Loading...
HomeMy WebLinkAbout20150623 Ver 1_Scoping Comments_20120124January 24 2012 MEMORANDUM To Melba McGee From Mason Herndon Division of Water Quality Fayetteville Regional Office A// Subject Comments on the Environmental Assessment related to proposed replacement of Bridge 116 on NC 24 210 (Rowan Street) over CSX Norfolk Southern Railroads and Hillsborough St and Intersection Improvements Cumberland County Federal Aid Project NoBRNHS 0024 State Project No 8 144501 TIP B 4490 State Clearinghouse Project No 12 0150 This office has reviewed the referenced document dated November 11 2011 The Division of Water Quality (DWQ) is responsible for the issuance of the Section 401 Water Quality Certification for activities that impact Waters of the U S including wetlands It is our understanding that the project as presented will result in impacts to jurisdictional wetlands streams and other surface waters The DWQ offers the following comments based on review of the aforementioned document Protect Specific Comments Although this project is not being proposed to be placed in the 404/NEPA Merger Process Given the potentially substantial impacts to Cross Creek associated with the project NCDWQ would like the opportunity to review and comment on the project s preliminary plans typically provided at the 4B and 4C stage of the Merger Process 2 Cross Creek are class C 303(d) waters of the State Cross Creek is on the 303(d) list for impaired use for aquatic life due to habitat degradation DWQ is very concerned with sediment and erosion impacts that could result from this project DWQ recommends that the most protective sediment and erosion control BMPs be implemented to reduce the risk of nutrient runoff to Cross Creek DWQ requests that road design plans provide treatment of the storm water runoff through best management practices as detailed in the most recent version of NC DWQ Stormwater Best Management Practices 3 DWQ request that all jurisdictional features identified within the study area in Figure 5 (Environmental Features in Project Area) of this document also be shown on Figure 2 (Current Study Alternative) to assist in identifymg minimization and avoidance within study alternative 225 Green St Suite 714 Fayetteville NC 28301 5043 One Phone 910-433 33001 FAX 910A86 0707 NofthCarohna Internet www nmaterouality orm 'J� atu [ y�� & An Equal Opportunity Affirmative Action Employer — 50/ Recycled 110 / Post Consumer Paper (% 4/ l`(� General Comments The environmental document shall provide a detailed and itemized presentation of the proposed impacts to wetlands and streams with corresponding mapping If mitigation is necessary as required by 15A NCAC 2H 0506(h) it is preferable to present a conceptual (if not finalized) mitigation plan with the environmental documentation Appropriate mitigation plans will be required prior to issuance of a 401 Water Quality Certification Environmental assessment alternatives shall consider design criteria that reduce the impacts to streams and wetlands from storm water runoff These alternatives shall include road designs that allow for treatment of the storm water runoff through best management practices as detailed in the most recent version of NC DWQ Stormwater Best Management Practices such as grassed swales buffer areas preformed scour holes retention basins etc After the selection of the preferred alternative and prior to an issuance of the 401 Water Quality Certification the NCDOT is respectfully reminded that they will need to demonstrate the avoidance and minimization of impacts to wetlands (and streams) to the maximum extent practical In accordance with the Environmental Management Commission s Rules (I 5A NCAC 2H 0506(h)) mitigation will be required for impacts of greater than 1 acre to wetlands In the event that mitigation is required the mitigation plan should be designed to replace appropriate lost functions and values The NC Ecosystem Enhancement Program may be available for use as wetland mitigation In accordance with the Environmental Management Commission s Rules { 15A NCAC 2H 0506(h)} mitigation will be required for impacts of greater than 150 linear feet to any single stream In the event that mitigation is required the mitigation plan shall be designed to replace appropriate lost functions and values The NC Ecosystem Enhancement Program may be available for use as stream mitigation Future documentation including the 401 Water Quality Certification Application should continue to include an itemized listing of the proposed wetland and stream impacts with corresponding mapping DWQ is very concerned with sediment and erosion impacts that could result from this project NC DOT shall address these concerns by describing the potential impacts that may occur to the aquatic environments and any mitigating factors that would reduce the impacts 10 An analysis of cumulative and secondary impacts anticipated as a result of this project is required The type and detail of analysis shall conform to the NC Division of Water Quality Policy on the assessment of secondary and cumulative impacts dated April 10 2004 11 NC DOT is respectfully reminded that all impacts including but not limited to bridging fill excavation and clearing to jurisdictional wetlands streams and riparian buffers need to be included in the final impact calculations These impacts in addition to any construction impacts temporary or otherwise also need to be included as part of the 401 Water Quality Certification Application 12 Where streams must be crossed the DWQ prefers bridges be used in lieu of culverts However we realize that economic considerations often require the use of culverts Please be advised that culverts shall be countersunk to allow unimpeded passage by fish and other aquatic organisms Moreover in areas where high quality wetlands or streams are impacted a bridge may prove preferable When applicable DOT should not install the bridge bents in the creek to the maximum extent