = 0.17 cfs Drawdown Time = 2.78 days 1 121 - WQ #11 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #11 - Required Surface Area Drainage Area to Basin = 23.41 acres Impervious Area to Basin = 7.86 acres Impervious Percentage = 340 Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 307o Site % impervious 347o Upper Boundary 407o Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.34 1.34 1.34 1.48 1.48 1.48 1.73 1.73 1.73 SA /DA = 1.48 Surface Area Required = 15,086 sf Surface Area Provided = 56,558 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ# 1 1 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #11 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume Runoff Volume Simple Me Drainage Area (A) = 23.41 Impervious Area = 7.86 Impervious Fraction (IA) = 0.34 Rainfall Depth (RD) = 1.00 Rv = 0.35 Storage = KS *Stageb KS = 55851.00 b = 1 1.0874 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 29928 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.56 Contour Average 392.56 ft Contour 392.60 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 392.0 0.0 56558 0 0 0 394.0 2.0 62475 59517 119033 119033 396.0 4.0 68657 65566 131132 250165 398.0 6.0 75104 71881 143761 393926 Storage Volume Runoff Volume Simple Me Drainage Area (A) = 23.41 Impervious Area = 7.86 Impervious Fraction (IA) = 0.34 Rainfall Depth (RD) = 1.00 Rv = 0.35 Storage = KS *Stageb KS = 55851.00 b = 1 1.0874 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 29928 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.56 ft Elevation Required to Detain WQ Volume = 392.56 ft Actual Orifice Elevation = 392.60 ft Temporary Pool Volume Provided = 32047 cf Temporary Pool Surface Area Provided = 58081 sf Matt Jones, El 11/16/2011 1121 - WQ #11 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #10 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 3.00 in 0.05 sf 392.00 ft 55851.00 1.0874 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 392.60 32047 0.163 392.55 28994 0.154 0.158 3053 19296 392.49 25966 0.144 0.149 3028 20372 392.44 22967 0.133 0.138 3000 21684 392.39 19998 0.121 0.127 2968 23334 392.34 17065 0.109 0.115 2933 25505 392.28 14172 0.094 0.101 2893 28554 392.23 11326 0.083 0.089 2846 32148 392.18 8537 0.056 0.070 2789 40067 392.12 5820 0.033 0.045 2717 60814 392.07 3205 0.015 0.024 2615 109689 Step Increment = 0.05 ft End Goal = 3204.74 cf Maximum Orifice Flow = 0.16 cfs Drawdown Time = 4.42 days 1 121 - WQ #12 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #12 - Required Surface Area Drainage Area to Basin = 9.12 acres Impervious Area to Basin = 3.56 acres Impervious Percentage = 39% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 307o Site % impervious 397o Upper Boundary 407o Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.34 1.34 1.34 1.69 1.69 1.69 1.73 1.73 1.73 SA /DA = 1.69 Surface Area Required = 6,723 sf Surface Area Provided = 11,806 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ# 12 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #12 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume Runoff Volume Simple Mi Drainage Area (A) = 9.12 Impervious Area = 3.56 Impervious Fraction (IA) = 0.39 Rainfall Depth (RD) = 1.00 Rv = 0.40 Storage = KS *Stageb KS = 11566.00 b = 1 1.2072 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 13286 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.12 Contour Average 403.12 ft Contour 403.20 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 402.0 0.0 11805 0 0 0 404.0 2.0 15072 13439 26877 26877 406.0 4.0 18637 16855 33709 60586 408.0 6.0 22483 20560 41120 101706 Storage Volume Runoff Volume Simple Mi Drainage Area (A) = 9.12 Impervious Area = 3.56 Impervious Fraction (IA) = 0.39 Rainfall Depth (RD) = 1.00 Rv = 0.40 Storage = KS *Stageb KS = 11566.00 b = 1 1.2072 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 13286 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.12 ft Elevation Required to Detain WQ Volume = 403.12 ft Actual Orifice Elevation = 403.20 ft Temporary Pool Volume Provided = 14414 cf Temporary Pool Surface Area Provided = 14500 sf Matt Jones, El 11/16/2011 1 121 - WQ #12 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #12 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 1.50 in 0.01 sf 402.00 ft 11566.00 1.2072 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 403.20 14414 0.063 403.10 12945 0.060 0.062 1468 23847 403.00 11505 0.057 0.059 1440 24577 402.89 10095 0.054 0.055 1410 25416 402.79 8718 0.050 0.052 1377 26399 402.69 7378 0.047 0.049 1340 27575 402.59 6078 0.043 0.045 1300 29022 402.48 4825 0.038 0.041 1253 30878 402.38 3626 0.033 0.036 1199 33401 402.28 2491 0.028 0.031 1134 37183 402.18 1441 0.020 0.024 1050 44050 Step Increment = 0.10 ft End Goal = 1441.35 cf Maximum Orifice Flow = 0.06 cfs Drawdown Time = 3.50 days 1 121 - WQ #14 Sizing WQ Volume 1121 - Del Webb WQ #14 Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 46.22 Acres Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Inch Rv= 0.50 (Rv = 0.05 +0.9 *IA) Runoff Volume (V) = 83889 cf (V = 3630 *Rp *Rv*A) Matt Jones, El 5/29/2012 Required Maps and Information r� ■ ■ ■T ■ %,sow snoop H ASSOCIATES, PA ANY REPRODUCTION WITHOUT PRIOR WRITIM CDNSENr IS PROHIBITED �'�' y- i��>.- -,s`. � v-�< � � s sn :t.: �� �. �>�r, r- � f'„ e_ r � i� • r�,�E �� �� cW • � e 7- � ��`�? - *` a, i- ^F, � i - vv� r�.v.�•e't >� ssra� v,.v a- ?' r - ,cf�._ .'jam: ��. ti " -- •es`�_ _ _ > y'; �.,,� ,t_r�yF'si>F::w -s _ 3 y-i '�� - � .� "mss _ '3 � -#�. -�E - ".,C`sti.Yr,c.:• w..3;.: ��:.� '=.G }<_ � - �?��`�x -_.w� s ,� �: -� ������ - � S.v''"_ "u-. -. ��. - � _, -sue _ •_''' _ rc > �>E.s ;'' -=r2i r - {_ �•L�= L - "�]'� 3c' ��i�'�1 - Am mg HORVATH _ "� - •= a�-'� y - �� - - °s. _ ` _ -mot - -/ _ ,< -`�' -v{� `��' ,r. �� .. -..��- _ -'�':> ,R: - -�zc�• � r'kv c�''� _tx ..2.� � - ..'YSl: >c:,. ~+-L�'�f' �"�_ ,S- )� {. -z _ -7 a �' _ - zr� - v� .Z • <�£e�. _ _ . '�`�zZS�?Q�,�r �`,� � • �� •sac '�- ? .-vim- - �. _� -• `. S._ ,_ � . n, � � �. \ate - ". � r-' ' r-c.^ � ,� 'L '. /- - - ,yitb - z._ =34•- .r;.a= z'.._�w- _..z,•. -.�- `i,. �t,y s'r -r '� ^ .ti�'3�.}ft�> _ � r� - -�x`E- % �'.�li:s s< �� A $ $ 0 C I A T E $ " '� a•` _ 5�!� �������� _ - 'S �� ` � _t. =_'"" - z F tivc� -� r=id �.fi _ �"��a' �" � `�"� _ if -� r y - a.:Y "{ tct'F- ff` - ,5- - _uA• - - l -: /�'" S / - a C` -': f la COt :5u 70.1it PIP.CE �1TE2]1 c .� ?. �_ s - a, �� � � -.�� •�� � ';;- i fi -9„oE - - , 8� � r �!. e u�a a a � - � r `� ' � � Y- .•�,'. �,-= 3.. - _ < � :a.�� - -�'- - � `t�c i' r v ` a��'�,s`rs , �,� oi, t �o��rl ai 7 7 ' - �! J>^ - ��, <Y- X .3. � a2`. ^.._S' 4 _ _ �`'� � ua::` �'•`�`-' •� ✓: � '�1 '�y$.'���.- `��,°�-�1 xP_�h,<- 5.. f_ . F P919A7OA;S4 1959.47ObG53 .a�ti _ vl.," F" _ '�'> _--� _.- ✓j -.- ` v? S'C �� - S37 NA4 f,EI 51Fffi PY ELl2] <><.: - `y �° ,c:. - .>r,` )c _ Y '�- •-. f - -. 1 Kam. `�' "l �_{, CNAI k=G.y1B.':MEE 374)1 'C - 1ta .,.'...1 -.�.s - .l _ �= ?' - �S]; �-^� `y, 5 ".vT \ Ems.: _ �,'f -" -- • ,T Vv ty -� > ~"� 4 ' ��� r=� �:� � ''-- G= l,:- :.�,3.J �`r a!l _ 5 f e13255.5rS? t e - 6�� _- . �. �� :�=:� _ - - era '�. - ixrr -s:� i - -� - =�'1`-• -� •. -- f;-x�_ .� ' -'�'rz - _ = 5,-.: `� _ ,``- _ -� . -Q s - � w � '.3, .� ... _ D _ ' ?'� � _ :'L�f.`P^ '� .1• �S �\ �.. 4� � „- ��� I �;;`_hG __ !_ s. _ ,t k- .Y� y- ��'[ � � a � a, '.� _ r -mil �s: � - '� �s -�`.- _ ti•'�:rc��?• -,� .. � a - ',a` -�-"`- s >u _3 �.� ,`�Y .ter -i:t r�?T„ --� c c` a ':L' t � a"c"��- "— l". - =-,3 f: � _ _ '� �' 'm c` -� ii--"' Sf ''ti � � .�. � � �`-' - �'�, •y - ;t 1� �3'� -6 ,mot- x� --� +F > �::° ■ -'' s,. - ��`' „1. - �'�"� r-? = f^- �--- �r.-t� v- .i'wv..Cs •.rte _ a Jw�; "��"._Tv: fF ��4-x� �. "`s�? /`- �,� - "` _c.�. -. , tom_ _ - t. xx� �- - �• ��� �?<. �,`F . •,� r �G ,.�-�; _ r �. -e:�'- ''Vii; s' y; ,_ = � >. R - r. c c.,..•. �'�_° 2: =. .a��' �i�" c_.- _'"r<aY _5,�•.< ',�•�• _�-.- s � t;" .���Y.��;,- '�a ,� "i ` f � -.r�'L f'�'".>� '�".Y�- "'il+ti�' v�cG.} •'i''i.��' �'yc- = ` -�iFSY ''-U' a`)�� �> .j-:: _v:F..: ^- � '. - - � -�: x - �=4'.�Yi =��,�• _ �� DEL WEBB - 3'� Y �3 p `�' 'Y �` .'4 r�'t '�i-S 'it ��"'�. ti -�'l' � /:'� », t J> '_ "}. "mow✓ - _ - K- - _ _"'Z4'c:� -. � �'3?, -''_ .' '''�s .- ;� =� e "�,c.`:: ;�,• �a fir" �:� _ -_ram _ `-4S� - - t, - K 4s' - - _ �a: : ,fi)� tom„ f �_ � � Gn':k -• _ � { ) �- �.i t,�"` J _ - $.,�tt 51�" i� L� vim, � =v-• i c`�.,�`� -�ha. fi .��" - tr� � f r -_ >'s�''i,. � �� - - - ' � , < % ; � -� - - v i - . Y . ✓L �S �sF /�` . r-.� -�✓�te.�` a • . }_�zS " x D , -- , `-� - ~G' `Z ' - -� ��, <. - ?} x - ` _ � . � ':- G`'} .y i- . � '- : ''}�.: `�i � !r� . � t - ? e y r.r3 - 'te: � s< -r.-"r N�, . .• ` -� . : ,� � L,L :•�C��S- '.rr� t .��,��{Q�: •. - ��. : - �-����r� y- r C = .` ' -k +�. - - ,r^ � �J�i t%� 1.',i>� ;- r ro � t J. :s, s -! ice _ '`% � i�"t. �' x : Y _ -.x. � � T �r ' �- .. z 3 Y : « ' mo)' t � = �. �`€ ' :`: � : ,'� f -r�'_�'. '•9<r : ' w�rf� -lt .'1F�`�T-. `•�. . LEESVILLE ROAD DURHAM no-us NORTH CAROLINA - 3 - � SOIL MAP a <� �•�, b , `n - �:. r� - � &"- h= ��:•�,. ter, --C. c �- •a-y= ter'- s � _. -a-, ,a t , r- s s - " �• .- .r_A^- - '2r� fib. -.:cs- 's�Is" C- iF.. �• `� -�z.- ��'�, . _:� , � , ` � ' <�" �, - :s� c,�`�- � �.' tom. •> k � - -��- �f• _ r� ..� r y �.: fti` ;;mot 'ice e. - tix3 .rs_..ti' .>.• ,»-r 5, .<s� �.�'., _ �",s y-�'� - 1 `.' �; mss.. • z,: - „r- > _ '-� _ T >�_ - ;-.. : Yr'- • -:�zW � �r - MR- ISM, -4th �L^ �, -<^^- �:,_'� - ..ic..•:,� S. - 4 ....:,- - ^� i./, � ? .. .� Ai"z --µ t �;.fs�`r -.:a; _ -,P� T � _.a _ ^ + -a�fs. :�,w ,k-:� � 7..,� _Sts= �` .� Sara /� - ",- •c`t,` . - - - - - �,. rte• 4 - ,Ffc.-:- >73 � �z� � . - - .. }., ii'-'� ' .�i�,..- Y � -�!• - _�•� -v_ _ .r -ice' '<� � - - ' °..fir- : � < _ - ��s�'r': � ^ =t s� •. s.^'_ �- _ :� r: � __ _LPL` M M 1. ..�. ?i_ €?.cs <-•a :3�; ' r t . t -.1 / � - `a.,- s..yc• , :'srr�:� " -:C-� ..s: :- a c . _. _. si_ iF%;c ��'z �� J,:r �f. .� - i \� SY o.G4': r�n�f�:w -F._.. :- r��`., •h_ :2 "�,- /vr:4� >�. -::- f _ "=�- 1 ." ;r.�"°'�� w --Y "° -t - ';•- iS -<<> -r _ _ ':� zf_.� ,y r -, , .r___ �� - ,'""J, �o�' -... ,:Cam '.> - -a :`-;`: � �:�f .,e .>,'•'��,�:Y;rs����< -� re .a,..:s. 4sti¢., - -U. ^F --� ". - $+ -c`• -. t^�l^_5.� t_ `, vr�: F.i -. ..�3"d-� -S' .Ca+MfN:�'R- r-�"" >, - s �L, -''-�. _� -•.>- - _ ,-� , �C. 6-� -'' ,� - � ."-cam - ,�` � ' z - ==-z `� - � � -`�- •_.� -.� - �� M �.. , --.� . �, ..fir: =� - �� - � -^ate _ - �„-�.� �••' :�s-- c_ _3== : �k i-. ` + � c?s"/a -e ..:. `� S*'ca.. '�raS'' :f:�,o•`- „r: w,,, �- �'3-` � . c e.�? ' -`4a., '• .�' 7k_ _ � � `. ,tea - _,Z' . Z.c'- � "��._. �,c- -- � k' f- -•�. - >.'_ - t: .sy -. �a sue. r�3'c`, x _ zG'�„ .cwi. -.'-> . �5 �M` _.y y `'- `;�_.'- f! `ta - � .� - +'f ':Y:. , ti _ ^«mss,. , <• � -,.\ '� - - �`- .c+'. -°"-c- GH � a'F �.Y: \`4 11 - .5'.... '3: G'7•,. - -,^ r.�cS.,.. Y`.Y N" a ' ,�` 'l ^ - > ham_- :�•: -",�- _ Emma s,x�y��� � :•-� . � " 'S, - r.r' •$�` -�- ° ?a.. ' , unA, �-J" "'x;, .`-{ -- 'ti - h . [k�,,F" ` - 2 Y .tip Z Z..Y.�. ' -.ti . 4a�'r • ,- use.' � : � > - - �- r% :� s <.: _ .<.�'^`ti"`'�"�,„- - - --- -`�- }`-'y^ -.ter- = r. �` .-<. '_a`` ' "i� - : � � y •r - � rn_ -.�. ;_.t„ .:��. -- � L -.,x .,ate - -. - '�%3 - £ - � _ T � L; -� - � - SF d'` -!- `'i._ - `,fi:• - - •fir -.. i'r6 ��' - :.s - ,`� � mac.. _ * � _. •. -.�$'= ' 3; `.v r., < �'. 7 - ..sc -' �. -c:y�: ` .fir,: �M � �-�ZZ - - -�Y -cZ'zr . `rr- '�.�"•. _ c- c.�".�` -%-� _ "� n.. ��,- s:�''= � ';`� -�' q�x .r -r "��. _. �. �. c•0.c.�s:_ r 8 ' � � �.' - - .?.rte'? x - �'fi `% _ . � _. .,M• _ `� '.�'�`' � -:-T :", s,.-:.9n - "� <� -mss `"do-- -x" �� - - oiv1L.1 on•E 8/412011 lulE SOIL DATA IS FROM USDA Q L MAP ,`= SOIL SURVEY FOR DURHAM 0 250 500 1000 Z F °�'�112, COUNTY, SHEET NUMBER 33 SMl SCALE: 1" =500' SCALE: 1"= 500' S M I QOOPYAA>lii 2007 TM DOMWDff AND THE DEM ARE THE PR0PERi1' OF HOWAEH ASSOm Es, PA ANY REPROOL 110H NT Mff PRIOR M4dT1E}E CONSENT IB PROHMM P k I I il el F:r e� i I n d, k e F I I k t I 'd, I V, P ite. el I e J, el I I V, it, id I fitt I I I r", I I I Vv n I F, e _.—d' I 'Fe; if d F J, i F% F, i i d' F` i, Ve" I V I 4' 1 de _," _111_FIV, 11 0 Fe ek; 4 A i 4 F S 1 Ile 1 1 Flk_ F s I . . ..... 11 1 1 1 " 11 itt de, �F! ne "e— I I, I IIIitIttIIIit........... it11IItII............ IeetI.. . ...... . .... IiIIIIF wfie IIIIIfinIt11. . ............... ..... 1........... I........ ............ . . .... 1I........ ... IIitIIII1I IIIIIII1IIIfI11I. ......... 1. . . ......... . II . . . ....... . ..... .... I11Itif1IFII11II............ I. .................. . ..... I1FitIIIIII....... .. . 1. . ......... Ir itIk- 1foft 00 low IS H EET FLOW ILENGTH I..... ...... itT�-' PATH I1ICONCENTRATEbtLdw low I1-LENGTH =1,92- . ..... I4,# I1r III— ---------- N7 .......... tIi- - - - - - - --- ---- ---- ---- IIIitf. ......... . ..... to )p#10 r inty .......... . ...... AREA\7 63.1.7-A itII-,PAT itTQ -H Ow eIN-- 7 E IdjAN SH �ET 6 ILEN IefeeLENGTH 646 II1IIekit 1III 47-F . . ......... I. . ... . ..... PROPERTY �T PATH tLINE (TY SHALLOW FLOW I II1TC PATH LENGTH 75' 11 eCH 0 100 61�NEL FIL W ........ . ... -LENGTH 750' IitTr­ PATH # E�MAT ED FLOW .......... T PAT�i,_F� ..... . .. ....... t1. .......... LENGTH 270 ILOinto, TC PATH -oft tIItSHE 41W 49 L IP, 4W REA 175' RATH' 'EL FL low HANN 2 IdtU140TH 7,64' . . ..... . IIT TC PATH CQ . . ... . ...... NtENTRATED FLOW 4e, L�JNGTH,#364` _P TCPATH`, Tc ��TH CHANNELFLOW SHEET FI 4 1 0w ILENGTH . ..... fENGTH �75' PATH ..... . ...... 4f iTC "'PATH ..-,,CHAN NL FLOWl/ CONCEN TC PATH LENGTH7=404 TRATED FLOW" kdLENGTH 354"', LAKi E FtOW:�� ....... ........... . ........... . .......... I.. .. --- - -- ATC PATH I. .......... IILENGTH 600' dCHANNELFLOW 'LENGTH. H ANN EL-FILO TQ(DP# ............... IZI-E XC . ..... O [)P#2 00 IARENI=6 -1 AC- No TC ........... . ........ , , lCHANNELIFLOW C1N :�`72 . . . ..... . LENGTH 341't 00 .. . ........ tITC­PATH` . . ......... TQ)PATH C"ANN-L CHANNELROV ATH V _d H 131 F SHEbil FLOW� ENGTH HAN KE LF LENGTH ATH­ TC P' ifCONC81NVATED FLOW . ... .. LENGTH =315 41f ITC PATH IW CONCNTRATED FLO, T Tk PATH CHANNELELIC)W .... .... ... it. ........ ATED kQW T PATH IItH E EV F L OW . ....... AREA�' ... ......... . . dNCENTR ITO DP"#* C LENGTH 425� Iif. . ......... LENQ7H 75' TH II�TA . ..... . .... HANNELFLOW"a Feed`7C PATH C .. . ....... ....... LENGTH ff CHANNELFLOW ..... ....... 1205' PATH� moo,& f'XTH Tc 01 LENGTH 970' CHANNELF ........ . ...... CHANNIELFLO IIVLEN" 34'- TO DPWA LENGTH­�L 985' 'PATH" 4V# . . ......... # A ARE' 7�MkAC wo TC PATH LE� G, TH 8A2' bp42 Y (TYP) ........... -CHANNIE-FU DRAINAQE AREA,,BOV DA R woo- �,N 4 -69 4,0 . .......... . ............ ­ - " , , , - , , I IPATk . .. . ...... c CHANNELF 1100 . .... . . ... ... IqLib TC PATH'l ## N II d- -4111 CHA` NELFLbWi woo I00�; �e LENGTH' 9.45"F c; ifitR �A l 2�. I.HANNEL FLOW_ LENrTl+= 44o' IDP#`1 I39.00,AC, Tc IPAT14 63.59 AC REA tCONQ CIN ENTRAUQ..FL0W ............ II-LENGTH 374", if. . . .... . ....... TC PATH 'TC- PATH, d0 'C4AWNELFL W ............ wo ",EET FLbw TC-PATH' LENGTH =i 33' w, 11 40P LENGTH =`,75' + -..§HEET FL # Ow- 0 D A #7 dLENG7H 75' Inow 40 dARFA.,--'7k4_66 AC' I55 . . . ....... ism ........ --- - ­ . ............ A [)tP I # A ....... ........ TC_PATH f -CONCENTRATE0'r-LOW 4*# -LENGTFt­,268' IIeI.......... r .... . ......... 11.......... Ie......... e. ......... . IFIte........... tIIIit. . . ........ IIIeIIII........... II........... . III�PRE-DEVELOPMENT DRAINAGE MAP 0 200 400 Boo SCALE: I" � 400' SCALE: 1"� 400' 0 @COPYRIGHT 2008 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH A S S 0 C I A T E S 16 CONSULTANT PLACE,SUITIE 201 DURHAM, NORTH CAROLINA 27707 P 919A90.4990 F 919A90.8953 537 MARKET STREET, SUITE LL20 CHATTAN OOGA, TE NN ESSE E 37402 P 423.266A990 F 423.266.5700 www.horvathassociates.com co 0 C) 0!� co < < Lu 0 u PRE- DEVELOPMENT DRAINAGE MAP 11/17/2011 1 ST SITE PLAN REVIEW mi DRAWN BY: CHECKED BY: MLJ DATE 8-4-2011 SCALE 1 400' PROJECT NO. 1121 M.114:11063 swi 0!� Lu m: '0 V) > 2: Lu L.0 Lu 0 1 < PRE- DEVELOPMENT DRAINAGE MAP 11/17/2011 1 ST SITE PLAN REVIEW mi DRAWN BY: CHECKED BY: MLJ DATE 8-4-2011 SCALE 1 400' PROJECT NO. 1121 M.114:11063 swi FisTTiFi . ..... IIIIVVVdFFITVIisdVVdIFIFIdIsVViFITIFitidIdiITIVdsTTTVdFFV........... itIVVFIVFiVIFIITsdVIdVVs............ edII.. . ...... . .... titVIVIsFFdiswtse TFIIVdTTiV. . ............... ..... IIVII........... — VI........ ............ . . .... IIind........ ... inIVIisViss IisddViFVIIVVIiIFFVsIVIFIVIIdV. ......... FtFisVFIIVFidIVVIFVV. ......... . . . ......... TIdFIdII . . . ....... . ..... .... iIFIddIsIdIisTVIisiisFTIt 9 ; t VITIdFVTVVVFIIdIVdiisinIVisisIVIII............ FFIITVsTInTTTTit. .................. V. ..... IIIIFTdVVFIIIIII. . ......... ....... .. . IIitVtVsVI. . . ..... ..... VIIiIVIIITVFFdlstIVIFdIdI... ... .... .... FTVII.. .... ... V. . .. ....... . . tIsTIII410 iFFITsisIFIVIFFIIFIIFIVTIFTFII- — — — — — — --- ---- ---- ---- IVITVIi. ......... . ..... IFIIVFIiIinin.......... IITIVdVFIVFIIFiFIIsitIFIVFTIVIIFIItVVTVFVI. . ........ < IIVFTIiisVVFitFisFFIVFFIFVIIVTVFIL IFIIIVFiVFTTVFdIIdIIFVVFFIVItVFFlow- I. .... ..... ":,/ I. ........ . ... . . ........ TdisIVVisIFIVitVsdII. .......... FsIvr, IITIFV4w 41M III.... . ..... FIlw VdittFitditVIIisVVsi IT FFIttsVtVViIIIVol VVFIVFFslit(/ TTIs..... . ...... IIssIiIVVVVB #1 V3T, dVlop#9 I........... II. .......... VTViisddFisdTFWst# IdFF............... dd. .......... TVw # PRO�,ERTY LlNEjTYP) 410_ Ir . ...... ITTVtFI*0 10 . . ...... 0 IIFFFIIsIII- — - — -------- dT40WQ # I 0 FF.......... IItFT4,F# . . . ........... diI. .......... IV- - - — ------- VIFFITVVIis. .......... VEA D3 V.Al NAG E AR B0UNDARYfTYP) dVIII414p VT7 dV. ..... . .... Ill�,E)P" 41k . . ... ..... II. ....... ....... F10 IVVIVisi.......... is4t* IIFTI........... sVTVee . .. .. iVVFo F10 FVFT0 4 V.... . . ... ... i41l VIVVIsVTIit WOWS ddIF1A F4W" 41 FFVVVIVViFVFsVIOR iVIIFVFTFVIVTFFdVIFVIIV............. IIFFFITIisViisitTitI............ VIAV ............ ViTF16 IIdt IVIFis4, IsTVIV. . . ....... ViTVDF d........ --- — ­ . ............ VIVITV....... ........ I4i# i4 TTI41* IAF* 4Q* 10 IVinIIIIIFIITVeIVIFITIIViI.......... FI.... . .......... VIVV.......... VVVVIV........... . . IitViVdFItVF. . .... . .... VVsFIFFVIIIiFtnVFIitIis. ........ . FVITFVVnVTVIIsVITV........... I........... . IFVisIVTVIIII ,-- 1 --,,�POST-DEVELOPMENT OVERALL LAYOUT MAP_ SW2jSCALE' V�400' 0 200 400 800 SCALE: 1"� 400' @COPYRIGHT 2008 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH A S S 0 C I A T E S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919A90.4990 F 919A90.8953 537 MARKET STREET, SUITE LL20 CHATTAN OOGA, TE NN ESSE E 37402 P 423.266A990 F 423.266.5700 www.horvathassociates.com co 0 C) 0!� co < < Lu 0 u POST- DEVELOPMENT OVERALL LAYOUT MAP 11/17/2011 1 1 ST SITE PLAN REVIEW mi 1/26/2012 2ND SITE PLAN REVIEW MJ DRAWN BY: CHECKED BY: MLJ DATE 8-4-2011 SCALE I 400' PROJECT NO. 1121 SW2 0!� Lu m: 'o V) > 2: Lu L.0 Lu < POST- DEVELOPMENT OVERALL LAYOUT MAP 11/17/2011 1 1 ST SITE PLAN REVIEW mi 1/26/2012 2ND SITE PLAN REVIEW MJ DRAWN BY: CHECKED BY: MLJ DATE 8-4-2011 SCALE I 400' PROJECT NO. 1121 SW2 V A\ /7 t t s ................ N\ > .. ...... .......... to - - - - ---------- ............. rc,rr r" .rrj ............. J�j war r WQ#1-1; @COPYRIGHT 2008 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH A S S O C I A T E S 16 CONSULTANT PLACE, SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 537 MARKET STREET, SUITE LL20 CHATTANOOGA, TENNESSEE 37402 P 423.266.4990 F 423.266.5700 www.horvathassociates.com co C) cz co < < Lu 0 u W= Lu 10 I > z C/) L.0 Lu Lu Ah 44 a FZ POST- DEVELOPMENT DRAINGAGE MAP #1 11/17/2011 1 1 ST SITE PLAN REVIEW I mi 1/26/2012 A 2ND SITE PLAN REVIEW I MJ DRAWN BY: CHECKED BY: MLJ DATE 8-4-2011 SCALE 1 = 200' PROJECT NO. 1121 SHEET NO. SW3 F�- F DP ft It re, Jr U"P =2t, ZZ f J d d, A` d, Nn J, TCFFAIH 'd - CHANNELF Low w. 'd LENGTH 533' FF s I fisf, i M &al` s' w. go DPr`rj ., J s d" ' 7 Sam , PAT ONC 95 w Q 9 'd" FIV F, tr IF t. y F, is ■ ■ U t I P i 4 1 f Is ........... id F, Adtil' P i s i . .... ....... "d, 10 w. �� : � � w 4#0 WX r n r w. w. I 'd ■'d d NJ, d di MA' Is, f f i F % . ......... i I d i 4(4 ■ Is f 1IF d il F I 'dF, ry Is F, d, d 'd- FW ■ TC PATH 7-d -d' SHEET FLOW rr v LENGTH 75' r r ............ • N, +r ry . ..... • 3. d% t F�s F TC PATH GONG ENTIZATMID FLOW LENGTH 354' ry d- w. d d ■', N �d — P PATH F, CHANNELIFLOW • LENGTH = 600' 40# �OTC PATH dl� CHANNELFLOW 10 411k ■ LENGTH = 341' u IF, • r. k Y. /A" ............. did I ........... ry IF dd, d ■ ry Ar 1 w. /d ■ 7 is -F jrr -d, d, 41P I 1 I s rYrrr J, % ■ dd, d I, F, I , V) > 2: Lu L.0 Lu 0 F < I, A ;N d-.- �e dd' DRAINAGE A R EA YO U N DARY (TYP) ry ■ ix w. — - d, rvr - ------- it N F ; is - AREA z- 220 AC' ■ fit i! si IF t 7! = 85 d- ■ ss/ V1 irs d 0 100 2 0 0 400 NI11 I /1� t is d"'d SCALE: 1"= 200', ■ d, did . ... . ....... m . .... . I is DRAINAGE MAP11#2, 7 .... .......... 'd .......... .... .... • .... . .... . /d, W4 SCA LE: V 200' V Y'4 ■ "0000 d, TC PATH EEdt ■ N, @COPYRIGHT 2008 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED X X CONCENTRATED FLOW . .... .. LEt.4GTH 425' % is I ■ u X X— d 0Y Lu rYrrr J, % ■ dd, d I, F, I , V) > 2: Lu L.0 Lu 0 1 < wd# d-.- �e dd' DRAINAGE A R EA YO U N DARY (TYP) ry ■ ix w. — - d, rvr - ------- N rvr d d is - it r F, "-d, ■ fit i! ■ -d' ■ /Fl. d 0 100 2 0 0 400 NI11 I df t is d"'d SCALE: 1"= 200', ■ rr . ... . ....... "d- "FIV 'PMENT DRAINAGE MAP11#2, 7 .... .......... s \1.,fS-T--rDEV' • .... . .... . /d, W4 SCA LE: V 200' V Y'4 ■ EEdt F N, @COPYRIGHT 2008 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED gr =1111116 �: : , v r r r, r Aft 4% 00 Ov. i F` d- 'd d so s Tb PATH ■ DP#6 "± s, wr CHANNELFLOW ■ TC PATH wo J s 'd /d .......... LENGTH SHEET FLOW V, rvr I Aw" LENGTH 75' ,rte Ni V TC PAT 4%# s LOW ww CHA�kNELF ■ LENGTH = 985' w. w. rr raj .. . ....... T 0 'bP#6 ■ V, AREA = 74.39 AC,- . ............... . .... CN w. 'W 71',1 ....... . ... . . ....... .. rvr rrr d, dd� d 'M, i to -d. 10 ■ '10 d, V7 rr d X vy X I mass% F I ANg w ON ma so 01 m d -d Add -d% 0 . .... 6N ■ I 'd A C-:) PROPERTY LINE (TYP) w. M. TM Id, ...... .... F— a- -4 1.. N. did F 4 d, ■ Z. ....... ............ . . . ..... CN =86 .................. fw 11 0Y Lu rYrrr J, % ■ dd, d I, F, I , V) > 2: Lu L.0 Lu 0 1 < till d-.- �e dd' DRAINAGE A R EA YO U N DARY (TYP) ry ■ ix w. — - d, rvr - ------- N rvr d d is - it r F, "-d, ■ fit i! ■ -d' ■ M- d 0 100 2 0 0 400 NI11 I df t is d"'d SCALE: 1"= 200', ■ rr . ... . ....... "d- "FIV 'PMENT DRAINAGE MAP11#2, 7 .... .......... s \1.,fS-T--rDEV' • .. . ....... ..)t /d, W4 SCA LE: V 200' V Y'4 ■ EEdt @COPYRIGHT 2008 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH A S S O C I A T E S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 537 MARKET STREET, SUITE LL20 CHATTAN OOGA, TE NN ESSE E 37402 P 423.266.4990 F 423.266.5700 www.horvathassociates.com co 0 co < < Lu 0U POST- DEVELOPMENT DRAINGAGE MAP #2 11/17/2011 1 I 1 ST SITE PLAN REVIEW I mi 1/26/2012 2ND SITE PLAN REVIEW I MJ DRAWN BY: CHECKED BY: MLJ DATE 8-4-2011 SCALE 1 200' PROJECT NO. 1121 SHEET NO. S W4 0Y Lu m: 'o V) > 2: Lu L.0 Lu 0 1 < POST- DEVELOPMENT DRAINGAGE MAP #2 11/17/2011 1 I 1 ST SITE PLAN REVIEW I mi 1/26/2012 2ND SITE PLAN REVIEW I MJ DRAWN BY: CHECKED BY: MLJ DATE 8-4-2011 SCALE 1 200' PROJECT NO. 1121 SHEET NO. S W4 -Wt -I- Prepared for: Randy King - Pulte Homes 1225 Crescent Green Drive - Suite 250 Cary, NC 27518 (919) 816-1146 Table of Contents Narrative WQ# 1 Summary and Calculations WQ #2 Summary and Calculations DP #3 Summary WQ #4 Summary and Calculations HydroCAD Runoff Analysis HydroCAD 100 -Year Analysis (Clogged Orifices) Drainage Maps Narrative Del Webb BMP Design General Description Del Webb will be an approximately 296 -acre community south of Leesville Road east of the intersection with Doc Nichols Road. The entire project is in the Neuse river basin and the majority of the site is not in a watershed protection district. There are multiple streams located onsite and FEMA 100 -year floodplain is associated with a few reaches. The development for the site will consist of residential homes, a clubhouse area, and associated streets and parking. The community will be a residential development. The calculations included in this analysis are for the first phase of the development. Water Quality Ponds There are three water quality ponds that will be constructed in association with the first phase of the development; they are labeled WQ# 1, WQ #2, and WQ #3. Each pond is designed to completely detain the water quality runoff volume from its contributing drainage area in the temporary pool. The temporary pool in each pond will draw down over a period of 2 -5 days by means of a low flow orifice located in a siphon that will be installed in the riser. A larger orifice is set in the riser of each pond at the temporary pool to bypass larger storm events. There is one drainage point of interest for the discharge from the water quality ponds, DP #1. All three ponds work in conjunction to keep the post - development peak flow rate at DP# 1 below the pre - development rate for the 1 -, 2 -, and 10 -year rainfall events. The runoff from each pond will be discharged to a level spreader. Each level spreader is designed so that it's length is 10 feet for every 1 cfs of flow directed to it. WQ Ponds # 1 and #2 have flow splitters downstream of the principal spillway pipes that will limit the flow to the level spreaders. All flows in excess of what the level spreader can handle will be directed to a bypass pipe by means of an overflow weir in the flow splitter. The outlet structure for WQ #4 is designed with a closed top so that only the flow entering the riser through the orifices located in the riser wall will be directed to the level spreader. Dry Pond #3 There is one dry pond proposed for the site to attenuate the peak flow rate at DP #7 in the post - development condition. The pond will utilize a siphon with a low flow orifice to limit the peak flow during the 1 -year rainfall event to below the pre - development rate at DP #7. A larger orifice will be installed in the riser to limit the flows during the 2- and 10 -year rainfall events to below the pre - development rate. All runoff up to and including that resulting from the 10 -year rainfall event will be directed to a level spreader downstream of the PSP. Flows from larger storm events will bypass the riser, which has a closed top, by means of an emergency spillway cut into existing grade. Runoff Analysis The original runoff analysis presented in the SIA was amended for the Post - Development Analysis for Phase I. To determine the runoff rates at DP# 1, the areas that originally contributed to DP #1 that had runoff area removed from them to be directed to the WQ ponds were revised, but all other drainage areas were left unchanged. The areas that changed were labeled TO DP #1 PRE, TO DP #3 PRE, TO DP #5 PRE and TO DP #6 PRE in the pre - development analysis in the SIA. The drainage areas for the ponds and the ponds themselves were then added to the analysis to calculate the post - development runoff rates for the drainage point of interest, DP #1. Methodology • Drainage areas were delineated using 2 -foot contours for offsite areas and 1 -foot contours onsite. Onsite topography is from survey data and offsite topography is from City of Durham Aerial Topography, 1995. • United States Geological Survey Map is the Southwest Durham Quadrangle. • The FEMA Map associated with the site is Map # 3720076900J, effective date May 2, 2006, Panel 0769J. • Peak flows are determined using the NRCS Method, as described in TR -20, in HydroCAD Version 7.1. NRCS Curve Numbers are based upon cover condition and soil type as described below. • Soil data to determine curve numbers in the watershed are from USDA Durham County Soil Map # 33. • Cover conditions for each watershed was determined based on digital maps obtained from the City of Durham, survey information, aerial photography. • Time of concentration calculations were determined using the TR -55 method for sheet flow, shallow concentrated flow, lake flow, and channel flow • The routing analysis for the ponds was accomplished using HydroCAD Version 7.1 which utilizes the storage- indication method. WQ #1 Summary and Calculations DURHAM City of Durham Public Works Department Stormwater Services Divisions 1 B 6 9 101 City Hall Plaza, Durham, North Carolina, 27701 crrr OF MEDIcINE Telephone (919) 560 -4326 FAX (919) 560 -4316 Wet Detention Pond Design Summary Stormwater Management Construction Plan Review: A complete stormwater management construction plan submittal includes a design summary for each stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details. I. PROJECT INFORMATION Project Name: Del Webb - Duraleigh Arbors Phase 1 PIN: 0769 -03 -41 -8938 Case #: D1100150 Design Contact Person: Matt Jones Phone #: ( 919 ) 490 -4990 Legal Name of Owner: Pulte Group Owner Contact: Randy King Phone #: ( 919 ) 816 - 1100 Owner Address: 1225 Crescent Green Drive - suite 250, Cary NC Deed Book Page # or Plat Book Page# for BMP Property For projects with multiple basins, specify which pond this worksh et applies to: WQ 41 Does the proposed pond also incorporate stormwater detention. Yes No Detention provided for: X 1 -year X 2 -year x 10 -year other Dam Height: 12.3 (feet) Dam Classification: A Elevations Pond bottom elevation Permanent pool elevation Temporary pool elevation 1 -year storm orifice /weir elevation 1 -year storm water surface elevation 2 -year storm orifice /weir elevation 2 -year storm water surface elevation 10 -year storm orifice /weir elevation 10 -year storm water surface elev. Emergency spillway elevation Top of embankment/dam Maximum water surface elevation Areas Permanent pool area provided Minimum required permanent pool area Design storm surface area Drainage area (10 -acres min) 352.00 ft. (floor of the pond) 358.00 ft. (invert elevation of the orifice) 359.60 ft. (elevation of the structure overflow) 359.60 ft. (invert elevation) 360.12 ft. 359.60 ft. (invert elevation) 360.47 ft. 359.60 ft. (invert elevation) 362.27 ft. 363 .00 ft. (invert of emergency spillway) 365.38 (Settledit. (elevation) 363.89 ft. (max. storm pond can safely pass) 22, 7 6 4 ft (water surface area at orifice invert elevation) 18,403 ft (calculated surface area required) 34,460 ft (Specif frequency event: 10 year) 25.90 ac. (total drainage to the pond Discharges (Speck only applicable frequency events) At BMP At Analysis Point(s) that BMP Contributes to 1 -year Pre - development 315.36 cfs Post - development w/o detention 512.41 cfs With detention 312.27 CfS Volumes Permanent pool volume Water quality pool storage volume Design storm storage volume Total Storage volume provided at design storm Total Storage volume provided at top of dam Forebay volume 2 -year 1 -year 10 -year -year 2 -year 10 -year 708.99 CfS -year Inflow 49.69 Cfs 66 .7 4 cfs 125.68 CfS Cfs Routed outflow 1.54 cfs 3.28 cfs 8.93 cfs cfs At Analysis Point(s) that BMP Contributes to 1 -year Pre - development 315.36 cfs Post - development w/o detention 512.41 cfs With detention 312.27 CfS Volumes Permanent pool volume Water quality pool storage volume Design storm storage volume Total Storage volume provided at design storm Total Storage volume provided at top of dam Forebay volume 2 -year 10 -year -year 466.41 CfS 1059.27 CfS cfs 708.99 CfS 1399.58 CfS cfs 463.04 CfS 1052.03 CfS Cfs 77,743 ft3 (volume of main pond and forebay) 44,264 ft3 (volume above permanent pool) 131,430 ft3 (volume above permanent pool) 209,173 ft3 345,418 ft3 17,319 ft3 ( 20% of permanent pool volume) Hydraulic Depths Volume of normal pool divided by surface area of normal pool 3.42 ft. Volumes at temporary pool plus normal pool divided by surface area of temporary pool 4.01 ft. Other Parameters SA/DA' 1.63 (from DWQ table) Diameter of orifice 3.0 in. (must provide draw down over 2 to S day period) Draw -down time 75.12 hrs ' When using the SA/DA tables from the Stormwater Best Management Practices Manual, linear interpolation may be used for values between table entries. Riser /Principal and Emerge, 1 -year storm orifice /weir 2 -year storm orifice /weir 10 -year storm orifice /weir 25 - year storm orifice /weir Principal spillway Emergency spillway icy Spillway It diameter_ diameter_ diameter_ diameter diameter width 52 iform, 1s 48 18 ft. ztion in. length ft. in. length ft. in. length ft. in. length ft. in. side slopes 5 :1 slope 0 % II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Applicant's initials MLJ a. The permanent pool depth is between 3- and 6 -feet (required minimum hydraulic depth of 3- feet). MLJ b. The forebay volume is approximately equal to 20% of the pond volume. MLJ c. The temporary pool controls runoff for water quality design storm. MLJ d. The temporary pool draws down in 2- to 5 -days. MLJ e. The drainage area to the facility is at least 10- acres. MLJ f. Riprap outlet protection, if provided, reduces flow to non - erosive velocities (provide calculations). MLJ g. The pond length to width ratio is greater than or equal to 3:1. MLJ h. The pond side slopes above the permanent pool area are no steeper than 3:1. MLJ i. A submerged and vegetated shelf with a slope no greater than 6:1 is provided around the perimeter of the pond (show on plan and profile and provide a vegetation plan). MLJ J. Vegetative cover above the permanent pool elevation is specified. No woody vegetation is permitted on the embankment. MLJ k. A surface baffle, trash rack or similar device is provided for both the overflow and orifice. Flat top trash racks are not acceptable. Access hatch has been provided. MLJ 1. A recorded drainage easement is provided for each pond including access to the nearest right -of -way and is graded per Section 8.3, Stormwater Control Facilities (BMPs). MLJ m. If the basin is used for sediment and erosion control during construction, a note requiring clean out and vegetative cover being established prior to use as a wet detention basin shall be provided on the construction plan. MLJ n. A mechanism is specified which will drain the pond for maintenance and emergencies. Valves used shall be plug valves. MLJ o. Anti - floatation calculations are provided for riser structure. MLJ p. A plan view of the pond with grading shown is provided. MLJ q. A profile through the forebay, main pond and spillway is provided. Water surface elevations are shown on the profile. MLJ r. Riser structure details are provided. MLJ s. Dam designed to account for a 5.00% settlement factor. MLJ t. Compaction specifications for the embankment are shown on the plan. MLJ u. The minimum top of dam width has been provided for the pond embankment top width per Section 8.3, Stormwater Control Facilities (BMPs). Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement, payment of permit fee per facility and payment of surety are required prior to construction drawing approval. 1 121 - WQ# 1 Sizing.xls Surface Area Calcs (85% TSS) 1121 - Del Webb WQ #1 - Required Surface Area Drainage Area to Basin = 25.90 acres Impervious Area to Basin = 10.57 acres Impervious Percentage = 41% Pond Volume Provided = 77743 Surface Area at Normal Pool = 22764 Avereage Depth (Volume /SA) = 3.42 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 40% Site % impervious 41% Upper Boundary 50% Average Depth (Vol /SA) (ft) 3.0 3.4 4.0 1.73 1.61 1.43 1.76 1.63 1.45 2.06 1.92 1.73 SA /DA = 1.63 Surface Area Required = 18,403 sf Surface Area Provided = 22,764 sf Matt Jones, El 4/24/2012 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual. July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #1 Sizing.xls Below NP Volumes Matt Jones, El 4/24/2012 1121 - Del Webb Wet Detention Basin #1 Below Normal Pool Volumes Forebay Bottom Main Pool Bottom Forebay Volume Stage /Storage Calculations Forebay Volume = 17319 cf Main Pool Volume Stage /Storage Calculations Contour Average Contour Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (cf) (cf) 352.0 0.0 1329 0 0 0 357.5 5.5 4084 2707 14886 14886 358.0 6.0 5647 4866 2433 17319 Forebay Volume = 17319 cf Main Pool Volume Stage /Storage Calculations Main Pool Volume = 60425 cf Total Pond Volume Forebay Volume = 17319 cf Main Pool Volume = 60425 cf Total Pond Voume = 77743 cf Forebay Percentage of Total Volume = 22.28% Contour Average Contour Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (cf) (cf) 352.0 0.0 6491 0 0 0 357.5 5.5 12842 9667 53166 53166 358.0 6.0 16194 14518 7259 60425 Main Pool Volume = 60425 cf Total Pond Volume Forebay Volume = 17319 cf Main Pool Volume = 60425 cf Total Pond Voume = 77743 cf Forebay Percentage of Total Volume = 22.28% 1121 - WQ #1 Sizing.xls WQ Volume 1121 - Del Webb WQ #1 - Above Normal Pool Volume Runoff Volume Simple Method Drainage Area (A) = 25.90 Acres Impervious Area = 10.57 Acres Impervious Fraction (IA) = 0.41 Rainfall Depth (RD) = 1.00 Inch Rv= 0.42 (Rv = 0.05 +0.9 *IA) Runoff Volume (V) = 39233 cf (V = 3630 *Rp *Rv*A) Normal Pool Elevation = 358.00 Temporary Pool Elevation = 359.60 Temporary Pool Volume = 44264 cf Matt Jones, El 4/24/2012 1 121 - WQ #1 Sizing.xls Drawdown Orifice Sizing Matt Jones, El 4/24/2012 1121 - Del Webb Drawdown Orifice Sizing 3 30,453 22,700 0.6 m 3,5.2 Orifice Equation 3..5.2.1 Drawdown Titne Calculations for a Pond with can Orafice Outlet M Stormwater Management Manual For the specific case where At = A,, and II = 0 # * *g [(2 , fiiyrz +; I1llrrs G:rl cx 1121 - WQ #1 Sizing.xls Flow Splitter 1121 - Del Webb WQ #1 - Flow Spliffer Calcs Orifice Flow Desired Flow to Level Spreader = 7.00 cfs Level Spreader Lip Elevation = 354.00 feet Pipe to LS Invert = 353.60 feet Bypass Weir Elevation = 355.60 feet Diameter of Orifice = 15.00 inches Discharge Coefficient (Cd) = 0.60 g = 32.20 ft /s /s Submerged Area (a) = 1.23 ft2 Effective Head (h) = 1.38 feet Q = Cd *a *�2 *g *h Orifice Flow (Q) = 6.93 cfs Matt Jones, El 4/24/2012 1 121 - WQ #1 Sizing.xls Anti Float Calcs Extended Base- NC Products Manhole Riser /Barrel Anti - Flotation Calculation Sheet 1 121 - WO# 1 Riser Matt Jones, El 4/24/2012 Input Data =_> Invert of Extended Base = 353,25 feet Riser Crest Elevation = 362,30 feet Invert of Outlet Barrel = 354,50 Inside diameter of manhole = 4,0 feet Wall thickness of manhole = 5,0 inches Outside diameter of manhole riser sections = 4,83 feet Diameter of Extended base Pad = 6,0 feet Height of Extended Base Pad = 1 0,50 Ifeet Inside Barrel diameter = 18,0 inches Barrel Wall Thickness = 3,25 inches Outside Diameter of Barrel = 24,50 inches Diameter of 1 st Inlet = 8,0 inches Diameter of 2nd Inlet = 1 4,0 lincheS2 Diameter of 3rd Inlet = 15,0 inches2 Weight of Structure =_> Volume of Riser Walls = 49.43 cf Volume of Extended Base Pad = 14.14 cf Total Volume of Concrete = 63.57 cf Opening for barrel = 1.364 cf Opening for 1 st inlet orifice = 0.145 cf Opening for 2nd inlet orifice = 0.036 cf Opening for 3rd inlet orifice = 0.511 cf Total Volume of Openings in Concrete = 2.057 cf Total Concrete in Riser Section Minus Openings = 61.51 cf Depth of Concrete Fill Layer = 0.75 ft Volume of Concrete in Fill Layer = 9.42 cf Total Volume of Concrete Present in Riser = 70.94 cf Concrete unit weight = 1 142 lb/cf (From NC Products Catalog) Total Weight of Concrete = 10073 Ibs Amount of water displaced =_> Volume of Water Displaced by Riser Structure = 171.01 cf Volume of Water Displaced by Trash Rack = 26 cf Total Volume of Water Displaced = 1 97.01 cf Unit Weight of water = 62 Ib /cf Weight of water displaced = 12293 Ibs Determine if Anti - Flotation Block is Required =_> Safety factor to use = 1.25 (recommend 1.25 or higher) Actual Safety Factor = 0.82 Safety Factor Unacceptable Antiflotation Block Calculations Width of Antiflotation Block (Square) = 7.00 ft Height of Antiflotation Block = 0.75 ft Weight of Antiflotation Block = 5219 Ibs Weight of Structure and Antiflotation Block = 15291 Actual Safety Factor = 1.24 Safety Factor Acceptable 1 121 - POND OUTLET VELOCITY DISSIPATOR DESIGN.xIs Matt Jones, El W Q # 1 4/24/2012 Velocity Dissipator Calculations w/ PIPES.EXE NRCD Land Quality Section - Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. 25 -Year Outflow, Q (cfs) = 33.00 Flow Depth (ft.) 1.50 Slope, S (%) = 1.00 Velocity, V (ft /s) 18.67 Pipe Dia., D (in.) = 18 Manning's n Value = 0.013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe Dia., Do (ft.) = 1.50 Outlet Velocity, Vo (fps) = 1 8.67 Apron Length, LA (ft.) = 12.0 ZONE 3 Average Dia. Stone Thickness (inches) Class (inches) 4 A 12 8 B 18 >> 10 1 24 << 14 2 36 Width,W = 0.4 *LA + Do Thickness = 1.5 * DMAX Width, W = 6.3 ft. SAY: 7.0 ft. FINAL DIMENSIONS: Length, L (ft.) = 12.0 Width, W (ft.) = 7.0 Depth, D (in.) = 24 (NCDENR Erosion & Sed. Cont. Manual §8.06.6) Stone Class = 1 ( NCDOT Std. §1042) *Cells in red denote required inputs from PIPES.exe outputs WQ #2 Summary and Calculations DURHAM City of Durham Public Works Department Stormwater Services Divisions 1 B 6 9 101 City Hall Plaza, Durham, North Carolina, 27701 crrr OF MEDIcINE Telephone (919) 560 -4326 FAX (919) 560 -4316 Wet Detention Pond Design Summary Stormwater Management Construction Plan Review: A complete stormwater management construction plan submittal includes a design summary for each stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details. I. PROJECT INFORMATION Project Name: Del Webb - Duraleigh Arbors Phase 1 PIN: 0769 -03 -41 -8938 Case #: D1100150 Design Contact Person: Matt Jones Phone #: ( 919 ) 490 -4990 Legal Name of Owner: Pulte Group Owner Contact: Randy King Phone #: ( 919 ) 816 - 1100 Owner Address: 1225 Crescent Green Drive - suite 250, Cary NC Deed Book Page # or Plat Book Page# for BMP Property For projects with multiple basins, specify which pond this worksh et applies to: WQ 42 Does the proposed pond also incorporate stormwater detention. Yes No Detention provided for: X 1 -year X 2 -year x 10 -year other Dam Height: 10.0 (feet) Dam Classification: A Elevations Pond bottom elevation Permanent pool elevation Temporary pool elevation 1 -year storm orifice /weir elevation 1 -year storm water surface elevation 2 -year storm orifice /weir elevation 2 -year storm water surface elevation 10 -year storm orifice /weir elevation 10 -year storm water surface elev. Emergency spillway elevation Top of embankment/dam Maximum water surface elevation Areas Permanent pool area provided Minimum required permanent pool area Design storm surface area Drainage area (10 -acres min) 367.00 ft. (floor of the pond) 371.00 ft. (invert elevation of the orifice) 372.40 ft. (elevation of the structure overflow) 372.40 ft. (invert elevation) 373.22 ft. 372.40 ft. (invert elevation) 373.66 ft. 372.40 ft. (invert elevation) 375.39 ft 376 .10 ft. (invert of emergency spillway) 379.35 settled ft. (elevation) 377.58 ft. (max. storm pond can safely pass) 64, 5 5 9 ft (water surface area at orifice invert elevation) 43,260 ft (calculated surface area required) 79,592 ft (Specif frequency event: 10 year) 52.79 ac. (total drainage to the pond Discharges (Speck only applicable frequency events) At BMP 1 -year 2 -year 10 -year -year Inflow 137.50 cfs 175.88 cfs 302.90 cfs cfs Routed outflow 5.37 cfs 9.80 cfs 29.15 cfs cfs At Analysis Point(s) that BMP Contributes to 1 -year Pre - development 315.36 cfs Post - development w/o detention 512.41 cfs With detention 312.27 cfs Volumes Permanent pool volume Water quality pool storage volume Design storm storage volume Total Storage volume provided at design storm Total Storage volume provided at top of dam Forebay volume 2 -year ft3 10 -year 331, 602 -year 466.41 CfS 1059.27 CfS cfs 708.99 CfS 1399.58 CfS cfs 463.04 CfS 1052.03 CfS cfs 219,752 ft3 (volume of main pond and forebay) 99, 76 5 ft3 (volume above permanent pool) 331, 602 ft3 (volume above permanent pool) 551,354 ft3 931,416 ft3 46,031 ft3 ( 20% of permanent pool volume) Hydraulic Depths Volume of normal pool divided by surface area of normal pool 3.40 ft. Volumes at temporary pool plus normal pool divided by surface area of temporary pool 3.20 ft. Other Parameters SA/DA' 1.88 (from DWQ table) Diameter of orifice 4.0 in. (must provide draw down over 2 to S day period) Draw -down time 106 .32 hrs ' When using the SA/DA tables from the Stormwater Best Management Practices Manual, linear interpolation may be used for values between table entries. Riser /Principal and Emerge, 1 -year storm orifice /weir 2 -year storm orifice /weir 10 -year storm orifice /weir 25 - year storm orifice /weir Principal spillway Emergency spillway icy Spillway It diameter_ diameter_ diameter_ diameter diameter width 6 0 formation in. in. in. 60 in. 36 in. ft. length 212 ft. length - ft. length - ft. length ft. side slopes 5 :1 slope 0 % II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Applicant's initials MLJ a. The permanent pool depth is between 3- and 6 -feet (required minimum hydraulic depth of 3- feet). MLJ b. The forebay volume is approximately equal to 20% of the pond volume. MLJ c. The temporary pool controls runoff for water quality design storm. MLJ d. The temporary pool draws down in 2- to 5 -days. MLJ e. The drainage area to the facility is at least 10- acres. MLJ f. Riprap outlet protection, if provided, reduces flow to non - erosive velocities (provide calculations). MLJ g. The pond length to width ratio is greater than or equal to 3:1. MLJ h. The pond side slopes above the permanent pool area are no steeper than 3:1. MLJ i. A submerged and vegetated shelf with a slope no greater than 6:1 is provided around the perimeter of the pond (show on plan and profile and provide a vegetation plan). MLJ J. Vegetative cover above the permanent pool elevation is specified. No woody vegetation is permitted on the embankment. MLJ k. A surface baffle, trash rack or similar device is provided for both the overflow and orifice. Flat top trash racks are not acceptable. Access hatch has been provided. MLJ 1. A recorded drainage easement is provided for each pond including access to the nearest right -of -way and is graded per Section 8.3, Stormwater Control Facilities (BMPs). MLJ m. If the basin is used for sediment and erosion control during construction, a note requiring clean out and vegetative cover being established prior to use as a wet detention basin shall be provided on the construction plan. MLJ n. A mechanism is specified which will drain the pond for maintenance and emergencies. Valves used shall be plug valves. MLJ o. Anti - floatation calculations are provided for riser structure. MLJ p. A plan view of the pond with grading shown is provided. MLJ q. A profile through the forebay, main pond and spillway is provided. Water surface elevations are shown on the profile. MLJ r. Riser structure details are provided. MLJ s. Dam designed to account for a 5.00% settlement factor. MLJ t. Compaction specifications for the embankment are shown on the plan. MLJ u. The minimum top of dam width has been provided for the pond embankment top width per Section 8.3, Stormwater Control Facilities (BMPs). Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement, payment of permit fee per facility and payment of surety are required prior to construction drawing approval. 1 121 - WQ #2 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #2 - Required Surface Area Drainage Area to Basin = 52.79 acres Impervious Area to Basin = 25.64 acres Impervious Percentage = 49% Avereage Depth (Volume /SA) = 3.40 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 497o Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.4 4.0 1.73 1.61 1.43 2.01 1.88 1.69 2.06 1.93 1.73 SA /DA = 1.88 Surface Area Required = 43,260 sf Surface Area Provided = 64,559 sf Matt Jones, El 4/24/2012 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #2 Sizing.xls Below NP Volumes Forebay Bottom Forebay Bottom Main Pool Bottom 1121 - Del Webb WQ #2 Below Normal Pool Volumes Forebay 1 Volume Stage /Storage Calculations Forebay Volume = 41026 cf Forebay 2 Volume Stage /Storage Calculations Contour Average Contour Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (so (so (cf) (cf) 367.0 1 0.0 1 8618 1 0 1 0 1 0 370.5 3.5 11351 9985 34946 34946 371.0 4.0 12968 12160 6080 41026 Forebay Volume = 41026 cf Forebay 2 Volume Stage /Storage Calculations Forebay Volume = 5006 cf Main Pool Volume Stage /Storage Calculations Contour Average Contour Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (so (so (cf) (cf) 367.0 1 0.0 1 617 1 0 1 0 1 0 370.5 3.5 1679 1148 4018 4018 371.0 4.0 2272 1976 988 5006 Forebay Volume = 5006 cf Main Pool Volume Stage /Storage Calculations Main Pool Volume = 173721 cf Total Pond Volume Forebay Volume = 1 46031 cf Main Pool Volume = 1 173721 cf Total Pond Voume = 219752 cf Forebay Percentage of Total Volume = 20.95% Matt Jones, El 4/24/2012 Contour Average Contour Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (so (so (cf) (cf) 367.0 1 0.0 1 39853 1 0 1 0 1 0 370.5 3.5 45824 42839 149935 149935 371.0 4.0 49319 47572 23786 173721 Main Pool Volume = 173721 cf Total Pond Volume Forebay Volume = 1 46031 cf Main Pool Volume = 1 173721 cf Total Pond Voume = 219752 cf Forebay Percentage of Total Volume = 20.95% Matt Jones, El 4/24/2012 1 121 - WQ #2 Sizing.xls WQ Volume 1121 - Del Webb WQ #2 - Above Normal Pool Volume Runoff Volume Simple Method Drainage Area (A) = 52.79 Acres Impervious Area = 25.64 Acres Impervious Fraction (IA) = 0.49 Rainfall Depth (RD) = 1.00 Inch Rv= 0.49 (Rv = 0.05 +0.9 *IA) Runoff Volume (V) = 93347 cf (V = 3630 *Rp *Rv*A) Normal Pool Elevation = 371.00 Temporary Pool Elevation = 372.40 Temporary Pool Volume = 99765 cf Matt Jones, El 4/24/2012 1121 - Del Webb WQ #2 - Drawdown Orifice Sizing 4 74,603 64,559 0.6 1.4 3,5.2 Orifice Equation 3..5.2.1 Drawdown Titne Calculations for a Pond with can Orafice Outlet M Stormwater Management Manual For the specific case where At = A,, and II = 0 GCd a L 1 121 - WQ #2 Sizing.xls Flow Splitter 1121 - Del Webb WQ #2 - Flow Spliffer Calcs Orifice Flow Desired Flow to Level Spreader = 10.00 cfs Level Spreader Lip Elevation = 366.00 feet Pipe to LS Invert = 365.90 feet Bypass Weir Elevation = 369.40 feet Diameter of Orifice = 15.00 inches Discharge Coefficient (Cd) = 0.60 g = 32.20 ft /s /s Submerged Area (a) = 1.23 ft2 Effective Head (h) = 2.88 feet Q = Cd *a *�2 *g *h Orifice Flow (Q) = 10.02 cfs Matt Jones, El 4/24/2012 1 121 - WQ #2 Sizing.xls Anti Flotation Calculations Extended Base- NC Products Manhole Riser /Barrel Anti - Flotation Calculation Sheet 1 121 - WO #2 Riser Matt Jones, El 4/24/2012 Input Data =_> Invert of Extended Base = 361,00 feet Riser Crest Elevation = 375,30 feet Invert of Outlet Barrel = 367,00 Inside diameter of manhole = 5,0 feet Wall thickness of manhole = 6,0 inches Outside diameter of manhole riser sections = 6.00 feet Diameter of Extended base Pad = 7,2 feet Height of Extended Base Pad = 1 0,67 Ifeet Inside Barrel diameter = 36,0 inches Barrel Wall Thickness = 3,25 inches Outside Diameter of Barrel = 42,50 inches Diameter of 1 st Inlet = 4,0 inches Area of 2nd Inlet =1 4,0 Ifeet2 Weight of Structure =_> Volume of Riser Walls = cf Volume of Extended Base Pad = M14468 cf Total Volume of Concrete = cf Opening for barrel = 4.926 cf Opening for 1 st inlet orifice = 0.044 cf Opening for 2nd inlet orifice = 2.000 cf Total Volume of Openings in Concrete = 6.969 cf Total Concrete in Riser Section Minus Openings = 137.71 cf Depth of Concrete Fill Layer = 5.33 cf Volume of Concrete in Fill Layer = 104.72 cf Total Volume of Concrete Present in Riser = 242.43 cf Concrete unit weight = 142 lb/cf (From NC Products Catalog) Total Weight of Concrete = 34425 Ibs Amount of water displaced =_> Volume of Water Displaced by Riser Structure = 412.37 cf Volume of Water Displaced by Trash Rack = 26 cf Total Volume of Water Displaced = 438.37 cf Unit Weight of water = 62 Ib /cf Weight of water displaced = 27354 Ibs Determine if Anti - Flotation Block is Required =_> Safety factor to use = 1.25 (recommend 1.25 or higher) Actual Safety Factor = 1.26 Factor of Safety is Acceptable 1 121 - POND OUTLET VELOCITY DISSIPATOR DESIGN.xIs Matt Jones, El WQ #2 4/24/2012 Velocity Dissipator Calculations w/ PIPES.EXE NRCD Land Quality Section - Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. 