Loading...
HomeMy WebLinkAboutWQ0042263_Application (FTSE)_20210126DocuSign Envelope ID: CE5FD9FO-F449-4078-88BB-FCA5EBD69D7E Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: `+ ` (1)'T 1 3 (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: WTH Times, LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Federal ❑ State/County ❑ Municipal 3. Signature authority's name: David Boyd per 15A NCAC 02T .0106(b) Title: Registered Agent/Managing Member 4. Applicant's mailing address: P.O. Box 795 City: Lincolnton State: NC Zip: 28093- 5. Applicant's contact information: Phone number: (704) 201-3898 Email Address: david(a,timesoil.com RECEIVED/NCDEQ/DINR JAN 2 5 2021 MOORESVILLECIROS REGIONAL OFFICE ❑ Privately -Owned Public Utility ❑ Other II. PROJECT INFORMATION: 1. Project name: Moores Chapel Road 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.274° Longitude:-80.969° 5. Parcel ID (if applicable): 05549114 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Josh Butler License Number: 048418 Firm: Gateway Design Group, PLLC Mailing address: 15126 Castlebridge Lane City: Matthews State: NC Zip: 28104- Phone number: (910) 840-2661 Email Address: josh(cgatewaydesigngroup.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: McAlpine Creek, Inwin Creek, Sugar Creek Permit Number: NC0024970, NC0024945, NC0024937 Owner Name: Charlotte Water V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQunknown Downstream (Receiving) Sewer Size: 8" inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): Charlotte Water FORM: FTA 04-16 Page 1 of 5 DocuSign Envelope ID: CE5FD9FO-F449-4078-88BB-FCA5EBD69D7E VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ❑N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Residential Leased ❑ Retail with food preparation/service 0 School / preschool / day care ❑ Medical / dental / veterinary facilities 0 Food and drink facilities ❑ Church ® Businesses / offices / factories 0 Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse 0 Swimming Pool/Filter Backwash 0 Other (Explain in Attachment) 5. Nature of wastewater : % Domestic/Commercial 100 % Commercial % Industrial (See 15A NCAC 02T .0103(20)) 1 >Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ❑ No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow Convenience store 250 gal/plumbing fixture 9 2,250 GPD Car wash 1,200 gal/car wash 1 1,200 GPD Resturant 40 gal/seat 60 2,400 GPD gal/ GPD gal/ GPD gal/ GPD Total 5,580 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater des gn flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 5,580 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected 0 Other (Explain): FORM: FTA 04-16 Page 2 of 5 DocuSign Envelope ID: CE5FD9FO-F449-4078-88BB-FCA5EBD69D7E VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 352.2 PVC 8" 125.3 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VHI. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLE IL FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: PS-1 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.274° Longitude: -80.969° 3. Design flow of the pump station: .007 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 14 gallons per minute at 12 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 1.25 157 PVC 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 DocuSign Envelope ID: CE5FD9F0-F449-4078-88BB-FCA5EBD69D7E IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) D. 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **My private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **My other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(g) contains altematives where separations in 02T.0305(f) cannot be achieved. D. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage D. If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A D. See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? D. Information can be obtained from the 401 & Buffer Permitting Branch ❑ Yes ® No 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑Yes No ZN/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 DocuSign Envelope ID: CE5FD9FO-F449-4078-88BB-FCA5EBD69D7E X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: DocuSigned by: I, jsL Liu ,r (Professional Enginee,C1La eliaaItem III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be gu'.