HomeMy WebLinkAboutNCC210466_ESC Approval Submitted_20210201WY COOPER
Governor
MICHAEL S..REGAN
S�cfefary
BRA WRENN
Director
NORTH •CAROLINA
k ylrayunenta Qua►ity
January 4, 2021
LETTER OF APPROVAL
Wellco Constractors, Inc.
ATTN: William .S.Wellons,.Jr.,President
511 Hwy 210 North
Sprig Lake NC 283.90
RE: Project Name: Static. Line Brewery
Acres Approved: 3.9
project ra HARNE-2021-071
County: Harnett
City: Barbecue Township
Address: Amarillo Lane
River Basin: Cape Fear
Stream Classification Other.
Sub itted by: 4D Site. Solutions, Inc.
Date Received byLQS- Decembcr 1, 2020
Plait Type: NEW - Commercial
Dear Mr. Wellons:
The subject erosion and sedimentation control. plan has been approved by default. The Sedimentation Pollution
Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised
plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30
days (15 days for revised plans) of receipt of G.S. I I3A-54.1. The Act further states that if the approving authority
fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan
will be deemed approved.. The enclosed Certificate of Approval must be posted at the job site. This plan approval
shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as
is required by Title 15A NCAC 4B .01.29.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOU
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This
form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named
project. The N01 form may be accessed at de .nc. ovINCG01. Please direct questions about the NOI form to Annette
Lucas at Annette. lucas@nedenr.gov or Paul Clark at Paul. clark nedenr. ov. After you submit a complete and correct NOI
Form, a. COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of
Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
North Carolina department of Environmental Quality 113¢visinrt of Energy; Mineral and Land Resources
�,,....D_ E Fayetteville Regional Office i 225 Green Street, S€rlte 7141 Fayetteville, North Carolina 28,301
�caT; c rtt
9I0.433.3300
Letter of Approval
Wellco Contractors, Inc.
January 4, 2021
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require'that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO I permit and the COC, once it is received. .
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan, including the use of equipment and technology owned and operated by the Department, (e.g., survey
equipment, vehicles, unmanned aerial vehicles, etc.). Unless this office hears otherwise from you, this correspondence
serves as your authorization for DEMLR to utilize equipment and / or technology on your property for inspection purposes.
Title 15A NCAC 4B :0118(a). requires that a copy of the approved erosion control plan be on file at the job site.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the
revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity.
This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of theinformation provided in the Financial Responsibility
Form, which you provided. You are requested to file an amended form if there is any change in the information included on
the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres.
Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In
addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you
plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
r
mothy L. La.Boun
Regional Engineer
DEMLR
Enclosures: Certificate of Approval
NPDES NCGOI Fact Sheet
cc: 4D Site Solutions, Inc. (via email)
Landon Chandler, Harnett County via email)