Loading...
HomeMy WebLinkAbout20090856 Ver 2_Minor Variance_20120329Beverly Eaves Perdue Governor Piwi icirA HCDEHR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H Sullins Director Variance Request Form (For Minor and Major Variances) Protection and Maintenance of Riparian Areas Rules VOTE This foray may be photocopied far use as an anginal Check the appropriate box below El Major Vanance VMinor Variance ©� @�aW= MAR 2 9 2012 a Please identify which Riparian Area Protection Rule applies (Note -this must be one of North Carohna s four buffered river basins The River Bain map is available at h_ptt AM etir state nc us/adnInVpiays/) /Neuse River Basin Nutrient Sensitive Waters Management Strategy Protection and Maintenance of Riparian Areas Rule (15A NCAC 02B 0233) ❑ Tar - Pamlico River Basin Nutrient Sensitive Waters Management Strategy Protection and Maintenance of Riparian Areas Rule (15A NCAC 02B 0259) Part 1 General Information (Please include attachments if the room provided is insufficient) 1 Applicant s name the corporation i dig idual etc ho owns the property) lam I- name MAN 2 Print owner /Signmg offic erson legal1v Name I p Tide Street address City State Zip Telephone Al 9) 'fit O - [1-34 Pax for the property jind its compliance) 3 Contact person who can answer questions about the proposed project Version 6 July 2009 Dee Freeman Secretary Name YifiV4-r_ UV� L -N�iL Telephone 91 2-'Fl— /19-7 kax Email j?� �i��5'�i2 ✓�L� G 4 Project name (Subdivision, facility or establishment name consistent with project name on plans specific onn,� letters Lion and mamtenan agr ements etc ) 5 Project location Street address AAA Cit) State zip L L — County Latitude/longitude , 7 _ --7 .7.7 -t37F 6 Date property was purchased 7 Directions to site from nearest mayor intersection (Attach an 8 Ys x 11 cope of the USGS top ,Zraph c map indicating the location of the site) , , I If 8 Stream to be impacted b) the proposed activity Streampame (for unnamed streams label as UT to the nearest named stream) 9 Which of the following permits/approv als will be required or have been receiti ed already for this project Required Received Date received Permit Type CAMA Mayor CAMA Minor 401 Certification/404 Permit On site Wastewater Permit NPDES Permit (including stormwater) Non - discharge Permit Water Supply Watershed Variance Erosion/Sedtmentatton Control Others (specify) Part 2 Proposed Activity (Please include attachments if the room provided is insufficient) 1 Description of proposed activity [Also please attach a map of sufficient detail (such as a plat map or site plan in Adobe (pdf) format) to accurately delineate the boundaries of the land to be utilized in carry mg out the activity the location and dimension of anv disturbance in the riparian buffers associated with the activity and the extent of riparian buffers on the land Include the area of buffer impact ui ft' 4 T AF_� ME �-D AZbA L X'A tul, � AW. i o/✓ Variance Request Form, page 2 tIA0 AA r 6!-PL%J �b 69- Version July 2009 C.A -9/'r/,2�)3 AA�b Frcd1ZDG6 tAK C® RAW OI538 A sya 2 Fill in the table below to ident&v the square footage of impact to Zones I & 2 in the protected riparian buffers and the required miugauon (Fill in the impacts portion of the table, even if mitigation is not required) *Zone 1 extends out 30 feet perpendicular from the most landward limit of the top of bank or the rooted herbaceous vegetation Zone 2 e -dends an additional 20 feet from the edge of Zone 1 3 State reasons why this plan for the proposed activity cannot be pracucally accomplished reduced or reconfigured to better nu umize or eliminate disturbance to the riparian buffers 4 Description of any best management practices to be used to control impacts associated with the proposed activity (f a control of runoff from impervious surfaces to provide diffuse flow re plantmg xegetation or enhancement of existmg vegetation etc) 5 Please provide an explanation of the following (1) The practical difficulties or hardships that would result from the strict application of this Rule (2) How these difficulties or hardships result from conditions