Loading...
HomeMy WebLinkAbout20110870 Ver 1_More Info Letter_20111031AY4 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary October 31, 2011 Mr. Larry Fox 1238 South Orange Ave. Sarasota, FL 34239 Subject: Request for More Information 401 Water Quality Certification Larry Fox Lots 6-7 - Shoreline Stabilization DWQ Project # 11-0870 Jackson County Response deadline: December 2, 2011 Dear Mr. Fox: The Division of Water Quality (DWQ) has performed a preliminary review of a 401 Water Quality Certification application submitted for the above referenced property. Additional information will be required in order to complete the review process. Please provide the following information so that we may continue to review your project. Additional Information Requested: Please provide photo documentation of the shoreline that is to be stabilized. 2. Please provide an estimate of the slope of the land at the shoreline (i.e., 2:1 slope, 1:1 slope (2 foot run: 1 foot rise, etc.)). 3. The DWQ, along with Duke Energy Lake Services, require that you evaluate the feasibility of a) bioengineered techniques (i.e., native plantings to alleviate soil erosion in lieu of or in combination with hard structures), b) rip-rap only, and c) the combination of dry stack wall and rip-rap (i.e., part of the shoreline stabilized with rip-rap and part of the shoreline stabilized with dry stack rock). The DWQ will not approve rip-rap or hard structures until the bioengineered (vegetative planting) option is evaluated. If a dry stack wall is approved, it must be built in combination with rip-rap (as shown in Figure 3). This is a Duke Energy Lake Services requirement. 4. Describe how the work will be conducted. DWQ and Duke Energy Lake Services prefer that work be conducted from a barge (to minimize impacts on existing shoreline vegetation). Location: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 Phone: 828-296-45001 FAX: 828-299-70431 Customer Service: 1-877-623-6748 T?TOne t? 1 Internet: www.ncwaterquality.org 1 ? OI/t?hC/]a'?1 ohn.a An Equal Opportunity 1 Affirmative Action Employer 'lt "? "194 Mr. Fox October 31, 2011 Page 2 of 2 5. Please use the sketch diagram (Exhibit A) provided to show the work to be done (an example is given on the back). Please provide your response in writing to the addresses below prior to December 2, 2011. Four copies of the required information should be provided to the 401 Permitting Unit at: Mr. Ian McMillan 401 Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 and a single copy to the Asheville Regional Office at: Susan A. Wilson Surface Water Protection Section 2090 US HWY 70 Swannanoa, NC 28778 If we do not hear from you by the deadline, we will assume that you no longer want to pursue this project and we will consider the project withdrawn. This letter only addresses the preliminary application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Susan A. Wilson at 828-296-4665 or susan.a.wilsongncdenr.g-ov , if you have any questions. Sincerely, Keith Haynes cting Regional Supervisor Surface Water Protection Asheville Regional Office cc: Gary Coyle, P.O. Box 2536, Cashiers, NC 28717 (w/attachments) David McHenry - North Carolina Wildlife Resources Commission (e-copy) Ian McMillan - 401 Permitting Unit Robert Shelton, Jackson County (e-coy) Lisa Leatherman, Duke Energy Lake Services (e-copy) ARO File copy S AS WPUackson\401 sW on-DO1Vox Property 201 I Wddlnfo.Fox Prop. 10 2011.doc