25 -Year Outflow, Q (cfs) = 80.00 Flow Depth (ft.) 3.00 Slope, S (%) = 1.00 Velocity, V (ft /s) 11.33 Pipe Dia., D (in.) = 36 Manning's n Value = 0.013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe Dia., Do (ft.) = 3.00 Outlet Velocity, Vo (fps) = 11.33 Apron Length, LA (ft.) = 24.0 ZONE 3 Average Dia. Stone Thickness (inches) Class (inches) 4 A 12 8 B 18 >> 10 1 24 << 14 2 36 Width,W = 0.4 *LA + Do Thickness = 1.5 * DMAX Width, W = 12.6 ft. SAY: 13.0 ft. FINAL DIMENSIONS: Length, L (ft.) = 24.0 Width, W (ft.) = 13.0 Depth, D (in.) = 24 (NCDENR Erosion & Sed. Cont. Manual §8.06.6) Stone Class = 1 ( NCDOT Std. §1042) *Cells in red denote required inputs from PIPES.exe outputs DP #3 Summary and Calculations DURHAM City of Durham Public Works Department Stormwater Services Divisions 1 B 6 9 101 City Hall Plaza, Durham, North Carolina, 27701 crrr OF MEDIcINE Telephone (919) 560 -4326 FAX (919) 560 -4316 Dry Detention Basin Design Summary Stormwater Management Construction Plan Review: A complete stormwater management construction plan submittal includes a design summary for each stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details. I. PROJECT INFORMATION Project Name: Del Webb - Duraleigh Arbors Phase 1 PIN: 0769 -03 -41 -8938 Case #: D1100150 Design Contact Person: Matt Jones Phone #: (919 ) 490 -4990 Legal Name of Owner:Pulte Group Owner Contact: Randy King Phone #: ( 919 ) 816 -1100 Owner Address: 1225 Crescent Green Drive - suite 250, Cary NC Deed Book Page # or Plat Book Page# for BMP Property For projects with multiple basins, specify which pond this worksheet applies to: DP 43 Detention provided for: X 1 -year X 2 -year x 10 -year other Dam Height: 8.6 (feet) Dam Classification: C Elevations Basin bottom elevation 402.00 ft. (1loor of the pond) 1 -year storm orifice /weir elevation 402.00 ft. (invert elevation) 1 -year storm water surface elevation 405.09 ft. 2 -year storm orifice /weir elevation 405.00 ft. (invert elevation) 2 -year storm water surface elevation 405.35 ft. 10 -year storm orifice /weir elevation 405.00 ft. (invert elevation) 10 -year storm water surface elevation 406.45 ft. Emergency spillway elevation 407.00 ft. (invert of emergency spillway) Top of embankment/dam 409.57 settled ft. (elevation) Maximum water surface elevation 407.44 ft. (max. storm pond can safely pass) Areas Design storm surface area 6767 ft2 (Sped frequency event. 10 .year) Drainage area 3.20 ac. (total drainage to the pond) Volumes Total storage volume provided at design storm 21679 ft3 Total storage volume provided at top of dam 9700 ft3 Hydraulic Depth (volume of design storm divided by surface area of design storm) Hydraulic Depth 3.20 ft. Discharges (Speck only applicable frequency events) At BMP Riser /Principal and Emerge, 1 -year storm orifice /weir 2 -year storm orifice /weir 10 -year storm orifice /weir - year storm orifice /weir Principal spillway Emergency spillway icy Spillway Inform, diameter 2 diameter 10 diameter lo diameter diameter 18 width 4 0 ft. II. REQUIRED ITEMS CHECKLIST ztion in. in. in. in. in. length ft. length ft. length ft. length ft. side slopes s :1 slope 0 % The following checklist outlines design requirements. In the space provided to indicate the following design requirements have been met and supporting documentation is attached. Applicant's initials MLJ a. Riprap outlet protection, if provided, reduces flow to non - erosive velocities (provide calculations). MLJ b. The basin side slopes are no steeper than 3:1. MLJ c. Vegetative cover for the basin is specified. No woody vegetation is permitted on the embankment. N/A closed d. A trash rack or similar device is provided for both the overflow and orifice. Flat top trash racks are not acceptable. Access hatch has been provided. MLJ e. A recorded drainage easement is provided for each basin including access to the nearest right -of -way and is graded per Section 8.3, Stormwater Control Facilities (BMPs). MLJ f. If the basin is used for sediment and erosion control during construction, a note requiring clean out and vegetative cover being established prior to use as a dry detention basin shall be provided on the construction plan. MLJ g. Anti - floatation calculations are provided for riser structure. MLJ h. A plan view of the pond with grading shown is provided. MLJ i. A profile through the forebay, main pond and spillway is provided. Water surface elevations are shown on the profile. MLJ j. Riser structure details are provided. MLJ k. Compaction specifications for the embankment are provided on the plan. MLJ 1. Dam designed to account for a 5.00% settlement factor. 1 -year 2 -year 10 -year -year Inflow 9.90 cfs 12.32 cfs 20.13 cfs cfs Routed outflow 0.22 cfs 0.62 cfs 2.89 cfs cfs At Analysis Point(s) that BMP Contributes to 1 -year 2 -year 10 -year -year Pre - development 0.32 cfs 1.00 cfs 4.93 cfs cfs Post - development w/o detention 10-93 cfs 13.68 cfs 23 .58 cfs cfs With detention 0.22 cfs 0.62 cfs 2.89 cfs cfs Riser /Principal and Emerge, 1 -year storm orifice /weir 2 -year storm orifice /weir 10 -year storm orifice /weir - year storm orifice /weir Principal spillway Emergency spillway icy Spillway Inform, diameter 2 diameter 10 diameter lo diameter diameter 18 width 4 0 ft. II. REQUIRED ITEMS CHECKLIST ztion in. in. in. in. in. length ft. length ft. length ft. length ft. side slopes s :1 slope 0 % The following checklist outlines design requirements. In the space provided to indicate the following design requirements have been met and supporting documentation is attached. Applicant's initials MLJ a. Riprap outlet protection, if provided, reduces flow to non - erosive velocities (provide calculations). MLJ b. The basin side slopes are no steeper than 3:1. MLJ c. Vegetative cover for the basin is specified. No woody vegetation is permitted on the embankment. N/A closed d. A trash rack or similar device is provided for both the overflow and orifice. Flat top trash racks are not acceptable. Access hatch has been provided. MLJ e. A recorded drainage easement is provided for each basin including access to the nearest right -of -way and is graded per Section 8.3, Stormwater Control Facilities (BMPs). MLJ f. If the basin is used for sediment and erosion control during construction, a note requiring clean out and vegetative cover being established prior to use as a dry detention basin shall be provided on the construction plan. MLJ g. Anti - floatation calculations are provided for riser structure. MLJ h. A plan view of the pond with grading shown is provided. MLJ i. A profile through the forebay, main pond and spillway is provided. Water surface elevations are shown on the profile. MLJ j. Riser structure details are provided. MLJ k. Compaction specifications for the embankment are provided on the plan. MLJ 1. Dam designed to account for a 5.00% settlement factor. MLJ m. The minimum top of dam width has been provided for the pond embankment top width per Section 8.3, Stormwater Control Facilities (BMPs). Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement, payment of permit fee per facility and payment of surety are required prior to construction drawing approval. 1121 - WQ#3 Riser Anti - Flotation Calcs.xls NC Products Extended Base Riser Input Data =_> Extended Base- INC Products Manhole Riser /Barrel Anti - Flotation Calculation Sheet 1 121 - WQ #3 Riser Invert of Extended Base = 400.75 feet Riser Top Elevation = L102,00 09.00 feet Invert of Outlet Barrel = Inside diameter of manhole = 4.0 feet Wall thickness of manhole = 1 5.0 linches cf Outside diameter of manhole riser sections = 4.63 feet Diameter of Extended base Pad = b.0 feet Height of Extended Base Pad =1 0.50 feet Inside Barrel diameter = 16.0 inches Barrel Wall Thickness = 1 3.25 linches ft Outside Diameter of Barrel = 24.50 inches Diameter of 1 st Inlet = inches Diameter of 2nd Inlet = M10 inches2 Height of Flat Top = feet Weight of Structure =_> Volume of Riser Walls = cf Volume of Extended Base Pad = Mcf cf Total Volume of Concrete = Opening for barrel = 1.364 cf Opening for 1 st inlet orifice = 0.036 cf Opening for 2nd inlet orifice = 0.227 cf Opening for 3rd inlet orifice = 0.002 cf Total Volume of Openings in Concrete = 1.630 cf Total Concrete in Riser Section Minus Openings = 51 .53 cf Depth of Concrete Fill Layer = 0.75 1cf ft Volume of Concrete in Fill Layer = 9.42 Total Volume of Concrete Present in Riser = 60.96 cf Concrete unit weight = 142 lb/cf (From NC Products Catalog) Weight of Flat Top = 1700 Total Weight of Concrete = 10356 Ibs Amount of water displaced =_> Volume of Water Displaced by Riser Structure = 156.33 cf Unit Weight of water = 62 lb/cf Weight of water displaced = 9755 Ibs Determine if Anti - Flotation Block is Required =_> Safety factor to use = 1.25 (recommend 1.25 or higher) Actual Safety Factor = 1.06 Factor of Safety is Unacceptable Antiflotation Block Calculations Width of Antiflotation Block (Square) = 7.00 ft Height of Antiflotation Block = 0.67 ft Weight of Antiflotation Block = 4641 Ibs Weight of Structure and Antiflotation Block - 14997 Actual Safety Factor = 1.54 Safety Factor Acceptable Matt Jones, El 4/24/2012 WQ #4 Summary and Calculations DURHAM City of Durham Public Works Department Stormwater Services Divisions 1 B 6 9 101 City Hall Plaza, Durham, North Carolina, 27701 crrr OF MEDIcINE Telephone (919) 560 -4326 FAX (919) 560 -4316 Wet Detention Pond Design Summary Stormwater Management Construction Plan Review: A complete stormwater management construction plan submittal includes a design summary for each stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details. I. PROJECT INFORMATION Project Name: Del Webb - Duraleigh Arbors Phase 1 PIN: 0769 -03 -41 -8938 Case #: D1100150 Design Contact Person: Matt Jones Phone #: ( 919 ) 490 -4990 Legal Name of Owner: Pulte Group Owner Contact: Randy King Phone #: ( 919 ) 816 - 1100 Owner Address: 1225 Crescent Green Drive - Suite 250, Cary NC Deed Book Page # or Plat Book Page# for BMP Property For projects with multiple basins, specify which pond this worksheet applies to: WQ 44 Does the proposed pond also incorporate stormwater detention? es No Detention provided for: x 1 -year x 2 -year 0 -year other Dam Height: to . 8 (feet) Dam Classification: A Elevations Pond bottom elevation Permanent pool elevation Temporary pool elevation 1 -year storm orifice /weir elevation 1 -year storm water surface elevation 2 -year storm orifice /weir elevation 2 -year storm water surface elevation 10 -year storm orifice /weir elevation 10 -year storm water surface elev. Emergency spillway elevation Top of embankment/dam Maximum water surface elevation Areas Permanent pool area provided Minimum required permanent pool area Design storm surface area Drainage area (10 -acres min) 375.00 ft. (floor of the pond) 381.00 ft. (invert elevation of the orifice) 381.60 ft. (elevation of the structure overflow) 3 e i-co ft. (invert elevation) 381.87 ft. 381.60 ft. (invert elevation) 382.03 ft. 381.60 ft. (invert elevation) 382.68 ft. 383 .30 ft. (invert of emergency spillway) 385.46 Settled ft. (elevation) 383.63 ft. (max. storm pond can safely pass) 7,553 ft (water surface area at orifice invert elevation) 1, 778 ft (calculated surface area required) 11,115 ft (Specif frequency event' 10 year) 2.76* ac. (total drainage to the pond *Drainage area same as approved site plan Discharges (Speck only applicable frequency events) At BMP At Analysis Point(s) that BMP Contributes to 1 -year Pre - development 315.36 cfs Post - development w/o detention 512.41 cfs With detention -� 12 27 cfs Volumes Permanent pool volume Water quality pool storage volume Design storm storage volume Total Storage volume provided at design storm Total Storage volume provided at top of dam Forebay volume 2 -year 1 -year 2 -year 466.41 10 -year -year Inflow 6.86 cfs 8.84 cfs 15.44 cfs cfs Routed outflow 0.29 cfs 0.58 cfs 1.53 cfs cfs At Analysis Point(s) that BMP Contributes to 1 -year Pre - development 315.36 cfs Post - development w/o detention 512.41 cfs With detention -� 12 27 cfs Volumes Permanent pool volume Water quality pool storage volume Design storm storage volume Total Storage volume provided at design storm Total Storage volume provided at top of dam Forebay volume 2 -year 10 -year -year 466.41 CfS 1059.27 CfS cfs 708 .9 9 CfS 1399.58 CfS cfs 463.04 CfS 1052.03 CfS cfs 24,332 ft3 (volume of main pond and forebay) 5,228 ft3 (volume above permanent pool) 16,554 ft3 (volume above permanent pool) 40, 886 ft3 85,305 ft3 5,750 ft3 ( 20% of permanent pool volume) Hydraulic Depths Volume of normal pool divided by surface area of normal pool 3.22 ft. Volumes at temporary pool plus normal pool divided by surface area of temporary pool 3.06 ft. Other Parameters SA/DA' 1.48 (from DWQ table) Diameter of orifice 1.5 in. (must provide draw down over 2 to S day period) Draw -down time 77.52 hrs 1 When using the SA/DA tables from the Stormwater Best Management Practices Manual, linear interpolation may be used for values between table entries. Riser /Principal and Emerge, 1 -year storm orifice /weir 2 -year storm orifice /weir 10 -year storm orifice /weir - year storm orifice /weir Principal spillway Emergency spillway icy Spillway Inform, diameter 8 diameter - diameter - diameter diameter 18 width 4 8 ft. ztion in. in. in. in. in. length ft. length ft. length ft. length ft. side slopes 5 :1 slope 0 % II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Applicant's initials MLJ a. The permanent pool depth is between 3- and 6 -feet (required minimum hydraulic depth of 3- feet). MLJ b. The forebay volume is approximately equal to 20% of the pond volume. MLJ c. The temporary pool controls runoff for water quality design storm. MLJ d. The temporary pool draws down in 2- to 5 -days. N /A* e. The drainage area to the facility is at least 10- acres. N/A f. Riprap outlet protection, if provided, reduces flow to non - erosive velocities (provide calculations). MLJ g. The pond length to width ratio is greater than or equal to 3:1. MLJ h. The pond side slopes above the permanent pool area are no steeper than 3:1. MLJ i. A submerged and vegetated shelf with a slope no greater than 6:1 is provided around the perimeter of the pond (show on plan and profile and provide a vegetation plan). MLJ J. Vegetative cover above the permanent pool elevation is specified. No woody vegetation is permitted on the embankment. MLJ k. A surface baffle, trash rack or similar device is provided for both the overflow and orifice. Flat top trash racks are not acceptable. Access hatch has been provided. MLJ 1. A recorded drainage easement is provided for each pond including access to the nearest right -of -way and is graded per Section 8.3, Stormwater Control Facilities (BMPs). MLJ m. If the basin is used for sediment and erosion control during construction, a note requiring clean out and vegetative cover being established prior to use as a wet detention basin shall be provided on the construction plan. MLJ n. A mechanism is specified which will drain the pond for maintenance and emergencies. Valves used shall be plug valves. MLJ o. Anti - floatation calculations are provided for riser structure. MLJ p. A plan view of the pond with grading shown is provided. MLJ q. A profile through the forebay, main pond and spillway is provided. Water surface elevations are shown on the profile. MLJ r. Riser structure details are provided. MLJ s. Dam designed to account for a 5.00% settlement factor. MLJ t. Compaction specifications for the embankment are shown on the plan. MLJ u. The minimum top of dam width has been provided for the pond embankment top width per Section 8.3, Stormwater Control Facilities (BMPs). Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement, payment of permit fee per facility and payment of surety are required prior to construction drawing approval. 1 121 - WQ #4 Sizing.xls Surface Area Calcs (85% TSS) 1121 - Del Webb WQ #4 - Required Surface Area Drainage Area to Basin = 2.76 acres Impervious Area to Basin = 0.97 acres Impervious Percentage = 35% Total Pond Volume Below NP = 24332 cf Normal Pool Surface Area = 7553 sf Avereage Depth (Volume /SA) = 3.22 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 30% Site % impervious 35% Upper Boundary 40% Average Depth (Vol /SA) (ft) 3.0 3.2 4.0 1.34 1.28 1.08 1.54 1.48 1.26 1.73 1.66 1.43 SA /DA = 1.48 Surface Area Required = 1,778 sf Surface Area Provided = 7,553 sf Matt Jones, El 4/24/2012 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual. July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #4 Sizing.xls Below NP Volumes Forebay Bottom Main Pool Bottom Matt Jones, El 4/24/2012 1121 - Del Webb WQ #4 Below Normal Pool Volumes Forebay Volume Stage /Storage Calculations Forebay Volume = 5750 cf Main Pool Volume Stage /Storage Calculations Contour Average Contour Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (cf) (cf) 376.0 0.0 411 0 0 0 380.5 4.5 1681 1046 4707 4707 381.0 5.0 2489 2085 1043 5750 Forebay Volume = 5750 cf Main Pool Volume Stage /Storage Calculations Main Pool Volume = 18583 cf Total Pond Volume Forebay Volume = 5750 cf Main Pool Volume = 18583 cf Total Pond Voume = 24332 cf Forebay Percentage of Total Volume = 23.63% Contour Average Contour Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (cf) (cf) 375.0 0.0 1539 0 0 0 380.5 4.5 3774 2657 11954 11954 381.0 6.0 5064 4419 6629 18583 Main Pool Volume = 18583 cf Total Pond Volume Forebay Volume = 5750 cf Main Pool Volume = 18583 cf Total Pond Voume = 24332 cf Forebay Percentage of Total Volume = 23.63% 1 121 - WQ #4 Sizing.xls WQ Volume 1121 - Del Webb WQ #4 - Above Normal Pool Volume Runoff Volume Simple Method Drainage Area (A) = 2.76 Acres Impervious Area = 0.97 Acres Impervious Fraction (IA) = 0.35 Rainfall Depth (RD) = 1.00 Inch Rv= 0.37 (Rv = 0.05 +0.9 *IA) Runoff Volume (V) = 3670 cf (V = 3630 *Rp *Rv*A) Normal Pool Elevation = 381.00 Temporary Pool Elevation = 381.60 Temporary Pool Volume = 5228 cf Matt Jones, El 4/24/2012 1121 - Del Webb WQ #4 - Drawdown Orifice Sizing II&I 9,654 7, 0.6 3,5.2 Orifice Equation 3..5.2.1 Drawdown Titne Calculations for a Pond with can Orafice Outlet M Stormwater Management Manual For the specific case where At = A,, and II = 0 GCd a L 1 121 - WQ #4 Sizing.xls Anti Float Calcs Extended Base- NC Products Manhole Riser /Barrel Anti - Flotation Calculation Sheet 1 121 - WO #4 Riser Matt Jones, El 4/24/2012 Input Data =_> Invert of Extended Base = 373,00 feet Riser Top Elevation = 383,30 feet Invert of Outlet Barrel = 37b,00 Inside diameter of manhole = 4,0 feet Wall thickness of manhole = 5.0 inches Outside diameter of manhole riser sections = 4,83 feet Diameter of Extended base Pad = b,0 feet Height of Extended Base Pad = 1 0,50 Ifeet Inside Barrel diameter = 18,0 inches Barrel Wall Thickness = 3,25 inches Outside Diameter of Barrel = 24,50 inches Diameter of 1 st Inlet = 4,0 inches Diameter of 2nd Inlet = 8,0 inches2 Height of Flat Top = 1,0 feet Weight of Structure =_> Volume of Riser Walls = 50.88 cf Volume of Extended Base Pad = 14.14 cf Total Volume of Concrete = 65.01 cf Opening for barrel = 1.364 cf Opening for 1 st inlet orifice = 0.036 cf Opening for 2nd inlet orifice = 0.145 cf Total Volume of Openings in Concrete = 1.546 cf Total Concrete in Riser Section Minus Openings = 63.47 cf Depth of Concrete Fill Layer = 2.50 ft Volume of Concrete in Fill Layer = 31.42 cf Total Volume of Concrete Present in Riser = 94.88 cf Concrete unit weight = 1 142 lb/cf (From NC Products Catalog) Weight of Flat Top= 1700 Total Weight of Concrete = 15173 Ibs Amount of water displaced =_> Volume of Water Displaced by Riser Structure = 193.95 cf Unit Weight of water = 62 Ib /cf Weight of water displaced = 12102 Ibs Determine if Anti - Flotation Block is Required =_> Safety factor to use = 1.25 (recommend 1.25 or higher) Actual Safety Factor = 1.25 Factor of Safety is Acceptable HydroCAD Runoff Analysis 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 2 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 RunoffArea= 56.960 ac Runoff Depth >0.81" Flow Length= 3,173' Tc =23.6 min CN =72 Runoff =41.47 cfs 3.836 of Subcatchment 2S: TO DP #3 Runoff Area= 18.590 ac Runoff Depth >0.40" Flow Length =2,277' Tc =21.0 min CN =62 Runoff =5.06 cfs 0.617 of Subcatchment 3S: TO WQ #2 Runoff Area = 52.790 ac Runoff Depth= 1.45" Tc =5.0 min CN =83 Runoff = 137.50 cfs 6.364 of Subcatchment 4S: TO WQ #1 Runoff Area = 25.900 ac Runoff Depth= 1.07" Tc =5.0 min CN =77 Runoff =49.69 cfs 2.312 of Subcatchment 7S: TO DP #5 Runoff Area = 92.640 ac Runoff Depth >0.76" Flow Length= 3,614' Tc =29.0 min CN =71 Runoff =54.14 cfs 5.870 of Subcatchment 8S: TO DP #6 RunoffArea= 77.860 ac Runoff Depth >0.71" Flow Length= 2,455' Tc =25.3 min CN =70 Runoff =45.94 cfs 4.634 of Subcatchment 10S: TO WQ #3 POST Runoff Area =3.200 ac Runoff Depth= 1.74" Tc =5.0 min CN =87 Runoff =9.90 cfs 0.464 of Subcatchment 11S: TO WQ #4 RunoffArea =2.760 ac Runoff Depth= 1.38" Tc =5.0 min CN =82 Runoff =6.86 cfs 0.317 of Subcatchment 15S: TO DP #4 Runoff Area = 13.150 ac Runoff Depth = 0.76" Flow Length= 1,169' Tc =17.2 min CN =71 Runoff =10.83 cfs 0.833 of Reach 4R: DP #4,5, &6 REACH Peak Depth =1.50' Max Vet =4.5 fps Inflow= 106.91 cfs 11.517 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow =89.45 cfs 11.476 of Pond 1PA: WQ #1 Peak EIev= 360.12' Storage= 60.484 cf Inflow =49.69 cfs 2.312 of Outflow =1.54 cfs 1.140 of Pond 2PA: WQ #2 Peak EIev= 373.22' Storage= 161.783 cf Inflow= 137.50 cfs 6.364 of Outflow =5.37 cfs 3.605 of Pond 3P: WQ #3 Peak EIev= 405.09' Storage= 13.241 cf Inflow =9.90 cfs 0.464 of Outflow =0.22 cfs 0.214 of Pond 7P: WQ #4 Peak EIev= 381.87' Storage =7,891 cf Inflow =6.86 cfs 0.317 of Outflow =0.29 cfs 0.179 of Link 3L: DP #1 Inflow= 312.27 cfs 50.160 of Primary= 312.27 cfs 50.160 of 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 3 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Link 6L: DP #7 POST Inflow =0.22 cfs 0.214 of Primary=0.22 cfs 0.214 of 1 -Year Primary Outflow Imported from 1121 - POST DEVELOPMENT - DP#2 —Link 10L Inflow= 206.86 cfs 29.486 of Primary= 206.86 cfs 29.486 of Link 11L: DP #3 Link 13L: DP #5 Inflow =96.12 cfs 15.699 of Primary=96.12 cfs 15.699 of Inflow =99.40 cfs 10.683 of Primary=99.40 cfs 10.683 of Total Runoff Area = 343.850 ac Runoff Volume = 25.246 of Average Runoff Depth = 0.88" 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 4 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Subcatchment 1S: TO DP #1 Runoff = 41.47 cfs @ 12.19 hrs, Volume= 3.836 af, Depth> 0.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 9.420 55 Onsite Woods B 7.960 70 Onsite Woods C 11.290 77 Onsite Woods D 1.360 55 Offsite Woods B 0.890 70 Offsite Woods C 22.510 77 Offsite Woods D 3.530 80 Offsite Open D 56.960 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 415 0.0720 4.3 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 1,205 0.0380 4.9 19.65 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.0 945 0.0060 5.3 399.05 Channel Flow, Area= 75.0 sf Perim= 25.0' r= 3.00' n= 0.045 2.5 533 0.0020 3.6 534.69 Channel Flow, Area= 150.0 sf Perim= 40.0' r= 3.75' n= 0.045 23.6 3,173 Total Subcatchment 2S: TO DP #3 Runoff = 5.06 cfs @ 12.20 hrs, Volume= 0.617 af, Depth> 0.40" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 11.900 55 Onsite Woods B 4.010 70 Onsite Woods C 2.050 77 Onsite Woods D 0.630 80 Onsite Open D 18.590 62 Weighted Average 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 5 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 374 0.0530 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.0 440 0.0780 7.0 28.15 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 5.9 1,388 0.0080 3.9 78.72 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 21.0 2,277 Total Subcatchment 3S: TO WQ #2 Runoff = 137.50 cfs @ 11.96 hrs, Volume= 6.364 af, Depth= 1.45" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 25.640 98 Impervious 15.030 74 >75% Grass cover, Good, HSG C 12.120 61 >75% Grass cover. Good. HSG B 52.790 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: TO WQ #1 Runoff = 49.69 cfs @ 11.96 hrs, Volume= 2.312 af, Depth= 1.07" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 10.570 98 Impervious 14.150 61 >75% Grass cover, Good, HSG B 1.180 74 >75% Grass cover, Good, HSG C 25.900 77 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 6 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Subcatchment 7S: TO DP #5 Runoff = 54.14 cfs @ 12.27 hrs, Volume= 5.870 af, Depth> 0.76" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 9.950 55 Onsite Woods B 0.000 70 Onsite Woods C 10.600 77 Onsite Woods D 0.700 61 Onsite Open B 0.000 74 Onsite Open C 9.880 80 Onsite Open D 8.410 55 Offsite Woods B 27.310 70 Offsite Woods C 7.570 77 Offsite Woods D 0.330 61 Offsite Open B 10.370 74 Offsite Open C 7.520 80 Offsite Open D 92.640 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 354 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 600 0.0400 5.0 20.16 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.2 341 0.0260 4.8 28.83 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 4.3 1,310 0.0210 5.1 60.85 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 3.5 934 0.0100 4.4 88.02 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 29.0 3,614 Total Subcatchment 8S: TO DP #6 Runoff = 45.94 cfs @ 12.22 hrs, Volume= 4.634 af, Depth> 0.