Loading...
HomeMy WebLinkAboutNCC191962_NOT Closeout Documents_20210126.lk. C� Greenville `v' NORTH CAROLINA ENGINEERING Engineering Department-Sedimentation/Erosion Control Program January 25, 2021 Letter of Final Inspection Grace Construction, Inc. 420 Alton Village Drive Greenville, NC 27858 Re: Project Name: Ashcroft Village -Grace Construction Inc. Project Number: ESCP-2019-0051 County: Pitt Disturbed Acreage: 0.50 Responsible Party: Grace Construction, Inc. Dear Mr. Grace, At your request, this office has completed its final site inspection of the referenced project. We find the site stable and in compliance with the approved Sedimentation and Erosion Control Plan. Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been closed for this project. Please do not hesitate to call if you have any questions. Respectfully, John P. Harrell Civil Engineer I Engineering Department City of Greenville JHarrell(a/greenvillenc.gov www.greenvillenc.gov 252-329-4887