Loading...
HomeMy WebLinkAbout20081466 Ver 1_Stormwater Info_20111019.fb BURTON ENGINEERING ASSOCIATES CIVIL ENGINEERS LAND PLANNERS 5950 Fairview Road, Suite 100 Charlotte, NC 28210 P. O. Box 471943 Charlotte, NC 28247 704-553-8881; fax 704-553-8860 te--t4LoL' r, Attention: ?0 J Annette Lucas From: Glenn Morris osTr U; //- 1 U/ I tS/ 11 Company: NCDENR, DWQ Date: Wetlands & Stormwater Branch 512 N. Salisbury St. Raleigh, NC 27604 via: Cetm4er 12 e.% ' Job #: 246-212 Phone #: g I q- lbo (- U301 CC: Re: Bryton Corporate Center. Hambright Rd. Water Quality ?Aa Regwsbd?For Approva(DFor Your UseE3For Review and Comment Comments: Copies Date Sheets Description 1 Civil Drawings 1 Stormwater Management Calcs 1 Cover Letter & Attachements 1 Checklist & Supplements BURTON ENGINEERING ASSOCIATE PLEASE NOTIFY AT ONCE IF ALL ENCLOSURES ARE NOT INCLUDED. THANK YOU. BURTON ENGINEERING ASSOCIATES CIVIL ENGINEERS LAND PLANNERS September 19, 2011 Mr. Alan Johnson NCDENR 610 East Center Ave. Mooresville, NC C) 8-??4 (-9 (V Rr? RE: Bryton Hambright Road Water Quality DWQ # 07-0191 Dear Mr. Johnson: ;?0i DENR • WATER QUALITY WETLANDS AND STORMWATER BRANCH On behalf of the developer, American Asset Corporation, the following storm water plans & calculations are being submitted for review and compliance with the 401/404 permits for the creek crossing. This submittal is to replace the previously approved plans by Kimley-Horn and Associates, Inc., dated 10-28-10 and subsequently approved by Annette Lucas on 11/01/10 (NCDWQ 08-1466). The developer has opted not to proceed with those plans due to several issues that make the previous design not feasible. The following are offered as an explanation why the developer cannot proceed with the construction of the BMP's: • The previously approved plans have the BMP's located in areas that are not positioned to be incorporated easily into the future development plans. If left in their current position, they would be considered individual BMP's and the future development would not be able to have combined use of the facilities. It would be more advantageous to everyone if they were centrally located within the overall development where they could be easily managed and maintained instead of individual BMP's for the roadway alone. These combined ponds will be reviewed and regulated by the Town of Huntersville L.I.D. or their Post Construction Storm water Program. • The location of previously approved BMP's are situated in a location that impacted the best land for development along the road frontage. • The previously approved east basin BMP interferes with an existing curb cut on an NCDOT road. This driveway location cannot be moved based on its relationship to an existing intersection and other curb cuts. The curb cut is required in accordance with local zoning/plan requirements. # 5950 Fairview Road Suite 100 # Charlotte, NC 28210 # 704 553-8881 The locations of both previously proposed BMP's require significant amounts of earth to be moved which would involve constructing large, steep slopes in order to incorporate the BMP into the drainage pattern. The failure of these could potentially impact adjacent buffer, wetlands, and streams. The smaller proposed BMP's constructed in series do not involve as much difficult construction and fit better into the space provided. Based on the above, the developer would like to replace the wetponds with smaller, simpler BMP's with a footprint that has been reduced. We request that the revised BMP's be considered temporary until the future development incorporates them into the overall storm water management plan. Thanks 444-- Glenn Morris Project Manager # 5950 Fairview Road Suite 100 # Charlotte, NC 28210 # 704 553-8881 AN NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary November 1, 2010 Mr. Bang James Corporate Center, L.P. and Huntersville Town Center 3700 Arco Corporate Drive, Suite 350 Charlotte, NC 28273 Subject Property: Hambright Road Extension Mecklenburg County DWQ Project No. 08-1466 STORMWATER MANAGEMENT PLAN APPROVAL Dear Mr. James: On November 6, 2008, the NC Division of Water Quality (DWQ) issued a 401 Water Quality Certification (WQC) to impact 290 linear feet of unnamed tributary to Cane Creek to construct the, Hambright Road Extension in Mecklenburg County. In order to meet Condition 8 of the 401 Certification for this project, a stormwater management plan, dated September 20, 2010, was received by the DWQ on September 28, 2010. Additional stormwater information, dated October 28, 2010, was received by the DWQ on October 29, 2010. This stormwater management plan has been reviewed and satisfies the stormwater management conditions of the 401 - Water Quality Certification. The stormwater treatment system, which includes two wet detention ponds and the signed and notarized Operation and Maintenance Agreements dated September 15, 2010, as approved by this Office, and the drainage patterns depicted on the plan sheets, must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. All stormwater management conveyances, detention and treatment structures shall have maintenance access and at least 10-foot drainage easement on each side to allow for the ability to maintain the structures, to perform corrective actions and shall provide protection of the structures from potential alterations by future property owners. This letter completes the review of the DWQ under Section 401 of the Clean Water Act. If you have any questions, please contact me at 919-715-3425. Sincerely, Annette Lucas, PE 401 Oversight/Express Review Permitting Unit 401 OversightiExpress Review Permitting Unit One 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 NorthCarolina Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 f/ts J/` Phone: 919-733-1786 t FAX: 919-733-6893 Nato' a"Y Internet http:/lh2o.enr.state.nc.us(ncwetlands7 An Equa' Opportunity 1 Affinnat ve Action Empzoyer Action ID. 2007-372-360 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT County: Mecklenburg USGS Quad: Cornelius GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Size and location of property (water body, Description of projects area and activity: Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Nationwide conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the peimittee to a stop work order, a restoration order and/or appropriate legal action. This verification is valid until the NWP is modified, reissued, or i scheduled to be modified, reissued, or revoked prior to March 18, 201 informed of changes tp the NWPs. We wi11 issue a public notice whe continence or are .under contract to commence this. activity before the modified.or revoked, you will have •twelye:(12) months from the. date to Complete 'the activity under the present terms and conditions of thi; date identified below, the nationwide permit authorizatIoi is reissued valid until Elie. expiration date identified below, provided it complies conditions. The District tfigincer may, at any time, exercise his disci revoke a case specific activity's authorization under and NWP voked.. All of the existing NWPs are It is incumbent upon you to remain the NWPs are reissued. Furthermore, if you late that the.:rclcvant nationwide pernnt is f the mod.}fieation.or. revocation of the NWp nationwide permit, If prior to the expiration nd/or modified, this verification will remain ith :all new and/or modified terms find tionary authority tp modify, suspend; or Property Owner/ Authorized Agent:: American Asset Corporation / Attn: Barry James Address; 3700 Arco Corporate Drive Charlotte, North CurolinA 28273 Telephone No.: 104-2954000 Applicable Laws ®Section 404 (Clean Water Act, 33. USG 1344) ? Section 10. (Rivers and Harbors Act, 33 USC'403) Authorization; Regional General Permit Number: Nationwide permit Number: 39 Activities subject to Section 404, (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to deterpune Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the :Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Amanda Jones at 828. ;271 7980 x231; Corps Regulatory Official Amanda Jones Date: March 15, 2007 Expiration Date of Verification: March 18, 2007 Copy Furnished: S&EC, Attn: Wendell Overby, 236 LePhillip Court, Suite C, Concord, NC 28025 r cc) `C William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W, Klimek, P.E. Director Division of Water Quality March 1, 2007 DWQ# 07-0191 Mecklenburg County Mr. Barry James Huntersville Corporate Center LP & Huntersville Town Center 3,700 Arco Corporate Dr., Suite $50 .Charlotte., NO 28273 Subject: Bryton Town Center, Huntersville APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. James: You have our approval, in accordance with the attached conditions .and those listed below, to fill 0.172 acre of wetland anal impact 3815 linear feet (If) of unnamed stream (3971f of perennial) to Cane Creek in order to construct the subject development in Mecklenburg County, as described in your application received by the Division of Water Quality (DWQ) on January 31, 2007. After reviewing your application, we have determined that this project it; covered by Water Quality Genera) Certification Number 3402, which can be viewed on our web site at http://h2o:enr.state,nc.us/ncwetlands. T. General Certification allows you to use Nationwide Permit Number 39 once it is issued to you by the U.S Army Corps of Engineers.. ;Please note that you should get any other federal, state or local permits before proceeding with your project, including 111. those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed. regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification..: If the property is sold, the new owner must be given a copy.of the Certification and approval letter; and is thereby responsible for complying With all conditions. In addition to the requirements of the certification, you must also comply with the following conditions: 1. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. 