Loading...
HomeMy WebLinkAbout20110661 Ver 1_Staff Comments_20120301110061 Chastain II —take 2 AML comments March 1 2012 The scour hole appears to be significantly undersized for the peak flows that will be directed to it The length of level spreader needed to handle the estimated 10 year peak flow that you have estimated is over 1200 feet This capacity is not likely to be replaced by a grassed scour hole equipped with a rock dam that is only 10 feet in length The DWQ strongly recommends providing a bypass system for larger storms and designing a scour hole that is appropriately sized and lined for the one inch /hour storm Please redesign and provide calculations for the maximum velocity that will be discharged from the scour hole It appears that your calculations have underestimated both the percentage of impervious surface in the drainage area and the C value Please re visit these numbers before you address Item (1) above Lucas, Annette From Lucas Annette Sent Thursday March 01 2012 12 28 PM To Chapman Amy Cc Lucas Annette Subject FW 11 0061 Chastain II — take 2 Attachments 11 0061 Chastain II —take 2 docx Sorry — NOW they are attached From Lucas Annette Sent Thursday, March 01, 2012 12 27 PM To Chapman, Amy Cc Lucas, Annette Subject 110061 Chastain II — take 2 Amy My comments are attached Let me know when you have set up the meeting Thanks Z Annette M Lucas PE Environmental Engineer NCDENR ( DWQ I Wetlands and Stormwater Branch 1650 Mail Service Center Raleigh NC 27699 1650 (M ill) 512 N Salisbury St Raleigh NC 27604 1 911, Floor (Lo( itior7 & P noels) Phone (919) 807 6381 1 Fax (919) 807 6494 1 Email tlnnc ttr I m i' q nr dt tit o" Website http / /portal ncdenr org/web /wc1/swp/ws /401 j.A Betore pi mtm,� this envul please consider your bud ,-et and the environment E mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties