Loading...
HomeMy WebLinkAbout20081466 Ver 1_Stormwater Approval_20120130R VA W6 North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakdd P E Dee Freeman Governor Director Secretary January 30 2012 DWQ Project # 08 1466 Mecklenburg County Mr Barry James Corporate Center L P and Huntersville Town Center 3700 Arco Corporate Drive Suite 350 Charlotte NC 28273 Subject Property Hambright Road Extension MODIFIED STORMWATER MANAGEMENT PLAN APPROVAL Dear Mr James On November 6 2008 the NC Division of Water Quality (DWQ) issued a 401 Water Quality Certification to impact 290 linear feet of unnamed tributary to Cane Creek to construct the Hambright Road Extension in Mecklenburg County In order to meet Condition 8 of the 401 Certification for this project a stormwater management plan was approved by the DWQ on November 1 2010 A modified stormwater management plan dated October 18 2011 was submitted by your consultant Glenn Morris of Burton Engineering Associates and was received by the DWQ on October 19 2011 Revisions to the modified stormwater management plan dated January 11 1012 were received by the DWQ on January 12 2012 The DWQ approves the SMP for the office building and shop (with subsequent revisions received December 20 2011) to satisfy the stormwater condition required by the General Water Quality Certification This approval is for the purpose and design that you described in your application If you change your project you must notify us and you may be required to send us a new SMP If the property (or a lot on the property) is sold the new owner must be given a copy of this approval letter and is thereby responsible for complying with all conditions This approval requires you to follow the conditions listed in the General Water Quality Certification for the project and the following additional conditions listed below The SMP approved by the DWQ for the office building and shop consists of a sand filter dry detention basin and level spreader vegetated filter strip and all associated stormwater conveyances inlet and outlet structures and the grading and drainage patterns depicted on plan sheets dated December 12 2011 The approved SMP must be maintained in perpetuity No changes to the structural stormwater practices shall be made without written authorization from the DWQ The stormwater management structures shall have maintenance access and at least a 10 foot drainage easement on each side to allow for the ability to maintain the structures and to perform corrective actions The stormwater easements shall be recorded to provide protection of the structures from potential alterations by future property owners Wetlands Buffers Stormwater Compliance and Permitting Unit (WeBSCaPe) 1650 f 1a l Service Center Raleigh Noah Carolina 2/609 1650 Phone 010 801 6 001 FAX 919 801 641)4 Inteinet http /portal ncdenr oig/w i m14 An Equ i Opportunity 1 Affirmahv P chon Emplo/ei Mr Barry James Page 2 of 2 January 30 2012 2 Operation and Maintenance of BMP Maintenance activities for the proposed sand filter dry detention basin and level spreader vegetated filter strip shall be performed in accordance with the notarized O &M agreements signed by Mr Paul Herndon on October 20 2011 The O & M agreement must transfer with the sale of the land or transfer of ownership /responsibility for the BMP facility DWQ must be notified promptly of every transfer Thank you for your attention to this matter If you have any questions or wish to discuss these matters further please do not hesitate to contact me at 919 807 6381 Sincerely G6,�& Va 8JP-� Annette M Lucas P E Wetlands Buffers and Stormwater Compliance and Permitting Unit AML /aml cc Samar Bou gazale DWQ MRO Michael Parker DWQ MRO Alan Johnson DWQ MRO USACE Asheville Regulatory Field Office DLR Mooresville Regional Office File Copy Glenn Morris Burton Engmeenng Associates 5950 Fairview Road Suite 100 Charlotte NC 28210 Filename 0814e66HambrightRoadExt (Mecklenburg)_SW_Approve