2. All wetlands, streams, surface waters, and riparian buffers located on the project site where impacts are not allowed'shall be clearly marked (example- orange fabric fencing) prior to any land disturbing -.p p activities. ' n-07'uo °'na North Carol 4r Owision of Water Quality Z l0 East Center Ave., Suite 301 Mooresville, NC 28115 Phone (704)663-1699 Cu$tomer Service Internet: ncwoterqulalty.org FAX (704) 663-6040 1-877-f23-6748 An Equal Opporkunitq/A*rriat Actim Employer-5p94 Recycledlt0% Post Consumer paper 3. We understand that you have chosen to contribute to the Ecosystem Enhancement Program (EEP) in order to compensate for the impacts to the stream. In accordance with 15A NCAC 2R .0402 and 15A NCAC 2B :0242(7), this contribution will satisfy our compensatory mitigation requirements under 15A NCAC 2H .Q506(h) and 15A NCAC 2B .0233(10). Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program), the stream impacts shall not occur. The ln-Lieu-Of-Fee Coordinator should be contacted at (919) 715-2227 if you have any questions concerning the EEP. You have one month from the date of this Certification to make this payment. For accounting purposes, this Certification authorizes the fill of 0.172 acre of wetlands and 3815 linear feet of stream in the Yadkin River Basin, Cataloging Unit 03040105, and 397 linear feet of stream mitigation is required.. Please be aware that the EEP rules require rounding of stream impacts to the nearest foot (15A NCAC 2R ,0503(b)). 4. Use of native vegetation and other soft stream bank stabilization techniques must be used where practicable instead of riprap or other bank hardening methods. If r'iprap is necessary, it shall not be placed in the streambed, unless approved by the DWQ. 5. Storm water discharge structures at this site shall be constructed in a manner such that-the potential receiving streams will not be impacted due to sediment accumulations, scouring or erosion of the stream banks (i.e. diffuse flow). 6. A final written storm water management plan shall be approved in writing by this Office (or local governing authority) prior to the construction of any permanent facilities at the subject site. The storm water facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the storm water management plan (as approved by this Office) shall be implemented. The structural storm water practices-as approved by this Office as well as drainage patterns most be maintained in perpetuity. No changes to the structural storm water facilities shall be made without written authorization from the Division of Water Quality.. 7. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notification application. All construction activities associated with this project shall meet, and/or exceed, those requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual and shall be conducted so that no violations of state water quality standards statutes or rules occur. 8. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within two months of the date the Division of Land Resources has released the project. 9. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of Completion" form to the 401/Wetlands Unit of the NC Division of Water Quality. Please send photographs of the upstream and downstream sides of each culvert site to document correct installation, along with the Certificate of Completion form. 10. Continuing Compliance. The applicant (American Asset Corporation, Barry James) shall conduct all activities in a manner so as not to contravene any State water quality standard (including any requirements for compliance with section 303(0) of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 21-1.0507(d). Before codifying the certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 21.1.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to the applicant in writing, shall be provided to the United States Army Corps of Engineers for reference in. any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 1508 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This Certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the -Division of Water Quality under Section 401 of the Clean Water Act. If you. have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-.9721. Sincerely, z? yi forAlan W. Klimek, P.E. Attachments cc: Army Corps of Engineers, Asheville Ian McMillan, Wetlands Unit Becky Fox, EPA Central Files File Copy Wendell Overby cAltou Geot ROUNAS. LLP for Service" August 11, 2011 Mr. Barry James AAC Real Estate Services, Inc. 3700 Arco Corporate Drive Suite 350 Charlotte, North Carolina 28273 Reference: Report of Limited Subsurface Exploration Bryton Development Detention Pond Charlotte, North Carolina ECS Project No. 08-7794-A Dear Mr. James: Per your request, ECS Carolinas, LLP (ECS) is pleased to present this letter summarizes our findings of the limited subsurface exploration for the above referenced project. ECS performed the limited subsurface exploration in general accordance with our proposal dated August 10, 2011 (No. 08-12970P). The purpose of our services was to measure groundwater adjacent to an existing detention pond located north of Hambright Road Extension and east of the new culvert. Project Information The project site is located on Hambright Road Extension between.`Old Statesville Road (Highway 115) and Everett Keith Road in Charlotte, North Carolina. It is our understanding that groundwater measurements were needed adjacent to an existing detention pond located north of Hambright Road Extension and east of the new culvert. The approximate location of the detention pontl1s shown on the:Site Location Map (Figure 1) presented in the Appendix of this report. Scope of Services The limited subsurface exploration Included -the execution of two (2)-`auger borings to a'depth20 feet below 'existing grades. Temporary `piezometers were installed In the boreholes to obtain groundwater measurements. The auger boring locations were established in the field using a 1b0-foot tape and existing site features as reference. The approximate test locations are shown on the Boring Location Diagram (Figure 2) presented in the Appendix of this report and should be considered accui=ete only to the degree implied by the method used to iodate them. 8702 RW Oak Blyd , Suite A, Charlotte, NC 28217 0 (704) 525-5152 • Fax (704) 525-7178 www,eahmited.cara Athsrllk.WC*.ChuloOe,NC*GrmWm,NCsGr,en ilk.SC', Raleigh.NC*Swwmboro.NCsUminMNG ECS CAROLINAS, LLP Report of Limited Subsurface Exploration Briton Development Detention Pond Charlotte, North Carolina ECS Project No. 08-7794-A September 6, 2011 Page 1 Findings The results of our groundwater (GW) measurements are summarized in the table below. Auger Boring ` Tlme of Boring 24-hr GW 48-hr GW 120-hr GW Location GW Reading Reading Reading Reading 8-10-2011 8-11-2011 8-12-2011 8-15-2011 B-1 14'0" 8110" 819" 8'9" B-2 N/A 17'6" 17'1 17'11" 730, 5 740,91 " GW measurements are approximate depth below existing grade. Fluctuations in the groundwater elevation should be expected depending on precipitation, run- off, utility leaks, and other factors not evident at the time of our evaluation. Normally, highest groundwater levels occur in late winter and spring, and the lowest levels occur in late summer and fall. Limitations The auger borings and groundwater measurement performed at this site represent the subsurface conditions at the location of the borings only. Due to inconsistencies associated with- prevailing geology, there can be changes in the subsurface conditions over relatively short distances that have not been disclosed by the results of the borings performed. If the project information is incorrect, or if the structure location (horizontal or vertical) and/or dimensions are changed, please contact ECS so that our findings may be reviewed. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this preliminary exploration should be reported to us for our ;evaluation. The assessment of site environmental conditions for the presence of pollutants in the soil, rock, and groundwater of the site was beyond the scope of this preliminary exploration. 31 s ?f SITE ' } ? alt R`i1 i Hi [I W Rd ' 4 3 Akixar4war?a Rd Sa A m Rcpej D, d 0 JDp!Ur s FIGURE 1 PROJ. MOR. SCALE . Source EHF N.T.i. ffi 7 SITE LOCATION MAP DRAFTSMAN PROJECT NO. Google Maps e 08-77" w . Bryton Development Detention Pond REVISIONS FIGURE 00 101 , Huntersville, North Carolina _ SETTING THE DATE STANDARD ???? 08-1 FORSERVCE DIE- l4L'to WATER QUALITY CALCULATIONS for STORMWATER MANAGEMENT BRYTON HAMBRIGHT ROAD WATER QUALITY By BURTON ENGINEERING ASSOCIATES 5950 Fairview Rd. Suite 100 Charlotte, NC 28210 (704) 553-8881 ,?. %k CAI#, 'SA. 121' x'99 '?MptN??Q; ?. ON T N:1ExcelTemplates\WaterQuauty\Wgcalcs.xis BRYTON Hambright Road Water Quality Stormwater Management Project Narrative Introduction This project will provide storm water quality for Hambright Road as required by the 404/401 permits (DWQ #07-0191). The goal is to provide 85% T.S.S. removal for the entire project. This is to be accomplished by combining six BMP's to achieve the total required removal rate. The west basin is approximately 2.60 acres of drainage area with 2.21 acres of impervious area. The treatment train is proposed to be a sand filter (85% T.S.S.), grass swale (35% T.S.S.) and filter strip with level spreader (40% T.S.S). The combined efficiency is 94.15% (please see efficiency calcs). The east basin consist of 15 acres of drainage area with 6 acres of impervious area. This treatment train is to consist of an extended dry detention basin (50% T.S.S.), grassed swale (35% T.S.S.) and filter strip with level spreader (40% T.S.S.). The combined efficiency for this treatment train is 80.5% T.S.S. Results The combined project wide removal rate is weighted according to drainage area is summarized below: Project wide T.S.S. removal rate: 94.15% x 2.6 ac + 80.5% x 15.0 ac = 84.5 % - 85% (2.6 ac + 15.0 ac) Exceptions: The following