HomeMy WebLinkAboutSW8030321_COMPLIANCE_20030702STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO. SW
DOC TYPE ❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE-
YYYYMMDD
state of North Carolina
Department of Environment
and Natural Resources
Wilmington Regional Office
Division of Land Resources
Land Quality Section
Michael F. Easley, Governor
William G. Ross Jr., Secretary
P4'�'CWED
/ J
JUL 0 2 2003
July 2, 2003
NU FNR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
NOTICE OF VIOLATIONS OF THE
SEDIMENTATION POLLUTION CONTROL ACT
CERTIFIED MAIL P 7003 0500 0000 8804 2191
RETURN RECEIPT REQUESTED
Coastal Federal Bank
Ms. Susan Cooke, Senior V.P.
2619 Oak Street
Myrtle Beach SC 29577
Project Name: Coastal Federal Bank - Shallotte, NC
Project No: BR-03222
Brunswick County
Dear Ms. Cooke:
On June 27, 2003, personnel of this office inspected a project located off of SR 1357 in Brunswick
County, North Carolina. This inspection was performed to determine compliance with the North Carolina
Sedimentation Pollution Control Act of 1973. The inspection revealed a land -disturbing activity of
approximately 1.7 acres being conducted.
It is our understanding that you and/or your firm are responsible for this land -disturbing activity.
The purpose of this letter is to inform you that this activity was found to be in violation of the Act, NCGS
113A-50 to 66, and Title 15A, North Carolina Administrative Code, Chapter 4. If you feel that you are not
responsible for the following violations, please notify this office immediately.
The violations'that were found are:
Failure to conduct a land -disturbing activity in accordance with the provisions of an
approved erosion and sedimentation control plan. G.S. 113A-61.1.
Silt fence has not been installed per approved plan.
The erosion and sedimentation control plan approved by this office on April 14, 2003
must be immediately implemented on the site sufficient to restrain off -site sedimentation,
or if that plan can no longer address the field conditions, submit to this office a revised plan
that addresses current erosion and sediment control needs.
127 Cardinal Drive Extension, Wilmington, N.C. 28405.3845 Telephone 910-395.3900 Fax 910.350.2004
An Equal Opportunity Affirmative Action Employer
Ms.Susan Cooke
July 2, 2003
Page Two
2. Failure on a tract of more than one acre, when more than one acre is uncovered, to install
sedimentation and erosion control devices sufficient to retain the sediment generated by
the land -disturbing activity within the boundaries of the tract during construction upon and
development of the tract. G.S. 113A-57(3).
Off -site sedientation was observed in adjacent creek.
To correct these violations, you must:
1. Install silt fence per approved plan.
The initial one day civil penalty could be an assessment of up to $5,000.00. A time period for
compliance is not required for this initial one day civil penalty pursuant to NCGS 113A-61.1 (c) and NCGS
113A-64(a)(1). An initial one day civil penalty is being considered for this project.
If the violations described in this Notice are not corrected within 5 days following your receipt of this
Notice, the Division of Land Resources may take additional appropriate legal action against you pursuant
to NCGS 113A-64. That action could be the assessment of additional civil penalties and may result in the
initiation of other remedies as prescribed by the Act. If additional civil penalties are assessed for the
violations, the amount may be up to $5,000.00 per day for each day of the violation pursuant to NCGS
133A-64(a)(1). If all violations are corrected within the time period specified for compliance, additional civil
penalties or legal remedies will not be pursued.
Any new land -disturbing activity associated with this project should not begin until the area
presently disturbed is brought into compliance with the Act. When corrective actions are complete, you
should notify this office so that the work can be inspected. You should not assume that the site is in
compliance with the Act until we have so notified you. In addition, once compliance has been achieved,
all installed measures must be satisfactorily maintained until development is complete and the site is fully
stabilized to avoid further violations of the Act.
We solicit your cooperation, and would like to avoid taking further enforcement action. Atthe same
time, it is your responsibility to understand and comply with the requirements of the Act. Copies of the
relevant statute and administrative rules may be examined at this office or will be sent to you upon request.
Should you have questions concerning this Notice or the requirements of the Act, please contact either
Kevin Rowland or me at your earliest convenience.
Please do not hesitate to contact me regarding any questions you might have about this matter.
Sincerely,
Daniel Sams, P.E., M.E.
Regional Engineer
DESlbfr
cc: Sedimentation Specialist
WiRO-LQS
DWQ Supervisor - WiRO
D-
CD
r-
0
v'
Q
9
Permit No. 1) a 03a3 zi_/
(to he provided bY DTPQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORNI
WET DETENTION BASIN SUPPLEMENT
This form may be photocopied for use as an original
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
I. PROJECT INFORMATION
Project Name:- tJ =; ; - f - FI2 A-L_ 4-/ O- — S4A LLr07-FE. , A<_
Contact Person: _'S6/tS,4rJ C60,G F_ Phone Number: (94Z) 2D5 2lv 7 6
For projects with multiple basins, specify which basin this worksheet applies to: Tyks 1 t'1 �j
elevations
Basin Bottom Elevation i 0 • s- ft.
Permanent Pool Elevation IS-5- ft.
Temporary Pool Elevation 141 ? S ft.
areas
Permanent Pool Surface Area 3 3 O S sq. ft.
Drainage Area
[
ac.
[mpervious Area
0, Cad
ac.
;olianes
?ermanent Pool Volume
441 g
cu. ft.
