Loading...
HomeMy WebLinkAbout20070747 Ver 1_Comments to Year 3 Monitoring Rprt_20120131Strickland, Bev From: Merritt, Katie Sent: Tuesday, January 31, 2012 2:08 PM To: Strickland, Bev Subject: 2007 -0747 Bev, Will you please add the email below to 2007 -0747? Name the file, "Comments to Year 3 Monitoring Rprt ". I have already printed a hard copy for my files. Thank you and have a great rest of the day! Katie From: Merritt, Katie Sent: Tuesday, January 31, 2012 2:06 PM To: 'Scott Frederick' Cc: TIatSwampLLC'; Higgins, Karen Subject: Comments -GV /FS Year 3 Monit. Rprt Scott, I have reviewed the 3rd Year Annual Monitoring report for the Flat Swamp Neuse River Riparian Buffer and Nutrient offset Mitigation Bank (DWQ# 2007 - 0747). 1 have the following comments and requests: • Section 1.0 Introduction: o Please identify the date the monitoring was performed for 2011 0 3rd paragraph, last sentence: please revise the text to say that the banking instrument and an As -Built report is expected to be amended in 2012. Since we haven't finalized anything, and an As -built report has not been submitted (I only have a map), I'd rather we not state that anything has been determined, deleted, added, etc. Section 3.0 Conclusions: o 2" paragraph, first sentence: please revise the text to say that "GV /FS will be submitting a proposal to DWQ in 2012 to request approval to delete 50.51 acres planned for wetland mitigation to be added to the nutrient offset acreage. DWQ and the Bank Sponsor have agreed that GV /FS will amend the original banking instrument and revise the As -Built report to acknowledge and document the correct acreage dedicated to NOV's and NBC's if DWQ approves the proposal. • Were any of the 38 monitoring plots located on the 50.51 acre tract? If so, please state which of the 38 plots were on this tract somewhere in this section of the report or on Table 2. • Before the As -built report can be approved, it will need to be amended to reflect portions of the tract that include the 50.51 acres originally approved as stream /wetland mitigation. Without detailed information of plantings, monitoring, etc, DWQ cannot proceed with approving the addition of the 50.51 acres to the nutrient offset portion of the bank. Additionally, DWQ will need all monitoring report data for the past 3 seasons for this 50.51 acre tract to be included with the revised As -Built report (unless this tract includes some of the 38 monitoring plots). Additionally, DWQ will need to perform a site visit to confirm this acreage can be used as nutrient offset credits. Since I have never visited this site before, I'm hesitant to make any decisions without seeing the sight first. A revised BPDP may be necessary as well after further review. • Please add a statement in the report that speaks to whether or not GV /FS had any encroachment of the conservation easement. If there was any encroachment, please explain where that was, how the encroachment affected the restoration of planted stems, and what measures will be or have already been taken to resolve the issue. • Table 2: o Please identify planted vs volunteer species in each plot to be compliant with the Level I & II monitoring level protocol approved in the BPDP. Level 11 includes counting both planted and volunteers stems; therefore, please distinguish which of the counted stems were planted and which were volunteers. o Please include the common names of all of the species If you have any questions, please don't hesitate to give me a call. Sincerely, Katie Katie Merritt Environmental Compliance Specialist & Nutrient Offset Coordinator Wetlands & Stormwater Branch Division of Water Quality Work: 919- 807 -6371 Website: http: / /Portal.ncdenr.org /web /wq /swp /ws /webscape Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. `'� Please consider the environment before printing this email.