Loading...
HomeMy WebLinkAboutNCC193359_Annual Fee NOD Letter_20210201ROY COOPER cm MICHAEL S. REGAIN Srx-V-Y BRIAN WRENN opme G1' 2/1 /2021 STX Corp. Attn: Daniel Stout 111 Petrol Point Suite 204 Peachtree City, GA 30269 d. . NORTH CAROLINA EnOr rtrnerttal Quality Subject: Notice of Deficiency - Failure to Pay Annual Fee Invoice No. NCC193359-2020 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 12/15/2020 and was due on 1/15/2021. This fee applies to the following construction site: JBB Packaging Rail Rehabilitation and Construction 100 Grace Drive, Weldon, NC Halifax County Certificate of Coverage No. NCC193359 If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov. Sincerely, Annette Lucas Stormwater Program Supervisor Division of Energy, Mineral, and Land Resources NC Reference No. NCG01-2019-3359 North Carolina Department of EnAmnmenral ergy Quallly I Dlvlslnn of En, Mnera ll and Land Resources 512NanhSalleburyStreet 11612Mall Service Center I RalelgkNorth Carclina276W-1612 9197W9240