Loading...
HomeMy WebLinkAboutNCC191380_Notice of Termination_20210118Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 1/18/2021 1:29:07 PM (NOT Submittal) Approve by Morman, Alaina 1/19/2021 2:22:00 PM (NOT Request Review- NCC191380) • The task was assigned to Morman, Alaina. The due date is: January 21, 2021 5:00 PM 1/18/2021 1:29 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC191380 Coverage (COC) Enter the Certificate of Coverage Ninber No.* 2020 Annual Fee Status PAST DUE 2021 Annual Fee Status Nbybeblank (if not yet billed). This permittee owes a fee that is PAST DUE and has a pending NOD or NOV. Do not approve this NOT request until payment is resolved. If this NOT request is acceptable, payment may be waived if applicable, but that action must be completed first (at the NOD or NOV Reviewstep) to ensure records are routed to the correct folder in the repository. However, you can reject the NOT now if it is not acceptable. Information associated with this permit: Project Name Ziehl-Abegg Expansion Address 719 N. Regional Rd., Greensboro, NC County Guilford Latitude 36.1181 Longitude -79.9575 Permittee Listed South Atlantic Holding Il, LLC Legally Responsible James Rucker Individual NC Reference No. NCG01-2019-1380 E&SC Plan ID 2949 Original NOI 14848 Tracking No. Date COC Issued 8/15/2019 Prior Rescission Cate populates only if CDC was already rescinded at tirre of submittal. Date Reason for Rescission/Termination Request: Reason for C Project Closed -Out Termination of Q Sale (Another Owner/Operator will apply for a new COC) Coverage * a Mistake or Invalid Coverage 0 Other Add ional Nbre infornation about the basis of this request, if needed. Explanation Supporting Upload Supporting DDcurrentation if applicable. Documentation Mist bePDFforrat Project Close-out Information: Final Close-out 4/30/2020 Inspection Approval Project Close-out Closing Letter (EC2949) Replacement.pdf 325.79KB Approval Mist be RYfornat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature ol�O Type Name* Jim Rucker Title * Member Organization* South Atlantic Holding 11, LLC Date * 01 /18/2021 Email for jrucker@southatlanticcompanies.com Confirmation * Contact Telephone* 336-324-8887 NOT Certification SIGNED Notice Of Termination (NOT).pdf 243.38KB Form Mist be PDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) emac@dmp-inc.com Original Permittee CCdonNotificationBmils Email jrucker@southatlanticcompanies.com Original Site Contact GCd on Notificaiton BTails Email jrucker@southatlanticcompanies.com