Loading...
HomeMy WebLinkAboutSW8021203_HISTORICAL FILE_20190828STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW� DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Hall, Christine From: Hall, Christine Sent: Wednesday, August 28, 2019 10:03 AM To: ggenero@cecinc.com Subject: SW permits for East Carolina Bank in the Wilmington Regional Office (WIRO) Attachments: 2003 02 permit 021203.pdf; 2008 10 permit 080920.pdf George, Thanks for the phone call. I understand that First National Bank has acquired East Carolina Bank and you are attempting to identify the impacted permits. In the Wilmington Region, East Carolina Bank has the following two permits: SW8 021203 (Expired 2/13/17) in Morehead City, Carteret County SW8 080920 (Active — no expiration date) in Leland, Brunswick County I have also attached pdfs of these permits. You will likely notice that the permit for SW8 021203 lists an expiration date in 2013. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any stormwater permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension. These laws extended the expiration date of SW8 021203 to 2017. We also talked about whether this was a merger filed with the NC Secretary of State or actual change in.ownership. If it is a merger, you have the option to use the Permit Information Update Form. This form along with the transfer and renewal forms can be found at the bottom of this website. Additionally, you mentioned that First National Bank may have purchased other banks. If so, you might find the excel list of the active and expired permits on this website under the Active Permits heading helpful. Please let me know if you have additional questions. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 1Nothing Compares, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. STROUD ENGINEERING, P.A. Hestron Plaza Two 151-A Hwy. 24 MOREHEAD CITY, NC 28557 (252) 247-7479 TO NCDN R"VNis�or, O� Wclltcr �u�L+�f 1;'7 Card c7 bc- it ;��.eqn�L�� WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via ❑ Shop drawings ❑ Prints ❑ Plans ❑ Copy of letter ❑ Change order ❑ DAT£ _ r/f L� JOB NO. 1 ATTENTION ■Y� V ` Rf: fV;►_N_ Ng0.A5\A% ID2_12-03 R+ ins Sto�>►�,�,w�d1c r 0 ❑ Samples the following items: Il Specifications COPIES DATE NO. DESCRIPTION >acr r r� ' &r r cc.a-m-n 1 i BY: -- THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ For your use 0 As requested ❑ For review and comment ❑ FORBIDS DUE REMARKS ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: If enclosures are not as noted, kindlydlynonotfty u once. j <7. STROUD ENGINEERING, P.A. CONSULTING ENGINEERS HESTRON PLAZA TWO 151-A HWY.24 MOREHEAD CITY, NORTH CAROLINA 28557 (252)247-7479 September 13, 2004 Mr. Rick Shiver NCDENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Permit No. SW8 021203 East Carolina Bank — Morehead City High Density Stormwater Project Carteret County Dear Mr. Shiver, Y.- SEP .14 2004 Please find the attached Designer's Certification and Checklist for the referenced stormwater control system. The stormwater collection and treatment system has been installed in substantial conformance with the approved plans and permit. ��O C,Q9 ���,/ rely, :Q •f ~ Q // 4 b � _ Sf�gL Ronald D. Culli her, P.E. P QN �f+=11Goi111�0 107 COMMERCE ST. SUITE B GREENVILLE, NC 27858 (252)756.9352 102-D CINEMA DRIVE WILMINGTON, NC 28403 (910) 815-0775 HESTRON PLAZA TWO 151-A HWY. 24 MOREHEAD CITY, NC 28557 (252) 247-7479 1 State Stormwater Management Systems Permit No. SW8 021203 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO J. Dorson White, Ex. Vice President, The East Carolina Bank East Carolina Bank -Morehead City Carteret County FOR TIME construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rides") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and -approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 13, 2013, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stonnwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 37,515 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. 2 State Stormwater Management Systems Permit No. SW8 021203 DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Project Name: East Carolina Bank -Morehead City Permit Number: SW8 021203 Location: Carteret County Applicant: Mr. J. Dorson White Ex. Vice President & C.O.O. Mailing Address: The East Carolina Bank 1001 Red Banks Road Greenville, NC 27858 Application Date: December 6, 2002 Receiving Stream/River Basin: Newport River / White Oak Index #: WOK03 21-(1) Classification of Water Body: "C" Drainage Area, acres: 1.29 Onsite, ft2: 1.29 Offsite; ft2: 0 Total Impervious Surfaces, ft2: 37,515 Pond Depth, feet: 4.0 TSS removal efficiency: 90% (no filter is required) Pennanent Pool Elevation, FMSL: 97.00 (assumed) Permitted Surface Area, f12: 3,434 @Permanent Pool Permitted Storage Volume, ft3: 3,288 Temporary Storage Elevation, FMSL: 97.8 (assumed) Controlling Orifice: 1 "y pipe (drawdown in 2=5 days) Permitted Forebay Volume, ft3: 1,265 3 State Stormwater Management Systems Permit No. SW8 021203 II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. C. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, now spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. The permitted surface area, volumes and orifice size must be provided. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The permittee shall submit to the Director and shalt have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 4 State Stormwater Management Systems Permit No. SW8 021203 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. if the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Pennittee for a minimum of ten years from the date of the completion of construction. 12. Prior to the sale or lease of any portion of the property, the permittee shall notify DWQ zo and provide the name, mailing address and phone number of the purchaser or leasce. An access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 13. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the pennitted system. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have'been made. 15. The permittee must maintain the current pennitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a fonnal pen -nit transfer request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Pennittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. State Stormwater Management Systems Permit No. SW8 021203 Unless specified elsewhere, permanent seeding requirements for the stonnwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Pen -nit issued this the 13th day of February, 2003. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.E., Director �l Division of Water Quality By Authority of the Environmental Management Commission G1 STROUD ENGINEERING, P.A. Hestron Plaza Two 151-A Hwy. 24 MOREHEAD CITY, NC 28557 `\ (252) 247-7479 , `Q TO NCDt'IVR- �Aja QLC11-L1 IZi- Carl, cm ( DV. Fxf 1W M Q-ei v h ,1JG 2S/4oT WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via ❑ Shop drawings ❑ Prints ❑ Plans ❑ Copy of letter 0 Change order ❑ DATE 12 V2_ JOB NOP M F[ r 34 ATTENTION r f , s 1e W RE: the following items: ❑ Samples ❑ Specifications rr e G • i1�* • Il i311e � THESE ARE TRANSMITTED as checked below: 0 For approval ❑ For your use ❑ As requested t For review and comment ❑ FOR BIDS DUE REMARKS ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US PtQ.y a U fits--t+7 a o L4 Glr�-PSG COPY To - SIGNED: If enclosures are not as noted, kindly notlty us of on.