exceptions to the design procedures of the NCDENR BMP Manual were taken due to existing conditions within the project: • Extended Dry Detention Pond #1 has its invert within 1.5' of the SHWT (2.0' normaly required). This will help to maintain a small permanent pool as suggested by the manual. • Filter Strip / level Spreader #1 has a downstream filter strip average slope of 18% (0-6% normaly required). This is due to existing grades within the wooded filter strip. A calculation through the filter strip shows the velocity to be 0.7 feet/sec which is a non- erosive (less than 2 feet/sec). • Filter Strip / Level Spreader #2 has a downstream filter strip average slope of 8.3% (0-6% normaly required). This is due to existing grades within the wooded filter strip. A calculation through the filter strip shows the velocity to be 0.3 feet/sec which is a non- erosive (less than 2 feet/sec). J a D W ? a ? J F- ED w m a z 0 oc m 0 CO U C West Summary 9/19/2011 STORMWATER MANAGEMENT SUMMARY BASIN CHARACTERISTICS WEST BASIN AC SF DRAINAGE AREA= 2.60 113,256 IMPERVIOUS AREA= 2.21 96,268 % IMPERVIOUS 85.0% SOIL TYPE(S) CECIL, HSG B SCS RUNOFF CN'S= 98 (100% IMPERVIOUS) °61 ( 100% PERVIOUS) CN= 92.5 TIME OF CONCENTRATION= 0.0833 HRS 5.00: MIN. BMP'S PROVIDED THREE BMP'S SELECTED TO PROVIDE COMBINED REMOVAL EFFICIENCY OF 94.15% TSS SAND FILTER Sized for 1" storm using the routed SCS Type 11 storm. Flows greater than the 1" storm are diverted using a flow splitter. Modified CN's are used to develop the computed WQv of 7,692 cf or 0.177 ac-ft. Detention times of 39.6 hrs (40 hrs) are provided. Routed output shows the Sand Filter drains mostly within 30 hours. GRASS SWALE Sized for 10 year storm even though the flows greater than the 1" storm are diverted from the upstream Sand Filter. FILTER STRIP/LEVEL SPREADER 65 If Level Spreader using with a 30' wooded filter strip. 0-6% is the max recommended slope. Existing grades are 18% at the top of the receiving channel which are 133 If away. P:1DWG1246-230 Bryton SWMi246-230 NCDENRWgca1cs1.x1s c BMP Efficiency(West) BRYTON 9/6/2011 HAMBRIGHT ROAD WATER QUALITY BMP EFFICIENCY CALLS TSS REMOVAL EFFICIENCY (%) TN REMOVAL EFFICIENCY N TP REMOVAL EFFICIENCY (%) FECAL REMOVAL ABILITY HIGH TEMP. CONCERN BIORETENTION WITHOUT IWS 85 35 45 High Med BIORETENTION WITH IWS 85 40 45 High Med STORMWATER WETLANDS 85 40 40 Med High WET DETENTION POND 85 25 40 Med High SAND FILTER 85 35 45 High Med GRASSED SWALE 35 20 20 Low Low RESTORED RIPARIAN BUFFER 60 30 35 Med Low FILTER STRIP, GRASSED or THICK 25 20 30 Med Low FILTER STRIP, WOODED, REVEG. 30 20 30 Med Low FILTER STRIP, WOODED 40 20 30 Med Low INFILTRATION DEVICES 85 30 35 High Low DRY EXT. DETENTION BASIN 50 10 10 Med Med PERMEABLE PAVEMENT SYSTEM 0 0 0 Low Med ROOFTOP RUNOFF MANAGEMENT 0 0 0 Low Med BMP's in Series E = A + B - [(A x B)/100] where E = Total pollutant removal efficiency (%) A = Efficiency of the First or Upstream BMP B = Efficiency of the Second or Downstream BMP Removal TSS Three BMP's In Series SAND FILTER 85 % GRASSED SWALE 35 % FILTER STRIP, WOODED 40 % E =. 94.15% Page 1 of 1 Sand Filter NCDENR 2007 (West) BRYTON HAMBRIGHT ROAD WATER QUALITY SAND FILTER DESIGN Updated per NCDENR 2007 BMP Manual & Sept 2009 85% Total Suspended Solids 35% Total Nitrogen 45% total Phosphate COMPUTE WATER QUALITY VOLUME Drainage Area = 2.60 ' ac Maximum contributing drainage area to a Sand Filter is 5 acres % Impervious = 85.00 % USE SIMPLE METHOD Rv=0.05+0.009(1) 0 0.815 IN/IN P= 1.0 IN WQV 7,692 ft3 WQVA4 = 5,769 ft3 A diversion or bypass structure must divert all but the design flow for the filter 9/6/2011 0 DETERMINE FILTER BED & SEDIMENTATION BASIN SURFACE AREA h MaWiller = WQV A4 (ft3) A. (ft) + Ar (ft) Assume H,n,X until min (AS + AF) = Atotai Assume h MaxRlter h MaxFilter 2.00 ft Greater of AS and Af X 2 Min, (A,+AF)=: 1,600 ft2 Min. Area for Sedimentation Chamber As = 249 x 0.95 x 1 Maximum Head on the Sand Filter must not exceed 6 ft (Design Storm only) Choose a combination of Af & hMaxFiiter to meet the space available. Sedimentation Chamber and Sand Filter should be about the same size. Min. Area for Sand Filter Af= WQVx1.5ft 3.5 ft/day x 1.66 days x (Avg Head + 1.5 ft) AS 800 ft2 Af = 94 ft2 Elev Bottom Area Used = 1,400 ft2 Bottom Area Used= 1,375 ft2 830 Top Area Used = 2,480 if Top Area Used= 2,430 ft2 832 3,880 ft3 3,805 ft3 VERIFY VOLUMES Volt.wi = (A, + Af ) x hMaxFdter Compare to WQVAd? volt,,., = 1; ?,,668 fta Page 1 of 2 l Sand Filter NCDENR 2007 (West) SIZE UNDERDRAIN SYSTEM Determine capacity of Under Drain System Af=WQvxdit[(kxHf+Df)xTfj Where: Af = 794 ftz df = 1.5 ft k = 3.5 ft/day hf = 1.00 ft Tf = 1.66 Days 2.0 Ft z Af Provided= 806 ft Q at Full Depth = Q at Avg Depth Time to Drain= Safety Factor of 10 0.076 ff 0.054 cfs 39.57 hrs 0.540 cfs surface area of filter bed filter bed depth coefficient of permeability media average height of water above filter bed, (Hmax / 2) (40 Hours, 1.66 Days)) Max. Depth of Storage Volume surface area provided (806 sf Bottom of Sand) Compute Perforation Capacity Pipes Length 4 Holes/Row # of Perforations 1 290 4 50% of Perforations = 1180 Holes 3/8" Dia. Hole Capacity of One Hole = CA(2gh)^0.5 Holes spaced 6" o/c. 0.0(37 cfs/Hole Min of 2 pipes Max 10' o/c Total Capacity = 8.023 cfs apacity of Filter Media = 0.540 cfs Perforation Capacity = > Media Capa< OK 9/6/2011 N:Wxcel Templates\waterQualiWopy of NCDENRWgc8lcs1.XIs Page 2 of 2 2320 Holes NCDENR Grass Swale (West) BRYTON 9/6/2011 HAMBRIGHT ROAD WATER QUALITY GRASS SWALE DESIGN TYPE OF SWALE: For-Credit Swale Updated per NCDENR 2007 BMP Manual & June 2009 35% Total Suspended Solids 20% Total Nitrogen 20% Total Phosphate Drainage Area = 2.6. AC Q1o= 6.88 cfs No min. or max. drainage area Trapezoidal Channel Retardance Level = C N High = , 0.110 VR = 0.60 Vei = 0.96 fps depth = 1.02 ft D = 2.00 ft W = ; 22.0 ft Left Slope = 5 H:V Right Slope = 5 H:V Bottom Width 2 ft Slope = 0.0096 ft/ft (Based on NRCS Resistance Factor) for 0.186 < VR < 36 OK < thin 1.0 fps (includes 6" Freeboard) Side slopes to be 5:1 or flatter for Credit Swales 3:1 or flatter for Non-Credit Swales Min. length =150 if / 100 If for Curb Outlet Systems Min 1 ft above SHWT Max velocity =1.0 fps for 10 year storm (For Credit) Min, bottom width = 2 ft Max bottom width = 6 ft Min. 6" freeboard above design Max. Al lowable Velocities Non-Credit Swale) Permissible Velocity Sloe Soils Grass Lining (fps) 0-5% Sands & Silt Bermudagrass 5 Tali Fescue 4.5 Bahiagrass 4.5 Kentucky bluegrass 4.5 Grass-legume mixture 3.5 Clays Bermudagrass 6 Tall Fescue 5.5 Bahiagrass 5.5 Kentucky bluegrass 5.5 Gress-legume mixture 4.5 Page 1 of 2 t CHECK ALLOWABLE SHEAR Tractive Force Procedure T=yxdxs T = shear stress Ib/ft2 y = unit weight of water d = depth flow, It s = channel slope, ft/ft T=, 0.61 Ib/sf < 1.0' OK Design Temp. Liner Check if Tema. Liner is Needed Q2= 5.75 cis (n=0.02) V2 3.2 FPS Vel. > 2.0 Liner Needed Straw with Net nviai = 0.059 Td = 1.45 Ib/sf ford > 0.5-2A' ft N (Inter.) d2 0.73 ft 0.059 T= 0.44 Ib/sf T < Td, OK Permissable Shear Stress Height Td A > 30" 3.7 B 11 - 24" 2.1 C 6 -10" 1.0 D 2 - 6" 0.6 E < 2" 0.35 Permissable Shear Stresses n Values per Depth Td 0-0.5' 0.5-2.0' > 2.0' Woven Paper Net 0.15 0.016 0.015 0.015 Jute Net 0.45 0.028 0.022 0.019 Straw with Net 1.45 0.065 0.033 0.025 S75 Straw Matrix, Poly Net 1.55 0.028 0.0415 0.055 S150 Straw Matrix 2 Poi 1.65 0.028 0.0415 0.055 SC150 Straw/Coconut U/V 1.80 0.018 0.034 0.05 1" Gravel Rip Rap 0.33 0.044 0.033 0.03 2" Gravel Rip Rap 0.67 0.066 0.041 0.034 6" Rock Rip Rap 2.00 0.104 0.069 0.035 9" Rock Rip Rap 3.00 0.0735 0.0375 12" Rock Rip Rap 4.00 0.078 0.04 15" Rock Rip Rap 5.00 18" Rock Rip Rap 6.00 NAExcel TemplateMaterQualitylCopy of NCDENRWgcalcsl.xls Page 2 of 2 Filter Strip w LS (West) BRYTON HAMBRIGHT ROAD WATER QUALITY 9/14/2011 FILLO- ST'R!P W/ LEWL SPPJ5APf?R? Updated per NCDENR 2007 BMP Manual 25% Total Suspended Solids (Thick Ground Cover) Discharge from : 30% Total Suspended Solids (Planted Wooded Vegetation) 40% Total Suspended Solids (Natural Wooded Vegetation) 1" Drawdown T 20% Total Nitrogen Discharge= 0.0711 cis 35% Total Phosphate Type of Filter Strip: Forested Min Length = 4.65 ft Length Prov'd 65 ft LENGTH OF FILTER STRIP/LEVEL SPREADER Type of Filter Strip Requirements Vegetation Length/ 1 cis Slope Max cis Grass or Thick Ground Cover 13 0-8% 10 Forested 65 0-6% 2 Forest Vegetation (100-150' Wide) 50 0-6% Forest Vegetation (>150' Wide) 40 0-6% VELOCITY OF LEVEL SPREADER (Based on Method by W.F. Hunt, D.E. Line NCSU NCDOT Level Spreader Workshop, Feb 19, 2001) Weir Equation Q=CwxLxH312 Where: Q = Flow, cis L = Length of Level Spreader, ft Cw = Weir Coefficient (set to 3) H = Driving Head, ft Continuity Equation: Q=VxA Combined Equation: Q=Vx213HxL H =(Q/(CwxL))^23 V = (Q/ (L x (Q/(CwxL))^2/3) H = i j3 ft Velocity $:A fps Min width of 13 If Max width of 130 If Filter Strip may be 30' if discharged from 1" Drawdown device Min width of Filter Strip to be 30' (50' SA Waters) Slopes shall be <5% where practicable & Max of 15% The first 10' of Riparian Buffer should be no more than 4% Typical non-erosive velocities range from 4 fps for dense grass or undergrowth to 2 fps for wooded. Manning's n values for Sheet Flow Good for Depths < 0.10' Smooth Surfces 0.011 Grass, Short 0.15 Dense Grass 0.24 Woods, Light 0.40 Woods, Dense 0.80 Check Manning's n = 0.240 Slope 0.150 fvft (of Filter Strip) Velocity = 04, fps (through Filter Strip) Page 1 of 1 East Summary STORMINATER MANAGEMENT SUMMARY 9/15/2011 BASIN CHARACTERISTICS EAST BASIN DRAINAGE AREA= IMPERVIOUS AREA= AC _ SF_ 15.00 653,490 ? r - - 6 261,360 % IMPERVIOUS SOIL TYPE(S) SCS RUNOFF CN'S= CN= TIME OF CONCENTRATION= BMP'S PROVIDED 40.0% 'VANGE?