Loading...
HomeMy WebLinkAbout20120071 Ver 1_Application_20120125Office Use Only 1 Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version Pre - Construction Notification (PCN) Form A Applicant Information I Drocessing 1 a Type(s) of approval sought rrom the Corps ®Section 404 Permit El Section 10 Permit 1b Specify Nationwide Permit (NWP) number NW 14 or General Permit (GP) number is Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ® Yes ❑ No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h Is the project located witnin a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project SR 1146 Baker Road 2b County Cherokee 2c Nearest municipality / town Murphy 2d Subdivision name N/A 2e NCDOT only T I P or state project no 14 020031 3 Owner Information 3a Name(s) on Recorded Deed North Carolina Department or Transportation 3b Deed Book and Page No N/A 3c Responsible Party (for LLC if applicable) N/A 3d Street address N/A 3e City state zip I N/A 3f Telepnone no N/A 3g Fax no N/A 3h Email address N/A Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The existing gravel road is surrounded primarily by pasture with some closed canopy oak pine forest along one side of a short section of road The road serves four single family houses 3b List the total estimated acreage of all existing wetlands on the property N/A 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property N/A 3d Explain the purpose of the proposed project To widen and pave the existing gravel road to current North Carolina Department of Transportation secondary road standards Se Describe the overall project in detail including the type of equipment to be used The water in the streams will be diverted and the existing culverts replaced and /or extended The road footprint will be widened by removing vegetation and cutting and filling to the required width The road bed will be prepared and then paved Back hoes dump truck paving equipment water pumps diversion pipe and various hand tools will be used to accomplish the work 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ® No ❑ Unknown project (including all prior phases) in the past? Comments NIA 4b If the Corps made the jurisdictional determination what type ❑ Preliminary ❑ Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company N/A Name (if known) N/A Other N/A 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation N/A 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain N/A Page -3) of 10 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non 404 other) (acres) Tem orarV T W 1 ❑ P ❑ T N/A N/A ❑ Yes ❑ No ❑ Corps ❑ DWQ N/A W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts �I /A 2h Comments N/A 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non 404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T roadside Channel Q to Rock "%Ford ❑ PER ® Corps <1 90 Rejocatfonreek ®INT ®pV�/Q S1A [I P ®T I flow ©►versi�in u tQ Rocky F6R, El PER [Xj Corps <1 115 Creek ® INT ® DWQ S2 ®P ❑ T Cujvelxtensrn UT to RQO-- d ® PER ® Corps `0 Greek ❑INT ® DWQ S2A ❑ P ®T IowL��etvn UTJtoRocky Ford ®PER ® Corps 2 Creek ❑ INT ® DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ SM ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4A ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Page 4 of 10 PCN Form — Version 1 3 December 10 2008 Version 3h Total stream and tributarN impacts 20 31 Comments Total Temp�t�r Impact for swtdbag cofferdam artd Flaw diversion Ljs,1 k5 linear feet Total Impact for roadside seep relocation is 90 linear feet 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a Open water impact number — Permanent (P) or Temoorary (T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ❑ ° ❑ T N/A N/A N/A N/A 02 ❑P ❑T 03 ❑ PEI T 04 ❑ PEI T 4f Total open water impacts N/A 4g Comments N/A 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 N/A N/A N/A N/A N/A N/A N/A N/A P2 5f Total N/A N/A N/A N/A N/A N/P N/A 5g Comments N/A 5h Is a darn high hazard permit required? ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) N/A 51 Size of pond watershed (acres) N/A 5k Method of construction N/A Page of 10 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Impacts (for DWQ) If project will impact a protected noanan buffer then complete the chart below It yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6t 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temoorary T) impact required? B1 ❑ P ❑ T N/A N/A Nos N/A N/A B2 ❑ P ❑T El Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No 6h Total buffer impact-, N/A N/A 61 Comments N/A D Impact Justification and Mitigation 1 Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project � .y^� ^^g -.wc f [i"�"�' v"'e -,xe. w; r `4C R+,na, „^ryw ''�"",�'°'D�""i� u Vert is bean eeiid_ed the minamu_m Ingti�necessary'to widen the roa_dItoseco_nd_ary roadtandards lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Erasion arld S�d►mentatfon Contrjil ir�egsi les will lie implemented bxtater wilt pq divertgd arou c�curverf ides acid /or be arcclude�ifrbm ut±iprkjareas du ring installation 2 Compensatory Mitigation for impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ❑ No impacts to Waters of the U S or Waters of the State? 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation banK 2c If yes which mitigation option will be used for this ® Payment to in lieu fee program project? ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank N/A 3b Credits Purchased (attach receipt and letter) Type N/A Quantity N/A 3c Comments N/A Page 6 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attachea ❑ Yes 41b Stream mitigation requested linear teet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ®cold 4d Buffer mitigation requested (DWQ only) N/A square feet 4e Riparian wetland mitigation requested N/A acres 4f Non noanan wetland mitigation requested N/A acres 4g Coastal (tidal) wetland mitigation requested N/A acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan N/A 1 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 N/A N/A 3 (2 for Catawba) N/A Zone 2 1 5 6f Total buffer mitigation required N/A 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) N/A 6h Comments N/A Paae 7 of 10 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1 a Does the project include or is it adjacent to protected riparian buffers identified Yes No ❑ ® within one of the NC Riparian Buffer Protection Rules? lb It yes then is a diffuse flow plan included? If no explain why ❑ Yes No ❑ Comments N/A 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? N/A % 2b Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan explain why N/A 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan Project is covered by individual NPDES Permit NCS000250 ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWO Stormwater Program ❑ DWO 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? N/A ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No arached' 4 DWO Stormwater Proaram Review ❑ Coastal counties ❑ HOW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWO 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWO Requirement) la Does the project involve an expenditure of public (federal /s ate /local) funds or the Yes ❑ No use of public (federal /state) land? lb IT you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA /SEPA)? 1c If you answered yes to the above has the document review been rinalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter ) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in El Yes ®No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description This is a short (approximately 0 3 miles) rural secondary dead end road The road is being upgraded to minimum secondary road standards and is not expected to affect development patterns significantly 4 Sewage Disposal (DWO Requirement) 4a Clearly detail the ultimate treatment methods and aisposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility N/A Page 9 of 10 PCN �::orm — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or i Yes © No habita�? 5b Have you checKed with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c If yes indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical Habitat? North Carolina Natu al Heri,age Database 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would Impact Essential Fish Habitat? N/A There are no marine or estuarine communities within the Blue Ridge Province 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑ No status (e g National Historic Trust designation or properties significant in Nortn Carolina history ano arcnaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 7eprcafect r5 along ap exsbngroadway #hattaas bee�h, ghly� disturbec# therefioe we beve the p ©thaeologica end hston esoress mnmalxa tis ri early 2fl ect #uarrrt Bose on a paxd�Tri+~ssubrnit(edtotheVCQOT umanEntrironrrient Unit for cultural resourcesevies 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes Z No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the fioodplain determination? NC Floodplain Mapping Program Wesley Gnndstaff 0 7 11 8/2 01 2 Applicant /Agent s Printed Name Date /�1 Applicant /Age'n� 6ignature (Agent s�isignature is valid only if a a� ization letter from the applicant is a�fid ) Page 10 of 10 PCN Form - Version 1 3 Decembe 10 2008 Version