Loading...
HomeMy WebLinkAbout20120385 Ver 1_401 Application_20120412Eeregy. April 17 2012 526 South Church St Charlotte NC 28202 Mad Code EC09Q 704 382 4503 Danielle anderson @duke - energy com 201 20385 North Carolina Division of Water Quality NC DWQ 401/Wetlands Unit 1650 Mail Service Center Z&F.MD Raleigh NC 27699 -1650 t Re Stream Bank Stabilization at Graham Street Transmission Structure #5 �- Mecklenburg County NC The proposal is to construct a gabion wall along the Stewart stream bank at Graham Street Transmission Structure 5 The work is proposed to start May 1 2012 Enclosed you will find five (5) copies of the completed PCN form and sketches of proposed work to be completed for the above project The points of contact for this project have been Alan Johnson and Michael Burkhard with the Division of Water Quality Mooresville Regional office who are familiar with this project A field meeting was held with Eric Shook with Duke Energy Mr Johnson Mr Burkhard Steve Kichefski with US Army Corps of Engineers the design engineer and the contractor to complete the work prior to developing the project plan A check for the Minor Water Quality Application Fee in the amount of $240 00 is enclosed Please do not hesitate to contact me at 704 - 382 -4503 or Danielle andersonCcD-duke- eneray com should questions concerns and /or problems arise Sincerely Danielle Anderson Enclosures CC David Staggs Duke Energy Corporation Randy Veltn Duke Energy Corporation Eric Shook Duke Energy Corporation r9LK"ROW12 p APR 1 8 2012 pENR WATER OUAI 7Y o�ot w A r1! o9 O Y 20120385 Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1 3 December 10 2008 Version Pre - Construction Notification C F m 1 A Applicant Informatio Processing la Type(s) of approval sought from the Corps ❑ Section 404 Permit ❑ Section 10 Permit lb Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number 1 c Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ® Yes ❑ No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h is the project located within a NC DCM Area of Environmental Concern (AEC) ❑ Yes ® No 2 Project Information 2a Name of project STREAM BANK STABILIZATION AT GRAHAM STREET TRANSMISSION STRUCTURE #5 2b County MECKLENBURG COUNTY 2c Nearest municipality / town CHARLOTTE 2d Subdivision name N/A 2e NCDOT only T I P or state project no N/A 3 Owner Information 3a Name(s) on Recorded Deed DUKE ENERGY CORPORATION (RIGHT OF WAY) ON PROPERTY OF MECKLENBURG COUNTY 3b Deed Book and Page No 09276 -437 (DUKE ENERGY RIGHT OF WAY) 3c Responsible Party (for LLC if applicable) DUKE ENERGY CORPORATION 3d Street address 526 SOUTH CHURCH STREET 3e City state zip CHARLOTTE NC 28202 lull 3f Telephone no 704 382 -4503 1 8 ZQ E3hEmalloaddress ax n 704 382 -6542 �N darnelle anderson @duke energy com $ X�_- Page 1 of 11 PCN Form — Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) ~, 4;d Street address 4e City stat9 —zip _ 0 Telephone no' -" 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 11 PCN Form -Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) 07112205 1 b Site coordinates (in decimal degrees) Latitude 35 24656 Longitude 8086963 (DD DDDDDD) ( DD DDDDDD) 1 c Property size 27 35 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to STEWART CREEK proposed project 2b Water Quality Classification of nearest receiving water C 2c River basin CATAWBA 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application STEWART CREEK RUNS NEAR/THROUGH MARTIN LUTHER KING COMMUNITY PARK THERE IS EXISTING DUKE ENERGY R/W AND A TRANSMISSION STRUCTURE ON THE PROPERTY THE BANK OF STEWART CREEK IS WASHING OUT CAUSING A POTENTIAL SAFETY HAZARD NEAR THE STRUCTURE 3b List the total estimated acreage of all existing wetlands on the property N/A 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 120 IS THE LENGTH OF AREA CONSIDERED FOR THIS PROJECT WITHIN DUKE ENERGY RIGHT OF WAY 3d Explain the purpose of the proposed project TO USE GABION BASKETS TO STABILIZE STEWART CREEKS BANK PREVENTING FURTHER WASHOUT MINIMIZING THE SAFETY HAZARD THAT IS CURRENTLY PRESENT DUE TO THE WASHOUT NEAR THE TRANSMISSION STRUCTURE 3e Describe the overall project in detail including the type of equipment to be used A GABION WALL WILL BE CONSTRUCTED ALONG THE STEAM BANK AND AROUND TRANSMISSION STRUCTURE #5 A PORTION OF THE STREAM CHANNEL WILL BE DEWATERED ADJACENT TO THE GABION WALL THROUGHOUT THE REPAIR PROCESS (AS AGREED UPON BY USACE AND NCDWQ) THE REPAIR PROPOSAL WAS DISCUSSED AT THE PROJECT SITE WITH USACE (STEVE KICHEFSKI) AND NCDWQ (ALAN JOHNSON & MICHAEL BURKHARD) IN ADDITION THE CONTRACTOR COMPLETING THE WORK AND THE DESIGN ENGINEER ATTENDED DESIGN /PROPOSAL WILL BE SUBMITTED EXACTLY AS DISCUSSED AT THE MEETING THE PROJECT WAS AGREED TO BE COMPLETED UNDER NWP 12 PLEASE SEE ATTACHED DRAWING FOR FURTHER DETAIL 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / Yes ®No El Unknown project (including all prior phases) in the past? Comments NONE REQUESTED TO DATE 4b If the Corps made the jurisdictional determination what type ❑ Preliminary ❑ Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) N/A Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation N/A Page 3 of 11 PCN Form —Version 1 3 December 10 2008 Version 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions N/A 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain N/A Page 4 of 11 PCN Form —Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of Jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non -404 other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments N/A 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of Jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non -404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T STABILIZATION STEWART ® PER ❑ Corps 45 120 WITH GABIONS CREEK ❑ INT ® DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T []PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T []PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 120LF 31 Comments Page 5 of 11 PCN Form —Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number— (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑ PEI T 02 ❑P 03 ❑P 04 ❑P 4f Total open water impacts 4g Comments N/A 5 Pond or Lake Construct on If pond or lake construction proposed, then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments N/A 5h Is a dam high hazard permit required? ❑ Yes ®No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below if any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 131 ❑P ❑T El Yes ❑ No B2 ❑P ❑T El Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 61 Comments N/A Page 6 of 11 PCN Form — Version 1 3 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project PLAN TO ONLY DISTURB AREAS NEEDED TO INSTALL ADEQUATE BANK STABILIZATION 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques LIMIT DISTURBANCE STABILIZE DISTURBED AREAS TO PREVENT EROSION USE APPROPRIATE BEST MANAGEMENT PRACTICES 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments N/A 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments N/A 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan N/A Page 7 of 11 PCN Form —Version 1 3 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) N/A 6h Comments N/A Page 8 of 11 PCN Form —Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why ❑Yes No ❑ Comments N/A 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why THIS PROJECT IS NOT SUBJECT TO A NON -404 JURISDICTIONAL PERMIT OR NWP 14 18 29 39 41 42 44 46 OR GP31 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan N/A ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local governments jurisdiction is this project? DENR MOORESVILLE ❑ Phase If 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties 4a Which of the following state implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? 1 b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) N/A 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description N/A 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility N/A Page 10 of 11 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? 5c If yes indicate the USFWS Field Office you have contacted El Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? THERE WILL BE NO IMPACT TO ENDANGERED SPECIES OR CRITICAL HABITAT http / /www fws gov 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? http //ocean flondamanne org 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? NC STATE HISTORIC PRESERVATION OFFICE http / /www hpo ncdcr gov /nrlist htm 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA- designated 100 year floodplain? ® Yes ❑ No 8b If yes explain how project meets FEMA requirements NO NEW IMPERVIOUS AREA WILL BE DEVELOPED WITHIN THE FLOODPLAIN AREA 8c What source(s) did you use to make the floodplain determination? http / /www ncfloodmaps com DANIELLE L ANDERSON � � Lc� 4/17/2012 Applicant/Agent s Printed Name I- Applicant/Agent s Signature Date (Agents signature is valid only if an authorization letter from the applicant is provided Page 11 of 11 PC Form — Version 13 December 10 2008 Version N&r Th' �5c�Pel 156AIA, 1. MATERIAL LIST 42 - 3x3'x 12' Gabion Baskets 7 — 3'x4.5'x 12' Gabion Baskets 2 — 3'x.3'x6' Gabion Baskets Approximately 250 Cu.. Yd. Class Rip Rap 82 Linear Feet of 6High Chain Link Fence CONSTRUCTION SEQUENCE. L Install. Sandbag Cofferdam, at approximate location shown on plan; 2. Install Sediment Basin, Pump and drain lines .and begin dewatering of construction area; 3. Grade 10' Haul Road to area of Gabion Wall construction; 4. Grade Foundation for Gabion Wall to bedrock of stream; 5. Install first course of gabion Wall (9 foot wide base); 6. Maintain pumping to dewater high turbity water in construction area 7. Complete installation of Gabion Baskets/Stone until final height is reached; remove sandbag cofferdam as construction is completed; 8. Backfill area behind Gabions with Class I Rip Rap and properly compacted soil; 9. Perform Final Grading and Seed and Stabilize all disturbed areas. GENERAL NOTES 1. All construction to be in accordance with Gabion Basket Manufacturers:' Specifications; 2. Topography-shown was provided by Mecklenburg County GIS ;spot elevations are based on field shots taken April 7,2012 by Civiltek Associates, 3. This project is proposed to be permitted by the USACOE as a Nationwide Permit #12 (Utility Construction), 4. Tax Parcel ID for this property is 07112205 with all construction within a Duke Energy Right of Way and under Duke Energy jurisdiction; 5. All dewatering and runoff from excavation stockpile to be routed through a Sediment Basin as shown on plan. C"Oot 0. w? CWTM AS30CIA7M PA All Rights Rasarv" Repro etion or use of the content of," 4aiximont, or oddffima or delowe to thin downiint. 10 whole or,i� pat, I Z-fl , t. wlt64( wfittew wn Sent of: MOM ASSOCIATM, P-k, io PROHOM. z 0-4 tai C13, 51 0 U 0 Z U o U 0* 03:U z (A