&W_ILKES HSG'C :98 (100% IMPERVIOUS) 74 ( 100% PERVIOUS) 83.6 0.0833; HRS 5.00' MIN. THREE BMP'S SELECTED TO PROVIDE COMBINED REMOVAL EFFICIENCY OF 80.5% TSS EXT. DRY DETENTION Sized for 1" storm using the routed SCS Type II storm. Flows greater than the 1" storm are diverted using a flow splitter. Modified CN's are used to develop the computed WQv of22,325 cf or 0.514ac-ft. Detenion times of 2.3 days (2-5 days) are provided. Routed output shows the Ext. Dry Pond drains within 50 hours (2.08 days) GRASS SWALE Sized for 10 year storm even though the flows greater than the 1" storm are diverted from the upstream Ex.t Dry Pond. FILTER STRIP/LEVEL SPREADER 70 If Level Spreader used with a 30' wooded filter strip. 0-6% is the max recommended slope. Existing grades are 8.3% at the receiving channel which are 50 If away. NAExcel Templates\WaterQuality\NCDENRWgcalcsl.xls BMP Efficiency(East) BRYTON 916/2011 HAMBRIGHT ROAD WATER QUALITY :BW EFFICIENCY CALCS: TSS REMOVAL EFFICIENCY (%) TN REMOVAL EFFICIENCY N TP REMOVAL EFFICIENCY (%) FECAL REMOVAL ABILITY HIGH TEMP. CONCERN BIORETENTION WITHOUT IWS 85 35 45 High Med BIORETENTION WITH IWS 85 40 45 High Med STORMWATER WETLANDS 85 40 40 Med High WET DETENTION POND 85 25 40 Med High SAND FILTER 85 35 45 High Med GRASSED SWALE 35 20 20 Low Low RESTORED RIPARIAN BUFFER 60 30 35 Med Low FILTER STRIP, GRASSED or THICK 25 20 30 Med Low FILTER STRIP, WOODED, REVEG. 30 20 30 Med Low FILTER STRIP, WOODED 40 20 30 Med Low INFILTRATION DEVICES 85 30 35 High Low DRY EXT. DETENTION BASIN 50 10 10 Med Med PERMEABLE PAVEMENT SYSTEM 0 0 0 Low Med ROOFTOP RUNOFF MANAGEMENT 0 0 0 Low Med BMP's In Series E=A+B-[(AxB)1100] where E = Total pollutant removal efficiency (%) A = Efficiency of the First or Upstream BMP B = Efficiency of the Second or Downstream BMP Removal TSS Three BMP's in Series DRY EXT. DETENTION BASIN 50 % GRASSED SWALE 35 % FILTER STRIP, WOODED 40 % E = $0.6% Page 1 of 1 Ext Dry Pond East#2 BRYTON 9!6!2011 HAMBRIGHT ROAD WATER QUALITY EXT. DRY DET. BASIN DESIGN Updated per NCDENR 2007 BMP Manual & June 2009 Pond Volume Linked to Worksheet: Dry Pond Volume (East #2) 50% Total Suspended Soilds 10% Total Nitrogen 10% total Phosphate SURFACE AREA REQ'D Drainage Area = 15.0 ac % Impervious = 40.00 % TEMP. DRAWDOWN DETERMINE 1 " STORM VOLUME USE SIMPLE METHOD Rv=0.05+0.009(1) The invert of the Dry Pond must be 2 feet above the SHWT (Seasonal High Water Table) Rv--' 0.41 IN/IN P= 1.0 IN VOLUME=DESIGN RAINFALL(Rv)DA 0.513 AC-FT VOLprov= • 0.641 AC-FT SEDIMENT STORAGE SEDIMENT STORGE VOL=25% OF WATER QUALITY VOLUME Sediment Storage Req'd= 0.128 ac-ft Sediment Storage Prov'd= 0.180 ac-ft Actual % Used = 28% FORE-SAY SIZE PRE-BAY VOL=20% OF PERM POOL VOLUME PRE-BAY VOLregd= 0.128 ao-ft PRE-BAY VOLprov.= 0.125 ac-ft Actual % Used = 20% % 22,325 CF at efev 736.22 at efev 732.40 at efev 733.00 Includes Forebay & Main Pond Page 1 of 2 Ext. Dry Pond East#2 9/6/2011 ORIFICE SIZING ORIFICE CALCULATIONS orifice formula Q=cA(2gh)^.5 w/ c=.6 2 DAY DRAWDOWN Q2= 0.16 cfs DIA {in) 3.0 5 DAY DRAWDOWN= Q5= 0,06 cfs Inv = 733.00 (cfs) FROM ORIFICE CALC'S: USE 3.0 INDIA ORIFICE Elev Q Top V Stor = t 736.22 Approx Draw Down Time = 2.3 days Inv. Out 1"3,04 54.89 hours Head = 1.07 3,293 minutes Avg Q = A cfs BOUYANCY CALCULATIONS Top of Box = 736.22 Bottom of Box = 731.00 Width of Box = 2.83 ft (Outside Dims) Length of Box = 3.67 ft (Outside Dims) BF= VOLstruct x densityH20 3,383 lbs WT str- 4,598 Ibs (2 - 48" Boxes) WT CONC=145-62.4(lb/sf)=82.6 SF= 1.2 WT OF ANCH. REQ'D= (538) Ibs VOL OF ANCH REQ'D= (6.5) d ANCHOR DIMS= L=! 1:63 ft W= 2.63 ft Thickness Reqd= (1.3) ft (16) in EMERGENCY DRAWDOWN ORIFICE CALCULATIONS orifice formula Q=cA(2gh)".5 w/ c=.6 DIA (in) 3.00 Perm Pool Vol = 0.180 acrft Inv 831.00 WS) FROM ORIFICE CALC'S: USE 3.00 IN DIA ORIFICE Elev Q Perm. Pool 833.40 Approx Draw Down Time = 11.3 hours Inv 831,00 0.47 days Head = 2.00 Avg Q = 0.19 cfs Driving Head = H/3 See Figure 3-3 NCDENR BMP Manual N:tExcel TemplatesXWaterQualitylCopy of NCDENRWgcalcsl.xls Page 2 of 2 DryPond Volume (East #2) BRYTON HAMBRIGHT ROAD WATER QUALITY Extended Det. Pry Pond Volumes Water Quality Linked to Worksheet: Ext. Dry Pond East#2 Inv of Pond = 731 1" Vol Storage Req'd = 0,51? ac-ft 25% Sediment Storage Req'd= ; 0:128 ac-ft Sediment Storage Prov'd= 0180 ac-ft Total Storage Req'd- 0:6+14 ac-ft 1" Vol Storage Prov'd = DA62 ao-ft Total Storage ProVd= 0.642 Prebay Vol. ProVd= 0,125 ac-ft Perm Pool Vol ProVd= 0.180 9/6/2011 Elev Include 25% of Perm. Pool 732.48 Volume for Sediment Storage 733.00 X38:22 736.22 734.50 733.00 PreBa Main Pond Total Inc. Total inc. Total Cum. Contour Area Avg. Area Volume Volume Area Avg. Area Volume Volume Volume Elev (ac) (ac) (ac-ft) (ac-ft) (ac) (ac) (ac ft) (ac ft) (ac-ft) 731 0.022 0.000 0.000 0.000 0.047 0.000 0.000 0.000 0.000 732 0.031 0.030 0.030 0.030 0.059 0.050 0.050 0.050 0.080 733 0.038 0.030 0.030 0.060 0.073 0.070 0.070 0.120 0.180 734 0.046 0.040 0.040 0.100 0.088 0.080 0.080 0.200 0.300 735 0.055 0.050 0.050 0.150 0.100 0.090 0.090 0.290 0.440 736 0.073 0.060 0.060 0.210 0.107 0.100 0.100 0.390 0.600 737 0.083 0.080 0.080 0.290 0.121 0.110 0.110 0.500 0.790 738 0.095 0.090 0.090 0.380 0.136 0130 0.130 0.630 1.010 STAGE / STORAGE m a? $ 0.0 0.2 0.4 0.6 Volume (ac-ft) 739 738 737 736 735 734 733 732 731 730 0.8 1.0 1.2 r NCDENR Grass Swale (East) BRYTON 9/6/2011 HAMBRIGHT ROAD WATER QUALITY GRASS SWALE DESIGN TYPE OF SWALE: For-Credit Swale Drainage Area = 15.0 AC Q10' 7.5 cfs No min. or max. drainage area Retardance Level = C N High = 0.143 VR = 0.40 Vel = 0.47 fps depth = 1.44 ft D = 2.00 ft W = 24.0 ft Left Slope = 5 H:V Right Slope = 5 H:V Bottom Width = 4 ft Slope = 0.0023 ft/ft Updated per NCDENR 2007 BMP Manual & June 2009 35% Total Suspended Solids 20% Total Nitrogen 20% Total Phosphate Trapezoidal Channel (Based on NRCS Resistance Factor) for 0.186 < VR < 36 OK < than 1.t? fps (includes 6" Freeboard) Side slopes to be 5:1 or flatter for Credit Swales 3:1 or flatter for Non-Credit Swales Min. length =ISO If / 100 If for Curb Outlet Systems Min 1 ft above SHWT Max velocity =1.0 fps for 10 year storm (For Credit) Min. bottom width = 2 ft Max bottom width = 6 ft Min. 6" freeboard above design Max. Al lowable Velocities Non-Credit Swale Permissible Velocity Sloe Soils Grass Lining (fps) 0-5% Sands & Silts Bermudagrass 5 Tall Fescue 4.5 Bahiagrass 4.5 Kentucky bluegrass 4.5 Grass-legume mixture 3.5 Clays Bermudagrass 6 Tail Fescue 5.5 Bahiagrass 5.5 Kentucky bluegrass 5.5 Grass-legume mixture 4.5 Page 1 of 2 CHECK ALLOWABLE SHEAR Tractive Force Procedure T=yxdxs T = shear stress Ib/ft2 y = unit weight of water d = depth flow, ft s = channel slope, ft/ft T 0.21 Ib/sf < 1.0' OK Design Temp. Liner Check if Temp. Liner is Needed Q2= 7.2 cfs (n=0.02) V2 1.9 FPS Vel. «2.0 Liner Not Needed Straw with Net ntr1ei = 0.054 Td = 1.45 Ib/sf for d > 0.5-2.0' ft N (Inter.) d2 0.92 ft 0.054 T= 0.13 Ib/sf fi < Td, OK Permissable Shear Stress Height Td A > 30" 3.7 B 11 - 24" 2.1 C 6-10" 1.0 D 2 - 6" 0.6 E < 2" 0.35 Permissabie Shear Stresses n Values per Depth Td 0-0.5' 0.5-2.0' > 2.0' Woven Paper Net 0.15 0.016 0.015 0.015 Jute Net 0.45 0.028 0.022 0.019 Straw with Net 1.45 0.065 0.033 0.025 S75 Straw Matrix, Poi Net 1.55 0.028 0.0415 0.055 S150 Straw Matra 2 Poly 1.65 0.028 0.0415 0.055 SC150 Straw/Coconut UN 1.80 0.018 0.034 0.05 V Gravel Rip Rap 0.33 0.044 0.033 0.03 2" Gravel Rip Rap 0.67 0.066 0.041 0.034 6" Rods Rip Rap 2.00 0.104 0.069 0.035 9" Rods Rip Rap 3.00 0.0735 0.038 12" Rods Rip Rap 4.00 0.078 0.04 15" Rods Rip Rap 5.00 18" Rock Rip Rap 6.00 N:1Excel TemplateMaterQuality%Copy of NCDENRWgcalasl.xls Page 2 of 2 Filter Strip w LSp (East) BRYTON HAMBRIGHT ROAD WATER QUALITY 9/14/2011 Updated per NCDENR 2007 BMP Manual 25% Total Suspended Solids (Thick Ground Cover) Discharge from : 30% Total Suspended Solids (Planted Wooded Vegetation) 1" Drawdown 40% Total Suspended Solids (Natural Wooded Vegetation) 20% Total Nitrogen Discharge=' 0.28 cis 35% Total Phosphate Type of Filter Strip: Forested Min Length = i 18.2 it Length Prov'd = 70 ft LENGTH OF FILTER STRIP/LEVEL SPREADER Tvpe of Filter Strip Requirements Vegetation Length/ 1 cfs Sloe Max cfs Grass or Thick Ground Cover 13 0-8% 10 Forested 65 0-6% 2 Forest Vegetation (100-150' Wide) 50 0-6% Forest Vegetation (>150' Wide) 40 0-6% VELOCITY OF LEVEL SPREADER (Based on Method by W.F. Hunt, D.E. Line NCSU NCDOT Level Spreader Workshop, Feb 19, 2001) Weir Equation Q=CwxLxH37 Where: Q = Flow, cfs L = Length of Level Spreader, ft Cw = Weir Coefficient (set to 3) H = Driving Head, ft Continuity Equation: Q=VxA Combined Equation: Q=Vx2/3HxL H =(Q/(CwxL))^2r' V = (Q/ (L x (Q/(CwxL))^2/3) H' ?r ft Velocity' ` fps Min width of 13 If Max width of 130 If Filter Strip may be 30' if discharged from 1" Drawdown device Min width of Filter Strip to be 30' (50' SA Waters) Slopes shall be <5% where practicable & max of 15% The first 10' of Riparian Buffer should be no more than 4% Typical non-erosive velocities range from 4 fps for dense grass or undergrowth to 2 fps for wooded. Manning's n values for Sheet Flow Good for Depths < 0.10' Smooth Surfces 0.011 Grass, Short 0.15 Dense Grass 0.24 Woods, Light 0.40 Woods, Dense 0.80 Check Manning's n 0.400. Slope 0 0a'3' ft/ft (of Filter Strip) Velocity = ; Q, fps (through Filter Strip) Page 1 of 1 ?- U C J O N c OPP W pp N N (n (? rn U) rn z °Q N o.ro 0 CV v U O Q N N Q d C >+ ? C O E NN ? N a ld M a U.) ?Wp / C Q / O / eem00 / 0 >%oi `U Y ? O a? ch _ U m v (0.O.O a m r M J C) Aw/ll to N h 0 p a M_ LL E ca 0 246-230-85%TSS Charlotte 6-hr 1-Inch linch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 7S: DA Hambright Rd (West) Runoff = 4.28 cfs @ 3.10 hrs, Volume= 0.177 af, Depth= 0.82" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., ime Span= 0.00-120.00 hrs, dt= 0.01 hrs Charlotte 6-hr 1-Inch l inch Rainfall=1.00" * 0.390 77.2 CN=61 CNm=77.2 Grass W415h4ed CW 5 4L-) ?4 VZ„ * 2.210 99.6 CN= 98 Paving CNm = 99.6 9 2.600 96.2 Weighted Average 0.390 77.2 15.00% Pervious Area 2.210 99.6 85.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: DA Hambright Rd (West) Hydrograph I I I { 1 I I I I ! 1 ! ! ! 