Loading...
HomeMy WebLinkAboutNCC191556_MODIFICATION Supporting Documents_20210115 (2)1 City of onroe Engineering January 7, 2021 Ryan Homes Attn: Jared Kimak 10710 Sikes Place, Ste. 200 Charlotte, NC 28277 300 W Crowell Street, Monroe, NC 28112 monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1 RE: LETTER OF APPROVAL EROSION AND SEDIMENT CONTROL SUBMITTAL Project Name: Cottage Green - Phase 2 Submittal No.: 20-00202074 Disturbed Area: 13.96 Acres (7.01 additional) Location: 1739 Pageland Highway Submitted by: Wayne Harris Date Received: December 21, 2020 New Submittal: Revision: X Dear Mr. Kimak: The City of Monroe Engineering Department has reviewed the subject erosion and sedimentation control plan for Lots 92-26, 57-64, and 103-117 with the addition of lots #1, 65-102 & 219-221. The noted plan has been reviewed and is found to be acceptable; therefore, you are issued this Letter of Approval and Certificate of Plan Approval. Plan approvals shall expire within three (3) years following the date of this approval if no land disturbing activity has been undertaken, as required by the City of Monroe Code of Ordinance Chapter 158.16 (G). The Certificate of Approval, NCGO1 permit, Certificate of Coverage (COC) and record of inspections must be posted at a conspicuous location at the job site. If you proceed prior to approval of all plans you are doing so at your own risk. Chapter 158.16 (H) of the City Ordinance requires that a copy of the approved erosion control plan be on file at the job site. In addition, the City maintains the right of entry for periodic inspection as indicated in Chapter 158.17 (D) of the City Ordinance and by the G.S. 113A-61.1(a). This letter is due notice of such inspection. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at cc: Wayne M. Harris, P.E., Harris Engineering, 5200 Park Road, Suite 231, Charlotte, NC 28209 Zahid Khan, NCDEMLR-Mooresville Regional Office -email address: Zahid.khan@ncdenr.gov Sam Starnes, City of Monroe -Erosion Control Inspector, 3003 West Crowell St., Monroe, NC 28111 File 1 City of .Monroe Engineering 300 W Crowell Street, Monroe, NC 28112 monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1 deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucasgncdenr. og_v or Paul Clark at Paul. clarkgncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Please notify us to set up a preconstruction meeting prior to disturbing any land. If a preconstruction is not set up it will be a violation. A copy of an approved Certificate of Coverage (COC) should be provided at this meeting. Sincerely, Sam Starnes ET -II, Erosion Control cc: Wayne M. Harris, P.E., Harris Engineering, 5200 Park Road, Suite 231, Charlotte, NC 28209 Zahid Khan, NCDEMLR-Mooresville Regional Office -email address: Zahid.khan@ncdenr.gov Sam Starnes, City of Monroe -Erosion Control Inspector, 3003 West Crowell St., Monroe, NC 28111 File