Loading...
HomeMy WebLinkAboutSW8021219_HISTORICAL FILE_20030917STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW nolpy DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD C� WArfi Michael F. Easley, Governor !J `Q. William G. Ross Jr., Secretary otNorth Carolina Department of Environment and Natural Resources o6(W 7 AlanW. Klimek, DivD i on of WaterQuality Coleen H. Sullins, Deputy Director Division of Water Quality September 17, 2003 Mr. Henry Shitrit, President H& D Properties, LLC 14418 Ocean Highway Pawley's Island, SC 29585 Subject: REQUEST FOR DESIGNERS CERTIFICATION Stormwater Project No. SW8 021219 Shipwreck Point Golf P(ender County Dear Mr. Shitrit: On April 11, 2003, the Division of Water Quality issued a Stormwater Management Permit to you for the subject project. Per the terms and conditions of the permit, and Stormwater Regulation 15A NCAC 2H.10080), which stipulates the following: "Upon completion of construction, the designer for the type of Stormwater system installed must certify that the system was inspected during construction, was constructed in substantial conformity with plans and specifications approved by the Division and complies with the requirements of this Section prior to issuance of the certificate of occupancy." As of this date, our records indicate the required designer's certification has not been received. Operation of the stormwater system prior to submission of the required certification is a violation of NCAC 2H.10080) in accordance with NCGS 143-215.6. Construction is considered complete at the time the project is occupied by an owner or tenant for its intended use. Please submit the required certification by October 16, 2003. Failure to submit the certification is considered a violation of the permit, and is subject to enforcement action, per NCGS 143-215.6A. If you have any questions concerning this matter, please call me at (910) 395-3900. Sincerely, 1 n�Ct� Linda Lewis Environmental Engineer RSS/arl: S:1WQSISTORMWA-RPEREQ1021219.sep03 cc: Keith Bulla, P.E., w/enc. Pender County Building Inspections Linda Lewis Central Files N1. C. Division of Water Quality 127 Cardinal Drive Extension (91 D) 395-3900 Customer Service AA7A= Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 NCD£N C� IN p,.rFR Michael F. Easley, Governor �Ot pWilliam G. Ross Jr., Secretary G v North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E.,Director p Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality July 8, 2003 CERTIFIED MAIL #7003 0500 0000 8804 3037 RETURN RECEIPT REQUESTED Mr. Henry Shitrit, President H & D Properties, LLC 14418 Ocean Highway Pawley's Island, SC 29585 Subject: NOTICE OF VIOLATION Shipwreck Point Golf Stormwater Permit No. SW8 021219 Pender County Dear Mr. Shitrit: On July 1, 2003, Wilmington Regional Office personnel performed a Compliance Inspection of the subject project, located off Highway 50 near Topsail Beach, in Pender County, North Carolina. The inspection was performed to determine the status of compliance with Stormwater Permit Number SW8 021219, issued to you on April 11, 2003. The project has been found in violation of Stormwater Permit Number SW8 021219 , issued pursuant to the requirements of 15A NCAC 2H.1000. The violations found are: Condition 11.1- The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended purpose, prior to the construction of any built -upon surface. The pond was neither complete, nor vegetated at the time of the inspection, and construction of the building was well underway. To correct this violation you must : 1. Provide a written "Plan of Action" which outlines the actions you will take to correct the violation and a time frame for completion of those actions, on or before August 8, 2003. 2. Immediately complete construction of the pond and outlet structure prior to the construction of any more built -upon area. N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service S'A Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 NCDENR r Mr. Shitrt July 8, 2003 Stormwater Permit No. SW8 021219 Failure to provide the "Plan of Action" by August 8, 2003, or to correct the violations by the date designated in the "Plan of Action", are considered violations of 15A NCAC 21-1.1000, and may result in the initiation of enforcement action which may include recommendations for the assessment of civil penalties, pursuant to NCGS 143- 215.6A. Additionally, sedimentation was observed leaving this site. The Division of Land Resources will be copied on this Notice so that they may inspect the site for compliance with the approved Sedimentation Erosion Control plan. By copy of this letter to the Pender County Building Inspector, this Office is requesting that the Building Inspector consider withholding building permits and Certificates of Occupancy for this project until this matter is satisfactorily resolved. If you have any questions concerning this matter, please call Linda Lewis at (910) 395-3900. Sincerely, Rick Shiver Water Quality Regional Supervisor RSSlarl: S:1WQSISTORMWATINOTICE1021219.ju103 cc: Keith Bulla, P.E. Pender County Building Inspections Division of Land Resources Linda Lewis Central Office Q w w June 27, 2003 Keith P. Bulla, P.E. 3202 Binford Court Wilmington, N.C. 28405 Telephone: (910) 791-4724 Linda Lewis Environmental Engineer North