1 I I I I I ,p 1 I 1 1 I 1 ! I i ! ! ? I t 1 4.28 cis 1 ! I ! 1 I I I I ! , 1 I 1 I ! ? I ? ! { I ? f ! ? ? I I I I I 1 I I 1 I 1 ? I ? 1 I I 1 ? 1 ? ? 1 1 I ---r--r--r--r--r--?--?--?--?-- ---I-'-I-- -_..?_- -,-R'unoff=4:28-cfs- I 1 ! 1 1 I 1 1 I I I I I 1 1 { 1 I I Charlotte 8-hr 1-Inch 1 inch I ! - I II 1 1 I 1 I I I I I 1 1 I 1 I ! I I ! ! I I ! I I I I 1 ! 1 I „ ' 1 I I 'Rainfall=1' 00 I I I ! I 1 1 I 1 1 I I 1 1 I ? 1 I I 1 1 I I I I 1 1 ! I I { 1 - 1 I I I I 1 . ; ; ; --? -;Runoff ?4ra=2.G0 _ Vic- - I I I ? I I I I 1 I , I I I I I ! Runoff Volume=0.177 of 1 I i 1 , 1 1 ! I ! I ! 1 1 ! ! I 1 Runoff DePth'=01.82" t I -- ,-- 1- 1 I ! 1 1 I ! _I -'I Y ¦&5.OIIml'n ! I I I 1 ! 1 1 ? I 1 1 f I I I I 1 1 I ? 1 1 f I I I 1 I 1 I 1 I ? i I I I ? I I 11 1 I 1 1 1 1 ! 1 1 1 1 1 1 1 1 1 1 CN=77.2/99.1;5 I ! I I 1 I 1 I I 1 ? 1 f I 1 1 ? I ? ? I 1 I 1 I I ? I , I I ! ? 1 I I I I I I I I I 1 I I I I I I _ I ?? I I I I I I I I 1 I I { I ? ! I I 1 I ? 1 I I 1 1 1 I I I 1 I ? ? 1 I I I I 1 I I I 1 1 I I I ? 1 ! I I I 1 I I ! f 1 I 1 I I I ! ? I ! 1 1 I 1 I I ? 1 1 t 1 I I 1 ! 1 I I I I I I I 1 1 ( 1 I I I 1 I I I I ! ? 1 1 1 I 1 I I I I 1 1 1 1 I I I 1 1 1 1 t 1 1 I t 1 1 t 1 t 1 1 1 1? -Runoff 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 246-230-85%TSS Prepared by Burton Engineering Associates HvdroCAD® 9.00 s/n 03513 ® 2009 HvdroCAD Sc Charlotte 6-hr 1-Inch finch Rainfal1=1.00" Printed 9/6/2011 Summary for Reach 21 R: Grass Swale #1 [79] Warning: Submerged Pond 8P Primary device # 1 INLET by 0.04' Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 0.53" for l inch event Inflow = 0.41 cfs @ 3.66 hrs, Volume= 0.115 of Outflow = 0.33 cfs @ 3.91 hrs, Volume= 0.115 af, Atten= 19%, Lag= 14.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-120.00,hrs, dt= 0.01 hrs Max. Velocity= 0.38 fps, Min. Travel Time= 6.7 min Avg. Velocity = 0.13 fps, Avg. Travel Time= 19.9 min Peak Storage= 132 cf @ 3.80 hrs, Average Depth at Peak Storage= 0.18' Bank-Full Depth= 2.00', Capacity at Bank-Full= 40.63 cfs 4.00' x 2.00' deep channel, n=0.110 Side Slope Z-value= 5.0'/' Top Width= 24.00' Length= 150.0' Slope= 0.0096'/' Inlet Invert= 825.44', Outlet Invert= 824.00' Reach 21 R: Grass Swale #1 Hydrograph 0.4 I f I '? I 1 ! I 1 I 1 I 1 I t 1 1 i I 1 I OA 0.41ds 1 I I 1 I I I 1 1 ( I i 1 t I _ _- F-- L-- L-- f -- 0.4 - ! I I 1 - 0.38 - - - -r- - -?--?--(lam--r--FMea=160`/?` aY }(?? r--r--r--r--r--Ir--r--r--r--r--r--r ar?flow A{ - 1 , i 1 I i I I I I I 1 1 I 1 1 I 1 0.3 - --. --r--r--r --r- --r- r- r--r -. -r r- r- r¦¦¦C- -r -r -r ?- r 0.33Cfs 0. ;.- - ;--; ; - - ; nfJoW= cf? 0.32 - - -'- - I_ - -'- - - - -'- - ' L ' ' ;- - L - - L - -'- - 1 1 I I I I ; ( I 1 I i, 1 I 0.3 ow- 1 1 , I I 1 1 1 1 I I 1 t i 1 l I 1 I 1 0.28 I 1 1 I 1 1 I I , ! I I I i ' ?^q 0.26 ,.... - ` r - r r rAW Dp OF J- - - ?i I I 1 I 1 I 1 i 1 1 I ? I 1 I?r??? 1?iy?*?YIQA 1 ?r? ?/-1li1?.Q r?r? 1 .. 0.24 - ---r --r--r --r--r - r r--r- r- r -' --L - -' --L - IIiY?Vll? 0.22 -r--r -- r -r - M 0.2 I I I 1 I 1 1 _ - - I -- I - - - - 1 - -' - - ' - ' - - ` - ' - - 1 - ' 0.18 - - L--' L L L...LL 1 ' - '--- '- L--L - LO•L --'--- I 1 1 I 1 I I I 1 ? 1 I i I 1 , I A1 0.16 L L _ _ L L L _ _ L L _ _ II_ L L _ _L L _ _' 1 1 I 1 1 1 1 I f 1 1 0.14 - _f- - -1---?- --1---?- - -L --F - -L --1" --` - -L - -F - -L --f- --I- --F - -1' --L - -F --L _-I---L - - I I I 1 I 1 1 1 1 1 I I I I I I I _ 0.12 --------r- r r r r -r S.00961'J' 1 I 1 I 1 1 1 I 1 i 1 1 I I 1 1 0.1 r -- r--r -- r -- r -- r -- r -- r --r--r -- r -- r -- r -- rA- r?--r-- i I 1 I 1 I I t 1 1 I I t¦ ? ?3 1 Yf - 0.08 - r 1 --r--r--,---r--r- --r-- r --r--r--r--r--,---r "e, -7' s 0.06 I_ I 1 I_ _ I I _ t _ 1 1 I 1_ - I. .. _ I_ _ 1_ _. _ 1_ i I I 1 I I I_-I _--- ? I - -. I 1 I 1 { 1 I 1 I I 1 I 1 1 0.04 _ 1 1 I 1 I 1 1 1 1 1 1 I I 1 I I I 1 I I 1 1 0.02 - 1 I 1 1 I I I I 1 1 I 1 I 1 1 1 0 0 S 10 15 20 25 30 35 40 45 50 55 60 65 70 75 e0 85 so 95 100 105 110 115 1 Time (hours) Inflow outflow 246-230-85%TSS Charlotte 6-hr 1-Inch finch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCADO 9.00 s/n 03513 ® 2009 HydroCAD Software Solutions LLC Page 3 Summary for Pond 8P: Sand Filter #1 [81] Warning: Exceeded Pond 18P by 0.29'@ 6.11 hrs Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth= 0.53" for 1 inch event Inflow = 4.08 cfs @ 3.13 hrs, Volume= 0.115 of Outflow = 0.41 cfs @ 3.66 hrs, Volume= 0.115 af, Atten= 90%, Lag= 32.1 min Primary = 0.41 cfs @ 3.66 hrs, Volume= 0.115 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Eiev= 831.81'@ 3.66 hrs Surf.Area= 2,331 sf Storage= 3,360 cf Plug-Flow detention time= 488.5 min calculated for 0.115 of (100% of inflow) Center-of-Mass det. time= 488.8 min ( 706.7 - 217.9 ) Volume Invert Avail.Storage Storage Description #1 830.00' 5,093 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 830.00 1,375 0 0 832.00 2,430 3,805 3,805 832.50 2,720 1,288 5,093 Device Routing Invert Outlet Devices #1 Primary 825.58' 18.0" Round Culvert L= 28.0' RCP, square edge headwall, Ke= 0.500 Outlet Invert= 825.44' S= 0.0050? Cc= 0.900 n= 0.012 #2 Device 1 831.80' 2.0" x 16.5" Horiz. Orifice/Grate (DI-4) X 2.00 columns X 8 rows C= 0.600 Limited to weir flow at low heads #3 Device 1 830.00' Filter Media Head (feet) 0.00 1.00 2.00 Disch. (cfs) 0.000 0.054 0.076 Primary OutFlow Max=0.32 cfs @ 3.66 hrs HW=831.81' (Free Discharge) T--=Culvert (Passes 0.32 cfs of 19.92 cfs potential flow) r-2=Orlflce/Grate (1314) (Weir Controls 0.24 cfs @ 0.37 fps) 3=Filter Media (Custom Controls 0.07 cfs) 246-230-85%TSS Charlotte 6-hr 1-Inch finch Raintall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Pape 4 Pond 813: Sand Filter #1 Hydrograph i 1 4.08 i - inflOW I 1 1 1 1 1 I I 1 I 1 1 i I I I I I 1 I I 1 I I I I 1 I I I I i I i 1 I 1 1 I I 1 ? Prima 4 - -- +----- --+ +--+ -+ - - --* i- { - - - -- -- - ?-- 1 - I n f low; A:rea=2;600 at I i I I 1 1 I I I I I I 1 1 I I I I 1 I I I I I 1 1 1 I I 1 I I nfl ow=4;.08 ifs 1 II 1 t I I ? ? I I 1 1 I ? I I I 1 I I 1 3 _ L L L ?_ _ .l -1 1 _ J 1 1 _ 1_ 1 1 1 I I 1 1 I I ?r'ma TO'.-1-cfs 1 I I 1 I 1 i 1 I I I I I I 1 1 I I I 1 I I I I I I I I I 1 I I I 1 1 t t 1 1 I I V i I I I ? ? ? ? Peak ?Elev=$3'1.$1'' 1 I 1 ? I I I I 1 I I I I I 1 ! i 1 I I 1 I I I 1 1 I I I I 1 I i I I I I 1 1 1 I I 1 , 1 I I I _ LL 2 - '- - r gee_315360 c#- - 1 1 I I I I I I I I 1 1 I I I I I 1 1 1 I ? 1 ? I 1 ? I 1 I I I I 1 I I 1 1 1 ? 1 ? I ! ? I I 1 I f I i I I I 1 ? i i I I I 1 i I 1 ! I I ? I 1 I 1 I 1 1 1 I I I I 1 1 I 1 1 1 i I I I I t 1 I i I t I 1 I 1 I I I I 1 I 1 1 1 1 1 I 1 1 I 1 I I { I 1 1 I 1 1 1 - r--r--r--r--r--r--r--r--1--T--z--I- - -1--7--1-- ---------1---1---1---1--- 1 1 I I 1 ! I 1 I t i t I I I 1 1 1 I f 1 1 I 1 I I I f t i 4 I 1 I I I I 1 0.41 ? i ' 1 I 1 I I I 1 I - 1 I i I I I 1 I 1 t 1 I 1 f I I I I I f 1 I I 1 1 I t 1 f 1 1 1 I I i 1 i I I I 1 I 1 t 1 I 1 t t 1 I ? I t I I I I I 1 i 1 i t I I I I I I I 1 i I 1 i I I I I I I I I I 1 I 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 165, 110 115 120 Time (hours) 246-230-85%TSS Charlotte 6-hr 1-Inch finch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 5 Summary for Pond 17P: Spiitter MH-1 [57] Hint: Peaked at 834.07' (Flood elevation advised) Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 0.82" for l inch event Inflow = 4.28 cfs @ 3.10 hrs, Volume= 0.177 of Outflow = 4.28 cfs @ 3.10 hrs, Volume= 0.177 af, Atten= 0%, Lag= 0.0 min Primary = 4.28 cfs @ 3.10 hrs, Volume= 0.177 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 834.07'@ 3.10 hrs Device Routing Invert Outlet Devices #1 Primary 832.80' 15.0" Round Culvert 9 (to Sand Filter) L= 28.0' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 832.66' S= 0.0050? Cc= 0.900 n= 0.012 #2 Secondary 832.80' 24.0" Round Culvert (Bypass) L= 16.0' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 832.48' S= 0.0200? Cc= 0.900 n= 0.012 #3 Device 2 834.10' 6.0' long x 1.37' rise SC. Rect. Weir (partition) 2 End Contraction(s) 1.3' Crest Height QrimaryOutFlow Max=4.27 cfs @ 3.10 hrs HW=834.07' (Free Discharge) 1-1 =Culvert 9 (to Sand Filter) (Barrel Controls 4.27 cfs @ 4.25 fps) econdary OutFiow Max=0.00 cis @ 0.00 hrs HW=832.80' (Free Discharge) c tCulvert (Bypass) ( Controls 0.00 cfs) 3=SC. Rect. Weir (partition) (Controls 0.00 cfs) 246-230-85%TSS Charlotte 6-hr 1-Inch finch Rainfall=l. 00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Pape 6 Pond 17P: Splitter MH-1 Hydrograph I ? ? ! f 1 1 I ? ? ? ? ' I I I 1 ? 1 ? I ? I I 1 I I 1 1 I I i 1 1 I I inflow -4.28 cfs I 1 I I I I I 1 1 i I 1 i I I 1 t I I 1 i 1 1 I 1 1 I i i 1 1 ! 1 I I Outflow 1 ; ! 1 1 I 1 1 ! ; I 1 I 1 I -Primary 4 - r--r--------r--1- -I- r-. ---.-- - r . - lnfloW Atetm-2:60aA - Secondary ! 1 I t 1 1 I I ? 1 1 ? I I i I 1 1 I I 1 1 ! I ! 1 1 i I I I 1 Inflow; 4:28 d I t 1 i 1 1 1 I I i 1 ? I 1 I 1 1 I I IcI 1 1t 3 --,---;--- --;-- ;---;-- --- -=----- -- - jiff w=4:2 : ft-- II I I I I I I I I I 1 1 I I I ! 1 I I P ri ; Imary i 1 4 =12$ d Ii : I I I 1 1 1 I I I 1 ? i 1 1 1 I I I I I 1 I 1 I I I 1 I I I I 1 ! I I I I I I I I ! LL 2 - --; - ;- -;-- -- -- -- ;Seca; r v=0 QQ- ofe-- 1 I I ( ? 1 I I I i 1 I I 1 1 i 1 t 1 I I ftak F-lov=$34-07' I I I 1 1 1 I I ? 1 i I 1 1 I I 1 I I I 1 ? I I I I I ! 1 ; I ? 1 1 I ? i I ? I I ; ! I ? I ? I I I 1 ? ? 1 _J__ _1_-1111_-LL_-L 1 1 1 1 1 l I 1 1 I 1 1 I I I I I I f ? I I 1 I I I 1 I I I 1 1 I I 1 I 1 I 1 I I 1 I I I 1 1 ? ? I I I 1 I I I I I 1 1 I 1 I I I 1 ! I I I 1 ( 1 I I I I 1 I I I I 1 ? 1 I 1 1 I I I I I I I 1 1 i 1 I ? I 1 t i I 1 I 1 0.00 C18 ll ? I I 1 I i 1 I i I 1 f 1 I 1 1 0 0 5 10 15 20 25 30 35 40 45 50 55 80 85 70 75 80 85 90 95 100 i6770 115 120 Time (hours) 246-230-85%TSS Charlotte 6-hr 1-Inch finch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD09 00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 7 Summary for Pond 18P: Forebay Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 0.82" for l inch event Inflow = 4.28 cfs @ 3.10 hrs, Volume= 0.177 of Outflow = 4.08 cfs @ 3.13 hrs, Volume= 0.115 af, Atten= 5%, Lag= 1.4 min Primary = 4.08 cfs @ 3.13 hrs, Volume= 0.115 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 831.69'@ 3.13 hrs Surf.Area= 2,315 sf Storage= 3,148 cf Plug-Flow detention time= 51.9 min calculated for 0.115 of (65% of inflow) Center-of-Mass det. time= 26.4 min ( 217.9 -191.5 ) Volume Invert Avail.Storage Storage Description #1 830.00' 5,135 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 830.00 1,400 0 0 832.00 2,480 3,880 3,880 832.50 2,540 1,255 5,135 Device Routing Invert Outlet Devices #1 Primary 831.50' 20.0' long x 6.