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 1 -Year Rainfall= 3.00" 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 7 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Area (ac) CN Description 4.370 55 Onsite Woods D 1.550 70 Onsite Woods C 12.050 55 Offsite Woods B 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D 1.000 61 Offsite Open B 2.520 74 Offsite Open C 5.030 80 Offsite Open D 77.860 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 425 0.0470 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.7 970 0.0160 4.4 53.12 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 25.3 2,455 Total Subcatchment 10S: TO WQ #3 POST Runoff = 9.90 cfs @ 11.96 hrs, Volume= 0.464 af, Depth= 1.74" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 1.450 74 Onsite Open Space HSG 'C' 1.750 98 Onsite Impervious 3.200 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: TO WQ #4 Runoff = 6.86 cfs @ 11.96 hrs, Volume= 0.317 af, Depth= 1.38" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 0.970 98 Impervious 1.790 74 >75% Grass cover, Good, HSG C 2.760 82 Weighted Average 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 8 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 15S: TO DP #4 Runoff = 10.83 cfs @ 12.12 hrs, Volume= 0.833 af, Depth= 0.76" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 3.470 55 Onsite Woods B 9.680 77 Onsite Woods D 13.150 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 0.0 14.5 75 0.0270 0.1 0.7 Sheet Flow, 1,663 0.43 3.00 40.5 21.0 Woods: Light underbrush n= 0.400 P2= 3.50" 1.0 268 0.0820 4.6 691,125 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 163 0.0740 6.9 27.42 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.3 663 0.0410 8.2 123.34 Channel Flow, Area= 15.0 sf Perim= 11.0' r= 1.36' n= 0.045 17.2 1,169 Total Reach 4R: DP #4,5, &6 REACH Inflow Area = 186.410 ac, Inflow Depth > 0.74" for 1 -Year event Inflow = 106.91 cfs @ 12.23 hrs, Volume= 11.517 of Outflow = 89.45 cfs @ 12.51 hrs, Volume= 11.476 af, Atten= 16 %, Lag= 16.8 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 4.5 fps, Min. Travel Time= 8.8 min Avg. Velocity = 2.8 fps, Avg. Travel Time= 14.2 min Peak Depth= 1.50'@ 12.36 hrs Capacity at bank full= 1,201.80 cfs Inlet Invert= 366.00', Outlet Invert= 347.00' Custom cross - section table, n= 0.045 Length= 2,375.0' Slope= 0.00807' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.7 7.5 1,663 0.43 3.00 40.5 21.0 96,188 185.34 6.00 291.0 176.0 691,125 1,201.80 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 9 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Pond 1 PA: WQ #1 Inflow Area = 25.900 ac, Inflow Depth = 1.07" for 1 -Year event Inflow = 49.69 cfs @ 11.96 hrs, Volume= 2.312 of Outflow = 1.54 cfs @ 14.95 hrs, Volume= 1.140 af, Atten= 97 %, Lag= 179.1 min Primary = 1.54 cfs @ 14.95 hrs, Volume= 1.140 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 360.12' @ 14.95 hrs Surf.Area= 31,744 sf Storage= 60,484 cf Plug -Flow detention time= 355.5 min calculated for 1.138 of (49% of inflow) Center -of -Mass det. time= 221.4 min ( 1,073.2 - 851.8 ) Volume Invert #1 358.00' Mv01 e Description 267,675 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 358.00 22,700 0 0 358.50 27,300 12,500 12,500 360.00 31,600 44,175 56,675 362.00 34,000 65,600 122,275 364.00 36,300 70,300 192,575 366.00 38,800 75,100 267,675 Device Routing Invert Outlet Devices #1 Primary 354.50' 36.0" x 80.0' long Culvert RCP, groove end w /headwall, Ke= 0.200 Outlet Invert= 353.70' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 358.00' 3.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 359.60' 15.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 362.30' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #5 Primary 363.00' 52.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =1.53 cfs @ 14.95 hrs HW= 360.12' (Free Discharge) = Culvert (Passes 1.53 cfs of 78.61 cfs potential flow) 2= Orifice /Grate (Orifice Controls 0.34 cfs @ 7.0 fps) 3= Orifice /Grate (Orifice Controls 1.19 cfs @ 2.5 fps) 4= Orifice /Grate ( Controls 0.00 cfs) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) Pond 2PA: WQ #2 Inflow Area = 52.790 ac, Inflow Depth = 1.45" for 1 -Year event Inflow = 137.50 cfs @ 11.96 hrs, Volume= 6.364 of Outflow = 5.37 cfs @ 13.67 hrs, Volume= 3.605 af, Atten= 96 %, Lag= 102.6 min Primary = 5.37 cfs @ 13.67 hrs, Volume= 3.605 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 373.22' @ 13.67 hrs Surf.Area= 76,933 sf Storage= 161,783 cf Plug -Flow detention time= 322.4 min calculated for 3.605 of (57% of inflow) Center -of -Mass det. time= 203.0 min ( 1,034.9 - 831.9 ) 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 10 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Volume Invert Avail.Storage Storage Description #1 371.00' 711,664 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 371.00 64,559 0 0 371.50 71,505 34,016 34,016 373.00 76,669 111,131 145,147 380.00 85,193 566,517 711,664 Device Routing Invert Outlet Devices #1 Primary 367.00' 36.0" x 92.0' long Culvert RCP, square edge headwall, Ke= 0.500 8,249 14,646 Outlet Invert= 366.00' S= 0.01097' Cc= 0.900 n= 0.013 #2 Device 1 371.00' 4.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 372.40' 2.00'W x 2.00' H Vert. Orifice /Grate C= 0.600 #4 Device 1 375.30' 60.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #5 Primary 376.10' 60.0' long x 15.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =5.36 cfs @ 13.67 hrs HW= 373.22' (Free Discharge) 1= Culvert (Passes 5.36 cfs of 73.92 cfs potential flow) �2= Orifice /Grate (Orifice Controls 0.63 cfs @ 7.2 fps) 3= Orifice /Grate (Orifice Controls 4.74 cfs @ 2.9 fps) 4=Orifice/G rate ( Controls 0.00 cfs) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) Pond 3P: WQ #3 Inflow Area = 3.200 ac, Inflow Depth = 1.74" for 1 -Year event Inflow = 9.90 cfs @ 11.96 hrs, Volume= 0.464 of Outflow = 0.22 cfs @ 15.50 hrs, Volume= 0.214 af, Atten= 98 %, Lag= 212.9 min Primary = 0.22 cfs @ 15.50 hrs, Volume= 0.214 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 405.09' @ 15.50 hrs Surf.Area= 5,596 sf Storage= 13,241 cf Plug -Flow detention time= 378.2 min calculated for 0.214 of (46% of inflow) Center -of -Mass det. time= 259.5 min ( 1,077.1 - 817.6 ) Volume Invert Avail.Storage Storage Description #1 402.00' 51,309 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 402.00 3,033 0 0 404.00 4,642 7,675 7,675 406.00 6,397 11,039 18,714 408.00 8,249 14,646 33,360 410.00 9,700 17,949 51,309 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 11 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Device Routing Invert Outlet Devices #1 Primary 402.00' 18.0" x 56.0' long Culvert RCP, square edge headwall, Ke= 0.500 6.86 cfs @ 11.96 hrs, Volume= 0.317 of Outlet Invert= 401.40' S= 0.01077' Cc= 0.900 n= 0.013 #2 Device 1 402.00' 2.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 405.00' 10.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.22 cfs @ 15.50 hrs HW= 405.09' (Free Discharge) L1= Culvert (Passes 0.22 cfs of 13.01 cfs potential flow) �2=Orifice/G rate (Orifice Controls 0.18 cfs @ 8.5 fps) 3= Orifice /Grate (Orifice Controls 0.03 cfs @ 1.0 fps) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 381.87' @ 13.53 hrs Surf.Area= 9,999 sf Storage= 7,891 cf Plug -Flow detention time= 312.4 min calculated for 0.179 of (56% of inflow) Center -of -Mass det. time= 192.2 min ( 1,027.4 - 835.3 ) Volume Invert Avail.Storage Storage Description Pond 7P: WQ #4 Inflow Area = 2.760 ac, Inflow Depth = 1.38" for 1 -Year event Inflow = 6.86 cfs @ 11.96 hrs, Volume= 0.317 of Outflow = 0.29 cfs @ 13.53 hrs, Volume= 0.179 af, Atten= 96 %, Lag= 94.3 min Primary = 0.29 cfs @ 13.53 hrs, Volume= 0.179 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 381.87' @ 13.53 hrs Surf.Area= 9,999 sf Storage= 7,891 cf Plug -Flow detention time= 312.4 min calculated for 0.179 of (56% of inflow) Center -of -Mass det. time= 192.2 min ( 1,027.4 - 835.3 ) Volume Invert Avail.Storage Storage Description #1 381.00' 60,973 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 381.00 7,552 0 0 381.50 9,526 4,270 4,270 382.00 10,164 4,923 9,192 384.00 12,880 23,044 32,236 386.00 15,857 28,737 60,973 Device Routing Invert Outlet Devices #1 Primary 376.00' 18.0" x 66.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 375.20' S= 0.0121 T Cc= 0.900 n= 0.013 #2 Device 1 381.00' 1.5" Vert. Orifice /Grate C= 0.600 #3 Device 1 381.60' 8.0" Vert. Orifice /Grate C= 0.600 #4 Primary 383.30' 48.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =0.29 cfs @ 13.53 hrs HW= 381.87' (Free Discharge) Culvert (Passes 0.29 cfs of 19.25 cfs potential flow) 2 =Orifice /Grate (Orifice Controls 0.05 cfs @ 4.3 fps) 3= Orifice /Grate (Orifice Controls 0.24 cfs @ 1.8 fps) 4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) 1121 - POST DEVELOPMENT - DP #1 Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 12 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Link 3L: DP #1 Inflow Area = 755.420 ac, Inflow Depth > 0.80" for 1 -Year event Inflow = 312.27 cfs @ 12.39 hrs, Volume= 50.160 of Primary = 312.27 cfs @ 12.39 hrs, Volume= 50.160 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 6L: DP #7 POST Inflow Area = 3.200 ac, Inflow Depth > 0.80" for 1 -Year event Inflow = 0.22 cfs @ 15.50 hrs, Volume= 0.214 of Primary = 0.22 cfs @ 15.50 hrs, Volume= 0.214 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 10L: DP #2 Inflow Area = 414.770 ac, Inflow Depth > 0.85" for 1 -Year event Inflow = 206.86 cfs @ 12.31 hrs, Volume= 29.486 of Primary = 206.86 cfs @ 12.31 hrs, Volume= 29.486 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1 -Year Primary Outflow Imported from 1121 - POST DEVELOPMENT - DP #2-Link 10L Link 11 L: DP #3 Inflow Area = 257.790 ac, Inflow Depth > 0.73" for 1 -Year event Inflow = 96.12 cfs @ 12.51 hrs, Volume= 15.699 of Primary = 96.12 cfs @ 12.51 hrs, Volume= 15.699 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 13L: DP #5 Inflow Area = 173.260 ac, Inflow Depth > 0.74" for 1 -Year event Inflow = 99.40 cfs @ 12.24 hrs, Volume= 10.683 of Primary = 99.40 cfs @ 12.24 hrs, Volume= 10.683 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 13 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 RunoffArea= 56.960 ac Runoff Depth >1.12" Flow Length= 3,173' Tc =23.6 min CN =72 Runoff =60.13 cfs 5.321 of Subcatchment 2S: TO DP #3 Runoff Area= 18.590 ac Runoff Depth >0.62" Flow Length =2,277' Tc =21.0 min CN =62 Runoff =9.34 cfs 0.953 of Subcatchment 3S: TO WQ #2 Runoff Area = 52.790 ac Runoff Depth= 1.86" Tc =5.0 min CN =83 Runoff = 175.88 cfs 8.176 of Subcatchment 4S: TO WQ #1 Runoff Area = 25.900 ac Runoff Depth= 1.43" Tc =5.0 min CN =77 Runoff =66.74 cfs 3.087 of Subcatchment 7S: TO DP #5 RunoffArea= 92.640 ac Runoff Depth >1.06" Flow Length= 3,614' Tc =29.0 min CN =71 Runoff =80.03 cfs 8.211 of Subcatchment 8S: TO DP #6 RunoffArea= 77.860 ac Runoff Depth >1.01" Flow Length= 2,455' Tc =25.3 min CN =70 Runoff =68.94 cfs 6.541 of Subcatchment 10S: TO WQ #3 POST Runoff Area =3.200 ac Runoff Depth= 2.18" Tc =5.0 min CN =87 Runoff =12.32 cfs 0.582 of Subcatchment 11S: TO WQ #4 RunoffArea =2.760 ac Runoff Depth= 1.78" Tc =5.0 min CN =82 Runoff =8.84 cfs 0.410 of Subcatchment 15S: TO DP #4 Runoff Area = 13.150 ac Runoff Depth= 1.06" Flow Length= 1,169' Tc =17.2 min CN =71 Runoff =15.85 cfs 1.166 of Reach 4R: DP #4,5, &6 REACH Peak Depth =2.20' Max Vet =4.6 fps Inflow= 159.92 cfs 16.186 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow= 133.84 cfs 16.144 of Pond 1 PA: WQ #1 Peak EIev= 360.47' Storage= 71.752 cf Inflow =66.74 cfs 3.087 of Outflow =3.28 cfs 1.885 of Pond 2PA: WQ #2 Peak EIev= 373.66' Storage= 196.244 cf Inflow= 175.88 cfs 8.176 of Outflow =9.80 cfs 5.331 of Pond 3P: WQ #3 Peak EIev= 405.35' Storage= 14.720 cf Inflow =12.32 cfs 0.582 of Outflow =0.62 cfs 0.319 of Pond 7P: WQ #4 Peak EIev= 382.03' Storage =9,456 cf Inflow =8.84 cfs 0.410 of Outflow =0.58 cfs 0.268 of Link 3L: DP #1 Inflow= 463.04 cfs 70.206 of Primary= 463.04 cfs 70.206 of 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 14 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Link 6L: DP #7 POST Inflow =0.62 cfs 0.319 of Primary=0.62 cfs 0.319 of 2 -Year Primary Outflow Imported from 1121 - POST DEVELOPMENT - DP#2 —Link 10L Inflow= 300.95 cfs 40.571 of Primary= 300.95 cfs 40.571 of Link 11L: DP #3 Link 13L: DP #5 Inflow= 147.25 cfs 22.429 of Primary= 147.25 cfs 22.429 of Inflow= 148.23 cfs 15.021 of Primary= 148.23 cfs 15.021 of Total Runoff Area = 343.850 ac Runoff Volume = 34.447 of Average Runoff Depth = 1.20" 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 15 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Subcatchment 1S: TO DP #1 Runoff = 60.13 cfs @ 12.19 hrs, Volume= 5.321 af, Depth> 1.12" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 9.420 55 Onsite Woods B 7.960 70 Onsite Woods C 11.290 77 Onsite Woods D 1.360 55 Offsite Woods B 0.890 70 Offsite Woods C 22.510 77 Offsite Woods D 3.530 80 Offsite Open D 56.960 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 415 0.0720 4.3 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 1,205 0.0380 4.9 19.65 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.0 945 0.0060 5.3 399.05 Channel Flow, Area= 75.0 sf Perim= 25.0' r= 3.00' n= 0.045 2.5 533 0.0020 3.6 534.69 Channel Flow, Area= 150.0 sf Perim= 40.0' r= 3.75' n= 0.045 23.6 3,173 Total Subcatchment 2S: TO DP #3 Runoff = 9.34 cfs @ 12.18 hrs, Volume= 0.953 af, Depth> 0.62" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 11.900 55 Onsite Woods B 4.010 70 Onsite Woods C 2.050 77 Onsite Woods D 0.630 80 Onsite Open D 18.590 62 Weighted Average 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 16 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 374 0.0530 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.0 440 0.0780 7.0 28.15 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 5.9 1,388 0.0080 3.9 78.72 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 21.0 2,277 Total Subcatchment 3S: TO WQ #2 Runoff = 175.88 cfs @ 11.96 hrs, Volume= 8.176 af, Depth= 1.86" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 25.640 98 Impervious 15.030 74 >75% Grass cover, Good, HSG C 12.120 61 >75% Grass cover. Good. HSG B 52.790 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: TO WQ #1 Runoff = 66.74 cfs @ 11.96 hrs, Volume= 3.087 af, Depth= 1.43" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 10.570 98 Impervious 14.150 61 >75% Grass cover, Good, HSG B 1.180 74 >75% Grass cover, Good, HSG C 25.900 77 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 17 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Subcatchment 7S: TO DP #5 Runoff = 80.03 cfs @ 12.26 hrs, Volume= 8.211 af, Depth> 1.06" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 9.950 55 Onsite Woods B 0.000 70 Onsite Woods C 10.600 77 Onsite Woods D 0.700 61 Onsite Open B 0.000 74 Onsite Open C 9.880 80 Onsite Open D 8.410 55 Offsite Woods B 27.310 70 Offsite Woods C 7.570 77 Offsite Woods D 0.330 61 Offsite Open B 10.370 74 Offsite Open C 7.520 80 Offsite Open D 92.640 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 354 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 600 0.0400 5.0 20.16 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.2 341 0.0260 4.8 28.83 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 4.3 1,310 0.0210 5.1 60.85 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 3.5 934 0.0100 4.4 88.02 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 29.0 3,614 Total Subcatchment 8S: TO DP #6 Runoff = 68.94 cfs @ 12.21 hrs, Volume= 6.541 af, Depth> 1.01" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 2 -Year Rainfall= 3.50" 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 18 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Area (ac) CN Description 4.370 55 Onsite Woods D 1.550 70 Onsite Woods C 12.050 55 Offsite Woods B 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D 1.000 61 Offsite Open B 2.520 74 Offsite Open C 5.030 80 Offsite Open D 77.860 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 425 0.0470 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.7 970 0.0160 4.4 53.12 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 25.3 2,455 Total Subcatchment 10S: TO WQ #3 POST Runoff = 12.32 cfs @ 11.96 hrs, Volume= 0.582 af, Depth= 2.18" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 1.450 74 Onsite Open Space HSG 'C' 1.750 98 Onsite Impervious 3.200 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: TO WQ #4 Runoff = 8.84 cfs @ 11.96 hrs, Volume= 0.410 af, Depth= 1.78" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 0.970 98 Impervious 1.790 74 >75% Grass cover, Good, HSG C 2.760 82 Weighted Average 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 19 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 15S: TO DP #4 Runoff = 15.85 cfs @ 12.11 hrs, Volume= 1.166 af, Depth= 1.06" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 3.470 55 Onsite Woods B 9.680 77 Onsite Woods D 13.150 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 0.0 14.5 75 0.0270 0.1 0.7 Sheet Flow, 1,663 0.43 3.00 40.5 21.0 Woods: Light underbrush n= 0.400 P2= 3.50" 1.0 268 0.0820 4.6 691,125 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 163 0.0740 6.9 27.42 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.3 663 0.0410 8.2 123.34 Channel Flow, Area= 15.0 sf Perim= 11.0' r= 1.36' n= 0.045 17.2 1,169 Total Reach 4R: DP #4,5, &6 REACH Inflow Area = 186.410 ac, Inflow Depth > 1.04" for 2 -Year event Inflow = 159.92 cfs @ 12.22 hrs, Volume= 16.186 of Outflow = 133.84 cfs @ 12.50 hrs, Volume= 16.144 af, Atten= 16 %, Lag= 16.6 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 4.6 fps, Min. Travel Time= 8.7 min Avg. Velocity = 2.9 fps, Avg. Travel Time= 13.6 min Peak Depth= 2.20'@ 12.35 hrs Capacity at bank full= 1,201.80 cfs Inlet Invert= 366.00', Outlet Invert= 347.00' Custom cross - section table, n= 0.045 Length= 2,375.0' Slope= 0.00807' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.7 7.5 1,663 0.43 3.00 40.5 21.0 96,188 185.34 6.00 291.0 176.0 691,125 1,201.80 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 20 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 360.47' @ 13.32 hrs Surf.Area= 32,167 sf Storage= 71,752 cf Plug -Flow detention time= 292.3 min calculated for 1.885 of (61 % of inflow) Center -of -Mass det. time= 171.2 min ( 1,014.4 - 843.2 ) Volume Invert #1 358.00' Mv01 e Description 267,675 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Pond 1 PA: WQ #1 Inflow Area = 25.900 ac, Inflow Depth = 1.43" for 2 -Year event Inflow = 66.74 cfs @ 11.96 hrs, Volume= 3.087 of Outflow = 3.28 cfs @ 13.32 hrs, Volume= 1.885 af, Atten= 95 %, Lag= 81.5 min Primary = 3.28 cfs @ 13.32 hrs, Volume= 1.885 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 360.47' @ 13.32 hrs Surf.Area= 32,167 sf Storage= 71,752 cf Plug -Flow detention time= 292.3 min calculated for 1.885 of (61 % of inflow) Center -of -Mass det. time= 171.2 min ( 1,014.4 - 843.2 ) Volume Invert #1 358.00' Mv01 e Description 267,675 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 358.00 22,700 0 0 358.50 27,300 12,500 12,500 360.00 31,600 44,175 56,675 362.00 34,000 65,600 122,275 364.00 36,300 70,300 192,575 366.00 38,800 75,100 267,675 Device Routing Invert Outlet Devices #1 Primary 354.50' 36.0" x 80.0' long Culvert RCP, groove end w /headwall, Ke= 0.200 Outlet Invert= 353.70' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 358.00' 3.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 359.60' 15.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 362.30' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #5 Primary 363.00' 52.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =3.28 cfs @ 13.32 hrs HW= 360.47' (Free Discharge) = Culvert (Passes 3.28 cfs of 82.57 cfs potential flow) 2= Orifice /Grate (Orifice Controls 0.37 cfs @ 7.6 fps) 3= Orifice /Grate (Orifice Controls 2.91 cfs @ 3.2 fps) 4= Orifice /Grate ( Controls 0.00 cfs) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 373.66' @ 12.94 hrs Surf.Area= 77,476 sf Storage= 196,244 cf Plug -Flow detention time= 283.9 min calculated for 5.331 of (65% of inflow) Center -of -Mass det. time= 174.7 min ( 999.4 - 824.7 ) Pond 2PA: WQ #2 Inflow Area = 52.790 ac, Inflow Depth = 1.86" for 2 -Year event Inflow = 175.88 cfs @ 11.96 hrs, Volume= 8.176 of Outflow = 9.80 cfs @ 12.94 hrs, Volume= 5.331 af, Atten= 94 %, Lag= 59.2 min Primary = 9.80 cfs @ 12.94 hrs, Volume= 5.331 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 373.66' @ 12.94 hrs Surf.Area= 77,476 sf Storage= 196,244 cf Plug -Flow detention time= 283.9 min calculated for 5.331 of (65% of inflow) Center -of -Mass det. time= 174.7 min ( 999.4 - 824.7 ) 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 21 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Volume Invert Avail.Storage Storage Description #1 371.00' 711,664 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 371.00 64,559 0 0 371.50 71,505 34,016 34,016 373.00 76,669 111,131 145,147 380.00 85,193 566,517 711,664 Device Routing Invert Outlet Devices #1 Primary 367.00' 36.0" x 92.0' long Culvert RCP, square edge headwall, Ke= 0.500 8,249 14,646 Outlet Invert= 366.00' S= 0.01097' Cc= 0.900 n= 0.013 #2 Device 1 371.00' 4.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 372.40' 2.00'W x 2.00' H Vert. Orifice /Grate C= 0.600 #4 Device 1 375.30' 60.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #5 Primary 376.10' 60.0' long x 15.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =9.80 cfs @ 12.94 hrs HW= 373.66' (Free Discharge) 1= Culvert (Passes 9.80 cfs of 77.33 cfs potential flow) �2= Orifice /Grate (Orifice Controls 0.69 cfs @ 7.9 fps) 3= Orifice /Grate (Orifice Controls 9.11 cfs @ 3.6 fps) 4=Orifice/G rate ( Controls 0.00 cfs) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 405.35' @ 13.00 hrs Surf.Area= 5,823 sf Storage= 14,720 cf Plug -Flow detention time= 304.1 min calculated for 0.319 of (55% of inflow) Center -of -Mass det. time= 191.6 min ( 1,002.8 - 811.1 ) Volume Invert Avail.Storage Storage Pond 3P: WQ #3 Inflow Area = 3.200 ac, Inflow Depth = 2.18" for 2 -Year event Inflow = 12.32 cfs @ 11.96 hrs, Volume= 0.582 of Outflow = 0.62 cfs @ 13.00 hrs, Volume= 0.319 af, Atten= 95 %, Lag= 63.0 min Primary = 0.62 cfs @ 13.00 hrs, Volume= 0.319 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 405.35' @ 13.00 hrs Surf.Area= 5,823 sf Storage= 14,720 cf Plug -Flow detention time= 304.1 min calculated for 0.319 of (55% of inflow) Center -of -Mass det. time= 191.6 min ( 1,002.8 - 811.1 ) Volume Invert Avail.Storage Storage Description #1 402.00' 51,309 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 402.00 3,033 0 0 404.00 4,642 7,675 7,675 406.00 6,397 11,039 18,714 408.00 8,249 14,646 33,360 410.00 9,700 17,949 51,309 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 22 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Device Routing Invert Outlet Devices #1 Primary 402.00' 18.0" x 56.0' long Culvert RCP, square edge headwall, Ke= 0.500 8.84 cfs @ 11.96 hrs, Volume= 0.410 of Outlet Invert= 401.40' S= 0.01077' Cc= 0.900 n= 0.013 #2 Device 1 402.00' 2.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 405.00' 10.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.62 cfs @ 13.00 hrs HW= 405.35' (Free Discharge) L1= Culvert (Passes 0.62 cfs of 13.71 cfs potential flow) �2=Orifice/G rate (Orifice Controls 0.19 cfs @ 8.8 fps) 3= Orifice /Grate (Orifice Controls 0.43 cfs @ 2.0 fps) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 382.03' @ 12.72 hrs Surf.Area= 10,199 sf Storage= 9,456 cf Plug -Flow detention time= 264.9 min calculated for 0.268 of (65% of inflow) Center -of -Mass det. time= 155.7 min ( 983.6 - 827.9 ) Volume Invert Avail.Storage Storage Description Pond 7P: WQ #4 Inflow Area = 2.760 ac, Inflow Depth = 1.78" for 2 -Year event Inflow = 8.84 cfs @ 11.96 hrs, Volume= 0.410 of Outflow = 0.58 cfs @ 12.72 hrs, Volume= 0.268 af, Atten= 93 %, Lag= 45.4 min Primary = 0.58 cfs @ 12.72 hrs, Volume= 0.268 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 382.03' @ 12.72 hrs Surf.Area= 10,199 sf Storage= 9,456 cf Plug -Flow detention time= 264.9 min calculated for 0.268 of (65% of inflow) Center -of -Mass det. time= 155.7 min ( 983.6 - 827.9 ) Volume Invert Avail.Storage Storage Description #1 381.00' 60,973 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 381.00 7,552 0 0 381.50 9,526 4,270 4,270 382.00 10,164 4,923 9,192 384.00 12,880 23,044 32,236 386.00 15,857 28,737 60,973 Device Routing Invert Outlet Devices #1 Primary 376.00' 18.0" x 66.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 375.20' S= 0.0121 T Cc= 0.900 n= 0.013 #2 Device 1 381.00' 1.5" Vert. Orifice /Grate C= 0.600 #3 Device 1 381.60' 8.0" Vert. Orifice /Grate C= 0.600 #4 Primary 383.30' 48.