Cemporary Pool Volume
2.(q &
cu. ft.
orebav Volume
as 0
cu. ft.
7ther parameters
;A/DAI
)iameter of Orifice
0,
in.
)esign Rainfall
i O
in.
)esian TSS Removal 2
G D
(floor of the basin)
(elevation of the orifice)
(elevation of the discharge structure overflow)
(water surface area at the orifice elevation)
(on -site and off -site drainage to the basin)
(on -site and off -site drainage to the basin)
(combined volume of main basin and forebav)
(volume detained above the permanent pool)
(approximately 20% of total volume)
(surface area to drainage area ratio from DWO table)
(2 to 5 day ternporan, pool draw -down required)
(rninimurn 35% required)
COO p�7
Footnotes:
1 When using the Division SA/DA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2 in the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
.90% TSS removal. The NCDENR 3NIP manual provides design tables for both 85% TSS removal and 90% TSS removal.
II. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H ,1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stom-iwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
` r- _ a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
1�04 b. The forebay volume is approximately equal to 20% of the basin volume.
�`- c. The temporary pool controls runoff from the design storm event.
T d. The temporary pool draws down in 2 to 5 days.
�-� e. If required, a 30-foot vegetative filter is provided at the outlet'(include non -erosive flow
calculations)
`r f. The basin length to width ratio is treater than 3:1.
g. manent pool are no steeper than 3:1.
The basin. side slopes above the per
2` h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
D'144 i. Vegetative cover above the permanent pool elevation is specified.
j. A trash rack or similar device is provided for both the overflow and orifice.
k. A recorded drainage easement is provided for each basin including access to nearest right-
of-way.
m 1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin.
'~ m. A mechanism is specified which will drain the basin for maintenance or an emergency.
III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) Q does 13 does not incorporate a vegetated filter at the outlet.
This system (gheck-one)�Q sloes 0 does not incorporate pretreatment other than a forebay.
,.___ ^ ..F,I
4 ..
Maintenance activities shall be performed as follows:
L After every significant runoff producing rainfall event and at least monthly.
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and General condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed.
?. Repair eroded areas immediately, re -seed as necessary to maintain good:.vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system. (Le. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
1. Remove ar,cumulated sediment front the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and .not readily penetrate into accumulated sediments.
When the permanent pool depth reads Z. Z5- feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads / , 5- feet in the forebay, the sediment shall be removed.
BASIN DIAGR.4iVI
(fill in the blanks)
'7 _ Permanent Pool Elevation
Sediment Re oval El. (,Z, . I
Bottom Ele ation 6i F- ]i
FOREBA.Y
Sediment Removal Elevation ill / S ;
-------------75%
------------------------------.I- - ----
1� Bottom Elevation S + 25% 1
TWAIN POND
JOTS 04B,6-7 MA1„r„atNF-414 11\J V'+1 d `rON-L� -A-r
Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
T. All components of the wet detention basin system shall be maintained in good working, order.
acknowledge and agree by my signature below that I am responsible for the performance of the seven
Maintenance procedures listed above. I agree to notify D WQ of any problems with the system or prior to any
;hanges to the system or responsible parry.
. rint name: - vlsAr� CcOlc.E
title: SENtn2 VICE-
�rz��
address: i� OA
+`1 - 2D5 - 2-4? -:�CQ
Signature:
Date: - 2 • 03
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of -the subdivision has been named the president.
I, Lic�R A Z2Ln (l % , a Notary Public for the State of �� u4 CMG
County of do hereby certify that -�(-k tan oC)/LQ-
personally appeared before n1e this Ca� day of FLb � �Q�[� CQf. and acImowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness nay hand and official seal,
SEAL
My commission expires
r. -, I— n _.. � nn Pp0A LL of 4
L-78 03 0 3a-J
STORMWATER SUBMITTAL REQUIREMENTS
DETENTION POND
A. Site Plan
✓� 1. Development/Project Name
~� 2. Designer=s seal, signature, name and firm.
V., 3. Legend
4. North Arrow
5. Location Map with direction, distance to named streets, NCSR numbers.
6. Scale
�T 7. Date
✓ 8. Revision number and date.
9. Original contours, proposed contours, spot elevations, finished floor elevations.
ND ID, Existing drainage, including off -site. Provide a map of any offsite areas.
11 Property/Project boundary lines, dimensioned.4
12.. Mean High Water Line, if project is adjacent surface waters.
V 13. Drainage easements, catch basins, pipe sizes, inverts.
14. Wetlands delineated, or a note on the plans that none exist. Ponds may not be located
in a wetland.
15.' Details of the road, parking, cul-de-sacs, including sidewalk ,curb and gutter..
16. Drainage area to each pond delineated.
►� 17. Dimensions of the permanent pool.
18 Vegetated filter detail if using 85% TSS. This is NOT a connector ditch.
r% 19. Dimensions of the road, parking cul-de-sacs, sidewalks, and curb and gutter.
20. Unit footprint with dimensions and concrete wood deck areas noted.for apartments
or condo development.
21. Forebay at each inlet. (Prefer one inlet)
22. Inlets located such that entire pond is used for treatment and no short-circuiting.
23. Pond/forebay section detail with:
Bottom elevation
Permanent pool elevation PP
Storage pool elevation SP
Slopes: 3:1 above permanent pool
Vegetated shelf located below permanent pool, 6:1 slope, with begin and end
elevat ons arQund_main pond. (Not required inside forebay)
Forebay bottom elevation, 3:1 slopes :—
Forebay weir elevation between PP and DP.