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 Qrimary OutFlow Max=4.07 cfs @ 3.13 hrs HW=831.69' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 4.07 cfs @ 1.05 fps) 246-230-85%TSS Charlotte 6-hr 1-Inch finch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 8 Pond 18P: Forebay Hydrograph U. ? ? 1 I cfs 1 , I y I 1 1 I I i I I I I I I i 1 1 I 1 1 1 t r i I I 1 i 1 I i i I i 1 4.08 Cfs I ? a 1 1 I - I ---r--r I I 1 -- r -r- I , -T--r- I I 1 i 1 1 -r--T--T--T----- 1 1 1 1 i In#I6W Ald i2,6T_41 -- I I I I I I I I 1 1 I I I i I I 1 i I 1 I 1 Inflow=4.28 cfs I i I I 3 I 1 1 - r- T 1 1 I I ' I 1 ! I I I , , I I I I- I-- i I 1 ! I 1 I -- --Pdnia l 4:.0-?If\I -- i I 1 1 1 1 I 1 1 1 1 I I . i I I I I I , t ! i I ! I I I ? I 1 ' I I I I I i 1 I ! I I I 1 Pe i 1ak t Il?Iev I=83'1 I .t6I i , I I 1 1 9' 2 I 1 ? I I - 1 I , ! I 1 1 1 I I I I ? i I I 1 1 1 I I i I 1 , 1 I 1 1 i I 1 1 I 0- 14$ -Storms=3 I I I I I I 1 I I I I 1 I 1 1 i 1 I 1 I I 1 1 1 I I I 1 I I , I I 1 1 i , 1 t I 1 i 1 1 1 1 1 1 I 1 I ? 1 1 1 I 1 I I 1 1 I 1 1 I I I I I I I I I I I L _ _ _ _ L I 1 I t 1 I 1 1 I 1 1 I I I I I I I I I I ! I - 1 i 1 I I I ? i 1 I I I 1 1 I I I 1 1 1 I 1 I I I I I 1 I 1 1 I I 1 I 1 1 I 1 I I 1 1 1 I 1 1 I 1 1 I i 1 1 ? I 1 I I 1 1 I I ? i I 1 I ! 1 I 1 t f 1 1 I 1 I i I i I 1 1 I 1 . 1 I I I I f 1 I I 1 1 1 1 I I I I I 1 I I 1 i I 1 1 1 t 1 I I 1 1 I I 0 1 I I 1 I I ? I i I 1 I I I I { 1 I i 1 I 1 I t 1 ? 1 I 1 1 1 I I i 1 I I ! I 1 1 1 ( I 1 I ? I 1 I 1 1 ! 1 I I 1 I i I 1 1 1 I I 1 1 I 0 5 10 15 20 25 30 35 40 45 50 55 80 85 70 75 80 85 90 95 100 105 110 115 12 Inflow Primary I Time (hours) 246-230-85%TSS Charlotte 6-hr 1-Inch linch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAM 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Paoe 9 Summary for Pond 23P: Woods [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 0.53" for l inch event Inflow = 0.33 cfs @ 3.91 hrs, Volume= 0.115 of Primary = 0.33 cfs @ 3.91 hrs, Volume= 0.115 aft, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Pond 23P: Woods Hydrograph 0.36 r-- -- r --r --r--r--r----------- ! ! i I 1 1 I I ! ! 1 ! i ! i I I 1 ` I F- Inflow .12 0. - 0.33 cfs L L-L L- --- -L--' ---'-- L--L -L -L--L--L -L--'- - - I I 1 ! I ! 1 1 ! i ! I I 1 1 1 I - Primary 0.32 - '- - - 1- -'- -'- '- - -'- - -'- -'- - -'- - _'_ -'- - -'- - `- - -'- - -'- - -'- - -'- - -'- "- - ' ??af,]oW ,A t0 i#2 `6a0 gat 0.3 -- - . - - r -r - - r - - - - r- ---r--r --r--r--r--r--r , I i I I 1 I 1 1 1 t ! I ! ! I 1 0.26 `--? -?-- --r -r--' r- ---f---1---'---r- r--?- --?--r - r r - flow=D 33= cfs 0.26 _ _ _ - I I t - , - - -- ! -- 1 1 I I 0.24 - --- -- --; -- r r--,- - -----i--- ; - -, - -; - f}rimar 0:33- di - - 0.22 1 _1 I . _ ___r__r.__r__r__r__, ^ 0.2 ? I ! I I I I I I ! 1 i 1 I I 1 I I I I I 1 1 I ! 4 I I I 1 v 0.16 1 I ! ? I 1 I 1 _ ________I___ __'-__•-__I___!___'___'______ __ __ __ __1___-___-____I___t I I I I I 1 I 1 I I 1 1 1 ' ! 1 1 0.16 1 I I I I I I ! 1 1 I I I 1 1 ! 1 I I I I 1 - r r r r- r -r -r -r--r -r -r--r -r -r r- r r- r r _ r -r- r - I I 1 ! 1 I ! 1 I I I 1 1 I I I 0.14 - -?--L -= -?--- ----I --!---' ---- --= -r - --?--r -?-- ---'---'- ---- I I ! 1 1 1 I I I I 1 1 0.12 ! 1 ! 1 1 I ! ! 1 I I 1 -! I ! 1 I 1 1 I i I I I 1 1 0.1 - _ -' _ ! _ - ' -1 - - I I I 1 1 1 I 1 I 1 ! ! I 1 ! I I I I 0.06 - -r--r--r---r--. --r--!- r--r--r -r -r -r--r--r--r-- --r -I---r -r--r- I I I I 1 I I 1 1 ! I ! ! I 0 06 r-- -? -1 - -- '-- r - - - ?- L - - --? - - -- . ! I { I I 1 1 1 1 1 1 I I I I , I 0 ()4 .04 1 I I ! I 1 1_ i 1 I 1 I I ! I I 1 1 1 1 1 1 1 1 1 ! I 1 1 I 0.02 r--r--r--r --r--r--r--r-7- -i--1---r -r--r--r--r--r--r--r--r--r--r - I 1 ! 1 1 . 1 I I I 1 1 f I I I I 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 246-230-85%TSS Charlotte 6-hr 1-Inch 9inch Rainfall=9.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 10 Summary for Pond 26P: Level Spreader #1 [57] Hint: Peaked at 824.01' (Flood elevation advised) [61] Hint: Exceeded Reach 21R outlet Invert by 0.01'@ 3.91 hrs Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 0.53" for linch event Inflow = 0.33 cfs @ 3.91 hrs, Volume= 0.115 of Outflow = 0.33 cfs @ 3.91 hrs, Volume= 0.115 af, Atten= 0%, Lag= 0.0 min Primary = 0.33 cfs @ 3.91 hrs, Volume= 0.115 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 824.01'@ 3.91 hrs Device Routing Invert Outlet Devices #1 Primary 824.00' 65.0' long x ON breadth B.C. Rect. Weir (Level Spreader) Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=0.32 cis @ 3.91 hrs HW=824.01' (Free Discharge) 1=B.C. Rect. Weir (Level Spreader) (Weir Controls 0.32 cfs @ 0.34 fps) Pond 26P: Level Spreader #1 Hydrograph 0.36 r-- y I I 1 1 Cf5 0.33 1 i I I 1 1 I 1 1 I -Inflow 0. ?- I I I I 1 '.. I I ! 1 I I I 1 i 1 ! I - Primary 0.32 - --' -- --1- - -1- 1 --- I I I ? ? ; I I i I 1 1 I 1 'I ''---'- ------------------------L----- I I I I 1 1 I I1 - I 00a I- - _1--- Inflow Ate4: , ; ac , ; 2 0.3 - -- - - r-- -- - -- -- -- - - - - - , ? 0.28 I I I I I I t I I t 1 I I 1 I I -0' 33 cfis , ' Inflow : ? 0.26 !- - - - I I I , _ - - - - _ - - 1 1 I I I I I I I,- - --, I I 0.24 I ----r--;---?-- I 1 i I I I I I I 1 ? : t 1 I di- I I-- 1 - --- , --; -; - - -Prrmar =0'33 - 0.22 ' I -r--r -r--r -I- 1 1 I I 1 ----r--r--1---r -I---r--r--r--r---r--- -I---I---r r--r-- .? 0.2 - -L -?- I -? 1 1 1 I 1 1 1 - - -Peak-8le?i=$2+4.'I? - - 0.16 - 1 1 1 I I 1 1 - - -1- - - --- - '-- I---I --- 1- ---1- I 1 1 I I I ! I I 1 I I 1 1 I - I - 1 I I 1 I 1 ! 1 0.16 - --r--r--r--r--r- -r--r--r--r--r--1---r--r--r--r--r--r--r--r--r--r--r-- 0.14 I 1 I I I I 1 1 I 1 I I I I I I I I I I 1 I I I I I I 1 I I 1 I 1 1 0.12 - 1 1 I I ? I I I 1 I I I I 1 I I I I 1 I I 1 0.1 1 1 I 1 I I I 0.08 I 1 I I I - r r- r- r I , I I I I I I I 1 1 1 I 1 r r-r--r--r r - r r r r r ? 0.06 I I I I 1 1 I I I I i 1 I I I I I 1 1 I 1 I I I ( I I I I 1 I 1 I I I 004 1-- 1 I 1 ---------- I'111 --------------------- I I 1 I? I I I I I 1 I I I 0.02 1 1 1 I 1 r . r 1 I I 1 1 1 1 I 1 I I I I 1 I I r . . r r r r r -r -r r r r r 0 , I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 12 0 Time (hours) 246-230-85%TSS Charlotte 6-hr 1-Inch l inch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Paces, e 1 Summary for Pond 8P: Sand Filter #1 [81] Warning: Exceeded Pond 18P by 0.29'@ 6.11 hrs Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth= 0.53" for 1inch event Inflow = 4.08 cfs @ 3.13 hrs, Volume= 0.115 of Outflow = 0.41 cfs @ 3.66 hrs, Volume= 0.115 af, Atten= 90%, Lag= 32.1 min Primary = 0.41 cfs @ 3.66 hrs, Volume= 0.115 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 831.81'@ 3.66 hrs Surf.Area= 2,331 sf Storage= 3,360 cf Plug-Flow detention time= 488.5 min calculated for 0.115 of (100% of inflow) Center-of-Mass det. time= 488.8 min ( 706.7 - 217.9 ) Volume Invert Avail.Storage Storage Description #1 830.00' 5,093 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Su rf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 830.00 1,375 0 0 832.00 2,430 3,805 3,805 832.50 2,720 1,288 5,093 Device Routing Invert Outlet Devices #1 Primary 825.58' 18.0" Round Culvert L= 28.0' RCP, square edge headwall, Ke= 0.500 Outlet Invert= 825.44' S= 0.0050? Cc= 0.900 n= 0.012 #2 Device 1 831.80' 2.W' x 16.5" Horiz. Orifice/Grate (DI-4) X 2.00 columns X 8 rows C= 0.600 Limited to weir flow at low heads #3 Device 1 830.00' Filter Media Head (feet) 0.00 1.00 2.00 Disch. (cfs) 0.000 0.054 0.076 primary OutFlow Max=0.32 cfs @ 3.66 hrs HW=831.81' (Free Discharge) T--=Culvert (Passes 0.32 cfs of 19.92 cfs potential flow) -2--Orifice/Grate (DI-4) (Weir Controls 0.24 cfs @ 0.37 fps) L3=Filter Media (Custom Controls 0.07 cfs) 246-230-85%TSS Charlotte 6-hr 1-Inch linch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Hydrograph for Pond 8P: Sand Filter #1 Time Inflow Storage Elevation Primary Outflow-Volume (hours) (cfs) (cubic-feet) (feet) (cfs) (acre-feet) 0.00 0.00 0 830.00 0.00 0.000 5.00 0.13 3,335 831.80 0.13 0.029 10.00 0.00 2,399 831.38 0.06 0.060 15.00 0.00 1,391 830.87 0.05 0.083 20.00 0.00 743 830.49 0.03 0.098 25.00 30.00 0.00 0.00 384 194 830.27 830.14 0.01 0 01 0.106 g2LIJ .IV ?+ Q, . 3? tir 5 0111 35.0 0 0.00 97 830.07 0.00 0.113 40.00 0.00 48 830.03 0.00 0.114 45.00 0.00 24 830.02 0.00 0.114 50.00 0.00 12 830.01 0.00 0.115 55.00 0.00 6 830.00 0.00 0.115 60.00 0.00 3 830.00 0.00 0.115 65.00 0.00 1 830.00 0.00 0.115 70.00 0.00 1 830.00 0.00 0.115 75.00 0.00 0 830.00 0.00 0.115 80.00 0.00 0 830.00 0.00 0.115 85.00 0.00 0 830.00 0.00 0.115 90.00 0.00 0 830.00 0.00 0.115 95.00 0.00 0 830.00 0.00 0.115 100.00 0.00 0 830.00 0.00 0.115 105.00 0.00 0 830.00 0.00 0.115 110.00 0.00 0 830.00 0.00 0.115 115.00 0.00 0 830.00 0.00 0.115 120.00 0.00 0 830.00 0.00 0.115 246-230-85%TSS Type// 24-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAM 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Paae 1 Summary for Subcatchment 7S: DA Hambright Rd (West) Runoff = 17.24 cfs @ 11.96 hrs, Volume= 0.853 af, Depth= 3.94" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10yr24hrHuntersville Rainfall=4.80" Area (ac) CN Description 0.390 61.0 CN=61 CNm=77.2 Grass 2.210 98.0 CN= 98 Pavina CNm = 99.6 2.600 92.4 Weighted Average 0.390 61.0 15.00% Pervious Area 2.210 98.0 85.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: DA Hambright Rd (West) Hydrograph LL I 1 4 1 I I I I I 1 1 I I I I 1 I , I 1 -- 1 1 1 I i I I 1 J 1 1 1 ' 1 1 .17.24 cfs ; -- ?-- ;-- --,---,---,---, -; --; --? -,-- T--;--;-- ;------,---,---,--- 1 I 1 I i { 1 I I I I I I I I I I I i 1 ? I 1 _-1--T- "l-----"1- -1-"-'-1-_1. -1.. --f--T--?.. T-.