HomeMy WebLinkAboutSW8021203_HISTORICAL FILE_20190828STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW�
DOC TYPE
❑CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
Hall, Christine
From: Hall, Christine
Sent: Wednesday, August 28, 2019 10:03 AM
To: ggenero@cecinc.com
Subject: SW permits for East Carolina Bank in the Wilmington Regional Office (WIRO)
Attachments: 2003 02 permit 021203.pdf; 2008 10 permit 080920.pdf
George,
Thanks for the phone call. I understand that First National Bank has acquired East Carolina Bank and you are attempting
to identify the impacted permits. In the Wilmington Region, East Carolina Bank has the following two permits:
SW8 021203 (Expired 2/13/17) in Morehead City, Carteret County
SW8 080920 (Active — no expiration date) in Leland, Brunswick County
I have also attached pdfs of these permits. You will likely notice that the permit for SW8 021203 lists an expiration date
in 2013. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval
issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was
current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period
of any stormwater permit that was set to expire during this time frame to three (3) years from its current expiration
date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4)
years extension. These laws extended the expiration date of SW8 021203 to 2017.
We also talked about whether this was a merger filed with the NC Secretary of State or actual change in.ownership. If it
is a merger, you have the option to use the Permit Information Update Form. This form along with the transfer and
renewal forms can be found at the bottom of this website.
Additionally, you mentioned that First National Bank may have purchased other banks. If so, you might find the excel list
of the active and expired permits on this website under the Active Permits heading helpful.
Please let me know if you have additional questions.
Christine Hall
Environmental Engineer
Division of Energy, Mineral and Land Resources — State Stormwater Program
Department of Environmental Quality
910 796 7215 office
910 796 7335 direct
christine.hall@ncdenr.gov
127 Cardinal Drive Ext.
Wilmington, NC 28405
1Nothing Compares,
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
STROUD ENGINEERING, P.A.
Hestron Plaza Two
151-A Hwy. 24
MOREHEAD CITY, NC 28557
(252) 247-7479
TO NCDN R"VNis�or, O� Wclltcr �u�L+�f
1;'7 Card c7 bc-
it ;��.eqn�L��
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via
❑ Shop drawings ❑ Prints ❑ Plans
❑ Copy of letter ❑ Change order ❑
DAT£ _ r/f L�
JOB NO. 1
ATTENTION
■Y� V `
Rf:
fV;►_N_ Ng0.A5\A% ID2_12-03
R+ ins Sto�>►�,�,w�d1c r
0
❑ Samples
the following items:
Il Specifications
COPIES
DATE
NO.
DESCRIPTION
>acr r
r� ' &r r cc.a-m-n
1
i
BY: --
THESE ARE TRANSMITTED as checked below:
❑ For approval
❑ For your use
0 As requested
❑ For review and comment
❑ FORBIDS DUE
REMARKS
❑ Approved as submitted
❑ Approved as noted
❑ Returned for corrections
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
❑ PRINTS RETURNED AFTER LOAN TO US
COPY TO
SIGNED:
If enclosures are not as noted, kindlydlynonotfty u once.
j
<7.
STROUD ENGINEERING, P.A.
CONSULTING ENGINEERS
HESTRON PLAZA TWO
151-A HWY.24
MOREHEAD CITY, NORTH CAROLINA 28557
(252)247-7479
September 13, 2004
Mr. Rick Shiver
NCDENR
Division of Water Quality
127 Cardinal Drive Extension
Wilmington, NC 28405
Re: Permit No. SW8 021203
East Carolina Bank — Morehead City
High Density Stormwater Project
Carteret County
Dear Mr. Shiver,
Y.-
SEP .14 2004
Please find the attached Designer's Certification and Checklist for the referenced stormwater
control system. The stormwater collection and treatment system has been installed in substantial
conformance with the approved plans and permit.
��O C,Q9 ���,/ rely,
:Q
•f ~ Q // 4
b �
_ Sf�gL
Ronald D. Culli her, P.E.
P
QN
�f+=11Goi111�0
107 COMMERCE ST.
SUITE B
GREENVILLE, NC 27858
(252)756.9352
102-D CINEMA DRIVE
WILMINGTON, NC 28403
(910) 815-0775
HESTRON PLAZA TWO
151-A HWY. 24
MOREHEAD CITY, NC 28557
(252) 247-7479
1
State Stormwater Management Systems
Permit No. SW8 021203
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
J. Dorson White, Ex. Vice President, The East Carolina Bank
East Carolina Bank -Morehead City
Carteret County
FOR TIME
construction, operation and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rides") and the
approved stormwater management plans and specifications and other supporting data as attached
and on file with and -approved by the Division of Water Quality and considered a part of this
permit.
This permit shall be effective from the date of issuance until February 13, 2013, and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stonnwater system has been approved for the management of stormwater runoff as
described on page 3 of this permit, the Project Data Sheet. The stormwater control has
been designed to handle the runoff from 37,515 square feet of impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of this
permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this project must
be directed into the permitted stormwater control system. A permit modification must be
submitted and approved prior to the construction of additional built -upon area from
outside of the approved drainage area.
2
State Stormwater Management Systems
Permit No. SW8 021203
DIVISION OF WATER QUALITY
PROJECT DESIGN DATA SHEET
Project Name:
East Carolina Bank -Morehead City
Permit Number:
SW8 021203
Location:
Carteret County
Applicant:
Mr. J. Dorson White
Ex. Vice President & C.O.O.
