HomeMy WebLinkAbout19980260 Ver 7_Revised Approval Letter_20210209 DocuSign Envelope ID: B250B393-BOEB-48BE-A102-91FB2FA5E67C $SATE
t a
�� alibny.
ROY COOPER
Governor 6 ���
MICHAEL S.REGAN ,a 0, �___='
'`
SecretaryE$ °*
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
February 9,2021
Mr.Philip S.Harris,III,P.E.,CPM
Natural Environment Section Head
Project Development and Environmental Analysis
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh,North Carolina,27699-1598
Subject: Modification to 401 Water Quality Certification(WQC004131)for Section U-2579AB of the Winston Salem Northern
Beltway(Eastern Section of Future I-74)from I-40 to I-40 Business/US 421,pursuant to Section 401 of the Federal Clean
Water Act,for the Winston Salem Northern Beltway from I-40 to US 52(R-2247B Phase 2,CA,CB,CD,D,EA,EB,and
EC),from US 52 to US 311 north(U-2579C Phase 2,D,E,and F)and from I-40 Business to US 311 south(U-2579AA and
AB). This will be NCDWR Project No. 19980260 (version 7).
Note: On January 26, 2021,NCDOT requested a revision to the modification issued on January 25, 2021. There were a few minor
edits needed and a Table 5 describing wetland utility impacts was inadvertently left out of the original. Therefore, the
Certification issued on January 25, 2021 is to be replaced by this Certification dated February 9, 2021.
Dear Mr.Harris:
Attached hereto is a copy of modified Certification No.WQC004131 for TIP U-2579AB(v7-revised)issued to The North Carolina
Department of Transportation(NCDOT)dated February 9,2021.
For reference, WQC004131 was initially issued on November 14, 2017, revised on November 27, 2017,December 21, 2017 and on
February 7, 2019. Revised version 4(modification for TIP R-2247EB)was issued on August 13, 2019. Modification 5(for U-2579 D,
E&F)was dated November 14, 2019.Modification 6(for U-2579 D,E&F)was issued on November 30, 2020;and,In-Field
Modification issued for U-2579 D,E&F on January 14, 2021.
If we can be of further assistance,do not hesitate to contact us.
,-DocuSigned by:
/\ G ( m
‘--9C9886312DCD474...
Division of Water Resources
Electronic copy only distribution:
Eric Alsmeyer,US Army Corps of Engineers, Raleigh Field Office
Bill Barrett,NC Department of Transportation
Amy Euliss,DEO,NC Department of Transportation,Division 9
Beth Harmon,Division of Mitigation Services
Amanetta Somerville,US Environmental Protection Agency
Janet Mizzi,US Fish and Wildlife Service
Marla Chambers,NC Wildlife Resources Commission
File Copy
D_E North512North S Carolinab DeparSttment1 of
16 17 EnMvironmental Quality I Divisionl North Ca of Water Resources
alisury re et ail Service Center Raeigh, Carolina 27699-1617
NORTH CAROLINA
Deparhnentofe,wronmentaEau:ory 919.707.9000
DocuSign Envelope ID: B250B393-BOEB-48BE-A102-91FB2FA5E67C
401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act
with ADDITIONAL CONDITIONS
THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United
States and subject to the North Carolina Division of Water Resources(NCDWR)Regulations in 15 NCAC 2H.0500. This
certification authorizes the NCDOT to impact an additional 1.43 acres of wetlands,9,180 linear feet of permanent impacts and 824
linear feet of temporary impacts to jurisdictional streams in Forsyth County. The project shall be constructed pursuant to the
modification application dated December 2,2020. The authorized impacts are as described below:
Table 1. Wetland(Riverine/Riparian)Impacts in the Yadkin Pee Dee River Basin U-2579AB.
Fill Excavation Mechanized Clearing Impacts Requiring
Site (ac) (ac) (ac) Mitigation
(ac)
4A 0.13 - - 0.13
5A - - <0.01 <0.01
6A 0.03 - - 0.03
7A 0.36 - - 0.36
12A 0.08 - 0.17 0.25
13A 0.08 - - 0.08
14A 0.03 - 0.07 0.10
17A 0.06 - - 0.06
17B 0.09 - - 0.09
17C 0.03 - - 0.03
23A 0.22 0.02 0.06 0.30
Total 1.11 0.02 0.29 1.43*
*Mitigation totals are rounded.