24. Outlet structure detail with t ash rackand orif c size sped ed. imurash rack �—
openingsize is 4%3Y1(},Wd 4_WCWI r UV
' r
25 Note on plans that all roof drains must�e r�recJ e oprcke up bye pond.
26. A 11 L:W ratio has been provided for the pond.
P
—�� Maximum aver pond depth of 6'. (Parts of pond may be deeper -up to 75)
68. Vegetation requirements for pond slopes and wetland species for the 6:1 shelf are 1 isted. w -
Weeping Love grass is not suitable for use in North Carolina. _
2 13Q aYogs /Cjk r, d"'1 • �r i
ds c cafz�
5
add � �s 4-6►'�c�lc�Fe �/ � � or. � S
cam- P
STORMWATER SUBMITTAL REQUIREMENTS
DETENTION.POND (cont)
B. Calculations
1. 85% or 90% TSS Chart noted.
2. Pond depth.
3. SA/DA ratio calculation.
4. Required surface area at permanent pool.
5. Provided surface area at permanent pool (Based on pond dimensions)
6. Provided surface area at temporary design pool.
7. Required volume calculation.
8. Provided volume calculation.
9. Orifice size based on required V volume, using average head to design pool elevation.
10. Designer-s seal.
11. Built -upon area to each pond.
12. Forebay designed to hold 20% of the permanent pool volume. (Range of 18-22 OK.)
13. Non -erosive flow for 10 yr. storm in the vegetated filter, if using 85% TSS.
C. Supporting Documentation
1. Completed permit application and supplement.
a. Is the person who signed the landowner or a leasee? Must be landowner.
b. All sections and blanks completely filled in.
C. Check signature per .1003 (e). Make sure title is provided.
d. If agent signs, signatory authorization from owner.
e. Wet detention supplement sheet provided.
f. Mailing address & phone of applicant- no CIO.
✓, g. Verify water body classification. r 5 - Z5 -Z -j
h. Justifications for not meeting a design requirement.
1. If a modification, include Designer=s Certification.
No Hand initial design requirements. _ n CLk.5 LX-kz Q. GZ�,P
2. repowd-deed-restrictions 0
1 D CEDa ?10
ZC�)�ZC'3o)
�zC�rU
L 2 Yt
WET DETENTION POND ANALYSIS
FILE NAME
PROJECT #: SW8 030321
PROJECT NAME: Coastal Federal
G:\DATA\WPDATA\WQSkPOND\030321.WK1
REVIEWER: Laurie Munn
DATE: 16-May-03
'Receiving Stream: Woodward Branch Class: C SW HQW
Drainage Basin: Lumber Index No. 15-25-2-8
Site Area 1.68 acres
Drainage Area 7.339 00�square feet Area in Acres 1.68
IMPERVIOUS AREAS
Rational C
Building 3618.00
square feet
1.00
Parking 24494.00
square feet
1.00
Sidewalks 1195.00
square feet
1.00
square feet
square feet
square feet
TOTAL
square square feet
Rational Cc= 0.52
SURFACE AREA CALCULATION
% IMPERVIOUS
39.96%
SA/DA Ratio
4.50%
Des: Depth
3
Req. SA
3297 sf
TSS:
90
Prov. SA
3:D sf
VOLUME CALCULATION
* place a "1" in the box if Rational is used
Rational ?*
FOREBAY
Des. Storm
00„ Inches
_... .
Perm. Pool Volume= 4418
Rv=
0.410
Req, Forebay Volume= 883.6
Bottom
10.5 msl
Provided Volume=
990.00
Perm. Pool;3
SQ.. msl
Percent=
4°%p
Design Pool
14.25 msl
Storage met @elev
15.01 msl
Elevation
Area Inc. Vol. ACC. Vol.
Req. Volume504
; cf
13.50
3309.00
Vol. Prov. at DP
::.....:2696 > cf
14.25
1240.88 1240.88
ORIFICE. CALCULATION
Avg. Head =
0.36
ft
Q2 Area =
0.72
sq. inches
Flow Q2, cfs
0.014
cfs
Q5 Area =
0.29
sq. inches
Flow Q5, cfs
0.006
cfs
Orifice Area
0.44
sq. inches
No. of Orifices
„ , ., .':
Q=
0.009
cfs
Diameter, inches
7:.
weir H x W
in
x
in
Drawdown =
3 3
days
Surface Area @DP =
3881.33333 sq. ft.
Falling Head Drawdown =
4.9 days
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines,
COASTAL FEDERAL
Shallotte, NC
CALCULATIONS
AND
SUPPORTING MATERIAL
FOR
STORMWATER DESIGN
lIllarch 003
Prepared by:
East Coast
Engineering Company, P.A.
