Loading...
HomeMy WebLinkAboutWQ0042263_Application Attachment_20210126VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ❑N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Residential Leased ❑ School / preschool / day care ❑ Food and drink facilities ® Businesses / offices / factories ❑ Retail (stores, centers, malls) ❑ Retail with food preparation/service ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home 5. Nature of wastewater : % Domestic/Commercial 100 % Commercial % Industrial (See 15A NCAC 02T .0103(20)) �Is there a Pretreatment Program in effect? 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) ❑ Yes ❑ No ❑ No Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow Convenience store 250 gal/plumbing fixture 9 2,250 GPD Car wash 1,200 gal/car wash 1 1,200 GPD Resturant 40 gal/seat 60 2,400 GPD gal/ GPD gal/ GPD gal/ GPD Total 5,850 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i e , minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 5,850 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5