► laeOcutOtseityys, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 p violation. North Carolina Professional Engineer's seal, signature, and date 3. Applicant's Certification per 15A NCAC 02T .0106(b): .06tkif\JI V`j\ V"{ i (Signature Authority's name & title om Application Item I.3.) attest that this application for attest that t 's app rcation for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and I43-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: FORM: FTA 04-16 Page 5 of 5 Gate!, 910-840-2661 josl (i gate. 'a January 11, 2021 oe Mooresville Regional Office Water Quality Section 610 E. Center Avenue, #301 Mooresville, NC 28115 04 coQ i RECEIVED/NCDEQ/DWR JAN '',1 2021 AT3 AY E - N V G l I D/NCDEQ/DWR JAN 1 021 MOORESVILWQRO LE REG ©MOORESVILLE NAL OFFICE WQEE REGIONAL FICE RECEIVED/NCDEQIDWR Project: Moores Chapel Road Project Location: Mecklenburg County, North Carolina Dear Sir or Madam, On behalf of WTH Times, LLC, please find attached the following: JAN252021 WQROS MOORESVILLE REGIONAL OFFICE 1. One original and one copy of the Sewer System Extension Applications (FTA-04-16) 2. Cover letter 3. Application fee of S48o payable to North Carolina Department of Environmental Quality (NCDEQ) (under separate cover) 4. 8.5 x 11— USGS topographic map/Street level map 5. Flow Tracking Form (FTSE 10-18) 6. Proof of business entity This project involves the construction of gravity sewer and low pressure force main for a commercial site. Please contact me with any questions/comments. Sincerely, Josh Butler, P.E. President / Owner Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources I5A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION\\PPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: I. APPLICANT INFORMATION: 1. items must be co (to be completed by DWR) leted or the application evil) be returne Applicant's name: 11'TH Times. LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Federal ❑ State/County ❑ Municipal 3. Signature authority's name: Dean Brown per 15A NCAC 02T .0106,( Title: Vice President 4. Applicant's mailing address: P.O. Box 795 City: Lincolnton State: NC Zip: 23093- 5. Applicant's contact information: Phone number: (704) 740-9848 Email Address: deanstimesoil.com 1I. PROJECT INFORMATION: I. Project name: Moores Chapel Road 2. Application/Project status: ® Proposed (New Permit) If modification, provide the existing permit number: 1\'Q00 If new construction but part of a master plan, provide the existii 3. County where project is located: 'Mecklenburg 4: Approximate Coordinates (Decimal Degrees): Latitude: 35.274 Longitude:-80.969' 5. Parcel ID (if applicable): 055491 14 (or Parcel ID to closest downstream sever) I11. CONSULTANT INFORMATION: I. Professional Engineer: Josh Butler License Number: 048418 Firm: Gateway Desi,n Group. PLLC Mailing address: 15126 Castlebridge Lane City: Matthews State: NC Zip: 28104- Phone number: (910) 840-2661- Email Address: iosh4 eatewavdesigngroup.com IV. WASTEWATER TREATMENT FACILITY (W'WTF) INFORMATION: I . Facility Name: McAlpine Creek. Irvin Creek. Sugar Creek Permit Number: Owner Name: CharlotteWater V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than \\'\\`TF): I . Permit Number(s): \VQunknown EQ/DWR 1 4 2021 MOORESVILWQ LE REO ONAL OFFICE ❑ Privately-f Wi`i3tNQ 9/DWR ❑ Other JAN I MOORESVILLE REGIONA:. OFFICE RECEIVEDINCDEQ/DWR JAN 2 5 2021 WQROS MOORESVILLE REGIONAL OFFICE ❑ Existing Permit/Project and issued date: permit number: \VQ00___ C0024970. NC0024945. Downstream (Receiving) Sever Size: 8" inch Wide Collection System Permit Number(s) (if applicable): \VQCS Owner Name(s): Charlotte \\'ater FORM: FTA 04-16 C002-1937 Page 1 of 5 VI. GENERAL REQUIREMENTS I. lithe Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No EIN/A 2. If the Applicant is a Developer of lots to be sold, has a Develoer's 0 erational Aureentent (FORM: DEV) been attached? ❑ Yes ❑No N/A 3. If the Applicant is a ome/Property Owners' Association, has an Operational_Agreentent (FORM I-tOA) been attached? ❑ Yes ❑No ❑N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Residential Leased ❑ Retail with food preparation/service ❑ School / preschool / day care ❑ Medical /dental / veterinary facilities ❑ Food and drink facilities ❑ Church Businesses / offices / factories ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ SWiniming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of Nvastew % Domestic/Commercial 100 % Commercial %Industrial [See I5A NCAC 02T .0103(201) > Is there a Pretreatment Program in effect? C] Yes 6. Has a flow reduction been approved under 15A NCAC 02T 0114(f1? ❑ Yes ® No ➢ IfVesotrovide a corm' of flow reduction approval letter 7. Summarize wastewater generated by project: ❑ No Establishment Type (see 02T.01 f4} Convenience store Daily Design Flow 0 No. of units IMMI 1 Flow 2,250 GPD 1,200 GPD 250 gal/plumbing fixture Car wash 1,200 gal/car \vdash Resturant 40 gal/seat 60 2,400 GPD gal/ GPD gal/ GPD gal/ GPD Total 5,580 GPD a See 15A NCAC 02T .0114(b) (d) fe)(1) and (e)(2) for caveats to wastewater des gn flow rates (i.e., minimum flow per dwelling; proposed unknown non residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42_A-4). b Per I5A NCAC 02T .01 14(c), design flow rates for establishments not identified [in table 15A NCAC 023.01 141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 5.580 GPD (per 15A NCAC 02T .01 14) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where Holy will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 1'1I. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .00; 1. Summarize gravity sewer to be permitted: C (Gra Size (inches) Length (feet) 352.2 Material 8" PVC 8" 1253 DIP Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria Section III contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet ininimuut slope requirement is not allowed and a violation of the t1IDC VI I I. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & i1iD% (rum Stations/For+ COMPLETE FOR EACH PUNIP STATION INCLUDED IN THIS PROJECT I. Pump station number or name: PS-1 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.274' Longitude: -80.969' 3. Design flow of the pump station: .007 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 14 gallons per minute at 12 feet total dynamic head (TD1-l) 5. Summarize the force main to be permitted (for this Pump Station): sp: 6. Power reliability in accordance with 15A NCAC 02T .0305 I 1 ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(I)(B): Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: OX Portable power source with manual activation, quick -connection receptacle and telemetry - I5A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible %Vitt the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source Or pump, including travel timefranies, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): I . Does the project comply with all separations found in 15A NCAC 02T .0305(f) &. g) I5A NCAC 02T.0305(t) contains minimum separations that shall be provided for sever systems: Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches 18 inches Water mains (horizontal) 10 feet Reclaimed \eater lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, \VS -I waters of Class' or Class 11 impounded reservoirs used as a source of shrinking water 100 feet **Waters classified WS (except \VS -I or WS-V), B, SA, OR\V, HQ\V, or SB from normal high water (or tide elevation) and wetland s (see item 1X.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches • I5A NCAC 02T.0305contains alternatives where separations in 02T.0305(f1 cannot be achieved. • "'`Stream classifications can be identified using the Division's NC Surface Water Classifications web ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this applicatioi 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet i No variance is required if the alternative design criteria specified is utilized in design and construction • As built documents should reference the location of areas effected Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A • This would include Trout Buffered Streams per 15ANCAC 213,0202 4. Does the project require coveragelauthorization under a 404 Nationwide or ❑ Yes I No individual permits or 401 Water Quality Certifications? • Information can be obtained from the 401 & Buffer Perm ittingBranch Does project