HomeMy WebLinkAbout20071134 Ver 5_Inspection_20120224r4
A' ro A*
ODE R F
North Carolina Department of Environment and Natural Resources6�' 9 g 5
Division of Water Quality N �0 '�`/
y � '"its k r� �Z
Beverly Eaves Perdue Charles Waklld P E 'dos )4 Dee Freeman
Governor Director' Secretary
February 22 2012
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
Subject Inspection US Highway 19/19E
DWQ Project 07 1134
Individual Certification No 3706
TIP Nos R 2518A and R 2518B
Madison and Yancey Counties
Dear Mr Swain
On February 7 2012 I inspected the construction project on the US Highway 19/19E Project in Madison and
Yancey Counties Construction continues along most of the project with heavy grading bridge construction
pipe installation and paving activities underway
Please continue to ensure that all sediment and erosion control structures are maintained and seeding and
mulching are performed as required to protect State surface waters Also please refer to the attached
inspection report for any specific items noted during the inspections
If you have questions please call me at 828 296 4500
Sincerely
Michael R Parker
Environmental Senior Specialist
Attachment
cc Randy McKinney PE
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
US 19/19E February 2012 Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296 4500 \ FAX 828 299 7043
Internet www ncwaterguality mg
An qu I r)pporuinity rmrma ive Adhon Employer
NorthCarohna
�7/1'f1 /N/r� %fl
Wetland Inspection Report
Project Num 20071134 Version 6 Status Issued
Project Name NCDOT US 19 /US 19E R 2518 A R 2518 B & Project Type Road /Highway Widening
R 2519A
County Madison Region Asheville
Location NCDOT US 19 /US 19E R 2518 A R 2518 B & R 2519A
Latitude Longitude
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 02/07/2012
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person Title Phone
On Site Representative(s)
Primary Inspector Michael R Parker Phone 828 296 4500
Secondary Inspector(s)
Facility compliance Status n Compliant 0 Not Compliant
Program Area 401 (includes isolated /non 404)
Question Areas
0 Permit (401 WQC)
Inspection Summary
Most areas of the project appear to be in good shape
Please ensure adequate sediment and erosion controls are in place in and around the construction work between Stations 109 +00
and 113+00
Seeding and mulching should be performed as needed