that are unique to the proper[} involved Variance Request Form page 3 Version 6 Juh 2009 Buffer Impact Zone of Impact in Number Purpose for Multiplier Required Impact Square Feet (Indicate on the Impact Mitigation Plan Sheet Zone 1 4 3 15 Zone 2 Total *Zone 1 extends out 30 feet perpendicular from the most landward limit of the top of bank or the rooted herbaceous vegetation Zone 2 e -dends an additional 20 feet from the edge of Zone 1 3 State reasons why this plan for the proposed activity cannot be pracucally accomplished reduced or reconfigured to better nu umize or eliminate disturbance to the riparian buffers 4 Description of any best management practices to be used to control impacts associated with the proposed activity (f a control of runoff from impervious surfaces to provide diffuse flow re plantmg xegetation or enhancement of existmg vegetation etc) 5 Please provide an explanation of the following (1) The practical difficulties or hardships that would result from the strict application of this Rule (2) How these difficulties or hardships result from conditions that are unique to the proper[} involved Variance Request Form page 3 Version 6 Juh 2009 (3) If economic hardship is the major consideration, then include a speck cXplanation of the economic hardships and the proportion of the hardship to the enure value of the project Part 3 Stormwater 1 Provide a description of all best management practices (BMPs) that will be used to control nutrients and sedimentation impacts associated with the proposed activity Please ensure to include all applicable operation & maintenance agreements and worksheets for the proposed BMPs Also include the BMPs on your plan sheets 2 Attach a description of how diffuse flow will be maintained through the protected riparian buffers Please ensure to include all applicable operation & maintenance agreements and worksheets for the proposed diffuse flow measure(s) Also include the diffuse flow measure(s) on 3 our plan sheets 3 What will be the annual nitrogen load contributed b3 tins site after development in pounds per acre per year without structural BMPs (stormwater pond, wetland, infiltration basin, etc)? Attach a detailed plan for all proposed structural stormwater BMPs Drainage Size of Post - development BMP nrtrogen6 Final Final basin drainage nrtrogen6loading removal nitrogen nrtrogen6 basin rate without BMW effictencys loading rate loading (ac) (lbs/ac/yr) ('OA) (1bslaclyr) from drainage basin bs 1 2 3 4 S Totals s Attach calculations and references Attach calculations and references 61nclude Phosphorus in the Tar Pamhco Basm 4 Attach all applicable supplement form(s) and Inspection and Maintenance (I&M) Form(s) to this completed application The applicable supplemental form(s) and I &M form(s) for the proposed BMPs noted in Hour application can be downloaded from the following websrte http //h2o r-nr ,tats, n, w /,u/bmp lomi, htm Variance Request Form, page d Vernon 6 Jul-, 2009 Part 4, Proposed Impacts and Mitigation O ��� �3� 1� LX /• � � Provide a description of how mitigation will be achieved at your site pursuant to 15A NCAC 2B 0242 for tits Meuse Basin and 15A NCAC 2B 060 for the Tar Pamlico Basin If buffer restoration is the method 3 ou are requesting be sure to include a detailed plantmg plan to include plant type date of plantings the date of the one time fertilization in the protected riparian buffers and a plan sheet showing the proposed location of the plantings A guide to buffer restoration tan be downloaded at the following website http /Nit ii nceel) stet /ne," s /reports /buflei ` trill' If payment into a buffer restoration fund is how 3 ou plan to achieve your mitigation requirement then include an acceptance letter from the mitigation bank -, on propose to use stating they have the mitigation credits ax ailable for the mitigation requested Part 5 Deed Restrictions Bi your signature in Part 6 of this application 3 on certifN that all structural stormwater BMPs required by this variance shall be located in recorded stormwater easements that the easements will run ,% A the land that the easements