DocuSign Envelope ID: B250B393-BOEB-48BE-A102-91FB2FA5E67C
Table 2. Stream Impacts in the Yadkin Pee Dee River Basin,U-2579AB
Stream Description of Permanent Temporary Stream Impacts Requiring
Site Impacts Impacts Mitigation
Designation Impacts (linear ft) (linear ft) (linear ft)
Pipe 48 - -
1 Intermittent
Ditch 76 18 -
Pipe 51 - -
Dissipator Basin 20 - -
2 Perennial
Bank Stabilization 14 - -
Detour - 76 -
3 Pipe 137 12 -
4 Intermittent Fill 74 - -
5 Ditch 28 32 -
Culvert 589 - 589
6 Perennial Bank Stabilization 26 41 -
Outlet Protection 81 88 81
6B I Intermittent Pipe - 19 -
Pipe 92 - 92
7 Ditch 84 10 84
Perennial Riprap Pad 16 25 16
Pipe 342 - 342
8 Bank Stabilization 17 10 -
Intermittent Pipe 102 - -
Inlet Protection 66 10 66
Culvert 226 - 226
Outlet Protection 22 - 22
9 Perennial Ditch 149 - 149
Inlet Protection 18 - 18
Culvert 354 - 354
Ditch 195 10 195
DocuSign Envelope ID: B250B393-BOEB-48BE-A102-91FB2FA5E67C
Table 2. Stream Impacts in the Yadkin Pee Dee River Basin,U-2579AB
Stream Permanent Temporary Stream Impacts
Site Designation Description of Impacts Impacts Impacts Requiring Mitigation
(linear ft) (linear ft) (linear ft)
Intermittent Pipe 556 - -
10 Pipe 60 - -
Perennial
Ditch 52 - -
Perennial Culvert 372 - 372
12
Ditch/Stabilization 277 - -
Intermittent
Pipe 136 - -
13 Pipe 368 - 368
Bank Stabilization 28 10 -
Pipe 44 - -
14 Pipe cleanout - 43 -
Bank Stabilization 22 14 -
Pipe 36 10 -
15
Riprap Pad 23 48 -
16 Pipe Extension 44 26 -
Pipe 170 10 -
16A
Bank Stabilization 33 10
Perennial Culvert 427 - 427
17
Channel Protection 35 - 35
Fill 900 102 900
18
Bank Stabilization 44 11 -
Fill 80 - -
Ditch 50 - -
Pipe 14 - -
19 Pipe 16 - -
Ditch 65 - -
Pipe 18 - -
Channel Protection 6 6 -
DocuSign Envelope ID: B250B393-BOEB-48BE-A102-91FB2FA5E67C
Table 2. Stream Impacts in the Yadkin Pee Dee River Basin,U-2579AB
Permanent Temporary Stream Impacts
Stream Requiring
Site Description of Impacts Impacts Impacts
Designation Mitigation
(linear ft) (linear ft) (linear ft)
Pipe 100 - -
20 Perennial Ditch 55 10 -
Pipe 20 - -
Ditch 548 10
21 Intermittent -
Ditch 180 50 -
22 Ditch 67 - -
23 Ditch 62 10
24 Ditch 0 10 -
Culvert 92 - 92
25 Perennial Bank Stabilization 35 5 -
Outlet Protection 48 13 48
Culvert 56 - -
26 Inlet Protection 18 14 -
Outlet Protection 33 - -
Pipe 14 - -
27 Intermittent
Riprap Pad 12 10
Perennial 84 -
28 Culvert
Intermittent 30 -
29 Ditch 1,023 10 1,023
Perennial
30 Ditch 0 41 -
Totals 9,180 824 5,222
DocuSign Envelope ID: B250B393-BOEB-48BE-A102-91FB2FA5E67C
Table 3. Open Water(Pond)Impacts in the Yadkin Pee Dee River Basin U-2579AB.
Site Permanent Fill Impacts Requiring
Mitigation
4B 0.89 -
12B 2.37 -
24 0.35 -
Totals 3.61 -
Table 4. Utility Stream Impacts in the Yadkin Pee Dee River Basin U-2579AB.
Impact Type Temporary Impact Impacts Requiring
Site Gravity Sewer (linear feet) Mitigation
Line(inches)
U-1 8 6 -
U-2 16 8 -
U-3 8 _ 8 -
U-4 8 78 -
U-5 8 24 -
Totals 124 -
Table 5. Utility Wetland Impacts in the Yadkin Pee Dee River Basin U-2579AB.
Impact
Site Impact Type Temporary Impacts(ac) Requiring
Mitigation
U-5 Gravity Sewer Line(8 inch) 0 011 -
Totals 0.01 -
Table 6. Culverts/Pipes to be Buried in the Yadkin Pee Dee River Basin U-2579AB.
Site Culvert/Pipe Size
6 RCBC 12'x 10' (2 barrels)
9 RCBC 6'x 7'
14 RCP III 72"
17 RCBC 8'x 7'
25 RCBC 12'x 7' (3 barrels)
26 RCBC 7'x 8'
The modification application provides adequate assurance that the discharge of fill material into the waters of the Yadkin Pee Dee
River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and
discharge guidelines. Therefore,the State of North Carolina certifies that this activity will not violate the applicable portions of
Sections 301,302,303,306,307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions
hereinafter set forth.