Consulting Engineers
Shallotte, North Carolina 28459
Post Office Box 2469 4918 Main Street
Office: 910.754,8029
N
m
O
U
N
N
W
N
@ O
Q) m
_0
O U
LL cu
U a
IL G
U
(U
U
m
co D (
(D
o
0
O
4
O
O
0
0
0
LO
CD
M
CO
0
(D
LLB
Ln
0
0
Cr)
r
V
V,
CV
a0
0
W
i`
i,
N
M
0
C7
M
O
Cl
O
M
O
O
CC
6
M
O
O
O
O
C)
r
(1)
O
n
N
co
Ln
(D
�
N
N
Q)
a
a)
d
Oa
O ❑
�
X
x
>
IL
a_Ir
O
[7
X
>
c
a
°o
i l N
Lo
Q
CO
Q
E
X
CD
II
7
co
u
Q
O X
c
>
.2
o
<
CL
❑
x
+ r
L) I I
.O
C
m
m
—
O
a�
o
CD
Q�
E�
cu
❑
a
I I C
a0
���
I I
a
b
o
acr
m
!I
L
=
n
b
q)
ro
O
a
ms
o°
O
Q
a
Q
�
L�
m
Q
o
a�
C7
Q
Q)
ro
Q)
Q
a\
m
crs
Qcm
m
o
Q
Q)
f4
a
Q)
o
cn
cLa
a)
ro
0
c
Q
ai
a°i
o
L
�)
cm
C
4
0
j
O
N�
L
L
Q)
O
0
{
U)
W
w
V
Lol
Y
O
N
(�
N
N
N
N
U
(ice
C
C
C
C.0
U
IrP
(D
I�r
CO
r
CO
LO
<T
cM
LO
C )
O
r
0
00
I�
N
I --IT
O
N
Ltd
CD0C
000
0or
C')
CV)
o
O
O
C)
O
O
4)
Q)
E
M
N
N
U
ro
(U
b=
�
�
N
Lf)
O
N
C
C
r
r
r
�
X
X
0-
a)
a)
>
>
a)
O
❑
a_
N
a)
a)
om )
ro
cm
ro
co
o
O
O
m
v
v)
v
�
N
N
r)
E
p
7
,C
x
U
x
U
lw
N_
o
��
_
v'
C
k
r
U
55
U
QQ
oa
U
Q)
Q)
m
r-
Q)
Q)
CV
LO
U
L
00�-TD
L
3
ro
ro
-T3
-0
-
T
I
m
o
Q)
a
Q)
a
a)
a)
m
a)
-ro
0
ct
0
0
Q
4
i�
��o�Q���c�
East Coast Engineering Company, PA
EMN
Coastal Federal
Forebay Calculations
TOTAL POND VOLUME at PERMANENT POOL FOR POND
BEFORE FOREBAY DESIGNED (FOR ESTIMATION PURPOSES)
3.0' deoth. 6.1 slope for 10 '. then 3.1 slaoe
ELEVATION
(FT MSL)
SURFACE
AREA (SF)
INCREMENTAL
VOLUME (CF)
ACCUMULATIVE
VOLUME (CF)
10.5
474
725
725
11.5
975
1459
2183
12.5
1942
2626
4809
13.5
3309
1 2017, OF PERMANENT POOL VOLUME = 961.700
FOREBAY VOLUME at PERMANENT POOL
2:1 slope
ELEVATION
(FT MSL)
SURFACE
AREA (SF)
INCREMENTAL
VOLUME (CF)
ACCUMULATIVE
VOLUME (CF)
11.5
327
404
404
12.5
480
572
975
13.5
663
POND 1 VOLUME TO FOREBAY COMPARISON
FOREBAY
2:1 SLOPE
BOTTOM SF
327.14
SURFACE SF
663.11
DEPTH
2
VOLUME
990
POND
DEPTH
4
3:1 SLOPE
BOTTOM SF
424.79
TOP SF
893.94
DEPTH
2.33
VOLUME
1536
6:1 SLOPE
BOTTOM SF
893.94
SURFACE SF
2556.64
DEPTH
1.67
VOLUME
2881
TOTAL POND VOLUME 4418
FOREBAY % OF POND 22.4%
Revision Date 2/17/03
¢z
aii
>; w
C
co
a
E
0
U
Q3
C
a)
C
cn
C
Li
0
IO
O
U
w
co
ui
N
C
O
E `�
U')N
U-� O
�
p
N
N
b
U) ¢ N
'
O
p
�
m
N
C)v)
LL)
�
C,N
ti
�
a0
T
T
�o`'
Joao
o
T
11 II
I I
m a) E
Q
L
Q Q o
O
0
CDm
a Q
-_
Q
Lo
U
cn¢(��°
O00
G
J
[D
LL (�
(
N
co
Q
b
b
00
�
U
p
U
r�
CD
Oi
N
Q
I7
E-)
r�
N
N fl7
LO
Q
o
o a
a`ro
r
II II
I I
I?
E
0
Q Q o
O
U
C) as u5
m CD
C) -
y
Q
'Q) a
u
CL ca
000
cr)QC7�
d
Q
Q
E
0
m
U
O
A
L1_ o
j
0)
N
co
Q
Q cr�
O
C:)
V
Q
p
to
W
N
U) r-
T
0
o
T
0
o
C) o
ti
ll II
I I
IZ
co
m E
a
Q Q
0
o
-~
OCD
m
Q InLo
co mw
n. 2
'� a)
000
c/)QC7
E E a) N w E a�
LL E W N m L� Q N N LL N o �
mQ� moo C (n< o� rn mQ w
6 o } U
U
co
IE
CO r p cry co(h m00u rQrT0) b p�bboob b CD �bbo `n p� Q
IQC
it 11
I I
0-
m E
o
Q Q O
0
U
a
a) �
a Q
Q]
'7A
In
U
(O ILO
Z3 (n
°�
oL❑❑U)<(D
a
9
II II I?
li
aL1°i E o
Q Q o O U
a) a1 Q Q) Q
ILO I9 O :3 (n 19 Ql II
C ❑ ❑ cn Q C7 F- c Cd
c�
Q
❑
E
0
m
U
0
9
II II tZ
I I
O
m m E a v
Q Q `0 0 U '.