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =0.58 cfs @ 12.72 hrs HW= 382.03' (Free Discharge) Culvert (Passes 0.58 cfs of 19.54 cfs potential flow) 2 =Orifice /Grate (Orifice Controls 0.06 cfs @ 4.7 fps) 3= Orifice /Grate (Orifice Controls 0.52 cfs @ 2.2 fps) 4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) 1121 - POST DEVELOPMENT - DP #1 Type 11 24-hr 2-Year Rainfall= 3.50" Prepared by {enter your company name here} Page 23 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Link 3L: DP #1 Inflow Area = 755.420 ac, Inflow Depth > 1.12" for 2 -Year event Inflow = 463.04 cfs @ 12.36 hrs, Volume= 70.206 of Primary = 463.04 cfs @ 12.36 hrs, Volume= 70.206 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 6L: DP #7 POST Inflow Area = 3.200 ac, Inflow Depth > 1.19" for 2 -Year event Inflow = 0.62 cfs @ 13.00 hrs, Volume= 0.319 of Primary = 0.62 cfs @ 13.00 hrs, Volume= 0.319 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 10L: DP #2 Inflow Area = 414.770 ac, Inflow Depth > 1.17" for 2 -Year event Inflow = 300.95 cfs @ 12.29 hrs, Volume= 40.571 of Primary = 300.95 cfs @ 12.29 hrs, Volume= 40.571 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 2 -Year Primary Outflow Imported from 1121 - POST DEVELOPMENT - DP #2-Link 10L Link 11 L: DP #3 Inflow Area = 257.790 ac, Inflow Depth > 1.04" for 2 -Year event Inflow = 147.25 cfs @ 12.49 hrs, Volume= 22.429 of Primary = 147.25 cfs @ 12.49 hrs, Volume= 22.429 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 13L: DP #5 Inflow Area = 173.260 ac, Inflow Depth > 1.04" for 2 -Year event Inflow = 148.23 cfs @ 12.23 hrs, Volume= 15.021 of Primary = 148.23 cfs @ 12.23 hrs, Volume= 15.021 af, Atten= 0 %, Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Lag= 0.0 min 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 24 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 RunoffArea= 56.960 ac Runoff Depth >2.28" Flow Length= 3,173' Tc =23.6 min CN =72 Runoff = 128.72 cfs 10.799 of Subcatchment 2S: TO DP #3 Runoff Area= 18.590 ac Runoff Depth >1.50" Flow Length= 2,277' Tc =21.0 min CN =62 Runoff =27.83 cfs 2.324 of Subcatchment 3S: TO WQ #2 Runoff Area = 52.790 ac Runoff Depth= 3.26" Tc =5.0 min CN =83 Runoff = 302.90 cfs 14.362 of Subcatchment 4S: TO WQ #1 RunoffArea= 25.900 ac Runoff Depth= 2.71" Tc =5.0 min CN =77 Runoff= 125.68 cfs 5.842 of Subcatchment 7S: TO DP #5 Runoff Area = 92.640 ac Runoff Depth >2.19" Flow Length= 3,614' Tc =29.0 min CN =71 Runoff = 176.00 cfs 16.924 of Subcatchment 8S: TO DP #6 RunoffArea= 77.860 ac Runoff Depth >2.11" Flow Length= 2,455' Tc =25.3 min CN =70 Runoff= 154.90 cfs 13.695 of Subcatchment 10S: TO WQ #3 POST Runoff Area =3.200 ac Runoff Depth= 3.66" Tc =5.0 min CN =87 Runoff =20.13 cfs 0.976 of Subcatchment 11S: TO WQ #4 RunoffArea =2.760 ac Runoff Depth= 3.17" Tc =5.0 min CN =82 Runoff =15.44 cfs 0.729 of Subcatchment 15S: TO DP #4 Runoff Area = 13.150 ac Runoff Depth= 2.19" Flow Length= 1,169' Tc =17.2 min CN =71 Runoff =34.31 cfs 2.402 of Reach 4R: DP #4,5, &6 REACH Peak Depth =3.32' Max Vet =4.6 fps Inflow= 355.83 cfs 33.600 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow= 293.20 cfs 33.553 of Pond 1 PA: WQ #1 Peak Elev= 362.27' Storage= 131.430 cf Inflow= 125.68 cfs 5.842 of Outflow =8.93 cfs 4.564 of Pond 2PA: WQ #2 Peak Elev= 375.39' Storage= 331.602 cf Inflow= 302.90 cfs 14.362 of Outflow =29.15 cfs 11.298 of Pond 3P: WQ #3 Peak EIev= 406.45' Storage= 21.679 cf Inflow =20.13 cfs 0.976 of Outflow =2.89 cfs 0.692 of Pond 7P: WQ #4 Peak EIev= 382.68' Storage= 16.409 cf Inflow =15.44 cfs 0.729 of Outflow =1.53 cfs 0.579 of Link 3L: DP #1 Inflow= 1,052.03 cfs 143.708 of Primary= 1,052.03 cfs 143.708 of 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 25 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Link 6L: DP #7 POST Inflow =2.89 cfs 0.692 of Primary=2.89 cfs 0.692 of 10 -Year Primary Outflow Imported from 1121 - POST DEVELOPMENT - DP#2 —Link 10L Inflow= 674.01 cfs 81.170 of Primary= 674.01 cfs 81.170 of Link 11L: DP #3 Link 13L: DP #5 I nflow= 332.56 cfs 47.175 of Primary= 332.56 cfs 47.175 of I nflow= 330.68 cfs 31.198 of Primary= 330.68 cfs 31.198 of Total Runoff Area = 343.850 ac Runoff Volume = 68.055 of Average Runoff Depth = 2.38" 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 26 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Subcatchment 1S: TO DP #1 Runoff = 128.72 cfs @ 12.17 hrs, Volume= 10.799 af, Depth> 2.28" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 9.420 55 Onsite Woods B 7.960 70 Onsite Woods C 11.290 77 Onsite Woods D 1.360 55 Offsite Woods B 0.890 70 Offsite Woods C 22.510 77 Offsite Woods D 3.530 80 Offsite Open D 56.960 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 415 0.0720 4.3 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 1,205 0.0380 4.9 19.65 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.0 945 0.0060 5.3 399.05 Channel Flow, Area= 75.0 sf Perim= 25.0' r= 3.00' n= 0.045 2.5 533 0.0020 3.6 534.69 Channel Flow, Area= 150.0 sf Perim= 40.0' r= 3.75' n= 0.045 23.6 3,173 Total Subcatchment 2S: TO DP #3 Runoff = 27.83 cfs @ 12.16 hrs, Volume= 2.324 af, Depth> 1.50" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 11.900 55 Onsite Woods B 4.010 70 Onsite Woods C 2.050 77 Onsite Woods D 0.630 80 Onsite Open D 18.590 62 Weighted Average 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 27 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 374 0.0530 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.0 440 0.0780 7.0 28.15 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 5.9 1,388 0.0080 3.9 78.72 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 21.0 2,277 Total Subcatchment 3S: TO WQ #2 Runoff = 302.90 cfs @ 11.95 hrs, Volume= 14.362 af, Depth= 3.26" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 25.640 98 Impervious 15.030 74 >75% Grass cover, Good, HSG C 12.120 61 >75% Grass cover. Good. HSG B 52.790 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: TO WQ #1 Runoff = 125.68 cfs @ 11.96 hrs, Volume= 5.842 af, Depth= 2.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 10.570 98 Impervious 14.150 61 >75% Grass cover, Good, HSG B 1.180 74 >75% Grass cover, Good, HSG C 25.900 77 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 28 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Subcatchment 7S: TO DP #5 Runoff = 176.00 cfs @ 12.24 hrs, Volume= 16.924 af, Depth> 2.19" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 9.950 55 Onsite Woods B 0.000 70 Onsite Woods C 10.600 77 Onsite Woods D 0.700 61 Onsite Open B 0.000 74 Onsite Open C 9.880 80 Onsite Open D 8.410 55 Offsite Woods B 27.310 70 Offsite Woods C 7.570 77 Offsite Woods D 0.330 61 Offsite Open B 10.370 74 Offsite Open C 7.520 80 Offsite Open D 92.640 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 354 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 600 0.0400 5.0 20.16 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.2 341 0.0260 4.8 28.83 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 4.3 1,310 0.0210 5.1 60.85 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 3.5 934 0.0100 4.4 88.02 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 29.0 3,614 Total Subcatchment 8S: TO DP #6 Runoff = 154.90 cfs @ 12.20 hrs, Volume= 13.695 af, Depth> 2.11" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 10 -Year Rainfall = 5.10" 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 29 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Area (ac) CN Description 4.370 55 Onsite Woods D 1.550 70 Onsite Woods C 12.050 55 Offsite Woods B 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D 1.000 61 Offsite Open B 2.520 74 Offsite Open C 5.030 80 Offsite Open D 77.860 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 425 0.0470 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.7 970 0.0160 4.4 53.12 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 25.3 2,455 Total Subcatchment 10S: TO WQ #3 POST Runoff = 20.13 cfs @ 11.95 hrs, Volume= 0.976 af, Depth= 3.66" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 1.450 74 Onsite Open Space HSG 'C' 1.750 98 Onsite Impervious 3.200 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: TO WQ #4 Runoff = 15.44 cfs @ 11.96 hrs, Volume= 0.729 af, Depth= 3.17" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 0.970 98 Impervious 1.790 74 >75% Grass cover, Good, HSG C 2.760 82 Weighted Average 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 30 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 15S: TO DP #4 Runoff = 34.31 cfs @ 12.10 hrs, Volume= 2.402 af, Depth= 2.19" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 3.470 55 Onsite Woods B 9.680 77 Onsite Woods D 13.150 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 0.0 14.5 75 0.0270 0.1 0.7 Sheet Flow, 1,663 0.43 3.00 40.5 21.0 Woods: Light underbrush n= 0.400 P2= 3.50" 1.0 268 0.0820 4.6 691,125 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 163 0.0740 6.9 27.42 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.3 663 0.0410 8.2 123.34 Channel Flow, Area= 15.0 sf Perim= 11.0' r= 1.36' n= 0.045 17.2 1,169 Total Reach 4R: DP #4,5, &6 REACH Inflow Area = 186.410 ac, Inflow Depth > 2.16" for 10 -Year event Inflow = 355.83 cfs @ 12.21 hrs, Volume= 33.600 of Outflow = 293.20 cfs @ 12.49 hrs, Volume= 33.553 af, Atten= 18 %, Lag= 16.7 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 4.6 fps, Min. Travel Time= 8.7 min Avg. Velocity = 3.1 fps, Avg. Travel Time= 12.6 min Peak Depth= 3.32'@ 12.34 hrs Capacity at bank full= 1,201.80 cfs Inlet Invert= 366.00', Outlet Invert= 347.00' Custom cross - section table, n= 0.045 Length= 2,375.0' Slope= 0.00807' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.7 7.5 1,663 0.43 3.00 40.5 21.0 96,188 185.34 6.00 291.0 176.0 691,125 1,201.80 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 31 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Pond 1 PA: WQ #1 Inflow Area = 25.900 ac, Inflow Depth = 2.71" for 10 -Year event Inflow = 125.68 cfs @ 11.96 hrs, Volume= 5.842 of Outflow = 8.93 cfs @ 12.60 hrs, Volume= 4.564 af, Atten= 93 %, Lag= 38.6 min Primary = 8.93 cfs @ 12.60 hrs, Volume= 4.564 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 362.27' @ 12.60 hrs Surf.Area= 34,308 sf Storage= 131,430 cf Plug -Flow detention time= 230.6 min calculated for 4.564 of (78% of inflow) Center -of -Mass det. time= 142.4 min ( 967.1 - 824.7 ) Volume Invert #1 358.00' Mv01 e Description 267,675 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 358.00 22,700 0 0 358.50 27,300 12,500 12,500 360.00 31,600 44,175 56,675 362.00 34,000 65,600 122,275 364.00 36,300 70,300 192,575 366.00 38,800 75,100 267,675 Device Routing Invert Outlet Devices #1 Primary 354.50' 36.0" x 80.0' long Culvert RCP, groove end w /headwall, Ke= 0.200 Outlet Invert= 353.70' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 358.00' 3.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 359.60' 15.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 362.30' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #5 Primary 363.00' 52.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =8.93 cfs @ 12.60 hrs HW= 362.27' (Free Discharge) = Culvert (Passes 8.93 cfs of 100.31 cfs potential flow) 2= Orifice /Grate (Orifice Controls 0.49 cfs @ 9.9 fps) 3= Orifice /Grate (Orifice Controls 8.45 cfs @ 6.9 fps) 4= Orifice /Grate ( Controls 0.00 cfs) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 375.39' @ 12.41 hrs Surf.Area= 79,575 sf Storage= 331,602 cf Plug -Flow detention time= 223.7 min calculated for 11.276 of (79% of inflow) Center -of -Mass det. time= 139.7 min ( 948.3 - 808.6 ) Pond 2PA: WQ #2 Inflow Area = 52.790 ac, Inflow Depth= 3.26" for 10 -Year event Inflow = 302.90 cfs @ 11.95 hrs, Volume= 14.362 of Outflow = 29.15 cfs @ 12.41 hrs, Volume= 11.298 af, Atten= 90 %, Lag= 27.0 min Primary = 29.15 cfs @ 12.41 hrs, Volume= 11.298 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 375.39' @ 12.41 hrs Surf.Area= 79,575 sf Storage= 331,602 cf Plug -Flow detention time= 223.7 min calculated for 11.276 of (79% of inflow) Center -of -Mass det. time= 139.7 min ( 948.3 - 808.6 ) 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 32 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Volume Invert Avail.Storage Storage Description #1 371.00' 711,664 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 371.00 64,559 0 0 371.50 71,505 34,016 34,016 373.00 76,669 111,131 145,147 380.00 85,193 566,517 711,664 Device Routing Invert Outlet Devices #1 Primary 367.00' 36.0" x 92.0' long Culvert RCP, square edge headwall, Ke= 0.500 8,249 14,646 Outlet Invert= 366.00' S= 0.01097' Cc= 0.900 n= 0.013 #2 Device 1 371.00' 4.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 372.40' 2.00'W x 2.00' H Vert. Orifice /Grate C= 0.600 #4 Device 1 375.30' 60.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #5 Primary 376.10' 60.0' long x 15.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =29.03 cfs @ 12.41 hrs HW= 375.39' (Free Discharge) 1= Culvert (Passes 29.03 cfs of 89.31 cfs potential flow) �2= Orifice /Grate (Orifice Controls 0.88 cfs @ 10.1 fps) 3= Orifice /Grate (Orifice Controls 26.84 cfs @ 6.7 fps) 4=Orifice/G rate (Weir Controls 1.31 cfs @ 1.0 fps) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 406.45' @ 12.17 hrs Surf.Area= 6,813 sf Storage= 21,679 cf Plug -Flow detention time= 200.2 min calculated for 0.691 of (71 % of inflow) Center -of -Mass det. time= 105.2 min ( 901.7 - 796.4 ) Volume Invert Avail.Storage Storage Pond 3P: WQ #3 Inflow Area = 3.200 ac, Inflow Depth= 3.66" for 10 -Year event Inflow = 20.13 cfs @ 11.95 hrs, Volume= 0.976 of Outflow = 2.89 cfs @ 12.17 hrs, Volume= 0.692 af, Atten= 86 %, Lag= 13.2 min Primary = 2.89 cfs @ 12.17 hrs, Volume= 0.692 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 406.45' @ 12.17 hrs Surf.Area= 6,813 sf Storage= 21,679 cf Plug -Flow detention time= 200.2 min calculated for 0.691 of (71 % of inflow) Center -of -Mass det. time= 105.2 min ( 901.7 - 796.4 ) Volume Invert Avail.Storage Storage Description #1 402.00' 51,309 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 402.00 3,033 0 0 404.00 4,642 7,675 7,675 406.00 6,397 11,039 18,714 408.00 8,249 14,646 33,360 410.00 9,700 17,949 51,309 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 33 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Device Routing Invert Outlet Devices #1 Primary 402.00' 18.0" x 56.0' long Culvert RCP, square edge headwall, Ke= 0.500 15.44 cfs @ 11.96 hrs, Volume= 0.729 of Outlet Invert= 401.40' S= 0.01077' Cc= 0.900 n= 0.013 #2 Device 1 402.00' 2.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 405.00' 10.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =2.89 cfs @ 12.17 hrs HW= 406.45' (Free Discharge) 't--1 =Culvert (Passes 2.89 cfs of 16.36 cfs potential flow) �2=Orifice/G rate (Orifice Controls 0.22 cfs @ 10.2 fps) 3= Orifice /Grate (Orifice Controls 2.66 cfs @ 4.9 fps) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 382.68' @ 12.39 hrs Surf.Area= 11,086 sf Storage= 16,409 cf Plug -Flow detention time= 205.9 min calculated for 0.578 of (79% of inflow) Center -of -Mass det. time= 123.3 min ( 934.7 - 811.5 ) Volume Invert Avail.Storage Storage Description Pond 7P: WQ #4 Inflow Area = 2.760 ac, Inflow Depth= 3.17" for 10 -Year event Inflow = 15.44 cfs @ 11.96 hrs, Volume= 0.729 of Outflow = 1.53 cfs @ 12.39 hrs, Volume= 0.579 af, Atten= 90 %, Lag= 26.3 min Primary = 1.53 cfs @ 12.39 hrs, Volume= 0.579 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 382.68' @ 12.39 hrs Surf.Area= 11,086 sf Storage= 16,409 cf Plug -Flow detention time= 205.9 min calculated for 0.578 of (79% of inflow) Center -of -Mass det. time= 123.3 min ( 934.7 - 811.5 ) Volume Invert Avail.Storage Storage Description #1 381.00' 60,973 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 381.00 7,552 0 0 381.50 9,526 4,270 4,270 382.00 10,164 4,923 9,192 384.00 12,880 23,044 32,236 386.00 15,857 28,737 60,973 Device Routing Invert Outlet Devices #1 Primary 376.00' 18.0" x 66.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 375.20' S= 0.0121 T Cc= 0.900 n= 0.013 #2 Device 1 381.00' 1.5" Vert. Orifice /Grate C= 0.600 #3 Device 1 381.60' 8.0" Vert. Orifice /Grate C= 0.600 #4 Primary 383.30' 48.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max =1.53 cfs @ 12.39 hrs HW= 382.68' (Free Discharge) Culvert (Passes 1.53 cfs of 20.72 cfs potential flow) 2 =Orifice /Grate (Orifice Controls 0.08 cfs @ 6.1 fps) 3= Orifice /Grate (Orifice Controls 1.45 cfs @ 4.2 fps) 4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 34 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Link 3L: DP #1 Inflow Area = 755.420 ac, Inflow Depth > 2.28" for 10 -Year event Inflow = 1,052.03 cfs @ 12.34 hrs, Volume= 143.708 of Primary = 1,052.03 cfs @ 12.34 hrs, Volume= 143.708 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 6L: DP #7 POST Inflow Area = 3.200 ac, Inflow Depth > 2.60" for 10 -Year event Inflow = 2.89 cfs @ 12.17 hrs, Volume= 0.692 of Primary = 2.89 cfs @ 12.17 hrs, Volume= 0.692 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 10L: DP #2 Inflow Area = 414.770 ac, Inflow Depth > 2.35" for 10 -Year event Inflow = 674.01 cfs @ 12.29 hrs, Volume= 81.170 of Primary = 674.01 cfs @ 12.29 hrs, Volume= 81.170 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 10 -Year Primary Outflow Imported from 1121 - POST DEVELOPMENT - DP #2-Link 10L Link 11 L: DP #3 Inflow Area = 257.790 ac, Inflow Depth > 2.20" for 10 -Year event Inflow = 332.56 cfs @ 12.48 hrs, Volume= 47.175 of Primary = 332.56 cfs @ 12.48 hrs, Volume= 47.175 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 13L: DP #5 Inflow Area = 173.260 ac, Inflow Depth > 2.16" for 10 -Year event Inflow = 330.68 cfs @ 12.22 hrs, Volume= 31.198 of Primary = 330.68 cfs @ 12.22 hrs, Volume= 31.198 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs HydroCAD 100 -Year Analysis (Clogged Orifices) 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 100 -Year Rainfall = 7.40" Prepared by {enter your company name here} Page 2 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 3S: TO WQ #2 Runoff Area = 52.790 ac Runoff Depth = 5.41" Tc =5.0 min CN =83 Runoff = 488.21 cfs 23.783 of Subcatchment 4S: TO WQ #1 Runoff Area = 25.900 ac Runoff Depth= 4.73" Tc =5.0 min CN =77 Runoff = 215.24 cfs 10.202 of Subcatchment 10S: TO WQ #3 POST Runoff Area =3.200 ac Runoff Depth = 5.87" Tc =5.0 min CN =87 Runoff =31.32 cfs 1.564 of Subcatchment 11S: TO WQ #4 Runoff Area =2.760 ac Runoff Depth = 5.29" Tc =5.0 min CN =82 Runoff =25.12 cfs 1.217 of Pond 1 PA: WQ #1 Peak Elev= 363.89' Storage= 188,638 cf Inflow= 215.24 cfs 10.202 of Outflow= 194.00 cfs 10.172 of Pond 2PA: WQ #2 Peak Elev= 377.58' Storage= 509,439 cf Inflow= 488.21 cfs 23.783 of Outflow= 388.65 cfs 23.629 of Pond 3P: WQ #3 Peak EIev= 407.44' Storage= 28,855 cf Inflow =31.32 cfs 1.564 of Outflow =29.80 cfs 1.564 of Pond 7P: WQ #4 Peak EIev= 383.63' Storage= 27,594 cf Inflow =25.12 cfs 1.217 of Outflow =23.37 cfs 1.217 of Total Runoff Area = 84.650 ac Runoff Volume = 36.767 of Average Runoff Depth = 5.21" 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 100 -Year Rainfall = 7.40" Prepared by {enter your company name here} Page 3 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Subcatchment 3S: TO WQ #2 Runoff = 488.21 cfs @ 11.95 hrs, Volume= 23.783 af, Depth= 5.41" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall= 7.40" Area (ac) CN Description 25.640 98 Impervious 15.030 74 >75% Grass cover, Good, HSG C 12.120 61 >75% Grass cover, Good, HSG B 52.790 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: TO WQ #1 Runoff = 215.24 cfs @ 11.95 hrs, Volume= 10.202 af, Depth= 4.73" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall= 7.40" Area (ac) CN Description 10.570 98 Impervious 14.150 61 >75% Grass cover, Good, HSG B 1.180 74 >75% Grass cover, Good, HSG C 25.900 77 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: TO WQ #3 POST Runoff = 31.32 cfs @ 11.95 hrs, Volume= 1.564 af, Depth= 5.87" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall= 7.40" Area (ac) CN Description 1.450 74 Onsite Open Space HSG 'C' 1.750 98 Onsite Impervious 3.200 87 Weighted Average 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 100 -Year Rainfall = 7.40" Prepared by {enter your company name here} Page 4 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 11 S: TO WQ #4 Runoff = 25.12 cfs @ 11.95 hrs, Volume= 1.217 af, Depth= 5.29" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall= 7.40" Area (ac) CN Description 0.970 98 Impervious 1.790 74 >75% Grass cover, Good, HSG C 2.760 82 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft /ft) (ft/sec) (cfs) 5.0 Direct Entry, Pond 1 PA: WQ #1 Inflow Area = 25.900 ac, Inflow Depth= 4.73" for 100 -Year event Inflow = 215.24 cfs @ 11.95 hrs, Volume= 10.202 of Outflow = 194.00 cfs @ 11.99 hrs, Volume= 10.172 af, Atten= 10 %, Lag= 2.1 min Primary = 194.00 cfs @ 11.99 hrs, Volume= 10.172 of Routing by St - thod, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Starting Elev ' Surf.Area= 34,345 sf Storage= 132,527 cf Peak Elev= 363.89' @ 11.99 hrs Surf.Area= 36,175 sf Storage= 188,638 cf (56,111 cf above start) Plug -Flow detention time= 172.5 min calculated for 7.115 of (70% of inflow) Center -of -Mass det. time= 16.5 min ( 825.3 - 808.8 ) Volume Invert Avail.Storage Storage Description #1 358.00' 267,675 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 358.00 22,700 0 0 358.50 27,300 12,500 12,500 360.00 31,600 44,175 56,675 362.00 34,000 65,600 122,275 364.00 36,300 70,300 192,575 366.00 38,800 75,100 267,675 Device Routing Invert Outlet Devices #1 Primary 354.50' 36.0" x 80.0' long Culvert RCP, groove end w /headwall, Ke= 0.200 Outlet Invert= 353.70' S= 0.0100 T Cc= 0.900 n=0.013 #2 Device 1 358.00' 3.0" Horiz. Orifice /Grate Limited to weir flow C=0.600 #3 Device 1 359.60' 15.0" Vert. Orifice /Grate C= 0.600 NX #4 Device 1 362.30' 48.0" Horiz. Orifice /Grate ted to weir flow C= 0.600 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 100 -Year Rainfall = 7.40" Prepared by {enter your company name here} Page 5 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 #5 Primary 363.00' 52.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max = 189.86 cfs @ 11.99 hrs HW= 363.87' (Free Discharge) 1=Culvert (Passes 75.89 cfs of 113.85 cfs potential flow) = ri ice rate on ro s c s 3= Orifice /Grate ( Controls 0.00 cfs) 4= ri ice rate ri ice ontro s .89 cfs @ 6.0 fps) 5= Broad -Crested Rectangular Weir(Weir Controls 113.97 cfs @ 2.5 fps) Ro09EO Stothod, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs StaSurf.Area= 79,470 sf Storage= 324,706 cf Peak Elev= 377.58' @ 12.01 hrs Surf.Area= 82,252 sf Storage= 509,439 cf (184,733 cf above start) Plug -Flow detention time= 185.8 min calculated for 16.175 of (68% of inflow) Center -of -Mass det. time= 23.7 min ( 818.1 - 794.3 ) Volume Invert Avail.Storage Storage Description Pond 2PA: WQ #2 Inflow Area = 52.790 ac, Inflow Depth = 5.41" for 100 -Year event Inflow = 488.21 cfs @ 11.95 hrs, Volume= 23.783 of Outflow = 388.65 cfs @ 12.01 hrs, Volume= 23.629 af, Atten= 20 %, Lag= 3.2 min Primary = 388.65 cfs @ 12.01 hrs, Volume= 23.629 of Ro09EO Stothod, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs StaSurf.Area= 79,470 sf Storage= 324,706 cf Peak Elev= 377.58' @ 12.01 hrs Surf.Area= 82,252 sf Storage= 509,439 cf (184,733 cf above start) Plug -Flow detention time= 185.8 min calculated for 16.175 of (68% of inflow) Center -of -Mass det. time= 23.7 min ( 818.1 - 794.3 ) Volume Invert Avail.Storage Storage Description #1 371.00' 711,664 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 371.00 64,559 0 0 371.50 71,505 34,016 34,016 373.00 76,669 111,131 145,147 380.00 85,193 566,517 711,664 Device Routing Invert Outlet Devices #1 Primary 367.00' 36.0" x 92.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 366.00' S= '/' Cc= 0.900 n=0.013 #2 Device 1 371.00' 4.0" Horiz. Orifice /Grate 0.00 Limited to weir flow C=0.600 #3 Device 1 372.40' 2.00'W x 2.00'H Vert. Orifice /Grat C= 0.600 #4 Device 1 375.30' 60.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #5 Primary 376.10' 60.0' long x 15.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max = 383.38 cfs @ 12.01 hrs HW= 377.57' (Free Discharge) 11=-Culvert Inlet Controls 102.48 cfs 14.5 fps) =Orifice/Grate ontrols 0.00 c s 3= Orifice /Grate Controls 0.00 cfs 4= Orifice /Grate (Passes 102.48 cfs of 142.33 cfs potential flow) 5= Broad -Crested Rectangular Weir (Weir Controls 280.90 cfs @ 3.2 fps) 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 100 -Year Rainfall = 7.40" Prepared by {enter your company name here} Page 6 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 k9flWME thod, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Surf.Area= 7,323 sf Storage= 25,574 cf Peak Elev= 407.44' @ 11.97 hrs Surf.Area= 7,727 sf Storage= 28,855 cf (3,281 cf above start) Plug -Flow detention time= 185.3 min calculated for 0.977 of (62% of inflow) Center -of -Mass det. time= 4.0 min ( 787.3 - 783.3 ) Volume Invert Avail.Storage Storage Description #1 402.00' Pond 3P: WQ #3 Inflow Area = 3.200 ac, Inflow Depth= 5.87" for 100 -Year event Inflow = 31.32 cfs @ 11.95 hrs, Volume= 1.564 of Outflow = 29.80 cfs @ 11.97 hrs, Volume= 1.564 af, Atten= 5 %, Lag= 1.3 min Primary = 29.80 cfs @ 11.97 hrs, Volume= 1.564 of k9flWME thod, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Surf.Area= 7,323 sf Storage= 25,574 cf Peak Elev= 407.44' @ 11.97 hrs Surf.Area= 7,727 sf Storage= 28,855 cf (3,281 cf above start) Plug -Flow detention time= 185.3 min calculated for 0.977 of (62% of inflow) Center -of -Mass det. time= 4.0 min ( 787.3 - 783.3 ) Volume Invert Avail.Storage Storage Description #1 402.00' 51,309 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area 2.760 ac, Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 402.00 3,033 0 0 404.00 4,642 7,675 7,675 406.00 6,397 11,039 18,714 408.00 8,249 14,646 33,360 410.00 9,700 17,949 51,309 Device Routing Invert Outlet Devices #1 Primary 402.00' 18.0" x 56.0' long Culver KQaQ RCP, square edge headwall, Ke= 0.500 Outlet Invert= 401.40' S= 0.0107 T Cc= 0.900 n=0.013 #2 Device 1 402.00' 2.0" Horiz. Orifice /Grate Limited to weir flow C=0.600 #3 Device 1 405.00' 10.0" Vert. Orifice /Grate C= 0.600 #4 Primary 407.00' 40.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 T2= OutFlow Max =28.85 c 11.97 hrs HW= 407.43' (Free Discharge) ulvert ( Controls 0.00 cfs ri ice rate asses < .24 cfs potential flow) 3= Orifice /Grate (Passes < 3.72 cfs potential flow) 4=B road-C rested Rectangular Weir (Weir Controls 28.85 cfs @ 1.7 fps) a sac!m thod, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Surf.Area= 11,929 sf Stora ge= 23,553 cf Peak Elev= 383.63' @ 11.98 hrs Surf.Area= 12,381 sf Storage= 27,594 cf (4,042 cf above start) Plug -Flow detention time= 210.0 min calculated for 0.676 of (56% of inflow) Center -of -Mass det. time= 5.6 min ( 802.5 - 796.9 ) Pond 7P: WQ #4 Inflow Area = 2.760 ac, Inflow Depth= 5.29" for 100 -Year event Inflow = 25.12 cfs @ 11.95 hrs, Volume= 1.217 of Outflow = 23.37 cfs @ 11.98 hrs, Volume= 1.217 af, Atten= 7 %, Lag= 1.9 min Primary = 23.37 cfs @ 11.98 hrs, Volume= 1.217 of a sac!m thod, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Surf.Area= 11,929 sf Stora ge= 23,553 cf Peak Elev= 383.63' @ 11.98 hrs Surf.Area= 12,381 sf Storage= 27,594 cf (4,042 cf above start) Plug -Flow detention time= 210.0 min calculated for 0.676 of (56% of inflow) Center -of -Mass det. time= 5.6 min ( 802.5 - 796.9 ) 1121 - POST DEVELOPMENT - DP #1 Type 11 24 -hr 100 -Year Rainfall = 7.40" Prepared by {enter your company name here} Page 7 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 4/24/2012 Volume Invert Avail.Storage Storage Description #1 381.00' 60,973 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 381.00 7,552 0 0 381.50 9,526 4,270 4,270 382.00 10,164 4,923 9,192 384.00 12,880 23,044 32,236 386.00 15,857 28,737 60,973 Device Routinq Invert Outlet Devices #1 Primary 376.00' 18.0" x 66.0' long Culver X 0.00 RCP, square edge headwall, Ke= 0.500 Outlet Invert= 375.20' S= 0.0121 '/' Cc= 0.900 n= 0.013 #2 Device 1 381.00' 1.5" Vert. Orifice /Grate X 0.00 C= 0.600 #3 Device 1 381.60' 8.0" Vert. Orifice /Grate X 0.00 C= 0.600 #4 Primary 383.30' 48.0' long x 10.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Pri OutFlow MaWonro 11.98 hrs HW= 383.63' (Free Discharge) = Culvert ( Contr = ri icl rate 0 cfs) 3= Orifice /Grate ( C ontrols 0.00 cfs) 4=B road-C rested Rectangular Weir (Weir Controls 22.57 cfs @ 1.4 fps) Drainage Maps Q #1 / �''► low / 1 Iz �yrr 9 7�*i*l , � Q #2 m =!L G1N mmo . 