-l--l--l- --?--? -r--?--;--j--t--?---?---?---?---?--?-_?_ 1 I :--:Rt?noff=a7,.24_?fr2_ 1 1 1 ! I I 1 I `Type 11 244v' f0'r2Thl7 i; u6tersv!1Ie - I 1 I { 1 1 I 1 I I - _ - - - -1 - R61nfall=4:80" - -- I 1 1 I I 1 I I I ! 1 I 1 i I ! 1 1 1 I 1 I 1 - ---------------- ------ --- - Ru'affArlay 610 c . 1111 T T l , -I - - - Au- hofIf V611 U- hie 0.853 of 1 1 1 1 I I 1 ------------ _ 1 1 i ? 1 1 1 1 1 I _?? I I I 1 1 I i I??.j ??n - I I I I ? I 1 I 1 1 1 I 1 1 I I i I I i i _ -; ; - -- ;-- CN=92A- I I 1 1 I T T TT__?______ I t 1 1 1 1 I I I 1 1 1 -_--__-_1_-_-_--________ I T1 1 I 11 T 1 1 { I 1 1 i 1 I I I I I I I I i I I 1 1 -Runoff 0 5 10 15 20 25 30 35 40 45 50 55 80 85 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 246-230-85%TSS Type// 24-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 ® 2009 HydroCAD Software Solutions LLC Page 2 Summary for Reach 21 R: Grass Swale #1 Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 2.99" for 10yr24hrHuntersville event Inflow = 6.88 cfs @ 11.99 hrs, Volume= 0.649 of Outflow = 6.75 cfs @ 12.07 hrs, Volume= 0.649 aft, Atten= 2%, Lag= 4.3 min Routing by Stor-Ind+Trans method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Max. Velocity= 0.91 fps, Min. Travel Time= 2.7 min Avg. Velocity = 0.16 fps, Avg. Travel Time= 15.8 min Peak Storage= 1,112 of @ 12.02 hrs, Average Depth at Peak Storage= 0.88' Bank-Full Depth= 2.00', Capacity at Bank-Full= 40.63 cfs Reach 21R: Grass Swale #1 Hydrograph 1 1 t I I 1 1 1 ! 1 I I I 1 I I I I 1 I { I 1 I I 1 1 1 1 ! 1 I 1 ! i I I 6.75 cis I --r -r--r--T--r--7--7--T--?--?--T--?--?--?---r--I---I---I---i---I---!--- I I I t } i I , 1 , f i 1 t I I 1 1 I I 1 I I I I i 1 ? i I , , , , Inflow Area=2.600 at i i I I 1 , , 1 I 1 ; ! I ! I I i 1 , i I ?nfitow ;fi.?g; cfs - II 1 , 1 I ? 1 I ! I , I i I I ! I I I 1 I _ 1 i ' 1 1 1 1 1 I I Outflow= 6.75 cfs _-r T7T 77 7 __T __ _?_ _1_ _1___ I I I 1 I I I I I I I I I I I A*gI ' DepIth=0'80' 4 4 4 1 I I i I 1 I 1 I 1 I I 1 ? 1 f ! I I ? I i t i i i 1 I 1 ? MFax Ve1=0.91 fps I i 1 ! 1 , I I f 1 I ! f 1 I I I 1 I 7 { I I 1 , I I I i 1 , I ! I 1 i I I I i 1 ! ! i i I I I i 1 f 1 I I&0.1, 1 I I 1 1 1 i , I I i , I I I 1 L=15,0.0' 1 1 I I I ! 1 1 1 1 1 I ! I 1 I I ( I I I ! I 1 ? 1 ! i I ! 1 I 1 1 I i I C R 4I 1 I 1 ? I I i , 1 1 I ! I I I I I I ? i 1 Capacity=40.63; cfs 1 1 I I 1 i I 1 ! I I ? I 1 1 , I I 1 I I 1 I ? i I , I I , I ? I ! t i ? I ? i I I ? I I i I I 1 , I i 1 ! ? ? I 1 I I I 1 1 i I 1 I 1 ? ? I 1 I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 1: Inflow outnow Time (hours) 4.00' x 2.00' deep channel, n=0.110 Side Slope Z-value= 5.0T Top Width= 24.00' Length= 150.0' Slope= 0.0096'/' Inlet Invert= 825.44', Outlet Invert= 824.00' 246-230-85%TSS Type 1l 24-hr 10yr24hrHunfersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 Summary for Pond 812: Sand Filter #1 Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 2.99" for 10yr24hrHuntersville event Inflow = 7.00 cfs @ 11.97 hrs, Volume= 0.649 of Outflow = 6.88 cfs @ 11.99 hrs, Volume= 0.649 af, Atten= 2%, Lag= 1.3 min Primary = 6.88 cfs @ 11.99 hrs, Volume= 0.649 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 831.95'@ 11.99 hrs Surf.Area= 2,403 sf Storage= 3,681 cf Plug-Flow detention time= 161.0 min calculated for 0.649 of (100% of inflow) Center-of-Mass det. time= 161.3 min ( 985.6 - 824.2 ) Volume Invert Avail.Storage Storage Description #1 830.00' 5,093 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 830.00 1,375 0 0 832.00 2,430 3,805 3,805 832.50 2,720 1,288 5,093 Device Routing Invert Outlet Devices #1 Primary 825.58' 18.0" Round Culvert L= 28.0' RCP, square edge headwall, Ke= 0.500 Outlet Invert= 825.44' S= 0.0050'/' Cc= 0.900 n= 0.012 #2 Device 1 831.80' 2.W' x 16.5" Horiz. Orifice/Grate (DI-4) X 2.00 columns X 8 rows C= 0.600 Limited to weir flow at low heads #3 Device 1 830.00' Filter Media Head (feet) 0.00 1.00 2.00 Disch. (cfs) 0.000 0.054 0.076 rlmary OutFlow Max=6.88 cfs @ 11.99 hrs HW=831.95' (Free Discharge) =Culvert (Passes 6.88 cfs of 20.17 cfs potential flow) '-2=Orifice/Grate (DI-4) (Orifice Controls 6.81 cfs @ 1.86 fps) 3=Filter Media (Custom Controls 0.07 cfs) 246-230-85%TSS Type 1124-hr 10yr24hrHuntersville Rainfa11=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD09 00 s/n 03513 02009 HydroCAD Software Solutions LLC Paoe 5 Summary for Pond 17P: Splitter MH-1 Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 3.94" for 10yr24hrHuntersville event Inflow = 17.24 cfs @ 11.96 hrs, Volume= 0.853 of Outflow = 17.24 cfs @ 11.96 hrs, Volume= 0.853 af, Atten= 0%, Lag= 0.0 min Primary = 7.06 cis @ 11.96 hrs, Volume= 0.711 of Secondary = 10.18 cfs @ 11.96 hrs, Volume= 0.142 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 834.81'@ 11.96 hrs Device Routing Invert Outlet Devices #1 Primary 832.80' 15.0" Round Culvert 9 (to Sand Filter) L= 28.0' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 832.66' S= 0.0050'/' Cc= 0.900 n= 0.012 #2 Secondary 832.80' 24.0" Round Culvert (Bypass) L= 16.0' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 832.48' S= 0.0200? Cc= 0.900 n= 0.012 #3 Device 2 834.10' 5.0' long x 1.37' rise SC. Rect. Weir (partition) 2 End Contraction(s) 1.3' Crest Height Qrimary OutFlow Max=7.05 cfs @ 11.96 hrs HW=834.81' (Free Discharge) 1=Culvert 9 (to Sand Filter) (Barrel Controls 7.05 cfs @ 5.75 fps) econdary OutFlow Max=10.15 cfs @ 11.96 hrs HW=834.81' (Free Discharge) ?tCulvert (Bypass) (Passes 10.15 cfs of 16.02 cis potential flow) 3=SC. Rect. Weir (partition) (Weir Controls 10.15 cfs @ 2.94 fps) Pond 17P: Splitter MH-1 Hydrograph 1 I 1 I 1 I l I 1 I 1 I 1 I '? t I 1 ! I 1 I - I I I I I I I 1 11 I I , I I 1 I ---I 1-- -1-"I- 1 -1--?-- 1-- i- ?, --, _ I I I -r-??_r. ..-r --?--r _r---r- 1- --r - -I ? - -- I 1 I I I 1 1 1 I I --t .-'- -?---;---;---;-- -- ;-- -- -- _ ?- 1 1 -; - --?r>fflaw='7:24-?f$-- 1 t I I I 1 ( 1 1 I I 1 --.--- 1 I I 1 I I I 1 I I i 1 ? I I I 1 I , aufflaw=17.24-cf - I 1 ? 1 1 f I { I 1 I __,_10.18 Ids -1 , , i ; , I 1 I , I I I I T7M Pr 1mar cfs * -- -- -- -- -- - -- ---I- ------- ---- - v - -- - - 1 1 I I = ? 1 = I ' acQda --='[Q?'1 cfs ---- -- -- -- - -- -- - I 7. Ids I I I - _ I 1 I 1 - - I I I I I I I I I I _ 1- 1 i , t 1 I ! I I I I 1 I 1 I I I I 1 I - ,r -- , ? i 1 I I i ! 1 I I 1 I I t r ? I 1 I I I I I I I I I I ? I I I I I I I t I 1 I I 1 I 1 1 I 1 I 1 1 I I 1 ?I I 1 1 1 i I 1 I 1 I I I I I 1 I 1 , L 1 I I I I 1 1 I I 1 I i I I 1 I I I I 1 I 1 I I I t I I I I I 1 1 I 1 I 1 I I I I I I 1 1 I 1 I I 1 1 I 1 I 1 I I 1 1 I ------- ---------------- 1 I 1 I I I 1 1 I 1 I I I 1 I i 1 I 0 5 10 15 20 25 30 35 40 45 SO SS 80 i5 70 75 80 85 90 95 100 105 110 115 1: Inflow - Outflow - Primary - seconds Time (hours) 246-230-85%TSS Type 1124-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCADID9 00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 6 Summary for Pond 18P: Forebay Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 3.28" for 10yr24hrHuntersville event Inflow = 7.06 cfs @ 11.96 hrs, Volume= 0.711 of Outflow = 7.00 cfs @ 11.97 hrs, Volume= 0.649 af, Atten= 1%, Lag= 0.9 min Primary = 7.00 cfs @ 11.97 hrs, Volume= 0.649 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 831.78' @ 11.97 hrs Surf.Area= 2,359 sf Storage= 3,336 cf Plug-Flow detention time= 81.7 min calculated for 0.649 of (91% of inflow) Center-of-Mass det. time= 33.8 min ( 824.2 - 790.4 ) Volume Invert Avail.Storage Storage Description #1 830.00' 5,135 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 830.00 1,400 0 0 832.00 2,480 3,880 3,880 832.50 2,540 1,255 5,135 Device Routing Invert Outlet Devices #1 Primary 831.50' 20.0' long x 6.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 Qrimary OutFlow Max=6.99 cfs @ 11.97 hrs HW=831.78' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 6.99 cfs @ 1.27 fps) 246-230-85%TSS Type 1124-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Paae 7 Pond 18P: Forebay Hydrograph u M I 1 I I 1 1 1 I I I I t I I I i I I I 1 1 I I ! I I I 1 I 1 I I i I 1 1 I 1 I I 1 1 I 7.00 Cy is 1 1 I I I 1 1 1 t 1 1 1 1 I 1 I I I I 1 I I 1 1 I --I---,- -r--r r--r--r --r --T --T -- T--I -- ; -- ?-- ?-- ;-- ;-- ?---I---I---1--?---1--- Inf low; Area=2;600; t, I 1 1 I I t ! I ? 1 I 1 I I i 1 i I ? 1 1 I I 1 I 1 t 1 t 1 1 r.__ r r r r r r y 1 1 1 __ ,__ _ y__.?_ Lnftow=7.0 cfs I 'L L I 1 1 I I 1 1 ? I I I 1 1 I I i i 1 I i _.__L__-LLLi_._;;;;;;_._;_-?rIr?a' ?7'f}b-cfs-- I I I I ! 1 I I I I I I I 1 1 1 1 1 1 1 I I i I 1 { 1 I i I I I I I i 1 1 I I t I i Peak :Elev=931 1 6' - I --,---- - 1---,-- ----p ----- i---1 -1 7--,------, I I I t 1 t 1 1 1 I I I 1 ; 1 I 1 i I ? I I 1 ! 1 , , I ( 1 Storage=31',336 cf t ? I I I I I I I I 1 i i , 1 1 I 1 1 I I I 1 1 I 1 I I I I 1 I I 1 i I 1 I i I I 1 1 I I I I 1 I 1 1 I f 1 I I 1 I 1 I I I ? 1 I I 1 I I I I i i 1 ! I I 1 I I I f I t I 1 I 4 ? I I I I I I I 1 I I I I I__ I__ I 1 I I I . 1 1 I I I t I I I ! I I I I 1 1 I I 1 1 I 1 f I I I i 1 I I I I I i I I i I I I I I I 1 I I I 1 1 I t I I 1 i i I i I 1 t { i 1 I 1 I I 1 I t 1 1 1 i 1 I 1 I I 1 I I I I ! I I I I ? I I I I I I I I I 1 1 1 I ; I I I i 1 1 ? 1 ? 1 ( I I ! I ? I 1 i I I I 1 1 V 1 i I 1 0 5 10 15 20 25 30 35 40 45 50 55 80 65 70 75 80 85 90 95 100 105 110 115 12 Inflow Prim Time (hours) 246-230-85%TSS Type 1124-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Paae 8 Summary for Pond 23P: Woods Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 3.65" for 10yr24hrHuntersville event Inflow = 15.99 cfs @ 11.96 hrs, Volume= 0.791 of Primary = 15.99 cfs @ 11.96 hrs, Volume= 0.791 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Pond 23P: Woods Hydrograph LUL. ! I 1 1 ! I I 1 ! i I I 1 I i I I I I ! ! 1 I L 1i1IJ J L L - rr rI T 1 1 _ 4nflow=15:9 0 di- ? F . _ rr--r--7-- 7-j-- j--'l_--1--,.._,_-"-1-'-I----I---i--. _? 1---j - - r.. I 4 ! ! I I - ! I I i 1 ! 1 -l'r:?ma?ry??=?5¦ ?? \/ ?- 1 I I I 1 ! I I { 1 1 1 I I I ! 1 , 1 II 1 1 I 1 I 1 ! 1 i 1 ! 1 1 1 ----- -------- i I I 1 ! ! 