0) O) C (1) z Q
ror vi �ca) U
[LO O I- f9 q) ii
WE
E`
m
CU
to
n
cv
U'a� BCD
o
O
O
r
r
rn
co
O
Il II I� a
w (v E O v
Q Q O a -�
a)Q) U)
rn0c Q)� 4% Q
[4 [u
a N c
!� ❑ ❑ co Q d
C
O
C
ca
Q
E
0
U
CD
c
CV
N
C
C
LU
V)
m
O
U
V)
m
LU
DOr
Cu
>
O
U
N
cD
N
T
T
L
-�t
Cl)
Cl)
O
r
r
T
r
C
C_
N
CO
N
.^
O
CD
u-)
ki
CD
a
N
V)
N
f)
N
VC
-t
CD
;—
I--
N
N
N
O
r
00
0
In
�o
Li)
C.
0
0
C)
C
Cl
O
0
0
0
0
0
Un
Ca
0
0
0
0
0
0
(V
N
N
N
N
N
un
Ln
V)
„Q
l..L
V
rIm
I~
co
T~
to
m
LD
0)
r`
M
CD
ti
LD
00
O
ul
coCN
p
CO
CJ
cf3
N
Ln
Ci
cn
�
C
N
N
N
L
r
Q
U
c
.N
CO
r
N
M
<t
m
m
m
m
w
U
U
U
U
w
U
O
O
00
O
00
O
CD
O
>
M
N
N
r
O
T
C
r
r
r
r
r
r
r
C7)
O,-yOLn
Cl)
CbV-
QJ
Q
a
d)
Lo
uo
Lo
r—
O
r,
T
0
0
0
0
0
0
0
0
Cn
0
0
0
0
0
o
o
N
(3)
N
L i
M
>
r
M
N
N
N
u7
Cj)
N
(N
N
N
LO
LC)
Lf)
T
T
T
r
T
T
nQ
W
CNm
m
in
m
c�~U
0
m
(�
U
U
U
IL
U
U
X
E
r
N
c?
-T
f
a
Cn
o
mmmmm_im
L
LL
U
U
U
U
U
Z
U
C
T
N
M
Q1
O
T
�
Cr7fI3(IJ(gC�(n�
G'S
Pipe Diameter (in.)
12
Type Pipe
CPP
"n" Value
0.013
Slope
0.0170
Flow Area (SF)
0.7850
Wetted Perimeter (FT.)
3.1400
Hydraulic Radius (FT.)
0.2500
Velocity (FPS)
5.91
Flowrate (CFS)
4.64
MANNING'S FULL FLOW IN PIPE
Pipe Diameter (in.)
12
Type Pipe
CPP
"n" Value
0.013
Slope
0.0050
Flow Area (SF)
0.7850
Wetted Perimeter (FT.)
3.1400
Hydraulic Radius (FT.)
0.2500
Velocity (FPS)
321
Flowrate (CFS)
2.52
Pipe Diameter (in.)
15
Type Pipe
CPP
"n" Value
0.013
Slope
0.0110
Flow Area (SF)
1.2266
Wetted Perimeter (FT.)
3.9250
Hydraulic Radius (FT.)
0.3125
Velocity (FPS)
5.52
Flowrate (CFS)
6.77
MANNING'S FULL FLOW IN PIPE
Pipe Diameter (in.) 15
Type Pipe CPP
"n" Value 0.013
Slope 0.0470
Flow Area (SF)
1.2266
Wetted Perimeter (FT.)
3.9250
Hydraulic Radius (FT.)
0.3125
Velocity (FPS)
11.41
Flowrate (CFS)
14.00
MANNING'S FULL FLOW IN PIPE
Pipe Diameter (in.) 15
Type Pipe
UP
"n" Value
0.013
Slope
0.0190
Flow Area (SF)
12266
Wetted Perimeter (FT.)
3.9250
Hydraulic Radius (FT.)
0.3125
Velocity (FPS)
7.26
Flowrate (CFS)
8.90
cti
LJ
E
r•
(n
07
CV
C)
a7
U) U �
Q� g
o
o
v
>7
h
CO
r
O
00
(O
r
L"
m
m OD C,
M (p Qom.
r N Q
Q
r
r
C
Q7
ti
II II II
cu m
W) (v E
�.
(Dr rn � •° U) Q
000c)E 12 GCS
MANNING'S FULL FLOW IN PIPE
Disharge Pipe
Pipe Diameter (in.)
15
Type Pipe
CPP
"n" Value
0.012
Slope
0.0100
Flow Area (SF)
1.2266
Wetted Perimeter (FT.)
3.9250
Hydraulic Radius (FT.)
0.3125
Velocity (FPS)
5.70
Flowrate (CFS)
6.99
01- n A/ \4
t
1 h
Iylt•oe�
� V
J
/ r
!
11 " ^ I
1::..I% tC'r�; f if f .•F•J '� •�
� t.,;r' y - a �, �•;r ,gyp, ,
h 4' �
� ��r) 11
i J ! %
� • 1� - ! !
J
} 7�
AV
,s''
r t 7
* tt
>/ /! ,j
Itl t
� r
•1j�
t
F•
I
�
f�
!if ,I! rIf
!
It
i�"� 3�
�
1
4
fJ j
/
! O
I / i
! J r
! ! /
f i !
