HomeMy WebLinkAbout20180865 Ver 1_More Information Received_20210203Staff Review Form
Updated September 4, 2020
Staff Review
Does this application have all the attachments needed to accept it into the review process?*
6* Yes r No
ID#* Version* 1
20180865
Is this project a public transportation project?*
Is this a DOT
project?*
Reviewer List:*
Yes r No
Select Reviewing Office:*
Yes
r No
Garcy Ward:eads\gpward
Washington Regional Office - (252) 946-6481
Does this project require a request for payment to be sent?*
Yes
r
No
Project Submittal Form
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type:*
✓ For the Record Only (Courtesy Copy)
✓ New Project
✓ Modification/New Project with Existing ID
✓ More Information Response
✓ Other Agency Comments
✓ Pre -Application Submittal
✓ Re-Issuance\Renewal Request
✓ Stream or Buffer Appeal
Is this supplemental information that needs to be sent to the Corps?*
Yes r No
Project Contact Information
Name: Paul Williams
Who is submitting the inforrration?
Email Address: pcwilliams2@ncdot.gov
Project Information
Existing ID #:
20180865
20170001 (no dashes)
Existing Version:
1
Project Name: Bridge # 53 over Collie Swamp on SR 1142 (Prison Camp Rd)
Is this a public transportation project?
(' Yes
✓ No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
✓ Yes r No r Unknown
TIP#: WBS#:
B-5503 55003.3.3
(Applies to DOT projects only)
County (ies)
Martin
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach docurrent
B-5503 Utility Impact Mitigation 2-2021.pdf
B-5503_mitigation area.pdf
20180865 Ver 1 - B-5503
we tland_mitigation_planting - 6_21_2018 2_05
PM.pdf
Only pdf or krrz files are accepted.
1.39MB
133.71 KB
849.8KB
Describe the attachments
or comments:
The project included onsite mitigation of 0.46 acre, but an section of that onsite mitigation will be maintained
for a relocated powerline. Approximately 4,279 sq.ft. of the onsite mitigation at Site 4 will not be reforested
due to powerline maintenance. To compensate for the lack of reforestation in the powerline maintenance
corridor, NCDOT would add an additional area to the onsite mitigation. At Site 3 of the project, NCDOT would
reforest a 6,172 sq.ft. area of previously maintained wetland within the ROW. This section is currently
covered in herbaceous vegetation and was previously maintained for the powerline prior to the powerline
relocation. This new area would be reforested according to the previously authorized reforestation plan and
added to the onsite mitigation. Monitoring shall be provided every year for 3 years post installation. All is
depicted in the attached drawings.
Sign and Submit
fJ By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to
the best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
c;T-.Rea'(Aiwa %r'f.
Submittal Date: Is filled in autorretically.