cannot be changed or deleted without concurrence from the State and that the easements w ill be recorded prior to the sale of any lot Part 6 Applicant's Certification I � `� t/ 14.0A (print or ripe name of person listed m Part I Item ) certif3 that the information included on this permit application form is correct, that the project will be constructed in conformance with the approved plans and that the deed restrictions in accordance with Part 5 9f-this form will be recorded,with all required pennit conditions Signature Date a2 Title Part 7 Plan Sheets Be sure to include a copy of all of 3 our completed application form plan sheets and maps in Adobe (pdf) format on a CD or floppv disk Vanance Request Form page 5 Version 6 Jul% 2009 Part 8 Checklist A complete application submittal consists of the following components Incomplete submittals will be returned to the applicant The complete variance request submittal must be received 90 days prior to the EMC meeting at which you vi ish the request to be heard Initial Belo% to indicate that the necessary information has been provided �i Item • Original and two copies of the Variance Request Form and the attachments listed below • A vicinity map of the project (see Part 1 Item 5) • Narrative demonstration of the need for a variance (see Part 2) • A detailed narrate a description of stormwater treatment /management (see Part 4) • Calculations supporting nitrogen (phosphorus in the Tar Pamlico Basin) loading estimates (see Part 4) • Calculations and references supporting nitrogen (phosphorus in the Tar Pamlico Basin) remo-% al from proposed BMPs (see Part 4) • Location and details for all proposed structural stormwater BMPs (see Part 4) • Three copies of the applicable Supplement Form(s) and I &M Form(s) for each BMP and/or narrative for each innovative BMP (see Part 4) • Three copies of plans and specifications including 0 Development/Project name 0 Engineer and firm__ --- 0 Legend and north arron 0 Scale (1 = 50 is preferred) 0 Revision number & date 0 Mean high water line (if applicable) 0 Dimensioned propert3 /project boundary 0 Location map with named streets or NC State Road number 0 Original contours proposed contours spot elevations finished floor elevations 0 Details of roads parking cul-de -sacs sideu alks and curb and gutter 0 Footprint of an3 proposed buildings or other structures 0 Wetlands delineated, or a note on plans that none exist 0 Existing drainage (including off -site) drainage easements pipe sizes runoff calculations 0 Drainage basins delineated 0 Perennial and mterinittent streams ponds lakes rivers and estuaries 0 Location of forest � egetation along the streams ponds lakes rivers and estuaries Vanance Request Forth, page 6 Vernon 6 Juh 2009 406 Melanie Dr. 0 100 200 400 Feet Field Value PIN 0764609401 Real Estate ID 0214042 Map Name 076419 Owner LEHMAN, THOMAS E & SHERRY S Mailing Address 1 406 MELANIE LN Mailing Address 2 CARY NC 27511-3570 Mailing Address 3 Deed Book 07115 Deed Page 0523 Deed Date 8/16/1996 Deeded Acreage 0.51 Assessed Building Value $131.509.00 Assessed Land Value $64,000.00 Total Assessed Value $195,509.00 Billing Class INDIVIDUAL Property Description LT668 PROP MARVIN ROBERT MILLER 95-411 Heated Area 1864 Site Address 406 MELANIE LN City Cary Township CARY Year Built 1996 Total Sale Price $147,500.00 Sale Date 8/16/1996 Type and Use Single Family Design Style Conventional Land Class RESIDENCE- 10 ACRES -HOME SITE Old Parcel Number 028-00000-0000 WAKE COUNTY Wr ... 14 a �M�„ ' loo 1 x,,rq• f r AMP 'qd •q nnd wt y� � _ I' �y- � � •� 1 r i _ i �•• 40 v ^ i a r n x' r 3 RAO= Ute! TAN I 01 OW 04 47*N 4229 6000 4449 28.80 0 A-00*0, "v►1 w TRAtLvaufle 1:b�Kvtkke w'stC '"q 1 S5q. a Sa 'fix 'g,9 -5)#q Z� !id 8 t�8 IAi88li Top of bank Top of bAnk 136A0I 50 ft stream buffet -^—� New naramp ---'� —'`~ J 406 MELANIE LANE 'LOT PLAN ;�Mj)ICK SEGTlt3N� sur oar To Vm" mW ama3mme M—PMv Y OF MWQSER7 ' MIL.LEA 0110078 Bas" 61lK OF 0`Mlmom P W; of 'a am* ovm atm WAIm co s� «" ati• .,..,....� cry GLENN 0. WAWA ANOCIATES 04lo lis CPAL ENGINEER & SURVEYQR$ WPM%.& �QOK NQ 294 A41 cireu U11%