Carolina Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Re: Storm Water Management Permit Application Shipwreck Point Golf, Pender County Storm Water Project Number SW8 021219 Dear Ms. Lewis: On behalf of Mr. Henry Shitrit, President, R&D Properties, LLC, 14418 Ocean Highway, Pawleys Island, South Carolina, 1 have enclosed one copy of the project drawings for a State approval sea]. These drawings were previously approved and sealed by your office but the owners copy of the certified set were misplaced by the property owner. Your assistance with re -sealing these drawings is appreciated. Sincerely, Keith P. Bulla, P.E. Project Engineer Enclosures .. :,tl 1 Keith P. Bulla, P.E. 3202 Binford Court Wilmington, N.C. 28405 Telephone: (910) 791-4724 April 10, 2003 Linda Lewis Environmental Engineer North Carolina Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Re: Storm Water Management Permit Application Shipwreck Point Golf, Pender County Storm Water Project Number SW8 021219 Dear Ms. Lewis: RECEIVEID APR 10 2003 DwQ G PROD #,c,�Gzr21`I On behalf of Mr. Henry Shitrit, President, H&D Properties, LLC, 14418 Ocean Highway, Pawleys Island, South Carolina, I have enclosed two copies of the storm water detail drawing with the revised temporary pool dimensions and storm water manual reference in accordance with your telephone message of April 9, 2003. . If you have any Questions in regard to the revised storm water management plan, please advise. Your assistance and patience with this project is appreciated and I apologize for all the inconveniences. Sincerely, V"U P 2JL-, Keith P. Bulla, P.E. Project Engineer Enclosures i i .. IcrC 'i.`I t r,; J .rt'i .I' F ,rl''.�r' ! J•'c'+ d.j ...3f , Ir { 'r1, -' � ' � �M1. Sr �` .r..• I' . '.1_ .. .i � "fII,J� 'J i � ��' 7- .11d+r r. r'. .'-,i.:.+T��J'.#i�i� 1.. i.:r, ' � _ +:..'F .J'.} .. .�-• "" - , r State Stormwater Management Systems Permit Number SW8 021219 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Henry Shitrit, c% H & D Properties, LLC Shipwreck Point Golf Pencler County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 11, 2013, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS I . This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 50,018 square feet of impervious area. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to any changes in the amount of built -upon area or the approved drainage area. fl State Stormwater Management Systems Permit Number SW8 021219 Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Shipwreck Point Golf SW8 021219 Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: Drainage Area, acres: Onsite, sq. ft.: Offsite, sq. ft.: Total Impervious Surfaces, sq. ft.: Pond Depth, feet: TSS removal efficiency: Permanent Pool Elevation, FMSL: Permitted Surface Area, sq. ft.: Permitted Storage Volume, cubic ft.: Temporary Storage Elevation, FMSL: Controlling Orifice: Permitted Forebay Volume, cubic ft.: Pender County Mr. Henry Shitrit c/o H & D Properties, LLC 14418 Ocean Highway Pawley's Island, SC 29585 April 10, 2003 UT Becky's Creek / Cape Fear CPF24 18-87-8 "SA" >1/2 mile from' 2.15 93,500 0 50,018 5.50 90% (no filter is required) 26.60 4,058 @Permanent Pool 5,367 27.75 1.25 cp (drawdown in 2-5 days) 1,822 State Stormwater Management Systems Permit Number SW8 021219 11. SCHEDULE OF COMPLIANCE The stonmwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. C. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This pen -nit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 10. At least 30 days prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 11. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittec for a minimum often years from the date of the completion of construction. 13. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. The permittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. 16. Prior to receiving a Certificate of Occupancy for this project, the permittee must have caused the project permitted under SW8 010515, Waves Beachwear, to come into compliance with the stormwater rules. Ill[. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of owership, or a name change, the permittee must submit a formal• permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. State Stormwater Management Systems Permit Number SW8 021219 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permitter grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 1 lth day of April, 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION r V— '4 --�' 0 J1 Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Keith P. Bulla, P.E. :Ag 3202 Binford Court Wilmington, N.C. 28405 E00Z' z 9 bdW Telephone: (910) 791-4724 Q��I���a March 26, 2003 Linda Lewis Environmental Engineer North Carolina Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Re: Storm Water Management Permit Application Shipwreck Point Golf, Pender County Storm Water Project Number SW8 021219 Dear Ms. Lewis: On behalf of Mr. Henry Shitrit, President, H&D Properties, LLC, 14418 Ocean Highway, Pawleys Island, South Carolina, I have enclosed for your review the revised storm water management plan and application in accordance with your comments dated February 25, 2003 in duplicate, and revised calculations and for the project Shipwreck Point Golf The following responses are to the like - numbered comments in your February 25 correspondence: 1. A scaled topographic map is enclosed noting the location of the project is more than '/2-mile to Beckys Creek. 