Loading...
HomeMy WebLinkAboutNCC192897_NOT Closeout Documents_20210209Charlolte-Mecklenburg STORM MR ATER2145 Suttle Avenue Services EC Inspection Report Charlotte, NC 2 8 2 0 8 Project Name: Baseball Field Turf Stormwater design Location: - Davidson Owner: Davidson College EC - Final Inspection #: 56,885 - Date/Time: 3/18/20 13:00 - 3/18/20 13:30 - Inspector: Chanell Hatch Weather conditions: Sunny Soil conditions: Workable Contact made: N/A Erosion and sediment control measures removed: YES Site permanently stabilized: YES BMP's installed per approved plans: N/A Summary: The site has been permanently stabilized per the plan and all erosion control measures have been removed. dx CHARLOTTE.. To report pollution or drainage problems call: 311 http://stormwater.charmeck.org 0 2/8/2021 12:22:48PM Page 1 of 1