Loading...
HomeMy WebLinkAbout20071134 Ver 5_Inspection_20120224r4 A' ro A* ODE R F North Carolina Department of Environment and Natural Resources6�' 9 g 5 Division of Water Quality N �0 '�`/ y � '"its k r� �Z Beverly Eaves Perdue Charles Waklld P E 'dos )4 Dee Freeman Governor Director' Secretary February 22 2012 Mr J J Swain Jr P E Division 13 Engineer N C Department of Transportation Post Office Box 3279 Asheville North Carolina 28802 Subject Inspection US Highway 19/19E DWQ Project 07 1134 Individual Certification No 3706 TIP Nos R 2518A and R 2518B Madison and Yancey Counties Dear Mr Swain On February 7 2012 I inspected the construction project on the US Highway 19/19E Project in Madison and Yancey Counties Construction continues along most of the project with heavy grading bridge construction pipe installation and paving activities underway Please continue to ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters Also please refer to the attached inspection report for any specific items noted during the inspections If you have questions please call me at 828 296 4500 Sincerely Michael R Parker Environmental Senior Specialist Attachment cc Randy McKinney PE Roger Bryan Division 13 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office US 19/19E February 2012 Inspection Letter SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296 4500 \ FAX 828 299 7043 Internet www ncwaterguality mg An qu I r)pporuinity rmrma ive Adhon Employer NorthCarohna �7/1'f1 /N/r� %fl Wetland Inspection Report Project Num 20071134 Version 6 Status Issued Project Name NCDOT US 19 /US 19E R 2518 A R 2518 B & Project Type Road /Highway Widening R 2519A County Madison Region Asheville Location NCDOT US 19 /US 19E R 2518 A R 2518 B & R 2519A Latitude Longitude SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 02/07/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person Title Phone On Site Representative(s) Primary Inspector Michael R Parker Phone 828 296 4500 Secondary Inspector(s) Facility compliance Status n Compliant 0 Not Compliant Program Area 401 (includes isolated /non 404) Question Areas 0 Permit (401 WQC) Inspection Summary Most areas of the project appear to be in good shape Please ensure adequate sediment and erosion controls are in place in and around the construction work between Stations 109 +00 and 113+00 Seeding and mulching should be performed as needed Page 1