1i 4 Im Mm w"mom]iiiu. NK v Y voo u t =00 . On =I= mim r r r BMP DRAINAGE MAP SCALE: 1" 120' 0 60 120 240 SCALE: 1"= 120' qN 3 10 ( 2.7 w� n we ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH A S S O C I A T E S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 P.O. BOX 970 HARRISON, TENNESSEE 37341 P 423.266.4990 www.horvathassociates.com NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 .......... N ,t r r r BMP DRAINAGE MAP SCALE: 1" 120' 0 60 120 240 SCALE: 1"= 120' qN 3 10 ( 2.7 w� n we ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH A S S O C I A T E S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 P.O. BOX 970 HARRISON, TENNESSEE 37341 P 423.266.4990 www.horvathassociates.com NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 BMP DRAINAGE MAP NARY E� -�NII PR OR FOR oN .0"s DRAWN BY: CHECKED BY: MLJ RH/TS DATE FEBRUARY 22, 2012 SCALE 1 "= 120' PROJECT NO. 1121 SHEET NO. BMPI <CONSTRUCTION DRAWINGS> 0 rn rn rl000 J cn < ® ~ oe 0 LLJ 0 7- mu I3e 0 m Lu Lu 9<0 �mZ C LU < 2z c fie 0 BMP DRAINAGE MAP NARY E� -�NII PR OR FOR oN .0"s DRAWN BY: CHECKED BY: MLJ RH/TS DATE FEBRUARY 22, 2012 SCALE 1 "= 120' PROJECT NO. 1121 SHEET NO. BMPI <CONSTRUCTION DRAWINGS> ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ HOIRVATH A S S O C I A T E S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 P.O. BOX 970 HARRISON, TENNESSEE 37341 P 423.266.4990 www.horvathassociates.com NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 PARTIAL GRADING & DRAINAGE PLAN - PHASE 1 ,•,'�.� N, c�, Rai "'' -. oFess P- c R 'N :.� DRAWN BY: CHECKED BY: FS RH/TS DATE APRIL 25, 2012 SCALE AS NOTED PROJECT NO. 1121 SHEET NO. 0401 ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED <CONSTRUCTION DRAWINGS> V) ry 0 rn rn rl000 J cn < ® F- oe 0 I3e 0 J 0 9_u _ J� s _ C) Lu W < r Ie n PARTIAL GRADING & DRAINAGE PLAN - PHASE 1 ,•,'�.� N, c�, Rai "'' -. oFess P- c R 'N :.� DRAWN BY: CHECKED BY: FS RH/TS DATE APRIL 25, 2012 SCALE AS NOTED PROJECT NO. 1121 SHEET NO. 0401 ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED <CONSTRUCTION DRAWINGS> Red trarglos at the upper fight haM correr indicate deslrgn Corr• rents Please complete the yellow shaded iterns. a LEVEL SPREADER . VEGETATED FILTER STRIP (L - F ) SUPPLEMENT This forfrr rrna f he crernplotely filled oral, prirrierf, fralfialed, ar ;cl siduidiferf, 0 L`t*7 .,anr�r'�a� The purpose of the LS -VF Stornevater enters LS -VFS from Type of VFS Explanation of any 'Other responses above Explanation ofany'Other responses above Explanation of any FQtheC responses above Engineered Ater strip (graded rx sodded, slope < 8%) Form SIN401 - LS -VFS - 27Jvi2 11 - Rev,9 page 1 of 3 srf ft in in 1ti ftfcfs 29 ft 30 ft' 30 it Form SIN401 - LS -VFS - 27Jvi2 11 - Rev,9 page 1 of 3 Elevation at clownslope base of level lip 401,00 frnsf Elevatbn at the end of the VFS that is farthest from the LS 399.00 firr-s€ Slope (from level !;P to the end of the VFS) 6.67 % Are any draws present in the VF S? n (Y or N) C< Is there a collector svials at the end of the VFS? T1 (Y or N) Bypass System Design Jif applicable) Is a bypass system provided? n (Y or Ni Is there an engineered flow splitting device? n (Y or N) Dimensions of the channel (see diagram below): Explanation of a oy 'Other responses above IM r,!a (Y or N) M IM EDIT PIP-aso indicate the page or plan sheet nimbers where the supporting clocumenta!lon can be found, An incomplete submittal package will result in a request for additional Information, This will delay final review and approval of the project, Initial in the space provided to indicate the folovvilng design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Form $W401 - LS-VFS - 27,1W2011 - Rov,9 page 2 or 3 2. Plan details (1" = 30" or larger) for the level spreader showing: - Forebay (if applicable ); High flow bypass system, One foot tope lines between the level lip and tarp of stream bank, Proposed drainage easement, and Design at ultimate build -oat. 3, Secton view of the level spreader '(t" = 2V or larger) showing: - Underdram system (if applioaUe); Level lip; Upsfdpe channel, and Downstope filter fabric, 4, Plan details of the flow splitting dev oe and supporting calculations (if applicable); 5. A oonstructiott sequence that shoves how the level spreader will be protected from sediment until Ina entire drainage area is stabilized. 6. If a non-engineered VFS is being used, then provide a photograph of the VFS showing; that no draws are. present, 7. The supporting calculations, 8, A copy of the signed and notarized operation and maintenance (O&M) agreement; Farm SW401 - LS -VFS - 27JuI2011 - Rev.J page 3 of 3 MATCH LINE SEE SHEET 0502 PROPERTY IDENTIFICATION NUMBERS: A_ ♦A AA • E (AAA A•W IA AR AA AAAA LIMITS OF DISTURBANCE F 3 i �s 5 \ _ - r . TEMPORARY ail TE C50,5 I�I� .w-- DIVERSION BEf�TY1 � r s � /' \ r-- ,,,.>� rte, ."' ... (j ; % ♦ , �' ob 2 a . t / ✓ ✓ \8 / -,TYP. COIR BAFFLE'--(3) 1 'SILT FENCE Fr Ss , { / f SEIM DETAIL �# 505 � - -- i° l � I TLET .. { i C Ou f r i ` si QITCET j t _ t r r _ 1 i c E j r ASIN #,6\ � � �•, ,~..:: � .,, � � 101" ° ~ , I, s~ a cgQ� ry - -,~. 9 x185 L r t TYP. COR BAFFLE,-(3),, FLT" (3 }: i < / _ C505 SEE 5.. f SEDIMENT BASIN WITH - TAIL lC5 i `.. I • DIw 4 05 / SKIMMER, 3 SPILLWAY i t , F , I P P ELEV 2. ! G° SKIMMER I1SCH GE I 5 - ° � _� SIN I ! ,✓ SRUWAY ELEV 374.5 MP R RY _ f T O f� x135' 'C BERM ENT � s aN � �.�.... ,, , _ w \ e - / \ / 2.5 SKIMtV1ER.20 sPILLYVAY 1 _ SILT FENCE { E "`, TEMPORARY ' � �, ° - - _ I ,- � ~ -- �.. SKIMMER DISCHARGE PIPE PROTECT( FENCE \ 505 IUER a C D SIGN BERM � _ _ ELEV X39.5 P. AROUND ALL WANDS AREAS ,- ' SPILLWAY ELEV = 394.5 r p'} e - .F }ASIN �5 i' 4 �4 .'-'' '� ./ - _-- � / d2Gtf. - _ � _ f 05'IWjx2l0`(Lj l� \ / - �, r e \ -_ i EDiMENTI BASIN WISH _ ✓� _ c( " 4" S IM ER 4fi' S�a1LL1nl -- \ 1 Y - :..¢261 . _._.. SKIMMER DISCHARGE P[PE ELEV 55.5! BASIN # l -- ' f \ ( i - 35 _. 1 f r i SPI LWA ELEV 4 7'(Wr( 154'(1} } l _ - 8 / - fi f I r 1 ! EDI EN1' BASIL ,W`ITFE .. ) "� -" '` - -� 1 1 i n 3" S 1MME 25' SPILLWAY - (-- X _.,... 1 - w , �SE�ETAIL /CSQS KIiVIMER DISC AR 'PIPE ELEV =392.5 � :, � °'� TPBF _ i 1 l r r 5 `�• tPI�WAY E EV = 34.5 / i I ._TEMPORARY C 05 gyp; - � ; '� � : � � ,, ♦ � � - � 5 DIVERS( ©�EI�_ ,, - / i �- ..�° f ' l .,�' _ w - j t 0505 f�ASiN# ' ', ' \ \ p t t (% / f.: i r f _... 50' WJXT 0i3' ,L) _ .. ` 3 ' SIFT EE C IW 1147 BASIN . ,C "505 / BASIN4 i s /% / _ r / ` f` --SEDIMENT BASIN WITH ► pI1T 1=T' ° 57' W)xl14'(Lj / f% ,- ; 1 f ; (4<201 C505 ;p , L1 ,AN 'S ILt AY ( ` / f � 2' PILLI�+IAY 1 [ \ p 2.5" SKIMMER -1 S ��% a '�, A I \ EDIMENT ASTN _ i r ` rr S GVITi _ t 1 PT AL � ( l \ - - r 5ISCH ELEV =�6.5 jj % ( c; I; ♦ SILT FENCE iR> E I K1MM ' -- ',:h i ti �`♦ \ " SKIMME R,14' SPILLWAY PI,('E 12 \ F ~E . -.., %,' SpItLWAY ELEV- 40$.5 I�OTECTI ENC -' / f \ ©_ \ SKIMM DS HARD IPE ELEV =394.5 t sj j ' f��... `f - ;.= t~. »r � HP SPT�LWAY ELEV 39E�.5 ,' p� F% //� �l, C✓�J '+w- " ^.-. �`�^s,. �'-"+, x 4 _••~'T'- ...... -.r'' ,. _ 2 E ' R ©T '^ P `� r' €w . eM C M F t� 5 I ITS O b EN C 05 ' l\ // 392 _ ._.-� ..�- � � (�'}fJ(j r TPSE , 1 / q \ ✓ter DISTURBANCE .. i �. I j BALL WIPE AS M" FQ TYP �OIR �AFI4CE 3 394 .,,., / f;- �, ' � _ M-. ! `� r . . Iy' i C� . � � ' ,, � o } f �. REQUIRED FOR SEE I�ET TL`41,C"505 �. I. _ � � _ i � .� � ..� � /` � _ t', ate. F 81 '� IVERSION DITCH �^�''" I � 4y � �' r % 392 r DRAINAGE 39a SF f 4U6 t 398 f �Q • 1. , / I _ _ _ ... _. V w- r3 SOLATED WETLANDS ` SILT FENCE., SILT FENC r� 0505 _ rr 1 SEDIMENT BAST TREE PROTECT�O / 5 C55 ISOLATED WETLANDS _ '� AM AND SPILLWAY TEMPORARY IMITS OF DISTURBANCE FENCE >r 505 ISOLATED WETLANDS for RCP _ (TYPICAL) DIVERSION BERM IN - 7.1 GENERAL CONSTRUCTION SEQUENCE FOR EROSION CONTROL INITIAL PHASE 1. INSTALL TREE PROTECTION FENCING IN ACCORDANCE WITH THE APPROVED SITE PLAN. 2,INSPECT TREE FENCE AND SUBMIT A "TREE PROTECTION FENCING CERTIFICATION" FORM TO DURHAM COUNTY S & E OFFICE, FAX: (919)560.0740. 3.CALL DURHAM COUNTY S &E OFFICE FOR INSPECTION OF TREE FENCE INSTALLATION, (919)560-3735. 4.OBTAIN ALL PERMITS AND APPROVALS NECESSARY TO BEGIN AND COMPLETE THE PROJECT. OBTAIN ALL PERMITS PRIOR TO BEGINNING ANY DISTURBANCE OF THE SITE SO WORK WILL NOT BE INTERRUPTED. 5.SCHEDULE AND HOLD A PRE - CONSTRUCTION CONFERENCE BEFORE BEGINNING ANY TIMBERING, CLEARING, GRUBBING, DEMOLITION OR GRADING. OWNER OR OWNER'S REPRESENTATIVE, GRADING CONTRACTOR AND EROSION CONTROL PERSONNEL SHALL ATTEND TO DISCUSS THE SCHEDULE AND EROSION CONTROL PLAN. 6,CLEAR ONLY THE AREA NECESSARY TO INSTALL GRAVEL CONSTRUCTION ENTRANCE AND SILT FENCES. 7.CLEAR THE AREA NECESSARY TO INSTALL SEDIMENT BASINS AND DIVERSION BERMS, SEED BERMS IMMEDIATELY AFTER INSTALLATION. 8.IF A STOCKPILE IS NECESSARY DUE TO EXCAVATION OF THE SEDIMENT TRAP /BASIN, PLACE A DOUBLE ROW OF SILT FENCE 10 FEET APART AT THE LIMITS OF THE STOCKPILE AREA SHOWN ON THIS PLAN. TREES AND GROUNDCOVER MAY BE REMOVED ONLY AS NECESSARY FOR THIS STOCKPILE. 9.PROVIDE TEMPORARY GROUNDCOVER FOR DIVERSION DITCHES AND SEDIMENT TRAPS /BASINS WITHIN 3 DAYS OF COMPLETION. INTERIM PHASE 1. BEGIN CLEARING, GRUBBING AND MASS GRADING OF SITE. INSTALL WATER QUALITY PONDS AND RETAINING WALLS AS CONSTRUCTION SCHEDULE OF MASS GRADING ALLOWS. MAINTAIN SLOPES TO ENSURE DRAINAGE TO SEDIMENT BASINS /WATER QUALITY PONDS, RELOCATE DIVERSION BERMS AS REQUIRED DURING GRADING ACTIVtTiES. AS WALL INSTALLATION BEGINS, ENSURE POSITIVE DRAINAGE AWAY FROM AND AROUND WALLS TO DIVERSION BERMS AND SEDIMENT BASINS. 2. CONTINUE TO GRADE SITE, INSTALLING ALL ASSOCIATED EROSION CONTROL MEASURES. FILL OR RELOCATE SEDIMENT BASINS AS REQUIRED DURING GRADING OPERATIONS. 1 PROVIDE ALL DISTURBED AREAS WITH GROUND COVER AS PER SEC. 1210.4(8) OF THE DURHAM COUNTY UDO AFTER COMPLI T €ON OF ANY PHASE OF CLEARING. E PREPARATION. GRUBBING OR GRADING. THE SEEDING, SEEDBED MULCH AND/OR ROLLED EROSION CONTROL PRODUCT INSTALLATION MUST BE IN ACCORDANCE WITH THE SEEDING SCHEDULE PROVIDED IN THIS S &E PLAN, FINAL PHASE 1. CONTINUE GRADING OF SITE, INSTALLING ROADS AND FINISHED LOT GRADES. INSTALL UTILITIES AND STORM SEWER MAINS AND STRUCTURES, WITH ASSOCIATED SEDIMENT CONTROL MEASURES AT STRUCTURES. 2, INSPECT AND MAINTAIN THE EROSION CONTROL DEVICES $O THEY CONTINUE TO FUNCTION AS INTENDED, REMOVE ACCUMULATED SEDIMENT IN THE TRAPS WHEN IT REACHES ONE -HALF THE DEPTH OF THE TRAP. REMOVE WASHED STONE ON THE OUTLET DEVICES AND REPLACE WITH CLEAN STONE WHEN IT BECOMES CLOGGED WITH SEDIMENT, INSPECT SILT FENCING DAILY, AND CLEAN FENCING OF SEDIMENT AFTER EACH RAINfALL. THE PERSON RESPONSIBLE FOR EROSION CONTROL IS ALSO RESPONSIBLE FOR INSPECTING AND MAINTAINING THESE DEVICES, 3. IF IT IS DETERMINED DURING THE COURSE OF CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE PROJECT SITE DESPITE PROPER IMPLEMENTATION AND MAINTENANCE Of THE EROSION CONTROL PLAN, THE PERSON RESPONSIBLE FOR THE LAND DISTURBING ACTIVITY IS OBLIGATED TO TAKE ADDITIONAL PROTECTIVE ACTION. 4. PROVIDE ALL DISTURBED AREAS WITH GROUND COVER AS PER SEC. 12,10.4(B) OF THE DURHAM COUNTY UDO AFTER COMPLETION OF ANY PHASE OF CLEARING, GRUBBING OR GRADING. THE SEEDING, SEEDBED PREPARATION, MULCH AND /OR ROLLED EROSION CONTROL PRODUCT INSTALLATION MUST BE IN ACCORDANCE WITH THE SEEDING SCHEDULE PROVIDED IN THIS S &E PLAN, 5. REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AFTER THE DRAINAGE AREA HAS BEEN SUFFICIENTLY STABIUZED TO PREVENT EROSION. REMOVE AND PROPERLY DISPOSE OF SEDIMENT AND DEBRIS FROM REMAINING DEVICES AND OFF SITE DEVICES AND STABILIZE THEIR LOCATION. STOCKPILE AREA 1, STOCKPILE AREA TO BE ACCESSED OFF LEESVLLLE ROAD. CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL PUBLIC ROADS IN A SEDIMENT FREE CONDITION. EROSION CONTROL LEGEND DESCRIPTION SYMBOL DETAIL GRAVEL CONSTRUCTION ENTRANCE _j 0 t < 0U TREE PROTECTION FENCE LIMITS OF DISTURBANCE - TraF LD - TPF C�o5 SILT FENCE sF S> sF 3 css�s TEMP SED. BASIN G5ii5 TEMP. DIVERSION BERM GsaZa INLET PROTECTION CL 6505 SILT FENCE OUTLET 7 csos SKIMMER ® & CSS}5 INLET PROTECTION ® �o EROSION CONTROL PLAN - ,�INITIAL PHASE C501 J 1" -100' 0 50 100 2€30 SCALE: I`= 100 tY LIMITS - F i?ISTURBANC I,- _u ARC(IED STON r , , : , FILT R ?`Wx12'Lx181p - APPROXIMATE .A A5 "B' RIP CL RA r ! P ; LOCATION OF f LINE WITH FILTER FABRIC � �� � -25' AV L GR � -. 00 '` F a r 1 � ' � 1 .434�ONSTRUCTI® j TYP. COIR..BAFrLE (3) r � •' / ,' SEE DETAIL 4/005 � _ / BASIN 9 #: SEDIMENT BASIN-WIT I.., -. 2.5" SKIMMER, 12' SPILLWA Y SKIT IME/R ISCHARGE PIPE ELEV_�406 SPIL I WAY ELEV M 408:5_.' ! t 0505 ' Ncl CONSTRUCTION 1 ENTRANCE / EXIT 0505 CCOPYRIGHT 2011 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED t HORVATH A S S Q C I A T E S 16 CONSULTANT PLACE. SUITE 2At DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919x490.8953 537 MARKET STREET, SUITE L2) CHATTANOOGA. TENNESSEE 37402 P 4232".4990 F 4232",5700 www,horvathassociates.eom Q. Q Z acid _j 0 0 < 0U < 0 W �Ex = W J to Z - U3 J CL EROSION CONTROL PLAN - INITIAL PHASE CA R E S S r • 2 • r • 1 I PER REVIEW COMMENT I JC 04/17/2012 DRAWN BY: CHECKED Rr FS RLH BATE DECEMBER 19. 2011 SCALE AS NOTED PROJECT NO. 1126 SHEET NO. C501 EROSION CONTROL PLAN HORVATH ASSOCIATES 16 CONSULTANT PAM SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919,490AWS3 537 MARKET STREET. SUITE LL20 CHATTANOOGA, TENNESSEE 37442 P 4232".4990 F 423.2".5700 www.horvathossociates,com Q. Q -j O 0 << aU W J io Q - CL EROSION CONTROL I ROL PLAN - INTERIM PHASE slrsssslt5 air . r•'r N CA `'•. O �� .,..,..•,• 1 ! •. A i A �srie��it►sss' PER REVIEW COMMENT � .3C 0411712012 DRAWN BY: CHECKED Br FS RLH DATE DECEMBER 19, 2011 SCALE AS NOTED PROJECT NO. 1 126 SHEET' NO. C503 EROSION CONTROL PLAN 25' R. MIN. 2� SURGE STONE OR R/R BALLAST A. 2 "-3" WASHED STONE PAD TO BE 501 X 25'W. PLACE A MINIMUM OF 6" OF STONE IN A CUT SECTION TO HELP SECURE FILTER CLOTH. B, PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS. C. LOCATE ENTRANCES TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES, D. MAINTAIN IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS, PERIODIC TOP DRESSING MAY BE NECESSARY. E. -LOCATE TEMPORARY PADS ON EACH SIDE OF ADJOINING ROADWAY �TEMPORARY l GRAVEL CONSTRUCTION ENTRANCE /EXIT C505 J SCALE: N.T.S. �tOia� FABRIC SKIMMER ­\ UNDERCUT FOR ADDED STORAGE IMPERMEABLE GEOTEXTILE FABRIC i_KUJ� Jt(_; IIUN PIPE FRONT FACE OVERFILL 6" FOR SETTLEMENT 2:1 SIDE SLOPE MAX. 700 G /M' COIR EROSION BLANKET, COIR MESH OR APPROVED EQUAL SPILLWAY (LINED WITH IMPERMEABLE GEOTEXTILE FABRIC) TEMP. SEDIMENT BASIN WITH SKIMMER & BAFFLES SCALE: N.T.S. FILTER O STONE END FILTER CLOTH HERE STL. POST --� HARDWARE CLOTH & WIRE FENCE ONLY " (�'7 SILT FENCE OUTLET 0505 SCALE: N.T,S. PVC ENO P'VC HARDWARE CLOTH FRONT VIEW PLAN FILTER CLOTH HERE 1--TOP OF SILT FENCE TO BE AT LEAST 6' ABOVE TOP OF STONE BURY WIRE FENCE, FILTI FABRIC & HARDWARE CLOTH IN TRENCH EERSE ; —YE VIEW PYG VENT' r- PVC' E" PiP1 � .wW .IV END CAP PVC PIPE 1/.2 "SIN I3t>k1�ICiE WATER' SURFACE SCHIEDULE. 40 PVC. PIK' FRONT VIEW PVC MIN 4' APART MARK SILT FENCE POST AT j DESIGN DEPTH TO INDICATE SILT CLEANOUT POINT TOE OF BERM ILT FENCE 'C` MCLDSURE .TER EI` TRY UNIT SCHWA= Of SNIUM1ER TAKEN FROM PENNSYLVANIA E WS=. AND SEDIMENT POf LUiBSNi :CONIMOL MMUAL,:WACH -20M 8 SKIMMER 0505 SCALE: N.T.S. SECTION SCHEDULE 40 PVC F40C. ORWICE PLATE 36" REFLECTIVE ORANGE -^ SAFETY NETTING HOOKED ONTO PREFORMED CHANNELS ON METAL POST. METAL POST @ 8'0.C. WIRE MESH, ATTACH WITH WIRE STAPLES (ALTERNATE) SIDE ELEVATION 24"X36" SIGN POSTED ON FENCE. SEE NOTE "D" BELO FOR LABELING METAL POST @ 8' O.C. 36" REFLECTIVE ORANGE SAFETY NETTING HOOKED ONTO PREFORMED CHANNELS ON METAL POST. FRONT ELEVATION r2" TREE PROTECTION FENCE 0505 SCALE: N.T.S. 16 GAUGE MIN. 6!'X 6" OR 4" X 4' WELDED WIRE HOOKED ONTO PREFORMED CHANNELS ON METAL POSTS. 78' O.C. MAXI 7 ULTRAVIOLET RESISTANT GEOTEXTILE FABRIC OR ` EQUIVALENT SECURED TO WIRE WITH METAL CLIPS OR WIRE AT WON CENTER. TREE PROTECTION NOTES; ,MAX. SEDIMENT STORAGE LEVEL IS 1/2 HEIGHT, REMOVE S11T FENCE SEDIMENT WHEN THIS LEVEL IS REACHED OR AS DIRECTED A) INSTALL TREE PROTECTION FENCING AT THE SAME TIME AS THE BY THE CONSERVATION INSPECTOR. r-- EROSION CONTROL MEASURES. MAINTAIN FENCING UNTIL ALL 1 r CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETED. EDIMENT STORAGE PIT FLOW B) INSTALL TREE PROTECTION FENCING ALONG THE ENTIRE LENGTH "'-SHEET DRAINAGE ONLY. OF THE PROPOSED CLEARING LIMITS AS DENOTED ON THE PLAN. j FLOW C) LOCATE TREE PROTECTION MEASURES SO THAT THEY MAINTAIN TO INCREASE STORAGE CAPACITY AND A 6 FOOT RADIUS AROUND EXISTING PLANTS OR PROVIDE A 1 :.'.'.',•,',• PROLONG THE LIFE OF THE SILT FENCE, IT FOOT RADIUS FOR EACH I INCH DIAMETER OF TREES (MEASURED IS GENERALLY ADVISEABLE TO DIG A AT A POINT 4-1 FEET ABOVE GROUND), WHICHEVER IS GREATER. ' ' ' ' ....'. .'.'.'.'. NATURAL GRADE SEDIMENT PIT IN FRONT Of THE SILT CARRY 12 INCHES OF FABRIC INTO TRENCH, FENCE WHENEVER POSSIBLE. COVER W. SOIL, TAMP AN D POST A SIGN ON THE FENCING STATING:'TREE PROTECTION T? BACKFILL. AREAMO TRESPASSING" AND "ZONA PROTECTORA PARA LOS ARBOLES /PROHIBIDO ENTRAR ". SPACE SIGNS EVERY 75 -100 FEET. "-- -CARRY 6" OF WIRE INTO TRENCH. E AT THE START OF GRADING INVOLVING THE LOWERING OF THE NOTE: ° ��L FLOW SHOULD NOT RUN ALONG SILT FENCE, USE EXISTING GRADE AROUND A TREE OR THE STRIPPING OF TOPSOIL, _ METAL POSTS AT 8' O.C. MAX. POSTS MUST DIVERSION DITCHES INSTEAD. MAKE A CLEAN, SHARP, VERTICAL CUT AT THE EDGE OF THE TREE BE 2' DEEP MINIMUM. SAVE AREA AT THE SAME TIME AS OTHER EROSION CONTROL NOTE: MEASURES ARE INSTALLED, INSTALL THE TREE PROTECTION SILT FENCES SHOULD NOT BE USED AT PIPE OUTLETS OR IN AREAS OF CONCENTRATED FLOW FENCING ON THE SIDE FARTHEST AWAY FROM THE TREE TRUNK AND (CREEKS, DITCHLINES, SWALES, ETC.). MAINTAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE PROTECTED AREA. 3 SILT FENCE F) TREE PROTECTION FENCING MUST BE INSTALLED PRIOR TO ISSUANCE OF ANY PERMITS. �C505JSCALE: N.T.S. 15% OF SURFACE AREA 12" MIN SLOPE 2:1 ��0 MAX NATURAL GROUND RF IL L OR CU T O SLOPES COMPACTED FILL BERM ltl 18" MIN FLO� DITCH 18" MIN ONE BERM /DITCH FAB. ON 5 TEMPORARY DIVERSION BERM /DITCH C505 SCALE: N.T.S. A) CHISEL COMPACTED AREA AND SPREAD TOPSOIL 3" DEEP OVER ADVERSE SOIL CONDITIONS, B) RIP THE ENTIRE AREA TO A 4" DEPTH. C) REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. D) APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE *BELOW) E) CONTINUE TILLAGE UNTIL A WELL PULVERIZED, FIRM, REASONABLY UNIFORM SEED BED IS PREPARED 5" TO 6" DEEP. F) SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. G) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. H) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDING WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. I) CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED, * APPLY: AGRICULTURAL LIMESTONE: 2T /AC (3 TON IN CLAY) FERTILIZER: 10 -10-10 AT 800- 10W#IAC SUPERPHOSPHATE: 500# /AC OF 20% ANALYSIS SUPERPHOSPATE MULCH: 2 TON(80 BALES) SM. GRAIN STRAW /ACRE ANCHOR: LIQUID ASPHALT 400 GALiAC EMULSIFIED ASPHALT 300 GALIAC SEEDING SCHEDULE FOR SHOULDERS. SIDE DITCHES & SLOPES (MAX 2:1 DATE TYPE PLANTING RATE AUG 15 -NOV 1 CREEPING RED FESCUE 300 # /AC NOV I -MAR I CREEPING RED FESCUE 300 # /AC AND ABRUZZI RYE 25 # /AC MAR I -APR 15 CREEPING RED FESCUE 300 # /AC APR 15 -JUN 30 HULLED COMMON BERMUDA GRASS 25 # /AC JUL 15 -AUG 15 RED FESCUE 120 # /AC AND BROWNTOP MILLET 35 # /RC OR SORGHUM -SUDAN HYBRIDS 30 # /AC FOR SLOPES 13:1 TO 2:1) MART -JUNI CREEPING RED FESCUE 50 # /AC (APR 15 -MAY 30) OR ADD LITTLE BLUESTEM 10/12 # /AC (MAR I -JUNE 30) OR ADD HULLED COMMON BERMUDA GRASS 25 # /AC JUN 1 -SEPT I ** *CREEPING RED FESCUE AND 120 # /AC * * *BROWNTOP MILLET 35 # /AC * * *OR SORGHUM - SULTAN HYBRIDS 30 ## /AC SEPT I -MAR I CREEPING RED FESCUE 120 # /AC (NOV i -MAR 1) ADD ABRUZZI RYE 25 # /AC CONSULT CONSERVATION ENGINEER OR SCS FOR ADDITIONAL €NFORMAPON CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS, ABOVE VEGETATION RATES ARE THOSE WH #CH DO WEU. FINDER LOCAL CONDITIONS: OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ­TEMPORARY-RESEED ACCORDING TO OPTS LIM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12'44 HEIGHT BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED OUT. A. MACHINE COMPACTION OF ALL FILL IS REQUIRED. DIVERSIONS 'r rcrjr SUFFICIENT TO DIRECT ALL SEDIMENT - LADEN STORMWATER A S [` O C I A T C S INTO A SEDIMENT CONTROL DEVICE MUST BE INSTALLED PRIOR TO CLEARING AND GRUBBING OF THE AREA (OR IN CONJUNCTION INLET ZONE WITH THIS OPERATION IF SEDIMENT CONTROLS AND DIVERSIONS 357o OF SURFACE ARE INSTALLED AS EACH CRITICAL POINT IS REACHED). AREA ■ FIRST CHAMBER B. DIVERSIONS SHALL BE LOCATED TO MINIMIZE DAMAGES BY 25% OF SURFACE CONSTRUCTION OPERATIONS. AREA SECOND CHAMBER C. DIVERSIONS SHALL BE SEEDED AND MULCHED IF THEY ARE 25% OF SURFACE TO REMAIN IN PLACE OVER 21 DAYS, AREA ■ DURHAM, NORTH CAROLINA 27747 D. CHECK DEVICE AFTER EACH RAIN, BUT ONCE A WEEK REGARDLESS OF RAINFALL. OUTLET ZONE REPAIR AS NECESSARY. 15% OF SURFACE AREA 12" MIN SLOPE 2:1 ��0 MAX NATURAL GROUND RF IL L OR CU T O SLOPES COMPACTED FILL BERM ltl 18" MIN FLO� DITCH 18" MIN ONE BERM /DITCH FAB. ON 5 TEMPORARY DIVERSION BERM /DITCH C505 SCALE: N.T.S. A) CHISEL COMPACTED AREA AND SPREAD TOPSOIL 3" DEEP OVER ADVERSE SOIL CONDITIONS, B) RIP THE ENTIRE AREA TO A 4" DEPTH. C) REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. D) APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE *BELOW) E) CONTINUE TILLAGE UNTIL A WELL PULVERIZED, FIRM, REASONABLY UNIFORM SEED BED IS PREPARED 5" TO 6" DEEP. F) SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. G) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. H) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDING WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. I) CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED, * APPLY: AGRICULTURAL LIMESTONE: 2T /AC (3 TON IN CLAY) FERTILIZER: 10 -10-10 AT 800- 10W#IAC SUPERPHOSPHATE: 500# /AC OF 20% ANALYSIS SUPERPHOSPATE MULCH: 2 TON(80 BALES) SM. GRAIN STRAW /ACRE ANCHOR: LIQUID ASPHALT 400 GALiAC EMULSIFIED ASPHALT 300 GALIAC SEEDING SCHEDULE FOR SHOULDERS. SIDE DITCHES & SLOPES (MAX 2:1 DATE TYPE PLANTING RATE AUG 15 -NOV 1 CREEPING RED FESCUE 300 # /AC NOV I -MAR I CREEPING RED FESCUE 300 # /AC AND ABRUZZI RYE 25 # /AC MAR I -APR 15 CREEPING RED FESCUE 300 # /AC APR 15 -JUN 30 HULLED COMMON BERMUDA GRASS 25 # /AC JUL 15 -AUG 15 RED FESCUE 120 # /AC AND BROWNTOP MILLET 35 # /RC OR SORGHUM -SUDAN HYBRIDS 30 # /AC FOR SLOPES 13:1 TO 2:1) MART -JUNI CREEPING RED FESCUE 50 # /AC (APR 15 -MAY 30) OR ADD LITTLE BLUESTEM 10/12 # /AC (MAR I -JUNE 30) OR ADD HULLED COMMON BERMUDA GRASS 25 # /AC JUN 1 -SEPT I ** *CREEPING RED FESCUE AND 120 # /AC * * *BROWNTOP MILLET 35 # /AC * * *OR SORGHUM - SULTAN HYBRIDS 30 ## /AC SEPT I -MAR I CREEPING RED FESCUE 120 # /AC (NOV i -MAR 1) ADD ABRUZZI RYE 25 # /AC CONSULT CONSERVATION ENGINEER OR SCS FOR ADDITIONAL €NFORMAPON CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS, ABOVE VEGETATION RATES ARE THOSE WH #CH DO WEU. FINDER LOCAL CONDITIONS: OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ­TEMPORARY-RESEED ACCORDING TO OPTS LIM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12'44 HEIGHT BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED OUT. ■ TOP OF DITCH 'r rcrjr (D A S [` O C I A T C S Z J 6" FREEBOARD 18" TOP ■ 16 CONSULTANT PLACE, SUITE 2131 ■ DURHAM, NORTH CAROLINA 27747 1 2 1 ■ P 919.49€3.4944 F 919.490.8953 U z EXIST. DITCH BOTTOM ■ 537 MARKET STREET, SUITE L= < ■ CHATTANOOGA, TENNESSEE 37442 423266.4490 N a P F 423.266.5100 www.tlaTVattlassociates.com ..;,: ■ NOTE: CUT 6" "V" NOTCH IN CENTER OF DAM ■ ■ ■ ■ Q 9 STONE CHECK DAM " ^ Z 0505 SCALE. N.T.S. ■ D ■ 'Q, (D QU Z J RIP RAP HEADWALL FLOW -_,., - ■ FILTER ,BERM #57 WASHED STONE I' THICK X 3' ■ HIGH (MIN) A, lam` ��� � °` � SEDIMENT STORAGE AREA ■ CURB INLET PROTECTION PERSPECTIVE VIEW AREAS TO BE FLOOD STORAGE RIP RAP HEADWALL (INSTALL WITH GRATE) ■ DISTURBED (CUT, ZONE 1 ri EXISTING GRADE FILLED) EXISTING INSTALLATION AND MAINTENANCE GUIDELINES PIPE ■ I - INSTALLATION: REMOVE THE GRATE FROM CATCH BASIN. IF USING OPTIONAL OIL ABSORBENTS; PLACE ■ F © m FLOW ABSORBENT PILLOW IN UNIT. STAND THE GRATE ON ■ END. MOVE THE TOP LIFTING STRAPS OUT OF THE WAY CLASS I RIP RAP NOTES: AND PLACE THE GRATE INTO THE BAG SO THAT THE a #57 WASHED STONE 1) DIMENSIONS ARE MIN. ACCEPTABLE GRATE IS BELOW THE TOP STRAPS AND ABOVE THE SEDIMENT STORAGE ZONE UNLESS OTHERWISE NOTED. LOWER STRAPS, HOLDING THE LIFTING DEVICES, ■ MAX SEDIMENT DEPTH INLET PROTECTION INSERT THE GRATE INTO THE INLET. (CLEAN OUT POINT) 2) USE STONE FILTER TO EXISTING PIPE INVERTS ■ THAT DRAIN 10 ACRES OR LESS ■ ■ MAINTENANCE: REMOVE ALL ACCUMULATED FRM VICINITY OF UNIT SEDIMENT AND ARCHED STONE FILTER EACH STORM EVENT. AFTER EACH STORM EVE TFTER ■ AND AT REGULAR INTERVALS, LOOK INTO THE BAG. IF ■ C505 SCALD: N.T.S. THE CONTAINMENT AREA IS MORE THAN 1/3 FULL OF SEDIMENT, THE UNIT MUST BE EMPTIED. TO EMPTY ■ UNIT, LIFT THE UNIT OUT OF THE INLET USING THE LIFTING STRAPS AND REMOVE THE GRATE, IF USING ■ FlUERSTONE OPTIONAL OIL ABSORBENTS; REPLACE ABSORBENT ■ DAM #5 OR #57 WHEN NEAR SATURATION. STONE STORAGE AREA ■ x FLOW FLOW • Materials used to construct temporary concrete washout facilities shall be removed from the site of the work and CATCH BASIN � disposed of or recycled. s Holes, depressions or other ground disturbance caused by the removal of the temporary concrete washout facilities shall be ���p��p� backfilled, repaired, and stabilized to prevent erosion. PLAN VIEW �c�3- Q� ©��p ` —GRATE �- LIFT STRAPS ■ STAPLES (2 PER BALE) WOOD OR METAL STAKES (2 PER HALE) VARIES STRAW PALE 81ND1NG € IRE 10 mil PLASTIC LINING NATIVE MATERIAL (DPT1oNAt.) NOT TO SCALE 'TAKE TYP.) 10 r1TiI PLASTIC LINING STRAW RALi_ (IYP.) NOT TO SCALE TYPE "ABOVE GRADE" WriH STRAW BALES 1. ACTUAL LAYOUT DETERMINED IN THE FIELD. 