HomeMy WebLinkAboutNCC191962_NOT Closeout Documents_20210126.lk.
C� Greenville
`v' NORTH CAROLINA
ENGINEERING
Engineering Department-Sedimentation/Erosion Control Program
January 25, 2021
Letter of Final Inspection
Grace Construction, Inc.
420 Alton Village Drive
Greenville, NC 27858
Re: Project Name: Ashcroft Village -Grace Construction Inc.
Project Number: ESCP-2019-0051
County: Pitt
Disturbed Acreage: 0.50
Responsible Party: Grace Construction, Inc.
Dear Mr. Grace,
At your request, this office has completed its final site inspection of the referenced project. We
find the site stable and in compliance with the approved Sedimentation and Erosion Control
Plan.
Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been
closed for this project.
Please do not hesitate to call if you have any questions.
Respectfully,
John P. Harrell
Civil Engineer I
Engineering Department
City of Greenville
JHarrell(a/greenvillenc.gov
www.greenvillenc.gov
252-329-4887