practicable 13 Sediment and erosion control measures shall not be placed in wetlands or streams 14 Borrow /waste areas shall avoid wetlands to the maximum extent practical Impacts to wetlands in borrow /waste areas will need to be presented in the 401 Water Quality Certification and could precipitate compensatory mitigation 15 The 401 Water Quality Certification application will need to specifically address the proposed methods for stormwater management More specifically stormwater shall not be permitted to discharge directly into streams or surface waters 16 Based on the information presented in the document the magnitude of impacts to wetlands and streams may require an Individual Permit (IP) application to the Corps of Engineers and corresponding 401 Water Quality Certification Please be advised that a 401 Water Quality Certification requires satisfactory protection of water quality to ensure that water quality standards are met and no wetland or stream uses are lost Final permit authorization will require the submittal of a formal application by the NCDOT and written concurrence from the NCDWQ Please be aware that any approval will be contingent on appropriate avoidance and minimization of wetland and stream impacts to the maximum extent practical the development of an acceptable stormwater management plan and the inclusion of appropriate mitigation plans where appropriate 17 Bridge supports (bents) shall not be placed in the stream when possible 18 Whenever possible the DWQ prefers spanning structures Spanning structures usually do not require work within the stream or grubbing of the streambanks and do not require stream channel realignment The horizontal and vertical clearances provided by bridges allow for human and wildlife passage beneath the structure do not block fish passage and do not block navigation by canoeists and boaters 19 Bridge deck drains shall not discharge directly into the stream Stormwater shall be directed across the bridge and pre treated through site appropriate means (grassed swales pre formed scour holes vegetated buffers etc ) before entering the stream Please refer to the most current version of NC DWQ Stormwater Best Management Practices 20 If concrete is used during construction a dry work area shall be maintained to prevent direct contact between curing concrete and stream water Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills 21 If temporary access roads or detours are constructed the site shall be graded to its preconstruction contours and elevations Disturbed areas shall be seeded or mulched to stabilize the soil and appropriate native woody species shall be planted When using temporary structures the area shall l be cleared but not grubbed Clearing the area with chain saws mowers bush hogs or other mechanized equipment and leaving the stumps and root mat intact allows the area to re vegetate naturally and minimizes soil disturbance 22 Placement of culverts and other structures in waters streams and wetlands shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches to allow low flow passage of water and aquatic life Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis equilibrium of wetlands or streambeds or banks adjacent to or upstream and down stream of the above structures The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by DWQ If this condition is unable to be met due to bedrock or other limiting features encountered during construction please contact the NC DWQ for guidance on how to proceed and to determine whether or not a permit modification will be required 23 If multiple pipes or barrels are required they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation and /or sills where appropriate Widening the stream channel shall be avoided Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage 24 If foundation test borings are necessary it shall be noted in the document Geotechmcal work is approved under General 401 Certification Number 3687/Nationwide Permit No 6 for Survey Activities 25 Sediment and erosion control measures sufficient to protect water resources must be implemented and maintained in accordance with the most recent version of North Carolina Sediment and Erosion Control Planning and Design Manual and the most recent version of NCS000250 26 All work in or adjacent to stream waters shall be conducted in a dry work area Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags rock berms cofferdams and other diversion structures shall be used to prevent excavation in flowing water 27 While the use of National Wetland Inventory (NWI) maps NC Coastal Region Evaluation of Wetland Significance (NC CREWS) maps and soil survey maps are useful tools their inherent inaccuracies require that qualified personnel perform onsite wetland delineations prior to permit approval 28 Heavy equipment shall be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams This equipment should be inspected daily and maintained to prevent contamination of surface waters from leaking fuels lubricants hydraulic fluids or other toxic materials 29 Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage Bioengineering boulders or structures shall be properly designed sized and installed 30 Riparian vegetation (native trees and shrubs) shall be preserved to the maximum extent possible Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction The NCDWQ appreciates the opportunity to provide comments on your project Shall you have any questions or require any additional information please contact me at (910) 308 4021 cc Clarence Coleman Federal Highway Administration Greg Burns PE Division 6 Engineer William D Gilmore PE Ecosystem Enhancement Program File Copy ec Ronnie Smith US Army Corps of Engineers Wilmington Field Office Jim Rerko Division 6 Environmental Officer Chris Militscher Environmental Protection Agency Travis Wilson NC Wildlife Resources Commission Belinda Henson DWQ Fayetteville Regional Office Sonia Carrillo DWQ Central Office