Mailing Address:
The East Carolina Bank
1001 Red Banks Road
Greenville, NC 27858
Application Date:
December 6, 2002
Receiving Stream/River Basin:
Newport River / White Oak
Index #:
WOK03 21-(1)
Classification of Water Body:
"C"
Drainage Area, acres:
1.29
Onsite, ft2:
1.29
Offsite; ft2:
0
Total Impervious Surfaces, ft2:
37,515
Pond Depth, feet:
4.0
TSS removal efficiency:
90% (no filter is required)
Pennanent Pool Elevation, FMSL:
97.00 (assumed)
Permitted Surface Area, f12:
3,434 @Permanent Pool
Permitted Storage Volume, ft3:
3,288
Temporary Storage Elevation, FMSL:
97.8 (assumed)
Controlling Orifice:
1 "y pipe (drawdown in 2=5 days)
Permitted Forebay Volume, ft3:
1,265
3
State Stormwater Management Systems
Permit No. SW8 021203
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in it's entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
The permittee shall at all times provide the operation and maintenance necessary to assure
the permitted stormwater system functions at optimum efficiency. The approved
Operation and Maintenance Plan must be followed in its entirety and maintenance must
occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
C. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, now spreader,
catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of DWQ. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
5. Decorative spray fountains will not be allowed in the stormwater treatment system.
6. The facilities shall be constructed as shown on the approved plans. The permitted surface
area, volumes and orifice size must be provided. This permit shall become voidable
unless the facilities are constructed in accordance with the conditions of this permit, the
approved plans and specifications, and other supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, a certification must be received from an
appropriate designer for the system installed certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other
supporting documentation. Any deviations from the approved plans and specifications
must be noted on the Certification. A modification may be required for those deviations.
If the stormwater system was used as an Erosion Control device, it must be restored to
design condition prior to operation as a stormwater treatment device, and prior to
occupancy of the facility.
9. The permittee shall submit to the Director and shalt have received approval for revised
plans, specifications, and calculations prior to construction, for any modification to the
approved plans, including, but not limited to, those listed below:
a. Any revision to any item shown on the approved plans, including the stormwater
management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the drainage
area.
e. Further subdivision, acquisition, or sale of the project area. The project area is
defined as all property owned by the permittee, for which Sedimentation and
Erosion Control Plan approval or a CAMA Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the approved
plan.
4
State Stormwater Management Systems
Permit No. SW8 021203
10. The permittee shall submit final site layout and grading plans for any permitted future
areas shown on the approved plans, prior to construction. if the proposed BUA exceeds
the amount permitted under this permit, a modification to the permit must be submitted
and approved prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by the
Pennittee for a minimum of ten years from the date of the completion of construction.
12. Prior to the sale or lease of any portion of the property, the permittee shall notify DWQ
zo and provide the name, mailing address and phone number of the purchaser or leasce. An
access/maintenance easement to the stormwater facilities shall be granted in favor of the
permittee if access to the stormwater facilities will be restricted by the sale or lease of any
portion of the property.
13. The permittee must maintain compliance with the proposed built -upon area and ensure
that the runoff from all the built -upon is directed into the pennitted system.
14. The Director may notify the permittee when the permitted site does not meet one or more
of the minimum requirements of the permit. Within the time frame specified in the notice,
the permittee shall submit a written time schedule to the Director for modifying the site to
meet minimum requirements. The permittee shall provide copies of revised plans and
certification in writing to the Director that the changes have'been made.
15. The permittee must maintain the current pennitted drainage area. No additional runoff
from outside of the permitted drainage area boundary may enter the permitted stormwater
facilities without first applying for and receiving a permit modification.
III. GENERAL CONDITIONS
This permit is not transferable. In the event there is a desire for the facilities to change
ownership, or there is a name change of the Permittee, a fonnal pen -nit transfer request
must be submitted to the Division of Water Quality accompanied by an application fee,
documentation from the parties involved, and other supporting materials as may be
appropriate. The approval of this request will be considered on its merits and may or may
not be approved. The permittee is responsible for compliance with all permit conditions
until such time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may subject the
Pennittee to enforcement action by the Division of Water Quality, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those
as may be required by this Division, such as the construction of additional or replacement
stormwater management systems.
The permittee grants DENR Staff permission to enter the property during normal business
hours for the purpose of inspecting all components of the permitted stormwater
management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The filing of
a request for a permit modification, revocation and reissuance or termination does not
stay any permit condition.
State Stormwater Management Systems
Permit No. SW8 021203
Unless specified elsewhere, permanent seeding requirements for the stonnwater control
must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of the permit.
9. The permittee shall notify the Division any name, ownership or mailing address changes
within 30 days.
Pen -nit issued this the 13th day of February, 2003.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Alan W. Klimek, P.E., Director
�l Division of Water Quality
By Authority of the Environmental Management Commission
G1
STROUD ENGINEERING, P.A. Hestron Plaza Two
151-A Hwy. 24
MOREHEAD CITY, NC 28557 `\
(252) 247-7479 , `Q
TO NCDt'IVR- �Aja QLC11-L1
IZi- Carl, cm ( DV. Fxf
1W M Q-ei v h ,1JG 2S/4oT
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via
❑ Shop drawings ❑ Prints ❑ Plans
❑ Copy of letter 0 Change order ❑
DATE 12 V2_
JOB NOP M F[ r 34
ATTENTION r f , s
1e W
RE:
the following items:
❑ Samples ❑ Specifications
rr e G • i1�* • Il i311e
�
THESE ARE TRANSMITTED as checked below:
0 For approval
❑ For your use
❑ As requested
t
For review and comment
❑ FOR BIDS DUE
REMARKS
❑ Approved as submitted
❑ Approved as noted
❑ Returned for corrections
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
❑ PRINTS RETURNED AFTER LOAN TO US
PtQ.y a U fits--t+7 a o L4 Glr�-PSG
COPY To -
SIGNED:
If enclosures are not as noted, kindly notlty us of on.