2. THE CONCRETE WASHOUT SIGN (SEE FIG. 4--15) SHALL BE INST'ALLEO WITHIN ' 1 R m OF THE TEMPORARY CONCRETE WASHOUT FACILITIY. MTPAM /FW4- 14.MYti 'W 8-14-02 11 CONCRETE WASH OUT AREA 0505 SCALE: N.T.S. EROSION CONTROL SITE DETAILS CA 41, YA GO 1 PER REVIEW COMMENT I JC 04/17/2012 DRAWN BY: CHECKED BY: RLH DATE DECEMBER 19, 2011 SCALE AS NOTED PROJECT NO, 1126 SHES NO. C505 ERas� ©N CQ�TRQ� ��� Uj J (D Z J EROSION CONTROL SITE DETAILS CA 41, YA GO 1 PER REVIEW COMMENT I JC 04/17/2012 DRAWN BY: CHECKED BY: RLH DATE DECEMBER 19, 2011 SCALE AS NOTED PROJECT NO, 1126 SHES NO. C505 ERas� ©N CQ�TRQ� ��� Red triang!as at tKa upper rightharid comer b6cam destin commerIs Please oomplete the yelloer shaded items, LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form njust be complotshyffliadout, printed, Initiated, and subrrnttod� Contact name Phofie number Date Drainage area number Explanation of any "Other' responses above Explanaton of any 'Othef' responses above Explanation of any 'Other' responses above fe fe cis min in/hr eta cis (Y or N) Wet detention pond 8.93 cis 8.93 cis 10 cis 6,93 cis Y (Y or N) M Do riot co:nplele this sestion of the f3ffr... Do not cornplele this seollon of 9t a fora:. Do no, oornplete W4 soclion of V a form. Ca rict corridete rh:s section of to foun. C. D not wrr pfe to th;s sectors a? th a .. o mn . Do FIC-1 corrplecs ti° is scot;ou of the form. Do riot oo ripleto this sodon of the fc -nt Do notcornplete this sect on of the form. Dc not compIete, thisseeJor, of file form. Do riot confiNde this saction of tus, form. Form SW401 - LS-VFS - 27Ju12011 • Rev 9 page 1 of 3 In in 10 fu"fs 69 it 70 ft 30 it Do riot co:nplele this sestion of the f3ffr... Do not cornplele this seollon of 9t a fora:. Do no, oornplete W4 soclion of V a form. Ca rict corridete rh:s section of to foun. C. D not wrr pfe to th;s sectors a? th a .. o mn . Do FIC-1 corrplecs ti° is scot;ou of the form. Do riot oo ripleto this sodon of the fc -nt Do notcornplete this sect on of the form. Dc not compIete, thisseeJor, of file form. Do riot confiNde this saction of tus, form. Form SW401 - LS-VFS - 27Ju12011 • Rev 9 page 1 of 3 Elevation at dowastope base of level lip Elevation at the end of the VFS that is farthest from We LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector svivale at this and of the VFS? 353.70 fmsl We ft 5.67 fill n or N) OK n —(Y (Y or N) y (Y or N) y —(Y or N) Please f; rai plan doniiis of Raw splifter & supporlIg calics. We ft We ft We ft We ft We ft We It'see Pick one: in (Y or N) nis (Y or N) Bypm directed to plunge pool adjacent to 100-year floodplain 0 Mn rrequ rements have been rn --l. If the applicant has d asig nated an agent the agent may initial. below. If a require ment has not been stif stificaflorr; Form 54IV401 - LSAIFS - 2MI2011 - Rev 9' page 2 of 3 2, Plan details (V = Wor larger) forthe level spreader shaviing,. - Forebay (if applicable), High flovi bypass system, One foot topo lines between the love lip and top of stream bank, Proposed drainage easemord, and Design at ultimate buW-out. 3. Section view of the level spreader (V 7 Wor larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric; 4. Plan details of the flow splitting device and supporting calculations (if applicable), 5. A construction sequence that shows how the lavelziereader will be protectedi from sediment Wil the entire drainage area is stabilized, 6. If a non,engineered VFS is being used, then provide is pWo9raph of the VF S showing that no draws are present. 7. The supporting calculalmns. 8. A copy of the signed and notarized operation and maintenance (OW) agreement; Ih 'Copy provided. Durham will not execute all indal pormitt =ngSee Form SW401 - LS-VFS - 27M2011 - Rey.9 page 3 of 3 ProJect name Contact name Phone number Date Drainage area number Stormwater enters LS-VFS from Type of V FS Explanation of any'Othe` responses above Explanation of any "Other' responses above Explanation of any'Olher" responses above cis Do not complete this snot -on c Etie fo,(i ; (Y or N) Do not complete this secton cline fcffm Wet detention pond 2915 of 29.15 '' cis 10 cts 10 cfs y (Y or hl) Farm SW401 - LS -VFS - 27JW2011 - Rev ,g page 1 or 3 in in 10 ftrcf 100' It 100 it 30 it Farm SW401 - LS -VFS - 27JW2011 - Rev ,g page 1 or 3 Elevation at downslope base of level lip Elevation at the end of the VFS that is to 4ftest from the LS Slope (from level lip to the end of the ;VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system proVded? Is there an engineered flow splitting device? Dimensions of the channel (see diagram belovi)� 36510 frIU4 364.00 fans! 5.67 % n (Y o* N) OK n (Y or NI) y (Y or N) y (Y or N) Please provide plan detsiis of flow splicer & sipport'rtg caics We it ftfa ft We ft We ft n/a ft n1a ftrseo Fick one: n (Y or N) n1a (Y 0, N) Bypass directed to plunge pool adjacent to 100-year floodplam M Page or plan sheet number and any notes: (Include Rations I C coofficiient per basin), High flow bypass aysift • Maintenance acceas� IiI41411 rd full I Form SW401 - LS-VFS - 27302011 - Rav,9 page 2 of 3 2. Plan details (I'm 30' or [a rgef) for the 10VOIS.Dreadershowiag: - Eorebay (if applicable) Hilih :.1tow bypass system; One foot tape lines between the level lip and top of stream be A, Proposed drainage easement, and - besicdn at ultimate build- out. . Section vier of the level spreader (V w 29 or larger) showing; - Underdoun system (if applicable), Level lip, - Upskope channel, and Downslope filter fabric; 4, Plan details of the Fmv splitting device and supporting calculations (if appli nle ), 5. A construction sequence that shows how the level spreader will be protected frorn sediment until the entire drainage area !s stabilized, g, If o non- engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present, 7, The supporting calculations. Form SW40i - LS -VFS - 27JW2041 - Rov.9 page 3 of 3 III:°:PUipUWUI LIM L7-YTe3. Vnr:: tVeG. '.U' ,G{Ai tliGWGkF 11 }t4+11 99 ct rgr,IG :::. Storrawator enters LS -VFS from k BMP Type of VFS Engineered filter strip (graded Ik sodded, slope, 8 %) Explanation of any *Other" responses above Explanation of any "Other' responses above If Stortrwater Enters the LS-VF from a BMP Type of BMP' Peak discharge from the BiMe'ff during the design storm Peak discharge from the BMP during the 10- yearstorm Maximum capacity of a 100 -foot long L -VF Peak flow directed to the LS -VFS Is a f'ow bypass system gofrg to be used? I? Do not complete this sacrinn of the flare fe too notcomplate this s li'm of the form. % fro not complete this secUen of the form 15 Do not complete this suction of the form. CIS Do riot complete this section of the form. m:n Do riot comp'e(e this section of the liver, m1hr, Do riot complete this soc, on rif the form CIS :)u riot comp'cre this sever on of Pic form, cis Do riot comp:dte this sin; Jan of the form, (Y or N) fro riot roe op eta flris seclion of the (tune. Form SW4 }5 - LS -VFS - 27JIZ!2e1 t - Rev.9 page i of 3 in to 10 Note 15 ft !! �0 it 30 If Form SW4 }5 - LS -VFS - 27JIZ!2e1 t - Rev.9 page i of 3 Elevation at doiynsfope base of level lip Elevation at the end of the >VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS?' Is there a collector swale at th a end of the VF S? 375.73 frnsi 374.00 fmsl 5.67 % n (Y or N) n (Y or,N) n (Y or N) 0 (Y or ) n (Y or N) We {Y or N }, Bypass directed to plunge pool adjacent to 100 -year iloodplaln W i � result in a request for additional information. following design requirements have been meL If met, attach justif!cation on can be found, An Incomplete submittal package will oval of the project. Initial in the SpaDe provided to indicate the the agent may initial below. If a requirement has not been Initials Page or plan Form SW401 - LS -VFS - 27JuI201 i - Rev.a page 2 of 3 2. Plan details (1" = 35' or larger) for the level spreader showing; - Forebay (if applicable), High flow bypass sys'.em, One foot tope lines between the level lip and top of stream bank, Proposed drainage easement. and Design at ultimate build out. 3, Section view of the level spreader (1" = 20' or larger) shove "ng; - Ungerdrain system (if applicable), Level lip, Upslope channel, and Dowflslope filter fabric.. 5, A construction sequence Prat shows how the level spreader will be protected from sediment until the entire drainage area is stabilized, 6, If a non- eng'Mored VFS is being; used, then provide a photograph of the VFS showing that no d raves are present. 7. The supporting calculations; t Form SVV401 - LS -VFS - 27J u12011 - Rows Bags 3 of 3 ■ PIN: 0769 -03 -41 -8938 PIN: 0769 -03-41 -6932 PIN: 0769 -03-41 -4887 PIN: 0769 -0442 -5588 PIN: 0769 -03 -44 -6000 PIN: 0769-03 -33 -2232 PIN: 0769-03- 248486 PIN: 0769 -03-35 -7254 PIN: 0769 -01 -35 -3524 PIN: 0769 -01 -26 -9080 PIN: 0769-01 -06 -9898 TBM SITE BENCHMARK NCGS MONUMENT ■ Parcel ID: 194413 Parcel ID: 194412 Parcel ID: 194411 Parcel ID: 194383 Parcel ID: 194384 Parcel ID: 193264 Parcel ID: 193265 Parcel ID: 210697 Parcel ID: 193271 Parcel ID: 193270 Parcel ID: 193320 I NC F EL = 409.94' NGVD 29 ■ X/7 ......AY .................. f,r` YJ f f ff f r 1 0 J., v a..nv Yrvv ,1 ................... f 1 c � ' I x 7 utlnC 30' WIDE ENGINEERED - -- 12 ".. .. VELOCIT FILTER STRIP m Y DISSIi' ATOIR v `� INSTALL FILTER..Fa4BRIC $ETtiNEEN SOIL AND R'IPI2AI ............. AIRIA LE WIDTH BMP S- F�SEIaAEPdT- �- T1fP�, t r t:.,. .. ... ... .......... WATER QUALITY POND #1 PLAN VIEW C4 OO SCALE: 1 " =20' 0 10 20 40 SCALE: 1 "= 20' 12'WIDE BERM HAND WHEEL TOP OF BERM = 366.00 1OD-YEARWSE=363.89 15"0 ORIFICE v 25-YEAR WSE 3,62-97 1.34 INV 359.60 ELEVATION 362-30 INVERTED SIPHON C 51 WITH WO ORIFICE 4.00' $ NORMAL POOL 35&00 UVA „F red. , � — . 1.00% _ Lt 81 P L El DEEP POOL BOTrOM 352.00 41 EN� MA­N­H��E�SEJRRF:j �=�K% D D , \WATER QUALITY POND #1 PROFILE VIEW ca501 SCALE: N.Ts. I�PA—GE�D��HRA­GM� r t 710 LF ' 15 0RCP ■ ■ ■ ■ ■ • ° ��N•Ecs'RO� �''•L V oil ■ � �'yG I NEED %P��� i ■ '•�...n.....•. ■ ■ ■ ■ LEVEL SPREADER LIP INVERT = 354.00 ■ HEADWALL ■ INVERT = 353.50 FILTER STRIP JUST DOWNSTREAM OF LEVEL SPREADER LIP ELEVATION = 353.71 ■ END OF ENGINEERED FILTER STIP 10 WIDE_ ELEVATION = 352.00 ■ LINEAR WETLAND — � i.� :�`E�G�N�I= RED�ILV�Ef� STRIP- ■ — ■ DRAWN BY; CHECKED BY: MU R D R D R R ■ DATE ■ APR125, 2012 ■ SCALE AS NOTED CITY OF DURHAM ■ PROJECT NO. t PUBLIC WORKS DEPARTMENT APPROVED ■ SHEET NO. ENGINEERING DATE ■ STORM WATER DATE C450 TRANSPORTATION DATE ■ DATE ■ DATE ■ <CONSTRUCTION DRAWINGS> ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED .............. .. J` { L, -:a ri t t ii t t l l 1_.........— 5a c � ' I x 7 utlnC 30' WIDE ENGINEERED - -- 12 ".. .. VELOCIT FILTER STRIP m Y DISSIi' ATOIR v `� INSTALL FILTER..Fa4BRIC $ETtiNEEN SOIL AND R'IPI2AI ............. AIRIA LE WIDTH BMP S- F�SEIaAEPdT- �- T1fP�, t r t:.,. .. ... ... .......... WATER QUALITY POND #1 PLAN VIEW C4 OO SCALE: 1 " =20' 0 10 20 40 SCALE: 1 "= 20' 12'WIDE BERM HAND WHEEL TOP OF BERM = 366.00 1OD-YEARWSE=363.89 15"0 ORIFICE v 25-YEAR WSE 3,62-97 1.34 INV 359.60 ELEVATION 362-30 INVERTED SIPHON C 51 WITH WO ORIFICE 4.00' $ NORMAL POOL 35&00 UVA „F red. , � — . 1.00% _ Lt 81 P L El DEEP POOL BOTrOM 352.00 41 EN� MA­N­H��E�SEJRRF:j �=�K% D D , \WATER QUALITY POND #1 PROFILE VIEW ca501 SCALE: N.Ts. I�PA—GE�D��HRA­GM� r t 710 LF ' 15 0RCP ■ ■ ■ ■ ■ • ° ��N•Ecs'RO� �''•L V oil ■ � �'yG I NEED %P��� i ■ '•�...n.....•. ■ ■ ■ ■ LEVEL SPREADER LIP INVERT = 354.00 ■ HEADWALL ■ INVERT = 353.50 FILTER STRIP JUST DOWNSTREAM OF LEVEL SPREADER LIP ELEVATION = 353.71 ■ END OF ENGINEERED FILTER STIP 10 WIDE_ ELEVATION = 352.00 ■ LINEAR WETLAND — � i.� :�`E�G�N�I= RED�ILV�Ef� STRIP- ■ — ■ DRAWN BY; CHECKED BY: MU R D R D R R ■ DATE ■ APR125, 2012 ■ SCALE AS NOTED CITY OF DURHAM ■ PROJECT NO. t PUBLIC WORKS DEPARTMENT APPROVED ■ SHEET NO. ENGINEERING DATE ■ STORM WATER DATE C450 TRANSPORTATION DATE ■ DATE ■ DATE ■ <CONSTRUCTION DRAWINGS> ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED 4 "0 PVC CLEANOUT WITH REMOVABLE CAP TOP OF SIPHON ASSEMBLY = 360.00 4"o PVC 4" X4 "X4" PVC TEE 4 "0 PVC PVC SLIP CAP WITH 3.0 "0 ORIFICE CEMENTED ONTO END OF 4 "0 PVC SECTION BOTTOM OF SIPHON ASSEMBLY= 357.00 A A INVERTED SIPHON ASSEMBLY 0451 )SCALE: N.T.S. 4 "0 PVC SIPHON ASSEMBLY INV IN = 358.00 PIN: 0769 -03 -41 -8938 PIN: 0769 -03-41 -6932 PIN: 0769 -03-41 -4887 PIN: 0769 -0442 -5588 PIN: 0769 -03-44 -6000 PIN: 0769-03 -33 -2232 PIN: 0769-03-24-8486 PIN: 0769 -03-35 -7254 PIN: 0769 -01 -35 -3524 PIN: 0769 -01 -26 -9080 PIN: 0769-01 -06 -9898 Parcel ID: 194413 Parcel ID: 194412 Parcel ID: 194411 Parcel ID: 194383 Parcel ID: 194384 Parcel ID: 193264 Parcel ID: 193265 Parcel ID: 210697 Parcel ID: 193271 Parcel ID: 193270 Parcel ID: 193320 GROUT 4 "0 PVC INTO WALL OF RISER PVC INVERT IN = 358.00 4 "0 PVC SLIP CAP W11, . 3.0 "0 ORIFICE writ n� ir• SECTION AA ACCESS DOOR CENTERED OVER STEPS 64°0 #4 REBAR RING 3" MI N 3" MIN + 1810 O -RING RCP 1 iv SECTION A -A NOTES: 1. USE #4 EPDXY -COATED STEEL REBAR {TYPICAL). 2. ALLOW MINIMUM 3" BETWEEN EXPOSED CONCRETE AND REBAR. 3. PLACEMENT OF CONCRETE ANTIFLOTATION BLOCK SHALL NOT CONFLICT WITH INSTALLATION OF 19'0 O -RING RCP. 4.INSTALL ANTI - FLOTATION BLOCK SUCH THAT rf DOES NOT CONFUCT WITH INSTALLATION OF 18" 0 O -RING RCP. 2 RISER STRUCTURE C451 SCALE: NTS N ELEVATION VIEW NOTE: SECURE (4) EVENLY SPACED I ZV'xl /8"GALVANIZED STEEL STRAPS 0 EACH JOINT OF RISER SECTION NOTE: PROVIDE STEPS IN RISER PER NCDOTSTD. 840.66 (SEE DETAIL) 3'k1/2" BOLT 12 kNkl /8" GALVIANIZED STEEL ANCHOR STRAP RISER JOINT 3kl/2 BOLT NOTE: EACH STRAP TO BE SECURED TO MANHOLE RISER BY (2) SM /2" GALVANIZED STEEL CONCRETE ANCHOR BOLTS. COATED WITH A BITUMINOUS COATING. 2' MIN. COVER FINISHE14 GRADE RISER CREST ELEV = 362M TO TOP OF BERM SAND DISF.<0.7MM FACE OF SEEPAGE 2' MIN. OUTSIDE EDGE DISF./DRS `U0.5 2' MIN. COVER DIAPHRAGM TO FACE # 57 STONE A 4''0 SCH, 40 TO TOP OF BERM F HEADWALL NON - PERFORATED PVCLD PROVIDE STEPS ®11 O.C. „ 1 6'' PRECAST 4'0 EXTENDED Y Ry 2 L.F. 4 °'0 SCH. 40 -' i r a. p PER NCDOT STANDARD � a PEEFORATED PVC BASE MANHOLE 18"0 RCP � 7ryXrv: 4.00' 410 SCH 410 PERFORATED „ n..rSTNE° a' PIPE WIITH CAP ' b MMI N EXTEND 4'°0 PVC A 18 "0 O-RING RCP+x 1' -6" BASE F PIPE THROUGH 18 "0 HEADWALL 15" 0 ORIFICE RCP :o EADWALL (SEE 4°'0 SCH. 40 -�, ry cy DETAIL] INV OUT = 359.60 NON - PERFORATED PVCLD 1 " -6" BELOW BOTTOM OF 11-6" 2-171 NC PRODUCTS PIPE 2 L.F. 4 '0 SCH. 40 DLSF. /DRS <U0.5 p. FACE OF SEEPAGE PRECAST 4'0 STALL EXTENDED DIAPHRAGM TO FACE OF PRRFORATED PVC PIPE WITH l ZED HEADWALL CAP -6 BASE MANHOLE SECTION ELEVATION VIEW '4 (OR APPROVED EQUAL) NO SCALE n PLAN N 0 PVC SIPHON ASSEMBLY C451 p NO SCALE • INV IN = 358,00 , 9 "THICK CONCRETE FILL LAVER . d {t y t _. tl ll t 4 rr 180 O -RING RCP ft f ,� INV OUT 354.5D n EXTENDED BASE INVERT = 353.25 18 "0O -RING RCP INV OUT = 354.50 AA o+ BEGIN CONCRETE CRADLE AT p EDGE OF ANTI FLOTATION BLOCK PLAN VIEW 64°0 #4 REBAR RING 3" MI N 3" MIN + 1810 O -RING RCP 1 iv SECTION A -A NOTES: 1. USE #4 EPDXY -COATED STEEL REBAR {TYPICAL). 2. ALLOW MINIMUM 3" BETWEEN EXPOSED CONCRETE AND REBAR. 3. PLACEMENT OF CONCRETE ANTIFLOTATION BLOCK SHALL NOT CONFLICT WITH INSTALLATION OF 19'0 O -RING RCP. 4.INSTALL ANTI - FLOTATION BLOCK SUCH THAT rf DOES NOT CONFUCT WITH INSTALLATION OF 18" 0 O -RING RCP. 2 RISER STRUCTURE C451 SCALE: NTS N ELEVATION VIEW NOTE: SECURE (4) EVENLY SPACED I ZV'xl /8"GALVANIZED STEEL STRAPS 0 EACH JOINT OF RISER SECTION NOTE: PROVIDE STEPS IN RISER PER NCDOTSTD. 840.66 (SEE DETAIL) 3'k1/2" BOLT 12 kNkl /8" GALVIANIZED STEEL ANCHOR STRAP RISER JOINT 3kl/2 BOLT NOTE: EACH STRAP TO BE SECURED TO MANHOLE RISER BY (2) SM /2" GALVANIZED STEEL CONCRETE ANCHOR BOLTS. COATED WITH A BITUMINOUS COATING. FINISHED GRADE 1 2' MIN. COVER FINISHE14 GRADE TO TOP OF BERM SAND DISF.<0.7MM FACE OF SEEPAGE 2' MIN. OUTSIDE EDGE DISF./DRS `U0.5 2' MIN. COVER DIAPHRAGM TO FACE # 57 STONE A 4''0 SCH, 40 TO TOP OF BERM F HEADWALL NON - PERFORATED PVCLD SIDE) 1 6'' =n Y Ry 2 L.F. 4 °'0 SCH. 40 -' i r � HEADWALL PEEFORATED PVC MIN. 18"0 RCP � 7ryXrv: 410 SCH 410 PERFORATED n..rSTNE° PVC (TYP) PIPE WIITH CAP ' b MMI N EXTEND 4'°0 PVC A 18 "0 O-RING RCP+x 1' -6" BASE F PIPE THROUGH 18 "0 HEADWALL O-RIN RCP :o EADWALL (SEE 4°'0 SCH. 40 ry cy DETAIL] EXTEND DIAPHRAGM NON - PERFORATED PVCLD 1 " -6" BELOW BOTTOM OF 11-6" 2-171 SAND DISF.<0.7MM PIPE 2 L.F. 4 '0 SCH. 40 DLSF. /DRS <U0.5 FACE OF SEEPAGE 55 DIAPHRAGM TO FACE OF PRRFORATED PVC PIPE WITH l ZED HEADWALL CAP -6 ELEVATION VIEW '4 NO SCALE PLAN NO SCALE FINISHED GRADE 1 2' MIN. COVER TO TOP OF BERM x w ;.,, ., . n.rc m..n.r :n , +.N r,•.,r.; 2' MIN. OUTSIDE EDGE OF PIPE TO EDGE OF MIN. a DIAPHRAGM {EACH SIDE) 1 6'' w Y Ry SAND 2 LAYER ° MIN. 18"0 RCP 410 SCH 410 PERFORATED PVC (TYP) #57 STONE 1' -6" BASE F PIPE TO BOTTOM OF STONE CROSS SECTION A NO SCALE 3 SEEPAGE DIAPHRAM C451 SCALE: N.T.S. PRECAST FLAT TOP — 36" MIN. CONCRETE CRADLE (SEE CONCRETE CRADLE PROFILE) 6° (TYP.} 113° DIAMETER O -RING RCP (CLASS .........Y #6 REBAR (GRADE 601 IV-MODIFIED TONGUE & GROOVE #3 REBAR TIES(U BARS) SPACED w. AT 10 FT. ON CENTER ",.n n • 17 CENTER TO CENTS , 1 1 R (TYP.) (MIN.) (MIN.) 6" FROM BOTTOM OF CRADLE :....:�... ......... ......... n` TO CENTER OF #d REBAR 18 "0 RCP IN FROM POND 8.583° 3' COVER (MIN.) TO p C/C (TYP.J OUTSIDE OF #3 TIE BAR CROSS-SECTION DETAIL CENTER OF 76 REBAR 4 CONCRETE CRADLE DETAIL C45 SCALE: N.T.S. OUTSIDE DIA. CROWN OF PIPE INSIDE DIA. CROWN OF PIPE TOP OF CRADLE #6 REBAR (GRADE 60) INSIDE DIA. INV OF PIPE OUTSIDE DIA. INVERT OF PIPE #6 REBAR (GRADE 60) ARE #3 REBAR(GRADE 60) SPACED INTER ALONG THE LENGTH OF THE 2. MAINTAIN A MIN, COVER OF 3" OF CONCRETE (TO THE OUTSIDE OF THE REBAR} FOR ALL REINFORCEMENT. 3. TRENCH TO BE BACKFILLED IN 5" LIFTS WHEN COMPACTION IS BY HAND. BACKFILL IS IN W LIFTS WHEN CONDUCTED BY MACHINE. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 18 "0 RCP BEFORE DRIVING OVER WITH HEAVY EQUIPMENT. z TBM SITE BENCHMARK NCGS MONUMENT NC F EL = 409.94' NGVD 29 BYPASS WEIR ELEV = 355.60 r ly +l t t 1 } t, INV IN = 353.70 J 4'0 EXTENDED BASE MANHOLE SAO ib9^ zo 4" THICK REINFORCED CONCRETE BAFFLE WALL GROUT TO WALLS AT BOTH ENDS z O a O U- Z_ b Q eo FLOW SPUTTER DETAIL C451 SCALE: N.T.S. 24" MANHOLE COVER FLUSH WITH TOP 150 RCP OUT TO LEVEL SPREADER INV OUT = 353.60 199 BYPASS PIPE INV OUT = 353.70 4'0 MANHOLE 150 RCP OUT TO LEVEL SPREADER im- CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORM WATER DATE TRANSPORTATION DATE DATE DATE ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ HOIRVATH ■ A S S O C I A T E S ■ ■ 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 ■ P 919.490.4990 F 919.490.8953 ■ P.O. BOX 970 ■ HARRISON, TENNESSEE 37341 P 423.266.4990 ■ www.horvathassociates.com ■ NORTH CAROLINA BOARD OF ■ EXAMINERS FOR ENGINEERS AND ■ SURVEYORS LICENSE NO.: C-0676 ■ ■ ■ ■ ■ ■ ■ J ® F- oe 7- ■ < m U 0 C 5 ■ J O Lu Lu Lu ■ ■ ■ ■ ■ ■ ■ W ■ • 1 O ## 1 DETAILS ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ P 3R ■ � �'yG I NEED %P��� i ■ '• ...n.....•. ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ DRAWN BY: CHECKED BY: MLJ RH/TS ■ DATE ■ APRIL 25, 2012 ■ SCALE AS NOTED ■ PROJECT NO. Ar ■ SHEET NO. ■ C451 ■ ■ ■ <CONSTRUCTION DRAWINGS> WATER QUALITY POND #2 PLAN VIEW SCALE: 1 " =30' 0 100 -YEAR WSE = 377.58 0 25 -YEAR WSE = 376.18 10 -YEAR WSE = 375.39 0 2 -YEAR WSE = 373.66 0 1 -YEAR WSE = 373.22 0 1" RUNOFF VOLUME WSE = 372.40 = DEEP POOL BOTTOM = 367.00 HAND WHEEL 2' WIDE X 2' TALL ORIFICE INV = 372.40 INVERTED 4'0 SIPHON ASSEMBLY INV = 371.00 ,Al PC)C)I = 371 [10 7 LF 9'0 DIP 6 .00 WATER QUALITY POND #2 PROFILE VIEW C452 %SCALE: N.T.S. 5� 1l `l t� ti 0 15 30 60 SCALE: 1 30' RISER CREST 3 ELEVATION = 375.30 1 INVERT OUT = 367.00 12' WIDE BERM TOP OF BERM = 380.00 (SEEMED = 379.351 88 LF 36"0 O -RING RCP @ 1.099 F rzartcruie.��x \ J eme�vgwcwx�rnonwuoe mum 1114�� �� 3 ,r FLOW SPUTTER MANHOLE t� BYPASS WEIR ELEVATION = 369.40 i ;- 36" 0 RCP BYPASS PIPE INV OUT = 366.00 nr� INV OUT = 365.90 n HEADWALL r/ INVERT = 365.60 26 LF 15 "0 RCP T0' WIDE :. LINEAR WETLAND t� 1, Lim am t, 1, /-LEVEL SPREADER LIP INVERT = 366.00 TBM SITE BENCHMARK NCGS MONUMENT NC F EL = 409.94' NGVD 29 FILTER STRIP JUST DOWNSTREAM OF LEVEL SPREADER LIP ELEVATION = 365.70 END OF ENGINEERED FILTER STIP ELEVATION = 364.00 CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORM WATER DATE TRANSPORTATION DATE DATE nATF I ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ HOIRVATH A S S O C I A T E S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 P.O. BOX 970 HARRISON, TENNESSEE 37341 P 423.266.4990 www.horvathassociates.com NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 WO #2 PLAN C)� E s P � co • T'vG I NEED %P��� i � 4 J Z O • Ho,.••'� DRAWN BY: CHECKED BY: MLJ RH/TS DATE APRIL 25, 2012 SCALE AS NOTED PROJECT NO. 1121 SHEET NO. C452 <CONSTRUCTION DRAWINGS> V) ry 0 rn rn rl000 J cn < ® F- oe 0 l3e 0 J II- O 9_u _ J� s _ C) Lu W < r ne 1) WO #2 PLAN C)� E s P � co • T'vG I NEED %P��� i � 4 J Z O • Ho,.••'� DRAWN BY: CHECKED BY: MLJ RH/TS DATE APRIL 25, 2012 SCALE AS NOTED PROJECT NO. 1121 SHEET NO. C452 <CONSTRUCTION DRAWINGS> 4 "0 PVC CLEANOUT WITH REMOVABLE CAP TOP OF SIPHON ASSEMBLY = 371.20 4"o PVC 4" X4 "X4" PVC TEE 4110 PVC BOTTOM OF SIPHON ASSEMBLY= 367.00 1 A A INVERTED SIPHON ASSEMBLY C452% SCALE: N.T.S. 3490 O -RING RCP INV OUT = 366.00 PLAN VIEW 2 RISER STRUCTURE 0452 SCALE: NTS GROUT 4 "0 PVC INTO WALL OF RISER PVC INVERT IN = 368.00 RISER CREST ELIEV = 375.30 PIN: 0769 -03 -41 -8938 PIN: 0769 -03-41 -6932 PIN: 0769 -03-41 -4887 PIN: 0769 -0442 -5588 PIN: 0769 -03-44 -6000 PIN: 0769-03 -33 -2232 PIN: 0769-03-24-8486 PIN: 0769 -03-35 -7254 PIN: 0769 -01 -35 -3524 PIN: 0769 -01 -26 -9080 PIN: 0769-01 -06 -9898 Parcel ID: 194413 Parcel ID: 194412 Parcel ID: 194411 Parcel ID: 194383 Parcel ID: 194384 Parcel ID: 193264 Parcel ID: 193265 Parcel ID: 210697 Parcel ID: 193271 Parcel ID: 193270 Parcel ID: 193320 4 "o PVC SECTION AA N ELEVATION VIEW PROVIDE STEPS ®16' O.C. PER NCDOT STANDARD NC PRODUCTS PRECAST 5'0 5' TALL EXTENDED BASE MANHOLE SECTION (OR APPROVED EQUAL) 5.33 THICK CONCRETE FILL LAYER PLACE EXTENDED BASE MANHOLE ON COMPACTED SUBGRADE NOTE: SECURE (4) EVENLY SPACED 12°x4'xl /8" GALVANIZED STEEL STRAPS 0 EACH JOINT OF RISER SECTION NOTE: PROVIDE STEPS IN RISER PER NCDOTSTD. 840.66 (SEE DETAIL) 3'x1/2" BOLT 12"xNkl /8" GALVIANIZED STEEL ANCHOR STRAP RISER JOINT 3'x1/2" BOLT NOTE: EACH STRAP TO BE SECURED TO MANHOLE RISER BY (2) SM /2" GALVANIZED STEEL CONCRETE ANCHOR BOLTS. COATED WITH A BITUMINOUS COATING. FINISHED GRADE 1 2' MIN. COVER FINISHE14 GRADE TO TOP OF BERM SAND DISF. <0.7MM FACE OF SEEPAGE 2' MIN. OUTSIDE EDGE DISF./DRS `U0.5 2' MIN. COVER DIAPHRAGM TO FACE # 57 STONE A 4''0 SCH, 40 TO TOP OF BERM F HEADWALL NON - PERFORATED PVCLD SIDE) 1 6'' =n Y Ry 2 L.F. 4 °'0 SCH. 40 -' i r � HEADWALL PREFORATED PVC MIN. 38"0 RCP � 7ryXrv: 4'0 SCH 40 PERFORATED n. :SINE° PVC (TYP) PIPE WITH CAP ' b MMI N EXTEND 4°0 PVC A 36 "9 O -RING RCP+x 1' -6" BASE 4F PIPE THROUGH C36" 0 HEADWALL O-RIN RCP :o EADWALL (SEE 4 °'0 SCH. 40 ry ry cy DETAIL) EXTEND DIAPHRAGM NON - PERFORATED PVCLD 1 " -6" BELOW BOTTOM OF 1' 6" 2'-0°' SAND DISF.<0.7MM PIPE 2 L.F. 4 '0 SCH. 40 DLSF. /DRS <UO.5 FACE OF SEEPAGE 55 DIAPHRAGM TO FACE OF PREFORATED PVC PIPE WITH „ HEADWALL CAP -1-6 2-0 1 ELEVATION VIEW '4 NO SCALE PLAN NO SCALE FINISHED GRADE 1 2' MIN. COVER TO TOP OF BERM x w ;•,, ., . n.rc m..n.r :n ,,.N :..,r.: 2' MIN. OUTSIDE EDGE OF PIPE TO EDGE OF MIN. a DIAPHRAGM {EACH SIDE) 1 6'' w Y Ry SAND 2' LAYER ° MIN. 38"0 RCP 4'0 SCH 40 PERFORATED PVC (TYP) #57 STONE 1' -6" BASE 4F PIPE TO BOTTOM OF STONE CROSS SECTION A NO SCALE 3 SEEPAGE DIAPHRAGM C452 SCALE: N.T.S. TBM SITE BENCHMARK NCGS MONUMENT NC F EL = 409.94' NGVD 29 PRECAST FLAT TOP MANHOLE COVER FLUSH WITH TOP 56 °'MIN. CONCRETE CRADLE (SEE CONCRETE CRADLE PROFILE) (TYP.) 36" DIAMETER O -RING RCP (CLASS 60 MANHOLE IV- MODIFIED z #6 REBAR (GRADE 601 TONGUE & GROOVE #3 REBAR TIES(U -BARS) SPACED BYPASS WEIR N AT 10 FT. ON CENTER ELEV = 369.40 1 1 ,.n M • 27 CENTER TO CENTS 1 m (TY ' } 7 h4 wr 1 (MIN.) (MIN.) z 6" FROM BOTTOM OF CRADLE io rr ~ 36°'0 RCP IN FROM POND ........ TO CENTER OF #d REBAR i 1 B' 0 RC LEVEL SPREADER ,....... ........ ......... ........... 8,583° 3" COVER QMIN.) TO P OUT TO L C/C (TYP.J OUTSIDE OF #3 TIE BAR t t f ti CROSS-SECTION DETAIL INV IN = 366.00 INV OUT = 365.90 _ 12 PIPE SECTION DETAIL _ CENTER OF #6 REBAR -- ­ 4 CONCRETE CRADLE DETAIL C452 SCALE: N.T.S. OUTSIDE DIA. CROWN OF PIPE INSIDE DIA. CROWN OF PIPE TOP OF CRADLE #6 REBAR (GRADE 60) INSIDE DIA. INV OF PIPE OUTSIDE DIA. INVERT OF PIPE #6 REBAR (GRADE 60) ARE #3 REBAR(GRADE 60) SPACED INTER ALONG THE LENGTH OF THE 2. MAINTAIN A MIN, COVER OF 3" OF CONCRETE (TO THE OUTSIDE OF THE REBAR} FOR ALL REINFORCEMENT. 3. TRENCH TO BE BACKFILLED IN 5" LIFTS WHEN COMPACTION IS BY HAND. BACKFILL IS IN 8" LIFTS WHEN CONDUCTED BY MACHINE. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 18 "0 RCP BEFORE DRIVING OVER WrrH HEAVY EQUIPMENT. 4" THICK REINFORCED CONCRETE BAFFLE WALL GROUT TO WALLS AT BOTH ENDS in z O a 0 ne Z_ d :o M 5 FLOW SPUTTER DETAIL C453 SCALE: N.T.S. 36 "0 BYPASS PIPE INV OUT = 366.00 50 MANHOLE 18" 0 RCP OUT TO LEVEL SPREADER CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORM WATER DATE TRANSPORTATION DATE DATE nATF ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ H01IRVATH ■ A S S O C I A T E S ■ ■ 16 CONSULTANT PLACE,SUTTE 201 DURHAM, NORTH CAROLINA 27707 ■ P 919.490.4990 F 919.490.8953 ■ P.O. BOX 970 ■ HARRISON, TENNESSEE 37341 P 423.266.4990 ■ www.horvathassociates.com ■ NORTH CAROLINA BOARD OF ■ EXAMINERS FOR ENGINEERS AND ■ SURVEYORS LICENSE NO.: C-0676 0 < ■ ■ ■ ■ ■ ■ ® F- oe ■ 0 m U � 0 � ■ o Op ■ J O • Lu �_� LU 0 < ■ ne ■ r ■ ■ ■ ■ ■ WO #2 DETAILS ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ CA R 0, 7''• Y ■ P 3R ■ � �'vG I NEED %P��� i tiI`I► "N� � O L • H0� �����• ■ '•�...n.....•. ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ DRAWN BY: CHECKED BY: MLJ RH/TS ■ DATE ■ APRIL 25, 2012 ■ SCALE AS NOTED ■ PROJECT NO. ■ SHEET NO. C453■ ■ ■ <CONSTRUCTION DRAWINGS> ............ ... ............. ... ............. . HW INV = 402.00 RISER--` I N OUT= 4C .00 -` CL Q u �Fop OF BERM = 410.00 � DRY POND 0454 #3 PLAN VIEW v 100 -YEAR WSE = 407.44 v 25-YEAR WSE = 407-16 '--�DRY POND C454 SCALE: N.T.S. CONCRETE FILL LAYER ON TOP OF FLAT TOP TO MAKE FLUSH WITH MANHOLE PRECAST FLAT TOP WIT H 24!9 MANHOLE OPENING 10"0 ORIFICE INV = 405.00 t N 4.00' INVERTED SIPHON ASSEMBLY WITH 2.0 0 ORIFICE INV = 402.00 MICROPOOL BOTTOM = 400.00 7E� E� 7 2 r- 0 10 20 40 SCALE: 1 20' TOP OF RISER ELEVATION = 408.00 3 OUT = 402D0 1 VWIDE BERM u- -A 56 LF 19'0 O-RING RCP 0 1.07% E C� c SrIF B CC:­ 1 -1 N �Gll 11 E YR 3 7 N D JA_F�f M 7 -��III III III III III III III III III III III III III III III III III III III III III #3 PROFILE VIEW HEADWALL INVERT = 401.40 10' WIDE LINEAR WE•L . .............. ............................. ............................... ............................. ................... .................. ■ ■ DRY POND #3 PLAN ■ PR oil ot, - --'z- -p ■ ■ ■ ■ LEVEL SPREADER LIP INVERT = 401.30 ■ //-FILTER STRIP JUST DOWNSTREAM OF LEVEL SPREADER UP ■ ELEVATION = 401.00 ■ END OF ENGINEERED FILTER STIP ELEVATION = 399.00 ■ ■ 7N i,77- 7 7 d, DRAWN BY: CHECKED BY: MLJ RH/TS ■ DATE ■ APRIL 25, 2012 ■ SCALE AS NOTED ■ CITY OF DURHAM ■ PROJECT NO. PUBLIC WORKS DEPARTMENT 1121 APPROVED ■ SHEET NO. ENGINEERING DATE ■ STORM WATER DATE TRANSPORTATION DATE C454 DATE ■ DATE <CONSTRUCTION DRAWINGS> @COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED TOP OF SIPHON ASSEMBLY 4"o PVC 4 1'X4 "X4" PVC TEE 4 "0 PVC PVC SLIP CAP WITH 70 ORIFICE CEMENTED ONTO END OF 4 "0 PVC SECTION BOTTOM OF SIPHON ASSEMBI A "f'X n\ /1 y f^ I r A A If-% 1 IT A A INVERTED SIPHON ASSEMBLY C455I SCALE: N.T.S. PIN: 0769 -03 -41 -8938 PIN: 0769 -03-41 -6932 PIN: 0769 -03-41 -4887 PIN: 0769 -0442 -5588 PIN: 0769 -03-44 -6000 PIN: 0769-03 -33 -2232 PIN: 0769-03-24-8486 PIN: 0769 -03-35 -7254 PIN: 0769 -01 -35 -3524 PIN: 0769 -01 -26 -9080 PIN: 0769-01 -06 -9898 Parcel ID: 194413 Parcel ID: 194412 Parcel ID: 194411 Parcel ID: 194383 Parcel ID: 194384 Parcel ID: 193264 Parcel ID: 193265 Parcel ID: 210697 Parcel ID: 193271 Parcel ID: 193270 Parcel ID: 193320 GROUT 4 "0 PVC INTO WALL OF RISER NVERT IN = 402.00 4 "0 PVC SLIP CAP W11, . 