;J
41
0
ZII
\mil
COASTAL FEDERAL
Shallotte, NC
CALCULATIONS
AND
SUPPORTING MATERIAL
FOR
STORMWATER DESIGN
Harch ?003
Prepared by:
East Coast
Engineering Company, P.A.
Consulting Engineers
Shallolte, North Carolinn 28459
Post Office Box 2469 49.18 Main Street
Office: 910.75,L8029
¢z
a�
j W
N
@
W
U)
c
,0
Q) m
C
U- U
@ r.
y U ,c
c
U d D
(D
@
co (DD
(~D
o
a
Q
�
O
Lo
0
0
`o
U)
U)
U
N
a
s
i
C?
O
O
UC}
CD
m
00
(n
(,D
u7
Lo
O
O
M
r
Iqr
1�3-
N
00
O
W
>-(�
1-
O
�
O
N
00
LO
(*7
Q3
40
C)
Qom?
Ih
N
cn
LO
CD
M
N
N
Q
N
C3
Q)
CD
a
oa
o 0
@
x
x
>
d
a.
O
X
>
O
'
_
a
°
0
11 CV
QLo
c
Qi
o�ll
E
@�
c�
Q X
>
lT
O
<
X
+
II
CO
Ql
Q
Q
O
a)
a
o
CD
O
j
L
a0
a
>
���
Q
u
Q)
ti
°Q
ZI
Q
O
>
(`•
�
N
ro
O
p
QqQ)
4�Q
Q
�
@
m
Q)
a
\
rp
Q3
Q)
a
�
a
7�3
V)
rob
m
c
O
d
L
nai
O,
°
cn
°
-
Frm
�
Q'
ro
ro
ro
44rLC/)
O
O
Z
cnW
65WvoC
c
N
in
Y
O
z
(%%
N
N
N
U
U
V
CO
V
CD
r
00
LO
Nil
M
LO
CA
CA
r
O
O
O
O
Z-
N
I--
ITO
N
LO
O
0
O
0
6
0
C0
Q
O
O
C'7
O
O
O
NY
v
ro
'a
N
Y)
U
N
�
�
C
C
r
r
r
�
X
X
C-
a�
�
O
=
D
N
0
O
O
Q)
N
N
a
m
a�
O
Qi
0
N
O
N_
N_
CL
N
�
E
'D
'O
C
X
X
Q)
e
e
,I
II
II
II
II
0
0
N
ko
00
'm
'O
c
N
4
m
fi
fi
'o-o
Q��
a
�ro�
0
o
m
ro
U
Y
o
o
a>
m
W
CiC'1zU
�CcOU¢¢��C'1
Coastal Federal
Forebay Calculations
TOTAL POND VOLUME at PERMANENT POOL FOR POND
BEFORE FOREBAY DESIGNED FOR ESTIMATION PURPOSES
� f ' rienth e- 1 clnna fnr 10 ' than 3.1 -,Irma
East Coast Engineering Company, PA
EMN
ELEVATION
(FT MSL)
SURFACE
AREA (SF)
INCREMENTAL
VOLUME (CF)
ACCUMULATIVE
VOLUME (CF)
10.5
474
725
725
11.5
975
1459
2183
12.5
1942
2626
4809
13,5
3309
1 20% OF PERMANENT POOL VOLUME = 9bl.70U
FOREBAY VOLUME at PERMANENT POOL
2:1 slope
ELEVATION
(FT MSL)
SURFACE
AREA (SF)
INCREMENTAL
VOLUME (CF)
ACCUMULATIVE
VOLUME (CF)
11.5
327
404
404
12.5
480
572
975
13.5
663
POND 1 VOLUME TO FOREBAY COMPARISON
FOREBAY
2:1 SLOPE
BOTTOM SF
327.14
SURFACE SF L
663.11
DEPTH
2
VOLUME
990
POND
DEPTH
41
3:1 SLOPE
BOTTOM SF
424.79
TOP SF
893.94
DEPTH
2.33
VOLUME
1536
6:1 SLOPE
BOTTOM SF
893.94
SURFACE SF
2556.64
DEPTH
1.67
VOLUME
2881
TOTAL POND VOLUME 4418
FOREBAY % OF POND 22.4%
Revision Date 2/17/03
¢z
CL2
a LLJ
N
m
0
U
W
N
c
0
cu
U
(B
cU ❑
L (Q
a) a)
L
a) ¢
LL. Q1
co
cn c
m
0 m
Sft
E
Lfj
LL L
lD N
O
N
U7 ¢
O p
o
}
Ui
U
O
Lf? (D p
OD
Q) t- CD
r
.-
r)
o O Y
T
11 II II
d
aa) N E
0
~ L L
¢ ¢ 0
O
0
U
{D c9
?m
e
U
C co
OOP
cjQC�F��
C1
N
a
E
0
N
m
U
CD
C�z
LLOD
ON
NN
¢
O O
m
U
v
M
I� 07
cD N p
co n CV Cl)
"I N a N
T
�
LO
IT
N O Y
Y
O O O
c0
r
II II II
Q'
0 Q) E
¢ ¢ o
o
U
) 0)
m
G c .a)
rot
b)
c
U
in 'ca �5
L0
q a m
m
H
❑o
L(D
o<
�
a
Fi
E
0
m
U
0
9
��Lo
CD
U-
N
co
N
U
c�
O
u)
o
L0
O
O O
U C) 0 O
I-
N
Q
H II II
a
N N E
¢ ¢ 0
0
U
mU�
Q)
co cu .03
ro a f6
c
U
co ca
Q co
m
a)
II
rn
0
E
L a) Ln U) `a) to coN � � Lo
LL O N �rj LL O 0)N N LL N `� 04 I-
w
} U o u U O
Lo�l
o co
O V) M LrIO-6
cn co M co co o 0 Lo Ln
O Tp 0 0 0 O r v N O O Q o o O r 00
r~o QUO o L
6moo O Q riot uo - o ~ No
II II a II II Q II II
II CU cu 0 II I{ cc ci•mo0N E
O E
¢¢O O
1:3Q
a��� a)
Cm)
v
A Q
,� .rn @ V) c U .c .� m e di ro c U
N ❑ (D +- Q) II (U S] N N kl t4 {� u) a cu a) Q) II
D O d c� a C7 ti C� r� 0 U) Q C7 F° C1 c Q C7 I� C�
r
Q
E
0
4
r
m
U
0
J
M
Q
E
O
M
m
U
0
s
O
MY
U)'l'.lnn[
0
Q
cv
LU
E 4
co
LL `U
N
m
CD
} U
o
Ch
d
T
O T
T
>n
Oi
CK?
