HomeMy WebLinkAboutNCC193359_Annual Fee NOD Letter_20210201ROY COOPER
cm
MICHAEL S. REGAIN
Srx-V-Y
BRIAN WRENN
opme G1'
2/1 /2021
STX Corp.
Attn: Daniel Stout
111 Petrol Point Suite 204
Peachtree City, GA 30269
d. .
NORTH CAROLINA
EnOr rtrnerttal Quality
Subject: Notice of Deficiency - Failure to Pay Annual Fee
Invoice No. NCC193359-2020
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 12/15/2020 and was due on 1/15/2021. This fee applies to the following construction site:
JBB Packaging Rail Rehabilitation and Construction
100 Grace Drive, Weldon, NC
Halifax County
Certificate of Coverage No. NCC193359
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov.
Sincerely,
Annette Lucas
Stormwater Program Supervisor
Division of Energy, Mineral, and Land Resources
NC Reference No. NCG01-2019-3359
North Carolina Department of EnAmnmenral ergy Quallly I Dlvlslnn of En, Mnera ll and Land Resources
512NanhSalleburyStreet 11612Mall Service Center I RalelgkNorth Carclina276W-1612
9197W9240