Loading...
HomeMy WebLinkAbout20120174 Ver 1_Email_20120227Dennison, Laurie From Bob Zarzecki [bzarzecki @sandec com] Sent Monday February 27 2012 1143 AM To Higgins Karen Debbie Edwards Cc Mcmdlan Ian Dennison Laurie Subject RE 2012 General Water Quality Certifications Thanks Karenl Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants PA From Higgins, Karen [mailto karen higgins @ncdenr gov] Sent Monday, February 27 2012 11 22 AM To Bob Zarzecki, Debbie Edwards Cc Mcmillan, Ian, Dennison, Laurie Subject RE 2012 General Water Quality Certifications Bob and Debbie You both asked a few questions about 401 processing during this period where new NWs and new GCs will be coming into effect in the next month or so I ve tried to answer both of your questions below Debbie's question Is the DWQ currently not accepting PCN applications? o DWQ is currently accepting PCN applications Debbie s question Can the DWQ not hold this application until they start processing under the new 2012 Certifications? o No DWQ will not be holding applications We will be processing applications as we get them in The language in the GC s refer to the corresponding Nationwide permit so whether the Corps issues under the old or new Nationwides your certification should remain valid until your Nationwide permit expires • Bob's question Can you confirm that the 2012 General Water Quality Certifications will be effective on or before March 19th? o The new General Certifications will become effective on March 19th Bob s question How do you plan to handle projects which have applied for a Nationwide Permit with the Corps and GC with DWQ received the NWP verification from the Corps prior to the expiration of the NWP (March 18th) but have yet to receive the GC authorization from DWQ? Would these GC authorizations be issued under the old GC or the new GC (assuming that they are not issued between now and the expiration of the old GC)? o We issue the GC that was in effect at the time the application was received The language in the GC s refer to the corresponding Nationwide permit so whether the Corps issues under the old or new Nationwide permit or we issue under the old or new certification your certification should remain valid until your Nationwide permit expires Hopefully this answers your questions but if not please feel free to call me and we can discuss further If you have questions about a specific project please contact the RO staff (or Ian if it is an IP) Thanks Karen Karen Higgins Wetlands Buffers Stormwater Compliance & Permitting Unit NCDENR Division of Water Quality 1650 Mail Service Center Raleigh NC 27699 1650 Phone (919) 807 6360 Email karen higgins @ncdenr gov Website http / /portal ncdenr org /web /wq /swp /ws /webscape E mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties A., Please consider the environment before printing this email From Bob Zarzecki [mailto bzarzecki0sandec coml Sent Thursday, February 23, 2012 3 18 PM To Higgins Karen Subject 2012 General Water Quality Certifications Importance High Karen I have a couple questions that I was hoping you could help us with 1 Can you confirm that the 2012 General Water Quality Certifications will be effective on or before March 19th? The drafts on the website have Chuck signing them on March 12th 2 Also how do you plan to handle projects which have applied for a Nationwide Permit with the Corps and GC with DWQ received the NWP verification from the Corps prior to the expiration of the NWP (March 18th) but have yet to receive the GC authorization from DWQ? Would these GC authorizations be issued under the old GC or the new GC (assuming that they are not issued between now and the expiration of the old GC)? if issued under the new GC that could cause problems with the fact that the Corps provided their verification under the old NWP We have some that have been in the cue with DWQ for some time have gone back and forth on various items (mostly stormwater related) are yet to be authorized by DWQ but have long since received their Corps verification Thanksl Bob Zarzeckl Wetlands Department Manager Soil & Environmental Consultants PA 11010 Raven Ridge Road Raleigh NC 27614 (919) 846 5900 Office Phone (919) 256 -4517 Direct Line (919) 846 9467 Fax (919) 270 2068 Mobile bzarzecki(D,sandec corn Visit us at SandEC corn' This electronic communication including all attachments is intended only for the named addressee (s) and may contain confidential information This electronic communication may not have passed through our standard review /quality control process Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design Rely only on final hardcopy materials bearing the consultants original signature and seal If you are not the named addressee (s) any use dissemination distribution or copying of this communication is prohibited If you have received this electronic communication in error please notify the sender by return a mail and delete the original communication from your system Thank you