HomeMy WebLinkAbout20081466 Ver 1_More Info Received_20120130Lucas, Annette
From Glenn Morris [genn @burtonengineering com)
Sent Monday January 30 2012 12 40 PM
To Lucas Annette
Subject Hambnght Rd WQ
Attachments SandFilterO &M pdf ExtDryPondO &M pdf
Thanks Annette)
Permit Number
(!o be pi of ided b) DWQ)
Drainage Area Number
Sand Filter Operation and Maintenance Agreement
I will keep a maintenance record on this BMP This maintenance record will be kept in a log in a
known set location Any deficient BMP elements noted m the inspection will be corrected repaired or
replaced immediately These deficiencies can affect the integrity of structures safety of the public and
the removal efficiency of the BMP
Important maintenance procedures
- The drainage area will be carefully managed to reduce the sediment load to the sand filter
- The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds
six inches
- Once a year sand media will be skimmed
- The sand filter media will be replaced whenever it fails to function properly after maintenance
The sand filter will be inspected quarterly and within 24 hours after every storm event greater than
10 inches (or 15 inches if m a Coastal County) Records of operation and maintenance will be kept in
a known set location and will be available upon request
Inspection activities shall be performed as follows Any problems that are found shall be repaired
immediately
i.in ind Vlaavtf
L BMP element- _ T Potential emblem. � _
How I will remediate the problem
Entire BMP Trasb/debrWjp present
Remove the trash/ debris
Adjacent pavement (if
Sediment is present on the
Sweep or vacuum the sediment as soon as
applicable)
pavement surface
possible
Perimeter of sand filter
Areas of bare soil and /or erosive
Regrade the soil if necessary to remove the
gullies have formed
gully and then plant a ground cover and
water until it is established Provide lime
and a one time fertilizer application
Vegetation'is too sh�rt or too long
t ti r
Maintain vegetation at an appropriate
height
Flow diversion structure
The structure is clogged
Unclog the conveyance and dispose of any
sediment offsite
The structure is damaged
Make any necessary repairs or replace if
damage is too large for repair
Forebay or pretreatment area
Sediment has accumulated to a
Search for the source of the sediment and
depth of greater than six inches
remedy the problem if possible Remove
the sediment and stabilize or dispose of it
in a location where it will not cause
impacts to streams or the BMP
Erosion has occurred
Provide additional erosion protection such
)t.t ant; 2
ob a rn
as reinforced turf matting or riprap if
needed to prevent future erosion
problems
Weeds are present
Remove the weeds preferably by hand If
a pesticide is used wipe it on the plants
rather than spraying
Form SW401 Sand Filter 0 &M Rev 4 2009Sept17 ? i Page 1 of 3
BMP element-
Potential problem
How I will remedlate the problem.
Filter bed and underdraii
Water is pondmg on the surface for
Check to see if the collector system is
collection system
more than 24 hours after a storm
clogged and flush if necessary If water
still ponds remove the top few inches of
filter bed media and replace If water still
onds then consult an expert
Outlet device
Clogging has occurred`
Clean out the outlet device Dispose of the
at
sediment offsite
The outlet device is damaged
Repair or replace the outlet device
Receiving water
Erosion or other signs of damage
Contact the NC Division of Water Quality
have occurred at the outlet
401 Oversight Unit at 919 733 1786
Li
Fonn SW401 Sand Filter O &M Rev 4 2009Sept17 Page 2 of 3
Permit Number
(io be provided b) DNVQ)
I acknowledge and agree by my signature below that I am responsible for the performance of the
maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior
to any changes to the system or responsible party
Project name Bryton, Hambrtght Road Water Quality
BMP di ainage area number Sand Filter #1, (West Basin)
Print name Mr Paul Herndon
Tale Vice President, Bryton Corporate Center LP
Address 3700 Arco Corporate Drive, Suite 350 Charlotte, NC 28273
PI
0
Date __ _ /0 - oly -ff
Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been
sold and a resident of the subdivision has been named the president
I Lo/"r A �U'Mu� a Notary Public for the State of
/�% r�arolidlG�, County of do hereby certify that
�dtGt� l�ft�an personally appeared before me this JD' day of
i�C.�o�t.✓ o1f� // , and acknowledge the due execution of t forgoing sand filte
maintenance requirements Witness my hand and official seal
s
rn
0 Got
SEAL
My commission expires 1,44g 1
Form SW401 Sand Filter O &M Rev 4 2009Sept17 Page 3 of 3
Permit Number
(to be pi ovided by DTYQ)
Drainage Area Number
Dry Extended Detention Basin
Operation and Maintenance Agreement
I will keep a maintenance record on this BMP This maintenance record will be kept to a
log m a known set location Any def }cient BMP elements noted in the inspection will be
corrected repaired or replaced immediately These deficiencies can affect the integrity
of structures safety of the public and the removal efficiency of the BMP
The dry extended detention basin system is defined as the dry detention basin outlet
structure pretreatment including forebays and the vegetated filter if one is provided
This system (check one)
® does ❑ does not
This system (check one)
❑ does ❑ does not
incorporate a vegetated filter at the outlet
incorporate pretreatment other than a forebay
Important mamtenance procedures