T Q
(] T
C)
Q C)
Q
CZ
E
Q Q
� 0) CU
m m C U Q
c e .m cti t a co .- c U
m ul a (D aJ 11
0 0 0 co < C7 ►—� � � C�
0
0
Q
Q Z
d 2
T w
C
O
Q
O
U
N
0
0
U
ANSI
m
O
V
N
p
(N
r
O
C
4
N
(D
N
r
O
CD
LO
U-)
(D
(3
N
cn
N
►n
N
Lo
CD
�
d
O
N
N
N
(D
r
00
v
to
U')
0
r-
r
f-
M
CL
O
O
O
q,
r
0
Cl
0
0
0
p
0
0
w
O
p
0
0
0
O
p
Q)
N
N
N
N
N
Uf)
cep
'n
Q
a
V
�
r
�
r
N
m
m
�`
Cl)
0D
Nr
�'
LO
co
CN
(D
r
p
N
O
TLo
co
N
N
O
N
Q
O)
'gr
C
r
N
N
N
�
(D
I—
.`
r
C
O
U
c
m
m
r
N
M
"Cr
m
❑
�]
m
U
U
U
U
U
ca
U
�
ocooaoocop
Q
>
M
N
N
r
O
r
cn
J'rr
d'
N
N
O
r
M
N
Q
r
CL
0
In
p
to
O
0
O
I-
r
0
r
Il
r
r
O
O
O
O
O
O
O
O
'r
N
O
N
Lq
M
>
M
N
N
N
if1
r
r
r
r
Q)
N
N
N
N
N
LO
U7
u)
Q)
Q
r
r
r
r
r
r
CL
N
M
CD
N
00
M
M
o
m
U
U
U
CLU
U
Lj
E
r
N
c?
00
m
(L
UUUUUZU
OJ
r
N
M
Or
NING'S FULL FLOW IN PIPE
Pipe Diameter (in.)
12
Type Pipe
CPP
"n" Value
0.013
Slope
0.0170
Flow Area (SF)
0.7850
Wetted Perimeter (FT.)
3.1400
Hydraulic Radius (FT.)
0.2500
Velocity (FPS)
5.91
Flowrate (CFS)
4.64
MANNING'S FULL FLOW IN PIPE
Pipe Diameter (in.)
12
Type Pipe
UP
"n" Value
0.013
Slope
0.0050
Flow Area (SF)
0.7850
Wetted Perimeter (FT.)
3.1400
Hydraulic Radius (FT.)
0.2500
Velocity (FPS)
3.21
Flowrate (CFS)
2.52
MANNING'S FULL FLOW IN PIPE
Pipe Diameter (in.)
15
Type Pipe
CPP
"n" Value
0.013
Slope
0.0110
Flow Area (SF)
1,2266
Wetted Perimeter (FT.)
3.9250
Hydraulic Radius (FT.)
0.3125
Velocity (FPS)
5.52
Flowrate (CFS)
6.77
MANNING'S FULL FLOW IN PIPE
Pipe Diameter (in.)
15
Type Pipe
CPP
"n" Value
0.013
Slope
0.0470
Flow Area (SF)
1.2266
Wetted Perimeter (FT.)
3.9250
Hydraulic Radius (FT.)
0.3125
Velocity (FPS)
11.41
Flowrate (CFS)
14.00
Pipe Diameter (in.)
15
Type Pipe
CPP
"n" VaIue
0.013
Slope
0.0190
Flow Area (SF)
1.2266
Wetted Perimeter (FT.)
3.9250
Hydraulic Radius (FT.)
0.3125
Velocity (FPS)
7.26
Flowrate (CFS)
8.90
q
L
\ / 11
E
< < / § \
\ \ 12 §
m cu c 0 �.g '
= a = O
/\ ®� a it/ 20
f i
000//ƒ/3�
MANNING'S FULL FLOW IN PIPE
Disharge Pipe
Pipe Diameter (in.)
15
Type Pipe
CPP
"n" Value
0.012
Slope
0.0100
Flow Area (SF)
12266
Wetted Perimeter (FT.)
3.9250
Hydraulic Radius (FT.)
0.3125
Velocity (FPS)
5.70
Flowrate (CFS)
6.99
4
of
1
,
L
+t
or
�
.f . F
r
O
1
!