2(a). The orifice was relocated so that the bottom invert is at the permanent pool elevation. 2(b). The entire shelf has been included in the permanent pool area, placed below the permanent pool. 2(c). A table of elevations and areas below permanent pool supporting the calculations has been added to the drawings. 2(d). The calculations were revised using the average head to calculate the draw down time. 2(e). The correct permanent pool area was used. 3. A note was added to the drawings indicating that there are no 404 wetlands located on the site. 4. The revised application was signed by the President of H&D Properties, LLC. The company has taken steps to be registered company in North Carolina 5. The common street will be constructed by Dan Medlin, P.O. Box 2489, Surf City, N.C., 28445, telephone number (910) 327-3158. It is my understanding that Mr. Medlin will be filing for a separate storm water management permit. 6. Additional spot elevations and the building finish floor elevation was added to the drawings. 7. The runoff from the golf course will flow into the water features and parking lot. Each golf course hole is equipped with a drain at the course ball hole that drains directly to the water features. The two water features are connected by a 12-inch PVC pipe and an overflow pipe is provided for the G' I r• S f% a 'r_' �, 'J :r "S r '!J � I� fr _ r .� 'i' jj Al 1 AT f r r �? .. ..,7. i a i . � 'IJ I._ 1 t,' .. I �S, _'J l�'i.' : `S:'']., i•r r rS, . iI V I Tm 'r water features that drains directly to the detention basin. A spillway is provided for the water feature that discharges to the parking lot. 8. See response to comment number 4. 9. An infiltration basin is not required. If you have any questions in regard to the revised storm water management plan, please advise. Sincerely, K'O'-L P. �3'A' Keith P. Bulla, P.E. Project Engineer Enclosures cc: Mr. Henry Shitrit (w/o encs.) Charles Riggs & Associates (wlens) - ! �. • ! �.�� 1 ��f J Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director ,Division of Water Quality Wilmington Regional Office February 25, 2003 Mr. Tom Balser, Agent_ _ H&D Properties, LLC 14418 Ocean Highway Pawley's Island, SC 29585 Subject: REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 021219 Shipwreck Point Golf Pender County Dear Mr. Baker: The Wilmington Regional Office received a Stormwater Management Permit Application for Shipwreck Point Golf on December 20, 2002. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide a scaled topographic map with the project boundaries scaled and noting the location,of the UT to Becky's Creek. If this project is within 1/2 mile of that UT, you must revise the stormwater design to infiltration. Per NCAC 2H .1005 (2)(b)(ii), high density control systems within 1/2 mile of SA waters or unnamed tributaries to SA waters, must provide an infiltration system to control the runoff from 1.5" of rain. 2. If it turns out that wet detention is allowed,. please revise the following items: ✓a. Relocate the 6" orifice pipe so that the bottom invert of the 1" orifice hole is at the permanent pool elevation. 1�b. The permanent pool dimensions shown in the calculations on Page 2 of 12 are contradictory. It appears to be located at the top of the vegetated shelf (which is the standard practice), but the dimensions below it stop mid -way in the shelf. Please include the entire shelf in the permanent pool area, and place it completely below the permanent pool. C. Please provide a table of elevations and areas below permanent pool to support the reported permanent pool volume and forebay volume calculations. t% d. Please use the average head, measured from the centerline of the orifice to the storage elevation to size the orifice. This will provide a more accurate draw down time since the flowrate through the orifice will decrease as the driving head decreases. e. The specified storage elevation of 27.7 will provide only 4,135 ft3 of storage. It appears that the wrong area (4,995 ft2) was used at 1' above the permanent pool. From page 4 of the calculations, this area is 4,095. ft2. Please correct and revise.'ir CDENR N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900 Fax (910) 350-2004 Customer Service 800-623-7748 \'Ir. Baker February 25, 2003 Stormwater Project No. SW8 021219 V/3. Per NCAC 2H.1003(g), please either delineate all wetlands on site, disturbed or undisturbed, or note on_the plans that none exist. Note ##14 regarding the absence of CAMA AFC's does not include 404 wetlands. ✓4. Per NCAC 2H.1003(e) the signature of the consultant or other agent can be accepted only if accompanied by a letter of authorization. Please either have the president, vice-president or Managing Member of the LLC sign the application and supplement, or have them sign the letter of authorization. ✓5. Who will be constructing the "common street"? Per NCAC 2H.1003 (b), projects under a common plan of development are considered as a single project, and require stormwater management measures. Please either account for this street in the design,of the stormwater control, or have the developer/owner secure a separate permit from the Division, which addresses the road and all the future development of the J.H. Batts Division. ✓6. Please provide grading and/or additional proposed spot elevations along the southern edge of the parking lot and the golf course area, and provide a finished floor elevation for the building. 