HomeMy WebLinkAbout20070796 Ver 2_8. 20070796 Ver 1_Approval Letter_20070726_20210121U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. 200701743 County: Lee USGS Quad: Sanford GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner / Authorized Agent: James Siler Address: PO Box 1874 Sanford, NC 27331 Telephone No.: 919-721-1353 Size and location of property (water body, road name/number, town, etc.): The proiect site is located off Cemetary road, near the elementary school in Sanford, Lee County, North Carolina and is identied as the St. James Place Subdivision Aquatic features on site drain to Gasters Creek in the Cape Fear River Basin. Description of projects area and activity: This permit verifies permanent impacts to 0.037-acre of wetlands, 115 linear feet of stream channel exhibiting important aquatic functions and 1,360 square feet of stream channel not exhibiting important aquatic functions In addition, temporary impacts are authorized to 15 linear feet of stream channel All impacts are associated with the construction of a residential subdivision. No mitigation is required for these impacts. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide Permit Number: 12 and 29 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Monte Matthews. Corps Regulatory Official: Monte Matt hews Date: 08/11/2007 Expiration Date of Verification: August 11, 2009 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit http://www.saw.usace.army.mil/WETLANDS/index.html to complete the survey online. Page 1 of 2 Copy Furnished: Christina Breen ECS Carolinas 9001 Glenwood Avenue Raleigh, NC 27617 Mr. Jeremy Thomas MS Consultants 336-B Carthage Street Sanford, NC 27330 Page 2 of 2 Determination of Jurisdiction: ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID Basis of Jurisdictional Determination: Wetlands identified using criteria within the 1987 Wetland Delineation Manual. Streams exhibited an ordinary high water mark and are connected via surface water to the Cape Fear River Corps Regulatory Official: Monte Matthews Date August 11, 2007 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Copy Furnished: Page 3 of 2 Action ID Number:2007-01743 County:Lee Permittee: Mr. James Siler Date Permit Issued: August 11, 2007 Project Manager: Monte Matthews Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT WILMINGTON REGULATORY FIELD OFFICE POST OFFICE BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Mr. James Siler File Number: 2007-01743 Date: August 11, 2007 Attached is: Nationwide Permit See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter ofpermission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.gM.mil/inet/functions/cw/cecwo/reg or Corps re lations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision If you only have questions regarding the appeal process you and/or the appeal process you may contact: may also contact: Monte Matthews Mr. Mike Bell, Administrative Appeal Review Officer CESAD-ET-CO-R U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room 9M 15 Atlanta, Georgia 30303-8801 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits and approved Jurisdictional Determinations send this form to: District Engineer, Wilmington Regulatory Division, Attn: Monte Matthews, Project Manager, Raleigh Regulatory Field Office, 6508 Falls of Neuse Road, Suite 120, Raleigh, North Carolina 27615 For Permit denials and Proffered Permits send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Mike Bell, Administrative Appeal Officer, CESAD-ET-CO-R, 60 Forsyth Street, Room 9M15, Atlanta, Georgia 30303-8801 O�O� W AT �9pG r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality July 26, 2007 DWQ Project # 07-0796 Lee County Mr. Jeremy Thomas MS Consultants, Inc. 336-B Carthage Street Sanford, NC 27330-4207 Subject Property: St. James Place Subdivision Gasters Creek [030613, 18-20-5, C] Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Thomas: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.037 acres of 404/wetland and 295 linear feet of intermittent stream, to construct the proposed residential subdivision, as described within your revised application dated July 16, 2007, and received by the N.C. Division of Water Quality (DWQ) on July 17, 2007. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3625 and 3631 (GC3625 and GC3631). The Certification(s) allows you to use Nationwide Permit(s) NW 12 and NW29, respectively, when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non - discharge, and other regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 21-1.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 401 OversightlExpress Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.st te.nc.us/ncvvetlands Nam` Carolina Natumally An Equal OpportunitylAffirmative Action Employer — 50% Recycled/10% Post Consumer Paper MS Consultants, Inc. Page 2 of 3 July 26, 2007 Type of Impact Amount Approved (Units) Plan Location or Reference 404/Wetland 0.037 (acres) PCN page 8 of 13 Stream - intermittent 295 linear feet PCN page 8 of 13 Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion. control measures and stormwater routing and treatment shall be on site at all times. 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/40 1 Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Protective Fencing - The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 2H, Section .0500; 6. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetiands. The text of the sample deed notification may be modified as appropriate to suit to this project. 7. Construction Stormwater Permit NCGO10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES MS Consultants, Inc. Page 3 of 3 July 26, 2007 General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self -monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http:Ah2o enr.state. nc.uslsu/Forms Documents. htm.- Certificate of Completion: 8. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly or Ian McMillan in the Central Office in Raleigh at 919-733-1786 or Mike Horan in the DWQ Raleigh Regional Office at 919-791-900. Sincer y, I$( Coleen H. Sullins, Director CHSlijm Enclosures: GC3625 and GC3631 Certificate of Completion cc: Lauren Cobb, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Christina Breen, ECS Carolinas, LLP, 9001 Glenwood Avenue, Raleigh, NC 27617 Filename: 0707965 tJamesPlaceS D(Lee)401