This approval is only valid for the purpose and design that you submitted in your application for a modification dated December 2,
2020. All the authorized activities and conditions associated with the phased permit Water Quality Certification issued on November
14,2017 and subsequent modifications and revisions, still apply except where superseded by this Certification.
Should your project change,you are required to notify NCDWR and submit a new application. If the property is sold,the new owner
must be given a copy of this Certification and approval letter and is thereby responsible for complying with all the conditions. If any
additional wetland impacts,or perennial stream impacts,for this project(now or in the future)exceed one acre or 300 linear feet,
respectively,additional compensatory mitigation may be required as described in 15A NCAC 2H.0506(h)(6)and(7). For this
approval to remain valid,you are required to comply with all the conditions listed below. In addition,you should obtain all other
DocuSign Envelope ID:B250B393-BOEB-48BE-A102-91FB2FA5E67C
federal,state or local permits before proceeding with your project including(but not limited to) Sediment and Erosion control,Coastal
Stormwater,Non-discharge and Water Supply watershed regulations. This Certification shall expire on the same day as the expiration
date of the corresponding Corps of Engineers Permit.
Condition(s)of Certification
1. This approval is only valid for the purpose and design that you submitted in your application for a modification dated
December 2,2020. All the authorized activities and conditions associated with the phased permit Water Quality
Certification issued on November 14,2017,along subsequent modifications and revisions, still apply except where
superseded by this Certification.
2. Off-Site Stream Mitigation. Compensatory mitigation for 5,222 linear feet of impact to streams is required. We
understand that you have chosen to perform compensatory mitigation for impacts to streams through the North Carolina
Division of Mitigation Service(DMS)(formerly NCEEP),and that the DMS has agreed to implement the mitigation for
the project. The DMS has indicated in a letter dated September 29,2017 that they will assume responsibility for
satisfying the federal Clean Water Act compensatory mitigation requirements for the above-referenced project,in
accordance with the DMS Mitigation Banking Instrument signed July 28,2010.
3. Off-Site Wetland Mitigation. Compensatory mitigation for impacts to 1.43 acres of riverine wetlands is required. We
understand that you have chosen to perform compensatory mitigation for impacts to wetlands through the North Carolina
Division of Mitigation Services(DMS)(formerly NCEEP),and that the DMS has agreed to implement the mitigation for
the project. DMS has indicated in a letter dated September 29,2017 that they will assume responsibility for satisfying
the federal Clean Water Act compensatory mitigation requirements for the above-referenced project,in accordance with
DMS's Mitigation Banking Instrument signed July 28,2010.
Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal
and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal
404 and/or Coastal Area Management Act Permit. This Certification shall expire upon the expiration of the 404 or CAMA permit.
If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may
obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative
Hearings within sixty(60)days of receipt of this notice. A petition is considered filed when it is received in the office of
Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday
between the hours of 8:00am and 5:00pm,except for official state holidays. The original and one(1)copy of the petition must be filed
with the Office of Administrative Hearings.
The petition may be faxed-provided that the original and one copy of the document is received by the Office of Administrative
Hearings within five(5)business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh,NC 27699-6714
Telephone: (919)431-3000,Facsimile: (919)431-3100
A copy of the petition must also be served on DEQ as follows:
Mr.Bill F.Lane,General Counsel
Department of Environmental Quality
1601 Mail Service Center
This the 9th day of February 2021
DIVISION OF WATER RESOURCES
,—DocuSigned by:n
s`--9C9886312DCD474...
S.Daniel Smith,Director
WQC No. 004131
DocuSign Envelope ID: B250B393-BOEB-48BE-A102-91FB2FA5E67C $SATE%mot a
�� any.
ROY COOPER -
Governor 6 : ���
MICHAEL S.REGAN \ 4,a 0, �___f
Secretary s4' '�O*
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
NCDWR Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and
any subsequent modifications,the applicant is required to return this certificate to the 401 Transportation Permitting
Unit,North Carolina Division of Water Resources, 1617 Mail Service Center,Raleigh,NC,27699-1617. This form
may be returned to NCDWR by the applicant,the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, ,hereby state that,to the best of my abilities,due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and
specifications,and other supporting materials.
Signature: Date:
Agent's Certification
I, ,hereby state that,to the best of my abilities,due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and
specifications,and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
I, ,as a duly registered Professional Engineer in the State of North
Carolina,having been authorized to observe(periodically,weekly,full time)the construction of the project for the
Permittee hereby state that,to the best of my abilities,due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules,the approved plans and specifications,and other supporting materials.
Signature Registration No.
Date
D_E North512North S Carolinalisb Department
1 of
16 17 EnMvironmentaaill Quality I Divisionl North of Water Resources
auryStreet Service Center Raeigh, Carolina 27699-1617
NORTH CAROLINA
DeparhnentofErwronmentaEau:ory 919.707.9000