/
1
LI 1 �
i
.4s
•� /! /
If
\
, r
LI`
NARRATIVE
for
Coastal Federal
Shallotte, Brunswick County, NC
DESCRIPTION
The site is a 1.68-acre tract located on the corner of Smith Avenue (SR 1357) and White
Street in Shallotte, NC. The proposed development on the site is 4038 square foot bank building
with twenty-eight (28) parking spaces and drive -through teller window. The site is wooded with
sandy topsoil and grades ranging from 0.5% to 2.0%. The site will be graded to meet the proposed
plans, however care will be taken to leave as many existing trees as possible and incorporate the trees
into the proposed landscaping. A portion of site is wetland. A wetland mitigation plan is proposed
to fill a portion of the wetland and create a new area of wetland. Construction is scheduled to begin
as soon as all permits and approvals are obtained.
STORMWATER MEASURES
The storrttwater- runoff from the site is estimated using the rational method. The site is not
located near SA waters, thus the first inch 0 ") of rainfall is accounted for in the design. The
stormwater will collect into one (1) wet detention basin on the site. The stormwater run-off will be
directed to the basins by curbed parking, catch basins, roofline gutters, and underground piping. The
basin will outlet to the existing natural drainage course on the site that will direct the outflow to the
Woodward Branch (C; Sw, HQW) that is in the Lumber River Basin.
EROSION CONTROL MEASURES
The attached plans and specifications give the requirements for erosion control measures.
Silt fence will be located at certain locations on the perimeter of the site and adjacent to wetlands.
The silt fence will be installed prior to any land disturbing activity. The runoff will be directed to the
wet detention basin during construction of the site. The basin area will be cleared and grubbed and
the basin constructed prior to any other land disturbing activity. The temporary diversion swales will
direct the runoff to the basin and shall be established prior to the remaining grading activities on the
site. Gravel inlet protection will be used around the catch basins until vegetation is established or the
area is paved. A gravel construction entrance will be constructed off of White Street. A riprap
energy dissipater will be used on the wet detention basin outlet. The grading contractor and the
developer wil I provide the maintenance for the erosion control measures.
CONSTRUCTION SEQUENCE
The Contractor will install the gravel construction entrance prior to beginning any clearing
and grading operations. Siit fence and check dams will be installed prior to beginning any clearing
and grading operations. The wet detention basin will be constructed immediately after that portion of
the site is cleared, and the outlet structure will be installed with outlet piping. Temporary diversion
swales will be installed and will direct runoff to the basin during construction. The catch basins and
underground piping will be installed and temporary inlet protection will be established. The site will
be graded to proposed grades. The run-off will be directed toward the catch basins during the
grading process. The parking area will be paved and the temporary inlet protection will be removed.
The disturbed areas will be landscaped and seeded upon completion, and as soon as possible. The
wet detention basins will be restored to original depth and design grades after completion of all other
construction.
NARRATIVE
for
Coastal Federal
Shallotte, Brunswick County, NC
DESCRIPTION
The site is a 1.68-acre tract located on the corner of Smith Avenue (SR 1357) and White
Street in Shallotte, NC. The proposed development on the site is 4038 square foot bank building
with twenty-eight (28) parking spaces and drive -through teller window. The site is wooded with
sandy topsoil and grades ranging from 0.5% to 2.0%. The site will be graded to meet the proposed
plans, however care will be taken to leave as many existing trees as possible and incorporate the trees
into the proposed landscaping. A portion of site is wetland. A wetland mitigation plan is proposed
to fill a portion of the wetland and create a new area of wetland. Construction is scheduled to begin
as soon as all permits and approvals are obtained.
STORMWATER MEASURES
The stormwater runoff from the site is estimated using the rational method. The site is not
located near SA waters, thus the first inch (I") of rainfall is accounted for in the design. The
stormwater will collect into one (1) wet detention basin on the site. The stormwater run-off will be
directed to the basins by curbed parking, catch basins, roofline gutters, and underground piping. The
basin will outlet to the existing natural drainage course on the site that will direct the outflow to the
Woodward Branch (C, Sw, HQW) that is in the Lumber River Basin.
EROSION CONTROL MEASURES
The attached plans and specifications give the requirements for erosion control measures.
Silt fence will be located at certain locations on the perimeter of the site and adjacent to wetlands.
The silt fence will be installed prior to any land disturbing activity. The runoff will be directed to the
wet detention basin during construction of the site. The basin area will be cleared and grubbed and
the basin constructed prior to any other land disturbing activity. The temporary diversion swales will
direct the runoff to the basin and shall be established prior to the remaining grading activities on the
site. Gravel inlet protection will be used around the catch basins until vegetation is established or the
area is paved. A gravel construction entrance will be constructed off of White Street. A riprap
energy dissipater will be used on the wet detention basin outlet. The grading contractor and the
developer will provide the maintenance for the erosion control measures.
CONSTRUCTION SEQUENCE
The Contractor will install the oravel construction entrance prior to beginning any clearing
and grading operations. Silt fence and check dams will be installed prior to beginning any clearing
and grading operations. The wet detention basin will be constructed immediately after that portion of
the site is cleared, and the outlet structure will be installed with outlet piping. Temporary diversion
swales will be installed and will direct runoff to the basin during, construction. The catch basins and
underground piping will be installed and temporary inlet protection will be established. The site will
be graded to proposed grades. The run-off will be directed toward the catch basins during the
grading process. The parking area will be paved and the temporary inlet protection will be removed.
The disturbed areas will be landscaped and seeded upon completion, and as soon as possible. The
wet detention basins will be restored to original depth and design grades after completion of all other
construction.