— The dramage area will be managed to reduce the sediment load to the dry
extended detention basin
— Immediately after the dry extended detention basin is established the vegetation
will be watered twice weekly if needed until the plants become established
(commonly six weeks) s.,, JAN ,l
— No portion of the dry extended ,dgterrtipn pond will be fertilized after the first
mitial fertilization that is required to establish the vegetation
— I will mamtam the vegetation m and around the basm at a height of
approximately six mches
— Once a year a dam safety expert will inspect the embankment
After the dry extended detention basin is established it will be inspected once a quarter
and within 24 hours after every storm event greater than 10 inches (or 15 inches if in
a Coastal County) Records of operation and maintenance will be kept m a known set
location and will be available upon request
Inspection activities shall be performed ap follows Any problems that are found shall
be repaired immediately
BMP element-
Potential problem
How I will reme&ate the problem
The entire BMP
Trash debris is present
Remove the trash debris
The perimeter of the dry
Areas of bare soil and /or
Regrade the soil of necessary to
extended detention
erosive gullies have formed
remove the gully and then plant a
basin
ground cover and water untrl it is
established Provide hme and a
rtr
one time fertilizer apphcation
Form SW401 Dry Detention 0 &M Rev 3 Page 1 of 4
(r 1ti <
BMP element-
Potential problem
How I will remediate the problem
The inlet device pipe or
The pipe is clogged (if
Unclog the pipe Dispose of the
swale
applicable)
sediment off site
The pipe is cracked or
Replace the pipe
otherwise damaged (if
applicable)
Erosion is occurtmg in the
Regrade the swale if necessary to
swale (if applicable)
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion
The forebay
Sediment has accumulated
Search for the source of the
and reduced the depth to 75%
sediment and remedy the problem if
of the original design depth
possible Remove the sediment and
(see diagram below)
dispose of it in a location where it
will not cause impacts to streams or
the BMP
Erosion has occurred or
Provide additional erosion
riprap is displaced
protection such as reinforced turf
E
matting or riprap if needed to
prevent future erosion problems
Weeds are present
Remove the weeds preferably by
hand If pesticides are used wipe
them on the plants rather than
spraying
The main treatment area
Sediment has accumulated
and reduced the dept to 75 A
Search for the source of the
sediment and remedy the problem if
of the on � mal design depth
(see diagrat€n �e1�gw)
possible Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP Revegetate disturbed
areas immediately with sod
(preferred) or seed protected with
securely staked erosion mat
Water is standing more than
Check outlet structure for clogging
5 days after a storm event
If it is a design issue consult an
appropriate rofessional
Weeds and noxious plants are
Remove the plants by hand or by
growing in the main
wiping them with pesticide (do not
treatment area
s ra
� t
s
Form SW401 Dry Detention O &M Rev 3 Page 2 of 4
t
r
r y
BMP element
Potential problem
How I will remediate the rrobIem
The embankment
Shrubs or trees have started
Remove shrubs or trees
to grow on the embankment
immediately
Grass cover is unhealthy or
Restore the health of the grass cover
eroding
consult a professional if necessary
Signs of seepage on the
Consult a professional
downstream face
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present
consult a professional to remove
beavers
An annual inspection by an
Make all needed repairs
appropriate professional
shows that the embankment
needs re air
The outlet device
Clogging has occurred
Clean out the outlet device Dispose
of the sediment off site
The outlet device is damaged
Repair or replace the outlet device
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality 401 Oversight Unit at 919
outlet
7331786
The measuring device used to determine the sediment elevation shall be such that it will
give an accurate depth reading and not readily penetrate into accumulated sedunents
When the basin depth reads 734 28 feet in the main pond the sediment shall be
removed t J} ` ` 11
III to i
When the basin depth reads 734 28 feet in the forebay the sediment shall be removed
Sediment Removal EN 734 28
Bottom ElevatiX 733 5
FOREBAY
BASIN DIAGRAM
(fill in the blanks)
I n 1 E C L,t
r
f25 r Pool
ume
Sedunent
Storage
t S
18 r t
�t
Temporary Pool Elevation 736 60
Sediment Removal Elevation 734 28
Bottom Elevation 733 5
MAIN POND
Form SW401 Dry Detention O &M Rev 3 Page 3 of 4
Volu
25%
Permit Number
(to be pi ovided by DTVQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party
Project name Bryton, Hambright Road Water Quality
BMP drainage area number Ext Dry Pond #1 (East Basin)
Print name Mr Paul Herndon
Title Vice President, Bryton Corporate Center LP
Address 3700 Arco Corporate Drive, Suite 350 Charlotte, NC 28273
Phone
Signature
Date /0 OU - �/
Note The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president
I �D/`( d 4 4 U`el ( , a Notary Public for the State of
A)Or7'h &1621616_ County of Vecdeli La , do hereby certify that
�luc� �Gr,�civn personally appeared before me this 'J0
day of cloll and acknowledge the due execution of the
forgoing dry detention basin maintenance requirements Witness my hand and official
sea], 'u' 6-1011- �'
CIrAlhe •
• V •
G
"SURG,G ®,•'•
SEAL
rol F t
My commission expires
Form SW401 Dry Detention 0 &M Rev 3 L u,u i
Page 4 of 4