2.0 "0 ORIFICE A"f7[ nx if— SECTION AA PROVIDE 8" THIICKCONCRETE FILL LAYER ON FLAT TOP TO MAKE TOP FLUSH WITH 0455 4 "0 PVC SIPHON ASSEMBLY MANHOLE COVER INV IN = 402.00 O TOP OF MANHOLE - ELEV = 409.00 � n 0 2.00' h 4. q PRECAST 4'0 EXTENDED BASE MANHOLE A' ? Y a r BOLT MANHOLE FRAME TO FLAT TOP NC PRODUCTS 40 PRECAST FLAT TOP (OR APPROVED EQUAL) PROVIDE STEPS 016" O.C. PER NCDOT STANDARD h 10'9 ORIFICE INV OUT = 405,00 INC PRODUCTS .~ PRECAST 4'0 5' TALL EXTENDED 4 0 PVC SIPHON ASSEMBLY 1 tf BASE MANHOLE SECTION p WITH 2 0 0 ORIFICE C455 f `1 `l (OR APPROVED EQUAL) PLAN VIEW 64 70 #4 REBAR RING 3" MIN 3" MIN 18'Y�J O -RING RCP f' 15" �T� 12 �T� 12" � � 17 °�r� 1T i 15" SECTION A -A CV z� In NOTES: 1. USE #4 EPDXY -COATED STEEL REBAR (TYPICAL). 2. ALLOW MINIMUM 3'° BETWEEN EXPOSED CONCRETE AND REBAR. 3. PLACEMENT OF CONCRETE ANTIFLOTATION BLOCK SHALL NOT CONFLICT WITH INSTALLATION OF IW 0 O -RING RCP. 41NSTALL ANTI - FLOTATION BLOCK SUCH THAT IT DOES NOT CONFLICT WIT H INSTALLATION OF 19'0 O -RING RCP. 2 RISER STRUCTURE C455 SCALE: NTS N MIS ELEVATION VIEW NOTE: SECURE (4) EVENLY SPACED I ZV'xl /8"GALVANIZED STEEL STRAPS 0 EACH JOINT OF RISER SECTION NOTE: PROVIDE STEPS IN RISER PER NCDOTSTD. 840.66 (SEE DETAIL) 3'k1/2" BOLT 12"xNkl /8" GALVIANIZED STEEL ANCHOR STRAP RISER JOINT �3'kl/2" BOLT NOTE: EACH STRAP TO BE SECURED TO MANHOLE RISER BY (2) SM /2" GALVANIZED STEEL CONCRETE ANCHOR BOLTS. COATED WITH A BITUMINOUS COATING. f INV IN — 402,00 ,4 ry m i t o e , FACE OF SEEPAGE 4 1 l f 7 ry. 2' MIN. COVER DIAPHRAGM TO FACE # 57 STONE f 1 B"0 O -RING RCP t LFL,F, 4 "QS SCH, 40 y TO TOP OF BERM F HEADWALL = INV OUT 402.00 NON - PERFORATED PVCLD ®F- E7T]61I Lu =n 7— 71 EXTENDED BASE INVERT = 400.75 18 "0 0 -RING RCP 2 L.F. 4 °'0 SCH. 40 -' i � o INV OUT = 402.00 HEADWALL PEEFORATED PVC n A A io 9_9..9 �# 7 °. s� _ BEGIN GONGRETE CRADLE AT T SINE PIPE WIITH CAP ' b EDGE OF ANTI FLOTATION BLOCK PLAN VIEW 64 70 #4 REBAR RING 3" MIN 3" MIN 18'Y�J O -RING RCP f' 15" �T� 12 �T� 12" � � 17 °�r� 1T i 15" SECTION A -A CV z� In NOTES: 1. USE #4 EPDXY -COATED STEEL REBAR (TYPICAL). 2. ALLOW MINIMUM 3'° BETWEEN EXPOSED CONCRETE AND REBAR. 3. PLACEMENT OF CONCRETE ANTIFLOTATION BLOCK SHALL NOT CONFLICT WITH INSTALLATION OF IW 0 O -RING RCP. 41NSTALL ANTI - FLOTATION BLOCK SUCH THAT IT DOES NOT CONFLICT WIT H INSTALLATION OF 19'0 O -RING RCP. 2 RISER STRUCTURE C455 SCALE: NTS N MIS ELEVATION VIEW NOTE: SECURE (4) EVENLY SPACED I ZV'xl /8"GALVANIZED STEEL STRAPS 0 EACH JOINT OF RISER SECTION NOTE: PROVIDE STEPS IN RISER PER NCDOTSTD. 840.66 (SEE DETAIL) 3'k1/2" BOLT 12"xNkl /8" GALVIANIZED STEEL ANCHOR STRAP RISER JOINT �3'kl/2" BOLT NOTE: EACH STRAP TO BE SECURED TO MANHOLE RISER BY (2) SM /2" GALVANIZED STEEL CONCRETE ANCHOR BOLTS. COATED WITH A BITUMINOUS COATING. FINISHED GRADE 1 2' MIN. COVER TO TOP OF BERM x w ;,,, .°, . n.rc m..n.r :n ,,.N r,•.,r.; 2' MIN. OUTSIDE EDGE OF PIPE TO EDGE OF LMI�N/.a,, DIAPHRAGM {EACH SIDE) 1 6 /��% Y R• SAND w�2' 18"0 RCP 4'0 SCH 40 PERFORATED PVC (TYP) #57 STONE TO BOTTOM OF STONE CROSS SECTION A NO SCALE 3 SEEPAGE DIAPHRAM C455 SCALE: N.T.S. 36" MIN. CONCRETE CRADLE (SEE CONCRETE CRADLE PROFILE) (TYP.) 18'° DIAMETER n O -RING RCP (CLASS ................ #6 REBAR (GRADE 601 IV-MODIFIED TONGUE & GROOVE #3 REBAR TIES(U BARS) SPACED w. AT 10 FT. ON CENTER 1� m 1 ",.n w n • 17 CENTER TO CENTS , n rcr 1 1 R (TYP.) (MIN.) (MIN.) L 6" FROM BOTTOM OF CRADLE ...... ............n TO CENTER OF #6 REBAR 8 583 3" COVER (MIN.) TO C/C (TYP.J OUTSIDE OF #3 TIE BAR CROSS-SECTION DETAIL CENTER OF 76 REBAR 4 CONCRETE CRADLE DETAIL C455 SCALE: N.T.S. OUTSIDE DIA. CROWN OF PIPE INSIDE DIA. CROWN OF PIPE TOP OF CRADLE #6 REBAR (GRADE 60) INSIDE DIA, INV OF PIPE OUTSIDE DIA. INVERT OF PIPE #6 REBAR (GRADE 60) ARE #3 REBAR(GRADE 60) SPACED INTER ALONG THE LENGTH OF THE 2. MAINTAIN A MIN, COVER OF 3" OF CONCRETE (TO THE OUTSIDE OF THE REBAR) FOR ALL REINFORCEMENT. 3. TRENCH TO BE BACKRLLED IN 5" UFTS WHEN COMPACTION IS BY HAND. BACKFILL IS IN W LIFTS WHEN CONDUCTED BY MACHINE. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 18 "0 RCP BEFORE DRIVING OVER WITH HEAVY EQUIPMENT. TBM SITE BENCHMARK NCGS MONUMENT NC F EL = 409.94' NGVD 29 CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORM WATER DATE TRANSPORTATION DATE DATE HATE I ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ H01IRVATH A S S O C I A T E S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 P.O. BOX 970 HARRISON, TENNESSEE 37341 P 423.266.4990 www.horvathassociates.com NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 FINISHE14 GRADE ry SAND DISF.<0.7MM FACE OF SEEPAGE DISF `U0.5 2' MIN. COVER DIAPHRAGM TO FACE # 57 STONE A LFL,F, 4 "QS SCH, 40 -/DRS TO TOP OF BERM F HEADWALL J NON - PERFORATED PVCLD ®F- oe Lu =n 7— 2 L.F. 4 °'0 SCH. 40 -' i � o n' - HEADWALL PEEFORATED PVC n O 9_9..9 �# 7 °. s� _ SINE PIPE WIITH CAP ' b _ N EXTEND 4'°0 PVC A 18 "0 OWING RCPix THROUGH HEADW ALL LRING RCP :o EADWALL (SEE LF2L.F. 4 10 SC91.40 ry cy DETAIL] EXTEND DIAPHRAGM NON - PERFORATED PVCLD 1 " -6" BELOW BOTTOM OF 1'-6" 2'-0°' SAND DISF,<0.7MM PIPE 2 L.F. 4 '0 SCH, 40 DLSF. /DRS <UD.5 y FACE OF SEEPAGE DIAPHRAGM TO FACE OF PRRFORATED PVC PIPE WITH ZED n, HEADWALL CAP ELEVATION VIEW A NO SCALE PLAN NO SCALE FINISHED GRADE 1 2' MIN. COVER TO TOP OF BERM x w ;,,, .°, . n.rc m..n.r :n ,,.N r,•.,r.; 2' MIN. OUTSIDE EDGE OF PIPE TO EDGE OF LMI�N/.a,, DIAPHRAGM {EACH SIDE) 1 6 /��% Y R• SAND w�2' 18"0 RCP 4'0 SCH 40 PERFORATED PVC (TYP) #57 STONE TO BOTTOM OF STONE CROSS SECTION A NO SCALE 3 SEEPAGE DIAPHRAM C455 SCALE: N.T.S. 36" MIN. CONCRETE CRADLE (SEE CONCRETE CRADLE PROFILE) (TYP.) 18'° DIAMETER n O -RING RCP (CLASS ................ #6 REBAR (GRADE 601 IV-MODIFIED TONGUE & GROOVE #3 REBAR TIES(U BARS) SPACED w. AT 10 FT. ON CENTER 1� m 1 ",.n w n • 17 CENTER TO CENTS , n rcr 1 1 R (TYP.) (MIN.) (MIN.) L 6" FROM BOTTOM OF CRADLE ...... ............n TO CENTER OF #6 REBAR 8 583 3" COVER (MIN.) TO C/C (TYP.J OUTSIDE OF #3 TIE BAR CROSS-SECTION DETAIL CENTER OF 76 REBAR 4 CONCRETE CRADLE DETAIL C455 SCALE: N.T.S. OUTSIDE DIA. CROWN OF PIPE INSIDE DIA. CROWN OF PIPE TOP OF CRADLE #6 REBAR (GRADE 60) INSIDE DIA, INV OF PIPE OUTSIDE DIA. INVERT OF PIPE #6 REBAR (GRADE 60) ARE #3 REBAR(GRADE 60) SPACED INTER ALONG THE LENGTH OF THE 2. MAINTAIN A MIN, COVER OF 3" OF CONCRETE (TO THE OUTSIDE OF THE REBAR) FOR ALL REINFORCEMENT. 3. TRENCH TO BE BACKRLLED IN 5" UFTS WHEN COMPACTION IS BY HAND. BACKFILL IS IN W LIFTS WHEN CONDUCTED BY MACHINE. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 18 "0 RCP BEFORE DRIVING OVER WITH HEAVY EQUIPMENT. TBM SITE BENCHMARK NCGS MONUMENT NC F EL = 409.94' NGVD 29 CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORM WATER DATE TRANSPORTATION DATE DATE HATE I ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ H01IRVATH A S S O C I A T E S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 P.O. BOX 970 HARRISON, TENNESSEE 37341 P 423.266.4990 www.horvathassociates.com NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 DRY POND #3 DETAILS CA R: P 3 ' • T'vG I NEED %PT� i L. HO-,,o% DRAWN BY: CHECKED BY: MLJ RH/TS DATE APRIL 25, 2012 SCALE AS NOTED PROJECT NO. 1121 SHEET NO. C455 <CONSTRUCTION DRAWINGS> ry Z J ®F- oe Lu 7— o J O 9_9..9 _ u s� _ Lu Lu fie DRY POND #3 DETAILS CA R: P 3 ' • T'vG I NEED %PT� i L. HO-,,o% DRAWN BY: CHECKED BY: MLJ RH/TS DATE APRIL 25, 2012 SCALE AS NOTED PROJECT NO. 1121 SHEET NO. C455 <CONSTRUCTION DRAWINGS> x- LEERED� LF ljg' I ■ rr r � r v .� r � _ f%1:00 /.,. � 0 10 20 40 ■ WATER QUALITY POND #4 PLAN VIEW C456 4SCALE' 1 "=20' SCALE: 1 20' ■ ■ ■ ■ CONCRETE FILL LAYER ON TOP OF FLAT TOP TO MAKE FLUSH WITH MANHOLE 12' WIDE BERM ��\A ai;Q TOP OP OF BERM = 386.00 PRECAST FLAT TOP Wff (SEMED 385 A&l 24'0 MANHOLE OPENING TOP OF STRUCTURE 100 -YEAR WSE = 383.63 ELEVATION = 383.30 c C,�q�l .................. 57 ,7 25-YEAR WSE 383.10 OORIFICE c ::::::::: Ml 10 -YEAR WSE 382.69 INV = 381.60 1 3 ZOL 2-YEAR WSE 382.03 4.00 1-YEAR WSE =381.88 INVERTED SIPHON ASSEMBLY ■ WITH l.Cf'O ORIFICE 1 RUNOFF VOLUME WSE 381-60 INV 381.00 NORMAL POOL = 381.00 ■ z HEADWALL LEVEL SPREADER UP INVERT = 376.00 2 INVERT 375.20 ■ 12 LF 8'0 DIP INVERT OUT 376.00 FILTER STRIP JUST DOWNSTREAM OF LEVEL SPREADER LIP ■ DEEP POOL BOTTOM 375.00 66 LF 18"0 O-RING RCP @ 1.21 % ELEVATION = 375.70 ■ �N = 376 -i. w END OF ENGINEERED FILTER STIP . . ... .. . .... 10'WIDE ELEVATION 374.00 LINEAR WETLAND IT ANDL -1 T7- L WETLAND ■ F7, ■ r, �RENC-H RETE-Fl L �Y� 457 E T 0 DRAWN BY: CHECKED BY: I .......... .......... .......... ........... — .......... ��T �HNIICAL�E �—IIEER T MLJ RH/TS I�p H �R� 4 S DATE APR1 25, 2012 ■ SCALE AS NOTED ■ CITY OF DURHAM PROJECT' NO. ■ PUBLIC WORKS DEPARTMENT 1121 APPROVED ■ SHEET NO. 2 WATER QUALITY POND #4 PROFILE VIEW ENGINEERING DATE STORM WATER DATE C456SCALE: N.T.S. TRANSPORTATION DATE C456 DATE ■ DATE <CONSTRUCTION DRAWINGS> @COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED 4 "0 PVC CLEANOUT WITH REMOVABLE CAP TOP OF SIPHON ASSEMBLY = 382.50 4"o PVC 4" X4 "X4" PVC TEE 4 "0 PVC PVC SLIP CAP WITH 1"0 ORIFICE CEMENTED ONTO END OF 4 "0 PVC SECTION BOTTOM OF SIPHON ASSEMBLY= 380.00 A A INVERTED SIPHON ASSEMBLY C457) SCALE: N.T.S. PIN: 0769 -03 -41 -8938 PIN: 0769 -03-41 -6932 PIN: 0769 -03-41 -4887 PIN: 0769 -0442 -5588 PIN: 0769 -03-44 -6000 PIN: 0769-03 -33 -2232 PIN: 0769-03-24-8486 PIN: 0769 -03-35 -7254 PIN: 0769 -01 -35 -3524 PIN: 0769 -01 -26 -9080 PIN: 0769-01 -06 -9898 Parcel ID: 194413 Parcel ID: 194412 Parcel ID: 194411 Parcel ID: 194383 Parcel ID: 194384 Parcel ID: 193264 Parcel ID: 193265 Parcel ID: 210697 Parcel ID: 193271 Parcel ID: 193270 Parcel ID: 193320 GROUT 4 "0 PVC INTO WALL OF RISER PVC INVERT IN = 381.00 4 "0 PVC SLIP CAP WIT,. 1.0 "0 ORIFICE SECTION AA PROVIDE 8" THICKCONCRETE FILL LAYER ON FLAT TOP TO MAKE TOP FLUSH WITH MANHOLE COVER TOP OF MANHOLE ELEV = 385.30 10 2.00' /r 4.00' �L r r r OPEN TO C457 4"0 PVC SIPHON ASSEMBLY OPERATE VALVE INV IN = 381.00 4 ' PRECAST BBASE MANHO LE EXTENDED i 4• 24"0 MANHOLE OPENING 18"0 O -RING RCP INV OUT = 376.00 PLAN VIEW 4 RISER STRUCTURE 0457 SCALE: NTS N ?ll■ ELEVATION VIEW # 57 STONE 2 L.F. 4 "9 SCH. 40 PEEFORATED PVC PIPE WIITH CAP - 18"0 O-RI1 SAND DISF.<0.7MM DISF. /DRS <UO.5 PLAN NO SCALE =n b [V FINISHE14 GRADE SAND DISF. <0.7MM FACE OF SEEPAGE DISF./DRS <U0.5 2' MIN. COVER DIAPHRAGM TO FACE 4'0 SCH, 40 — TO TOP OF BERM F HEADWALL NON - PERFORATED PVCLD �HEADWALL -A rr .S oNEry EXTEND 4"0 PVC THROUGH HEADWALL 1 ' ! _--HEADWALL (SEE r" DETAIL tj :Q FACE OF SEEPAGE DIAPHRAGM TO FACE OF HEADWALL EXTEND DIAPHRAGM l' -6" BELOW BOTTOM PIPE 18 "0 O-RING RCP 'ro" 2!-0" ELEVATION VIEW NO SCALE FINISHED GRADE 1 2' MIN. COVER TO TOP OF BERM x w ;,,, .�, . n.rc m..n.r :n ,,.N r,•.,r.; 2' MIN. OUTSIDE EDGE OF PIPE TO EDGE OF MIN.a DIAPHRAGM {EACH SIDE) SAND w�2' u�rtrc° avun. 11 18"0 RCP 4" O SCH 40 PERFORATED PVC (TYP) #57 STONE 1' -6" BASE F PIPE TO BOTTOM OF STONE BOLT MANHOLE FRAME TO FLAT TOP CROSS SECTION A INC PRODUCTS NO SCALE XO PRECAST FLAT TOP (OR APPROVED EQUAL) 3 SEEPAGE DIAPHRAM C457 SCALE: N.T.S. PROVIDE STEPS ®16" O.C. PER NCDOT STANDARD NC PRODUCTS PRECAST 4'0 5' TALL EXTENDED BASE MANHOLE SECTION (OR APPROVED EQUAL) 36" MIN, CONCRETE CRADLE (SEE CONCRETE CRADLE PROFILE) 2.5'THICKCONCRErE FILL LAYER (TYP.) 188' DIAMETER m O -RING RCP (CLASS ...........Y #6 REBAR (GRADE 601 IV - MODIFIED TONGUE & GROOVE #3 REBAR TIES(U -BARS) SPACED AT 10 FT. ON CENTER ",.n n • 17 CENTER TO CENTER P. 1 , m n rcr (TY ) 1 ELEV = 373.00 (MIN.) (MIN.) 6" FROM BOTTOM OF CRADLE Ak ..... :.....�... ,......: ........ ............. TO CENTER OF #6 REBAR 8,583 3" COVER (MIN.) TO C/C (TYp.J OUTSIDE OF #3 TIE BAR - PLACE EXTENDED BASE MANHOLE ON CROSS - SECTION DETAIL COMPACTED SUBGRADE _ 12 PIPE SECTION DETAIL _ NOTE:SECURE(4) EVENLYSPACED IZV'xl /8 "GALVANIZED STEEL STRAPS 0 EACH JOINT OF RISER SECTION NOTE: PROVIDE STEPS IN RISER PER NCDOTSTD. 840.66 (SEE DETAIL) 3'kl/2" BOLT 12"xNkl /8" GALVIANIZED STEEL ANCHOR STRAP RISER JOINT \--3'kl/2" BOLT NOTE: EACH STRAP TO BE SECURED TO MANHOLE RISER BY (2) SM /2" GALVANIZED STEEL CONCRETE ANCHOR BOLTS. COATED WITH A BITUMINOUS COATING. CENTER OF #6 REBAR -- ­ 4 CONCRETE CRADLE DETAIL 0457 SCALE: N.T.S. tm, ° :o o 4lSCH. 40 - NON - PERFORATED PVCLD OUTSIDE DIA. CROWN OF PIPE INSIDE DIA. CROWN OF PIPE TOP OF CRADLE #6 REBAR (GRADE 60) INSIDE DIA. INV OF PIPE OUTSIDE DIA. INVERT OF PIPE #6 REBAR (GRADE 60) ARE #3 REBAR(GRADE 60) SPACED INTER ALONG THE LENGTH OF THE 2. MAINTAIN A MIN, COVER OF 3" OF CONCRETE (TO THE OUTSIDE OF THE REBAR} FOR ALL REINFORCEMENT. 3. TRENCH TO BE BACKFILLED IN 5" LIFTS WHEN COMPACTION IS BY HAND. BACKFILL IS IN W LIFTS WHEN CONDUCTED BY MACHINE. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 18 "0 RCP BEFORE DRIVING OVER WrrH HEAVY EQUIPMENT. TBM ■ SITE BENCHMARK NCGS MONUMENT ■ NC F EL = 409.94' NGVD 29 ■ 0 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ 1) ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ CITY OF DURHAM PUBLIC WORKS DEPARTMENT ■ APPROVED ■ ENGINEERING DATE ■ STORM WATER DATE TRANSPORTATION DATE ■ DATE ■ DATE ■ ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HOIRVATH A S S O C I A T E S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 P.O. BOX 970 HARRISON, TENNESSEE 37341 P 423.266.4990 www.horvathassociates.com NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 WQ #4 DETAILS 5���'- R: P Is 3 ' • T'vG I NEED %P��� i '''�•.n.....•. DRAWN BY: CHECKED BY: MLJ RH/TS DATE APRIL 25, 2012 SCALE AS NOTED PROJECT NO. 1121 SHEET NO. C457 <CONSTRUCTION DRAWINGS> V) ry 0 on J Co � ® F- oe p p p 7— l3e 0 J I!— O 0..0 Lu s _ CLU Lu 1) WQ #4 DETAILS 5���'- R: P Is 3 ' • T'vG I NEED %P��� i '''�•.n.....•. DRAWN BY: CHECKED BY: MLJ RH/TS DATE APRIL 25, 2012 SCALE AS NOTED PROJECT NO. 1121 SHEET NO. C457 <CONSTRUCTION DRAWINGS> GENERAL NOTES' A. ALL SCM'S AND ALL ASPECTS APPEARING ON THE CONSTRUCTION DRAWINGSARE SUBJECT TO AS -BUILT SURVEY AND INSPECTION. ANY ASPECT OF CONSTRUCTION THAT DOES NOT CONFORM TO PLAN SHALL BE REBUILT OR REPAIREDATTHE CONTRACTOR'S EXPENSE. B. IF ANY DISCREPANCIES ARE FOUND BETWEEN THE SPECIFICATIONS AND THE CONSTRUCTION DRAWINGS, CONTACT THE DESIGN ENGINEER FOR CLARIFICATION C. ALL ASPECTS OF CONSTRUCTION SHALL CONFORM TO CITY, STATEAND GENERAL INDUSTRY STANDARDS FOR MATERIALS AND CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, NORTH CAROLINA BUILDING CODES. CONTRACTOR IS EXPECTEDTO BE FAMILIAR WITH THESE STANDARDS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INFORM THE DESIGN ENGINEER IN ANY SITUATION IN WHICH STANDARDS MAY CONFLICT WITH SPECIFICATIONS AND OR PLANS. D. PRIOR TO COMMENCING GRADING ACTIVITIES FOR ANY DAM, THE GEOTECHNICAL ENGINEER SHALL BE RETAINED AND MEET WITH THE ENGINEER. WORK MAY COMMENCE ON THE DAMS ONLY AFTER NOTICE TO PROCEED FROM THE ENGINEER. E. GEOTECHNICAL ENGINEER SHALL OBSERVE ALL ASPECTS OF THE CONSTRUCTION OF THE DAMS INCLUDING, BUT NOT LIMITED TO, PREPARATION OF THE FOUNDATION, INSTALLATION OF THE KEY TRENCH, INSTALLATION OFTHE PRINCIPAL SPILLWAY PIPE, AND THE INSTALLATION OF COMPACTED FILL. THE FREQUENCY OF OBSERVATION MUST BE SUFFICIENT FOR THE GETOECHNICAL ENGINEER TO STATE, IN HIS OR HER PROFESSIONAL OPINION, THAT THE SPECIFIC ITEMS OBSERVED AND TESTED WERE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS AND SPECIFICATIONS. GEOTECHNICAL ENGINEER SHALL PROVIDE GEOTECHNICAL CERTIFICATION IN ACCORDANCE WITH THE LATEST REQUIREMENTS OF THE CITY OF DURHAM'S BM CERTIFICATION PROGRAM (BCE). ALL ITEMS REQUIRED FOR THE CERTIFICATION SHALL BE PROVIDED, INCLUDING BUT NOT LIMITEDTO, DAM EMBANKMENT MATERIAL COMPOSITION AND DENSITY TESTING PAPERWORK INCLUDING MAP SHOWING LOCATION OF TESTINGS, COPIES OFALL CONCRETE COMPRESSIVE STRENGTH TESTING PAPERWORK FOR ANY CAST IN PLACE ITEMS ASSOCIATED WITH THE CONSTRUCTION OF THE DAM, COPY OFTHE PURCHASE RECEIPT FOR THE PRINCIPAL SPILLWAY PIPE IDENTIFYING THEASTM SPECIFICATIONS GOVERNING THE MANUFACTURE OF THE PIPE, COPY OFTHE MANUFACTURER'S CERTIFICATION THAT ANY ARMORING, OTHER THAN CONCRETE, USEDTO ARMOR THE EMERGENCY SPILLWAY WAS COMPLETED IN ACCORDANCE WITH THE MANUFACTURER'S PUBLISHED SPECIFICATIONS, COLOR DIGITAL PHOTOGRAPHS SHOWING THE DAM FOUNDATIONAL AREAS, THE RISER, THE PRINCIPAL SPILLWAY PIPE AS THOSE ITEMS WERE BEING PREPARED AND INSTALLED. F. ALL SCM'S WILL BE USED AS SEDIMENT TRAPS DURING CONSTRUCTION. BASINS SHALL BE CLEANED OF SEDIMENT, AND VEGETATION SHALL BE ESTABLISHED PRIOR TO FINALIZATION OFTHESCM'S. G. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IF EXISTING CONDITIONS ENCOUNTERED IN THE FIELD ARE DIFFERENT FROM CONDITIONS EXPECTED ON THE PLAN. H. FINE GRADING OF THE INTERIOR OF THE SCM'S, SOIL AMENDMENT AND FINAL PLANTING OF WETLAND VEGETATION SHALL NOT BE COMPLETED UNTIL THE SITE IS FULLY STABILIZED. AQUATIC SHELF AND DRY POND FLOOR PLANTING NOTES: A. THE TOP 6- INCHES OF SOIL OF THE AQUATIC SHELF FOR THE WATER QUALITY PONDS, AND THE ENTIRE FLOOR OF THE DRY POND SHALL INCLUDEAT LEAST 50% MIX OF TOPSOIL AND /OR ORGANIC MATERIAL. B. A LETTER SHALL BE PROVIDED BY THE LANDSCAPE COMPANY THAT INSTALLS THE AQUATIC SHELF PLANTS AND THE DRY POND FLOOR PLANTS CERTIFYING THAT THE NUMBER, TYPE, AND LOCATION OF ALL PLANTINGS AS INSTALLED IS IN ACCORDANCE WITH THE CONSTRUCTION DRAWINGS. SCM OUTLET STRUCTURE NOTES: A. ANY POURED CONCRETE SHALL BE MINIMUM 3000 PSI (28-DAY STRENGTH) UNLESS OTHERWISE NOTED. B. REINFORCED CONCRETE PIPE (RCP) OUTLET BARREL SHALL BE CLASS III RCP (ASTM C -76). THE PIPE JOINTS SHALL BE CONFINED O -RING RUBBER GASKET JOINTS (ASTM C -443 8, ASTM C -361). C. THE MANHOLE OUTLET RISER BASES SHALL BE MONOLITHIC EXTENDED BASE MANHOLES (AASHTO M -19). D. CONCRETE FILL LAYER SHALL BE POURED WITHIN THE INTERIOR OF EXTENDED BASE MANHOLES TO THE DEPTH SPECIFIED ON THE DETAIL. E. EACH WATER QUALITY POND SHALL BE PROVIDED WITH AN 8 "GATE VALVE AND DIP PIPE EXTENDING TO THE ELEVATION SHOWN ON THE PROFILES THAT WILL BE USED TO DRAW DOWN THE PERMANENT POOL OF THE PONDS. F. ALL OTHER ASPECTS OF THE RISER /BARREL CONSTRUCTION SHALL CONFORM TO THE DETAILS AND DETAILS NOTES ON THE CONSTRUCTION DRAWINGS. G.THE BROADCRESTED WEIR EMERGENCY SPILLWAYSSHALL BE CONSTRUCTED ENTIRELY IN "CUT ". PIN: 0769 -03 -41 -8938 PIN: 0769 -03-41 -6932 PIN: 0769 -03-41 -4887 PIN: 0769 -0442 -5588 PIN: 0769 -03-44 -6000 PIN: 0769-03 -33 -2232 PIN: 0769-03-24-8486 PIN: 0769 -03-35 -7254 PIN: 0769 -01 -35 -3524 PIN: 0769 -01 -26 -9080 PIN: 0769-01 -06 -9898 Parcel ID: 194413 Parcel ID: 194412 Parcel ID: 194411 Parcel ID: 194383 Parcel ID: 194384 Parcel ID: 193264 Parcel ID: 193265 Parcel ID: 210697 Parcel ID: 193271 Parcel ID: 193270 Parcel ID: 193320 BERM SOIL AND COMPACTION SPECIFICATIONS' A. CONSTRUCTION OF THE DAMS MUST BE DONE UNDER THE SUPERVISION OF GEOTECHNICAL ENGINEER THAT IS A REGISTERED PROFESSIONAL ENGINEER IN THE STATE OF NORTH CAROLINA. B. ON -SITE GEOTECHNICAL ENGINEER SHALL APPROVE CONTROLLED FILL FOR PLACEMENT WITHIN THE BERM SECTIONS. THE GEOTECHNICAL ENGINEER SHALL ALSO SPECIFY THE METHODS THAT WILL BE USED FOR PLACEMENT OF FILL. GEOTECHNICAL ENGINEER SHALL EITHER CERTIFY THAT SUBGRADE ISSUITABLE FOR EACH BERM OR SPECIFY PREPARATION METHODS AND MATERIALS. C. CONTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DAM EMBANKMENTS SHALL BE PLACED IN 6 -INCH LOOSE LIFTS (3 -INCH LOOSE LIFTS WITHIN 3 -FEET OF EITHER SIDE THE PRINCIPAL SPILLWAY PIPETOA DEPTH OF 2-FEET OVER THE PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESSTHAT 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF +/- 2 PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. EACH LIFT SHALL BE CONTINUOUS FOR THE ENTIRE LENGTH OF THE EMBANKMENT. NO BLASTED MATERIALS SHALL BE USED IN THE BERM CONSTRUCTION. SOILS THAT EXHIBIT SIGNIFICANT SHRINKAGE, SWELLING, DISPERSIVE CHARACTERISTICS, OR ORGANIC CONTENT GREATER THAN 5% BY WEIGHT SHALL NOT BE USED. D. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTSAND LIMBSSHALL BE REMOVED FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS WITH ORGANIC MATTER CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. E. BEFORE PLACEMENT OF CONTROLLED FILL FOR THE BERM SECTIONS, ALL UNSUITABLE EXISTING MATERIAL SHALL BE REMOVED AND THESURFACES PROPERLY PREPARED FOR FILL PLACEMENT. STONES LARGER THAN 3 "SHALL BE REMOVED FROM FILL. NO TREES OR WOODY VEGETATION OF ANY TYPE MAY BE LOCATED IN OR ON THE BERM SECTIONS. F. ANY FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING A STORM EVENT SHALL BE PROPERLY SCARIFIED PRIOR TO PLACEMENT OF THE NEXTSOIL LIFT. G. EARTHWORK COMPACTION WITHIN 3 FEET OF ANY STRUCTURES SHALL BE ACCOMPLISHED BY MEANS OF HAND TAMPERS, MANUALLY DIRECTED POWER TAMPERS OR PLATE COMPACTORS OR MINIATURE SELF-PROPELLED ROLLERS. ALL COMPACTION BY HAND SHALL BE CONDUCTED IN 5" LIFTS. FILLADJACENT TO THE RISERS AND PRINCIPAL SPILLWAY PIPES SHALL BE PLACEDSO THAT LIFTSARETHE SAME LEVEL ON BOTH SIDES OF THE STRUCTURES. H. TESTS FOR PERCENT COMPACTION OF THE PLACED FILL IN THE BERMSSHALL BE PERFORMED AS QC FOR THE CONSTRUCTION OFTHE DAM. CONTRACTOR SHALL COORDINATE SO THAT THESE TESTS CAN BE DONE. ALL PORTIONS NOT CONFORMING TO THE SPECIFIED DEGREE OF COMPACTION SHALL BE REWORKED OR REBUILT. ALL PORTIONS MUST ACHIEVE SPECIFIED MINIMUM DEGREE OF COMPACTION. GEOTECHNICAL CERTIFICATION OF SOIL COMPACTION SHALL BE SUBMITTED WITH FINAL AS -BUILT OF THE WETLANDSYSTEM. I. A KEY TRENCH SHALL BE PROVIDED IN ALL FILL AREAS OF EACH BERM. DEPTH OF THE TRENCH SHALL BE BASED ON THE DEPTH RECOMMENDATIONS PROVIDED BYTHE GEOTECHNICAL ENGINEER AS DETERMINED FROM SOIL BORING LOGS PROVIDED ALONG THE AXIS OF THE PROPOSED DAM EMBANKMENT. J. TREATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING, AND ROCK FOUNDATION PREPARATION MAY BE REQUIREDATTHE DISCRETION OF THE GEOTECHNICAL ENGINEER. ALL ACTIVITIES SHALL BE CLOSELY MONITORED AN DOCUMENTED BY THE GEOTECHNICAL ENGINEER. K. SURFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT CONSTRUCTION AND PLACEMENT OFTHE FILL. L. FOUNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLEAND /OR UNSUITABLE SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALLSUCH UNDERCUTTING SHALL BE PERFORMED AT THE DISCRETION OFTHE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. NO PORTIONSOFTHE FOUNDATION SOILS MAYBE STABILIZED WITH CRUSHED STONE. M. NO COMPACTION BY DROP WEIGHTS FROM A CRANE OR HOIST IS ALLOWED. TEMPORARY GRASS SEEDING SCHEDULE SEEDING DATE SEEDING MIXTURE APPLICATION RATE JAN 1 -MAY 1 RYE (GRMN) 120 LBS /AC MAY 1 -AUG 15 GERMAN MILLET 40 LBS /AC AUG 15 - DEC 30 RYE (GRMN) 120 LBS /AC 1. SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB /AC GROUND AGRICULTURE LIMESTONE AND 750 LBS /AC 10 -10-10 FERTILIZER (FROM AUG 16 - DEC 30, INCREASE 10 -10 -10 TO 1000 LBS /AC). 2. MULCH: APPLY 4000 LB /AC STRAW. ANCHOR STRAW BY TACKING WITH NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL, 3. MAINTENANCE: JAN 1 - AUG 15: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 - DEC 30: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LBS /AC OF NITROGEN IN MARCH, IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LBS /AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. PERMANENT GRASS SEEDING SCHEDULE SEEDING DATE SEEDING MIXTURE APPLICATION RATE AUG 25 - OCT (BEST) TALL FESCUE 200 LBS /AC FEB - APR 15 {POSSIBLE} 1. ADD 3 -INCH LAYER OF TOPSOIL TO ALL PORTIONS OF THE DAM PRIOR TO SEEDING. SEED AND MULCH OR HYDROSEED THE AREA AFTER ADDITION OF THE TOPSOIL. 2, MAINTENANCE: INSPECT AND REPAIR MULCH FREQUENTLY, MOW REGULARLY TO A HEIGHT OF 46 INCHES. 3. NURSE PLANTS: BETWEEN MAY 1 AND AUG. 15, ADD 15 LB /ACRE SUDANGRASS OR 10 LB /ACRE GERMAN MILLET. BEFORE MAY 1, OR AFTER AUG. 15, ADD 40 LB /ACRE RYE (GRAIN). SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. CONTINUE TILLAGE UNTIL A WELL- PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 5. SEED ON A FRESHLY PREPARED SEEDBED AND COVER 6. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 7. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. * SEE SEASONAL APPLICATION SCHEDULE NOTE: ALL POND BERMS AND INTERIOR POND AREAS WILL REQUIRE A HEALTHY STAND OF GRASS ON A MINIMUM OF 85% OF THE TOTAL AREA AT THE TIME THE CERTIFICATION PACKAGE IS SUBMITTED TO THE CITY. THE SCM'S WILL NOT RECEIVE FINAL CERTIFICATION UNTIL THIS REQUIREMENT HAS BEEN MET. TBM SITE BENCHMARK NCGS MONUMENT NC F EL = 409.94' NGVD 29 CITY OF DURHAM PUBLIC WORKS DEPARTMENT APPROVED ENGINEERING DATE STORM WATER DATE TRANSPORTATION DATE DATE DATE ©COPYRIGHT 2012 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ HOIRVATH A S S O C I A T E S 16 CONSULTANT PLACE,SUrrE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 P.O. BOX 970 HARRISON, TENNESSEE 37341 P 423.266.4990 www.h orvat h associates. om NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 SCM NOTES .••� °��N� C' R•°Z.7''Y AL c� Q OF E s P 3 ' �TR • T'vG I NEED %P��� i DRAWN BY: CHECKED BY: MLJ RH/TS DATE APRIL 25, 2012 SCALE AS NOTED PROJECT NO. 1121 SHEET NO. C458 <CONSTRUCTION DRAWINGS> � 44 0 J Co < ® F— oe LLJ 0 7- mu l3e 0 m J O p� i..0 Lu S _ C) Lu m �� ry ne n SCM NOTES .••� °��N� C' R•°Z.7''Y AL c� Q OF E s P 3 ' �TR • T'vG I NEED %P��� i DRAWN BY: CHECKED BY: MLJ RH/TS DATE APRIL 25, 2012 SCALE AS NOTED PROJECT NO. 1121 SHEET NO. C458 <CONSTRUCTION DRAWINGS>