HomeMy WebLinkAboutNC0088081_DMR Reporting_20060406Re: oolcson Remediation Site
Subject: Re: Cookson Remediation Site
From: Belinda Henson <Belinda.Henson@ncmail.net>
Date: Thu, 06 Apr 2006 09:51:11 -0400
To: Steve Davis <sdavis@shamrockenviro.com>
CC: Mark Brantley <Mark.Brantley@ncmail.net>
Steve,
You have to follow your NPDES permit. All samples of the effluent must be reported
on the DMR and all parameters that are required in the permit must be analyzed and
reported on your DMR as per your permit. If you have further questions please
contact me or our staff. Thanks.
Belinda
Steve Davis wrote:
Ms. Henson,
Does that mean I have to report a methylene chloride result, or just have
data available upon request? -
Thanks for your quick response.
Steve
Original Message
From: Belinda Henson[mailto:Belinda.Henson@ncmail.net] Sent: Tuesday, April 04,
2006 4:25 PM
To: Steve Davis
Cc: Mark Brantley
Subject: Re: Cookson Remediation Site
Mr. Davis,
As we discussed this morning, you should only sign the DMRs for the month or
months that you have been employed and designated as ORC. Please forward a copy
of the ORC designation to our office via mail or fax 910-486-0707 attention to
myself as well as sending a one to Raleigh/Training and Certification Unit.
Please remember DMRs must be submitted to Central Files no later than *30 days*
after the end of the *reporting* month.
To answer the effluent limitation question, methylene chloride has probably been
found in the waste stream in the past and monitoring only is all we require at
this time. That is not uncommon to have monitoring requirements only, it helps
DWQ to gather data to determine if a limit is needed in the future.
If you have further questions do not hesitate to contact me or Mark Brantley. .
Thanks.
Belinda
Steve Davis wrote:
Ms. Henson,
As a follow-up to our conversation on April 4, 2006, please advise as
pertaining to the January, February and March 2006 DMR's for the Cookson
Remediation site. As mentioned I was not the ORC for this facility during
January and February operations, but was responsible for the last two weeks
of March. I have completed the ORC designation form and forwarded to the
1 of 2 4/17/2006 1:00 PM
Re: Cookson Remediation Site
"Owner" for completion. I want clarification regarding the signing of the
DMR's mentioned above. I am generating these documents for the "Owner" and
would like to submit data as soon as possible.
On the effluent limitations and monitoring requirements page of the permit,
Methylene Chloride is listed as a monthly grab sample with no limitations,
can you elaborate?
Thanks for your help regarding this matter.
Stephen L. Davis
ORC
Belinda S. Henson
Regional Supervisor
NC DENR-Division of Water Quality
Surface Water Protection Section
Fayetteville Regional Office
(910)486-1541
2 of 2
4/17/2006 1:00 PM