comply with I5A NCAC 02T.01051s1 ) (additional perntitslcertifications)? \'es ❑ too Per 15A NCAC 02T.0105(461 directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, storntwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per I5A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ 1'es ❑ No El N/A ➢ If yes, include an attachment ‘vith details for each line, including type (aerial line, size, material, and location). IIigh priority lines shall be inspected by the permit tee omits representative at least once everysix-months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitec's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum D and Force Mains jlatest versions and the Gravity Sewer Minimum Design_Criter ElYes El] No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. A rroval of the request is required prior to submittal of the Fast Track Application and supporting documents, 2. Professional Engineer's Certi fication: ls>i Aer-- (Professional Engineer's name from Application Item 111.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent \with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000, as well as civil penalties up to S25,000 per violation. North Carolina Professional Engineer's seal, signature, and state: Applicant's Certification per I5A NCAC 02T .0106(b): 0.Q et" (Signature Auth rity's name&: title om Application Item 1.3.) 'sN CARS,,',. j�,�� tiZ;Q ,2�Z 448418® attest that this application for, has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and!or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package witt be returned to me as incomplete. NOTE - In accordance svith General Statutes 143-215.6A and 143 215.6 E3_, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a tine not to exceed S 10,000 as well as civil penalties up to S25,000 per violation. Signature: FOR\'I: FTA 0.1-16 Date: I 2-� Page 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: WTH Times, LLC Project Name for which flow is being requested: Moores Chapel Road (Store) More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937 All flows are in MGD c. WWTP facility's permitted flow 99.00 d. Estimated obligated flow not yet tributary to the WWTP 10.377 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 73.817 0.00585 84.194 85.0% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Paw Creek 11.4 4.56 6.612 0.867 7.479 -2.919 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstream Facility Name (Sewer): Rhyne Road Downstream Permit Number: Unknown Page 1of6 FTSJ10--18 III. Certification Statement: Keri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 9/10/2020 Signing Official Signature Date Chief Engineer Title of Signing Official Page 2 of 6 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section I1 where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 11.6 % and 0.867 MGD of the Available Capacity (E) in Pump Station Paw Creek ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.867 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Paw Creek Force Main Replacement is in design or under construction with planned completion in Paw Creek Force Main - 2020 ; and/or d. The following applies: Charlotte Water's Community Investment Plan has allocated funds for improvements to the Paw Creek force main and a five -million gallon EQ basin at Long Creek Pump Station. Long Creek and Paw Creek pump stations operate as a system using SCADA data to determine the rate of flow delivered from the upstream pump station, Long Creek, to Paw Creek the downstream facility. Long Creek pump station has the ability to transfer flows to flow equalization tanks during peak flow events and then meter out flow to Paw Creek as flow conditions allow. In addition, the basins for both stations are large and result in a daily peaking factor of 2.06 at Paw Creek Pump Station, which allows the stations to operate safely at flows greater than 40% of the firm pumping capacity. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 o File an Annual Report/Amend an Annual Report - Upload a PDF Filing Order a Document Online - Add Entity to My Email Notification List - View Filings - Print a Pre -Populated Annual Report form - Print an Amended a Annual Report form L ited Lia 'Lay Legal Name WTH Times, LLC Infor ation OM • any Sosld: 0675131 Status: Current -Active 0 Date Formed: 5/13/2003 Citizenship: Domestic Annual Report Due Date: April 15th Registered Agent: Boyd, David M, Ad resses Principal Office Reg Office Mailing Reg Mailing 1500 E Main St 1500 E. Main St PO Box 795 PO Box 795 Lincolnton, NC 28092 Lincolnton, NC 28092 Lincolnton, NC 28093 Lincolnton, NC 28093 Company • fficials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager Manager David Boyd Sweet Treat Holdings, LLC 1500 East Main Street 1500 East Main Street Lincolnton NC 28092 Lincolnton NC 28092 2� � �� � � w��/«� � � �� � < PUMP STATION C ' CU A TIONS For oores C a el oa Charlotte, North Carolina January 5, 2021 Prepared for: WTH Times Lincolnton, NC 0•011,191111110 ,P 0 ,,Oi—E-gi;o- sLis 11**,,' q if • ^7 • ( s 0 i ::: SEAL z , 04 -, --Z. ---- - A BUI domino, Gateway Design Group, PLLC P-2147 cell: (910) 840-2661 Mailing Address: 15126 Castlebridge Lane Matthews, NC 28104 NARRATIVE Moores Chapel Road is a new commercial project. The project consists of a restaurant, convenience store, and car wash. Sewage will leave the site via private grinder pump station and forcemain emptying into private manhole. Gateway Design Group, PLLC PUMP CALCULATIONS Gateway Design Group, PLLC SIZE PUMP STATION, WETWELL AND FORCE MAIN Project Name: Project No. Date: Calc By: r000res 2020-002 No. of Services Daily Flow Daily Flow, Qddf1 Offsite Additional Flow, Qdf2 Total Daily Flow, Qddf Peak Flow, Qp Size of Force Main, d Velocity, v1 (based on peak flow) Trial Pump Flow, Qadj Velocity, v2 (based on pump flow) Dia. of Wet Well, D TRIAL CYCLE TIME 20 min. pump down volume, V 20 min. pump down volume, V 20 min. pump down height, h Wet Well Elevations Top of Wet Well Elev. SS Inv. In High Water Alarm Pump 1 On Pump Off Bottom Required Depth of Wet Well 5,850 gpd 4.1 gpm 0.0 gpm 4.1 gpm 10.2 gpm 1.25 inches 2.7 ft/sec _2 gpm 3.1 ft/sec ft 20 min 53.7 gal 7.2 cf 0.7 ft Proposed 748.8 744.4 743.8 743.4 741.3 ft ft ft Qp=Qddf x 2.5 v1=0.409Qp/d^2 v2=0.409Qadj/d^2 V=tQddf(1-(Qddf/Qadj), t = 20 V=V*0.1337 h=4V/(3.14D^2) Ground Elev. + 12" Gravity Line Invert = Top minus 44.3" Alarm = 8" Above Pump On ft Pump On 4" Above Pump Off ft Pump Off = 13.84" from Bottom ft 10.2 ft Top Elev.-Bottom Elev. 123 in. PUMP STATION DESIGN SYSTEM CURVES Job Name Job No. Date 2020-0302 Starting Pump Elevation, Z1 Force Main Discharge Elevation, Z2 High Point Elevation, Z2max STATIC HEAD Length of Force Main (Feet) Diameter of Force Main (Ft), D Hazen Williams C for Force Main, C Discharge (GPM), Q Moores Chapel 2020-002 1 /6/2021 1.25" PVC 753 753 ,, t,,,i -520 753 753 9 753 }3 91 Velocity (Ft/Sec), v 1.6 2.1 2.6 3.1 3.7 Hazen Williams Equation - HEAD LOSS Hp= L ((10.44Q1.85)/((Cl.85)(D4.87))) 0 1 1 2 Hp = Total Piping System Head Loss 9 10 10 10 11 Minor Losses 11.25d Bends 22.5d Bends 45d Bends 90d Bends No. Check Valves Entrance/Exit No. Gate Valves No. Tees / ARV hl = Total Minor Losses (Feet) K value 0.0 0.0 0.0 0.0 0.2 0.1 0.0 0.0 0.3 Minor Losses (ft) 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.1 0.0 0.0 0.5 0.0 0.0 0.5 0.2 0.0 0.0 0.8 0.1 0.0 0.0 0.0 0.8 0.3 0.0 0.0 1.1 0.1 0.0 0.0 0.0 1.0 0.4 0.0 0.0 1.5 TDH (feet) = Hp+hl(minor) 10 10 11 11 12 Pump Curve (TDH) 230 170 120 70 20 Check Pump Cycle - 5322 gal (from Wet Well Sizing Calc) Volume Fill Time 3.2 min t=V/Qddf Pump Time z1.5 min t2=V/Qpump Total 17.7 min 3 cycles per hour, OK Total Head, Ft 240 220 200 180 160 140 120 100 80 60 40 20 0 0 4 System Pump Curve 6 8 10 12 14 16 I 1 I Discharge, GPM Pump Curve (TDH) PUMP CURVE Gateway Design Group, PLLC EIONE SPD PUMP PERFORMANCE CURVE GRINDER PUMP, 1HP, 1725 RPM - 230 100 % % - 220 95 90 - 210 85 % - 200 - 190 80 - LOW PRESSURE SYSTEM DESIGN PRESSURE - 180 T._ 75 CONSULT FOR INTERMITTENT USE ABOVE OR 185 FACTORY 80 PSI FEET TOH - 170 70 - 160 TYPICAL OPERATING PRESSURE TOTAL DYNAMIC HEAD (H), psig ) n O C� N N W 0C1 O An O n O O)n 1 - 150 - 140 - 130 - 120 - 110 o' o - 100 Q - 90 v- 0 - - 80 w w 70 `l - z 60 Q - Ld 50 = u - 40 Q z - >- 30 J Q - 20 0 I- - 10 - 0 -10 - -20 f I - -30 - -40 - -50 LJ - -60 0 2 4 6 8 10 12 14 16 18 DISCHARGE (Q), GPM ESD 08-0022 REV. 2, 6/08