7. How will runoff from the golf course be directed into the stormwater control system? 4? 8. H&D Properties, LLC, is not listed with the Secretary of State Corporations database. I am unable to issue a permit to a NC corporation that does not exist. r�o Please provide any documentation you have. Please check the spelling, and 9 provide the correct name of the corporation.. If the corporation is not registered with the NC Secretary of State, please do so. [9. If infiltration will be used, please revise the plans, provide a completed infiltration YY "" basin, supplement, provide supporting calculations, and a soils report, and make arrangements for the Division's soil scientist to be present when the soils consultant does the initial investigation. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to March 25, 2003, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A.. - Mr. Baker February 25, 2003 Stornlwater Project No. SWS 021219 Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, 4 &-" �6" Linda Lewis Environmental Engineer RSS/arl: S:IWQSISTORMWATIADDINFO120031021219.FEB03 cc: Linda Lewis Keith Bulla, P.E. 5 0,74F'-03-2003 ■ ■ I■ 01:50 PM PH EnuironmenLal 910 509 9495 P.01 Keith P. Bulk, PE ` 3202 Binford Caort FAX COVER Wilmington, NC 28405 Phone: (910) 362.0023 PAGE Phone: (910) 791-4724 FAX: (910) 362-0024 To: Linda Lewis From: Kehh Bulla Company: NCDENR Date; 3/3/03 Fax Number: 350-2004 Pages 2 Re: Stormwater Project No. SWS 021219, Shipwreck Point Golf Linda, Foxed for your review 1s the scaled location map In accordance with your request In comment number in correspondence dated 2/25/03 regarding the above referenced project. Resolving the issue of the project's proximity to SA waters is critical to resolving the remainder of our comments so I would appreciate your review and comments of the faxed map. Based on our discussion on 2/21/03 at the Gideon Square site, I was vender the impression that based on your knowledge of the area, the Shipwreck Point Golf project was within a % mile of Beckys Creek tributaries. The map I have provided illustrates the project to be more than % mile from Beckys Creek and UT's to Beckys Creek. Your assistance with this resolving this issue would be greatly appreciated. Keith P. Bulla, PE If you do not receive all pages or if portions are illegible, please call (910) 362-0023 for rcUmsmission ` TRANSACTION REPORT MAR-06-2003 THU 10:43 AM FOR: NCDENR WIRO 9103502004 :K SEND W DATE START RECEIVER PACES TIDE NOTE M# �c �c MAR-06 10:42 AM 93620024 1 44" OK „ 14 OF Date: March 6, 2003 To: Keith Bulla, P.E. Company: FAX #: 362-0024 Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources FAX COVER SHEET DWQ Stormwater Project Number: SW8 021219 Project Name: Shipwreck Golf Course MESSAGE: Keith: Alan W. Klimek, P.E., Director Division of Water Quality Wilmington Regional Office No. of Pages: 1 From: Linda Lewis Water Quality Section - Stormwater FAX # 910-350-2004 Phone # 910-395-3900 Please don't misunderstand me. I only said I thought you were within 1/2 mile of SA waters. I never know for sure until the project is located on a USGS topo map and scaled. This is a requirement for any project that ultimately drains to SA waters. In order to be able to use a wet pond to treat runoff, you had to verify that the project is at least 1/2 mile away. You should already have received the additional information request for this project. It was received a week or so after the other project. S:IWQSISTORM WATIADDINFO120031021219.MAR03 06ERR N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900 Fax (910) 350-2004 Customer Service 800-623-7748 E C E I UDEC�',2;0'2a02 Ms. Linda Lewis Keith P. Bulla, P.E. 3202 Binford Court Wilmington, N.C. 28405 Telephone. (910) 7914724 December 20, 2002 Environmental Engineer North Carolina Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Re: Storm Water Management Permit Application Shipwreck Point Golf, Surf City, Pender County, N.C. Dear Ms. Lewis: On behalf of H&D Properties, LLC, 14418 Ocean Highway, Pawleys Island, South Carolina, I have enclosed for your review, the storm water management application, one original and one copy; one wet detention basin supplement; plans and specifications, in duplicate; calculations; and project narrative; for the project Shipwreck Point Golf. Also enclosed is the $420.00 application fee. This project is being developed as a high -density project. The proposed project consists of a miniature golf course with parking and concession building. The storm water management method for this project is one detention basin designed for 90% removal of suspended solids. The detention basin is proposed to discharge to a dedicated roadway easement with roadside ditches. The project watershed drains to an unnamed tributary of Beckys Creek. If you have any questions in regard to this storm water management application, please advise. Sincerely, M Keith P. Bulla, P.E. Project Engineer Enclosures cc:H&D Properties, LLC (w/o encs.) Charles Riggs & Associates (wlenes)