1 I 1 I 1 I 1 ! i 1 I ! I ! t 1 1 i , T I. I 1 Y I I ! i ! i ? 1 ( ! 1 ! I I I 1 i _ ? I 1 1 t I 1 I I I 1 1 1 1 1 1 ! I I I 1 I 1 1 I I 1 I 1 t 1 I 1 1 1 1 I 1 1 I i ? ! 1 I 1 1 1 1 1 I 1 I 1 I 1 , I I I 1 1 1 I I ? I I 1 1 I 1 I 1 ! 1 1 I I I I 1 I __!_ i i ! I I 1 I I 1 t I 1 1 1 1 1 1 1 I I I I I I I 1 1 I 1 1 1 ? I i I 1 1 i 1 1 I 1 1 I I I 1 I 1 1 1 I i t 1 1 I I I I I i I I I I I i I i I , 1 I ! I 1 I 1 1 I I I I I 1 1 I I ? I 1 ! I I I 1 I ! 1 I i 1 ?. I I I I 1 1 L L ___I___?___1---1--_ I_. L__L 1 I 1 I 1 ? 1 1 I I 1 t 1 1 1 I 1 I I 1 I I I 1 i I I 1 i I , I I 1 1 1 , i 1 1 I ! I 1 I I I i I I 1 I I 1 ? I I Inflow Prima 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 65 90 95 100 105 110 115 120 Time (hours) 246-230-85%TSS Type// 24-hr 10yr24hrHunfersvil/e Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 9 Summary for Pond 25P: MH-3A Inflow = 10.18 cfs @ 11.96 hrs, Volume= 0.142 of Outflow = 10.18 cfs @ 11.96 hrs, Volume= 0.142 af, Atten= 0%, Lag= 0.0 min Primary = 10.18 cfs @ 11.96 hrs, Volume= 0.142 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 826.30'@ 11.96 hrs Device Routing Invert Outlet Devices #1 Primary 824.72' 24.0" Round Culvert L= 150.0' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 824.00' S= 0.00487 Cc= 0.900 n= 0.012 Qrimary OutFlow Max=10.15 cfs @ 11.96 hrs HW=826.30' (Free Discharge) 1=Culvert (Barrel Controls 10.15 cfs @ 5.25 fps) Pond 25P: MH-3A Hydrograph _ L _ _ L - - L - - 1 _ _ _ - - 1 _ - 1 - _ J _ _ J _ _ J J- L L _ - ' - ! I { ! 1 I 1 1 10.16 Cfa I 1 t ! ! I I i I I 1 1 I , 1 , 1 1 1 1 I I ? 1 i ? I 1 I ! 1 I 1 I I 1 I 1 1 1 1 1 1 I 1 ! 1 I ! I I 1 I ! ! ! I 1 1 1 I0floW-'10.1;8 Of$ I --r--r -r -- r -- r -- r -_r -- r -- I - -i---1--1 _ --;- -r --I--- r--I---. --r--. --r--r--r-- I 1 I ! r I I 1 I 1 1 1 I ! ! I 1 I 1 1 I I I Qr1m1a =10.18 c 1 ? ? 1 I I ! I 1 I I I I : : 4 i ? ? ? 1 i r Peek Elegy-$26 04 .3 0 ' , - -- -- -- -- -- -- -- -- -- -- - - - - , - ----- -- -- 1 1 I 1 1 I I I I I 1 i 1 ? 1 I ? 1 1 ? 1 I 1 1 1 1 1 1 1 I I I I 1 I I I 1 I I I I ! 1 1 1? I 1 1 ! , I 2 4 . J? r r r- -r'--r-----r--t----1--1-----11 r - ---7---r--I---r --I------r--r-- -r-- 1 I i -- -- I I f I ! 1 I I I I I I I ; I I I 1 - -- - - -- --:-- - -!-- I ! I 1 1 { I ! 1 I ! I I -. 1 -- -- --1---1-f?ound -C?I14,ert I I I f 1 _ 1 1 I I I I 1 1 1 I ? 1 ! I I 1 1 ! I 1 I { 1 I I I 1 f 1 1 i J I 1 I 1 1 I 1 I I I 1 I I ! I 1 I 1 1 1 i 1 1 1 ! n 010-- 1 I I I I 1 1 1 ( I 1 I ! I I 1 1 1 I 1 1 1 . I I ! I { ! 1 I ! I I 1 i ! 1 1 1 1 I 1 I I 1 I t I I ! 1 1??1 iii I 1 1 I I -- 1_ -- I I I ? 1 1 1 I I I 1 I 1 ! I 1 1 I I I I ! - - i 1 t I I ! I 1 1 I I 1 1 , , - - 1 -I s-o.oo48 I I I 1 I I I 1 1 I I , 1 1 I 1 ? 1 1 ! 1 1 1 I , ! I ? 1 I ( 1 I ? 11 :___I-._JJ I ! I I I 1 I 1 t I I I 1 I I 1 t 1 1 V 1 1 I 1 I 1 ? I ? I I I ! 1 1 J__ i___!___I-__?_____ I I I I 1 I I 1 1 I I I I { I I I 1 1 I I 1 { I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 90 85 90 95 1100 105 110 1115 1 Inflow Primary Time (hours) 246-230-85%TSS Type 1124-hr 10yr24hrHunfersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Pape 10 Summary for Pond 26P: Level Spreader #1 Inflow Area = 2.600 ac, 85.00% Impervious, Inflow Depth = 2.99" for 10yr24hrHuntersville event Inflow = 6.75 cfs @ 12.07 hrs, Volume= 0.649 of Outflow = 6.75 cfs @ 12.07 hrs, Volume= 0.649 af, Atten= 0%, Lag= 0.0 min Primary = 6.75 cfs @ 12.07 hrs, Volume= 0.649 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 824.11' @ 12.07 hrs Device Routing Invert Outlet Devices #1 Primary 824.00' 65.0' long x ON breadth B.C. Rect. Weir (Level Spreader) Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Qrimary OutFlow Max=6.74 cfs @ 12.07 hrs HW=824.11' (Free Discharge) T--1=B.C. Rect. Weir (Level Spreader) (Weir Controls 6.74 cfs @ 0.93 fps) Pond 26P: Level Spreader #1 Hydrograph LL I 1 /1? I 1 1 1 I I I 1 I 1 1 I I ? I I 1 I 1 1 1 I i F I 1 i i I 1 _ _r 6.75 Cis I l I ! 1 I i I I i 1 I I 1 I I 1 i I 1 1 I t i I i t . I I I I 1 I I I 1 ? 1 i Inflow Area=2;600;a? --------- ----------------------- - -I---,-- ,---I- -- I I I 1 I 1 I I ( 1 I I i i lhflow=6.75 cfs 1 1 1 i I I I I i I I ? ? I I I I 1 f 1 1 -------- -._ _ 1 _ _ _ _ = rim a ry-Cf I 1 ? 1 I I I ? I I I ? I I I ! - _ ; T - T - - ; ; Pia k :E l?ev=82;4.11' - I 1 I i I 1 I 1 I I 1 I i I I I I I I I i 1 ? i I I 1 1 I 1 1 1 I I 1 1 1 I I I ? I ? I i ? I I I ? I t I 1 1 I 1 I I 1 I I I I I I I ? ? 1 1 ? 1 1 I 1 L L _ L L. L L - L L 1 1 1 _ _ 1 I i I i I I I I 1 I -- - i ? I i I 1 I I I i I ? I 1 I I 1 1 I I I 1 i I i I I 1 I I 1 I 1 I 1 1 I 1 i 1 I 1 ! I I 1 1 I 1 I I 1 1 I I 1 I 1 1 1 I I e I I 1 1 1 I 1 I I I I i t I 1 1 I 1 ------ _ r _ _ r _ _ r _ _ T _ _ T ----------- -1 I I I ? 1 1 I I I I 1 I I 1 1 I I 1 1 I 1 I 1 l I I I 1 I 1 1 i i I I I I I I I i I 1 I 1 I I 1 1 I 1 1 I 1 1 1 1 1 ! I I I 1 1 I I 1 1 I I 1 1 I 1 1 __ _ L L 1 I 1 1 I I ! I I I 1 I i _ '. _. 1 1.__1_____1__1__.1__1__1__1__ 1 1 1 1 t 1 I 1 1 I i I I I I 1 i ? I I I 1 1 I 1 1 I 1 1 ! i I 1 1 ! I 1 1 I 1 1 1 1 I ! 1 1 I 1 I I 1 1 1 I 1 I 1 1 I I I 1 1 i I 1 I I I I 1 1 1 ? ( I I 0 5 10 15 20 25 30 35 40 45 50 55 BO 65 70 75 80 s5 90 95 100 1 05 110 115 12 Ineow Primary Time (hours) 246-230-85%TSS Charlotte 6-hr 1-Inch finch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 C2009 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 9S: DA Hambright Rd (East) Runoff = 11.63 cfs @ 3.11 hrs, Volume= 0.514 af, Depth= 0.41" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., ime Span= 0.00-120.00 hrs, dt= 0.01 hrs Charlotte 6-hr 1-Inch l inch Rainfall=1.00" Area (ac) CN 9.000 77.2 74 CNm=77.2 >75% Grass cover, Good, HSG C Wcj??+p CN £S A " 6.000 99.6 98 CNm=99.6 100% Imp 15.000 86.2 Weighted Average 9 e ?- utJQv ruh o-f- - 9.000 77.2 60.00% Pervious Area 6.000 99.6 40.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: DA Hambright Rd (East) Hydrograph U. U. I I ? ? I I I 1 I I I I I I I 1 1 I I i i 1 11.63 ds ? - - ; - - i - - a - - '? - - ? - - ? - - -I - - -I - - -1- - - L I I I I I 1 1 i I .. - ti -- L - - L. _- - 1. _ -. 1 _. _ , - - J .. _ ? - - -a - - -I - - -1- - I I I I 1 1 1 I I 1 I I ? ? I I I I 1 I I I I 1 1 1 t , 1 1 I ? 1 I 1 I I 1 1 I i 63 -cfS- - n-off-1-1., 1 I 1 1 I I I I l 1 ? ? I 1 1 1 1 1 1 ? _ - - _ - - -. 1 1 1 I I 1 1 t I I I 1 I 1 I 1 I i i 1 i ? I ' Ch rlotte 6=hI ? t,40ch; ?l I' c?_ - 1 1 ® 1 I I I 1 1 1 1 1 1 1 I r - r - r - - , - 1 - - -1 I - - I- 1 1 1 1 1 1 1 1 I 1 I I ' - - Rainfa11`1 00`? i 1 1 ? I I 1 1 I I t i l I ? l I I I I I ? ? ? ? I I I I I - Runoff Area=1.5.000 ad- - 1 I I I I I I I i I LLL1 1.__ JJi ? _ 1 J 1 1 RuOoff-Volut0e? O 644-Of-- I S 1 I 1 I i I I I I i I I 1 I I 1 1 I I 1 I I I t I ? 1 - -- --f -e-Pt ;Runof Dh=01' I 5 I 1 I I I i I I I I I I 1 I I r -r I I I i 1 1 I 1 I I 1 I 1 I 1 1 I I I i 1 i I 1 ? I 1 i -; - -r- Td-5'.0 min-- I I 1 I 4 ? - F - - - I -1 - - -1 - - - I - - -I I 1 { I I I I I i I ' , i I I 1 I ? I 1 I 1 V 1 i I I I I 1 C?=?7?2/99.?- - I I 1 I 3 L__ I I 1 I I I 1 1 1 1 1 I 1 1 t I I t 1 1 I I 1 1 1 1 1 - I 1 1 1 { I 1 1 I I I 1 1 1 I I I I 1 I i ? I I I ? 1 11 -__'___ 1 1 I 1 1 f I I t 1 I 1 1 1 i 1 1 1 1 I f 1 1 1 1 f 1 r--r--r-`r--,---I------I---1---r--1--_r_ I I I 1 i 1 I 1 1 I 1 { 1 f I , I 1 I I 1 1 I I 1 I f 1 I 1 1 1 1 I _-r--r--r--r------ 1-- 7---1 -------1---I--- 1 ! 1 I . 1 1 I 1 ? I t 0 5 10 15 20 25 30 35 40 45 50 55 60 95 70 75 80 95 90 95 Inn 1n5 110 115 i2 -Runoff Time (hours) 246-230-85%TSS Charlotte 6-hr 1-Inch linch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCADS 9.00 s/n 03513 ® 2009 HydroCAD Software Solutions LLC Page 2 Summary for Pond 11 P: Ext. Dry Pond #1 [81] Warning: Exceeded Pond 22P by 1.74'@ 3.71 hrs Inflow Area = 15.000 ac, 40.00% Impervious, Inflow Depth= 0.36" for 1inch event Inflow = 11.58 cfs @ 3.11 hrs, Volume= 0.448 of Outflow = 1.24 cfs @ 3.66 hrs, Volume= 0.448 af, Atten= 89%, Lag= 32.6 min Primary = 1.24 cfs @ 3.66 hrs, Volume= 0.448 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 836.28' @ 3.66 hrs Surf.Area= 0.111 ac Storage= 0.309 of Plug-Flow detention time= 356.6 min calculated for 0.448 of (100% of inflow) Center-of-Mass det. time= 356.5 min ( 565.2 - 208.7 ) Volume Invert Avail.Storage Storage Description #1 833.00' 0.521 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 833.00 0.073 0.000 0.000 834.00 0.088 0.080 0.080 835.00 0.100 0.094 0.174 836.00 0.107 0.103 0.278 838.00 0.136 0.243 0.521 Device Routing Invert Outlet Devices #1 Primary 833.00' 12.0" Round Culvert L= 42.0' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 832.79' S= 0.0050T Cc= 0.900 n= 0.012 #2 Device 1 833.00' 3.0" Vert. Orifice/Grate (1" Drawdown) C= 0.600 #3 Device 1 836.22' 16.0' long Top of Box 0 End Contraction(s) 5.2' Crest Height #4 Secondary 836.30' 40.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 Primary OutFlow Max=1.19 cfs @ 3.66 hrs HW=836.28' (Free Discharge) t =Culvert (Passes 1.19 cfs of 6.52 cfs potential flow) 2=Orifice/Grate 0" Drawdown) (Orifice Controls 0.42 cfs @ 8.55 fps) 3=Top of Box (Weir Controls 0.77 cis @ 0.80 fps) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=833.00' (Free Discharge) Broad-Crested Rectangular Weir ( Controls 0.00 cis) 246-230-85%TSS Charlotte 6-hr 1-Inch finch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD®9 00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 3 Pond 11 P: Ext. Dry Pond #1 Hydrograph I t , 1 1 i , 1 I , l 1 ! 1 1 1 i 1 , I , , I 1 I I 1 ; , , Inflow 1 1.5 6 Cs ?--r- 1 t -r--r--,---r--I---1--?--r--!' 1 i i 1 I I --I--?--?--,-'?--,--,--?--t--r--t-- 1 , 1 I , i , , - OuMow Primary „ - ; -; --- ----,---;---,---,--------,---- -lnflov;?4=fiv.flQO sc -secondary --' ---- -i---t---I---------'---i---'---'- i , , 1 1 , 1 , --I-- i--i- 1--!-'- -I- ' - Inflow=11.58 00 , , I 1 1 1 1 , 9 --r r r--r--r -r -, -1---: -r--f- -1--------?--, -,--?- r--r--r- ;outflow=1.24 cfs 8 - r- r - r -r r -r -- - ,- ,--+--+ +--+ -+--+- ? , I 1 I 1 P? ? v 7 1 I I I 1 1 ? I I I I I I i I 1 I 1 I t , I I 6 - -; -- -;- -;- -;- ------;---;------ - -- ---S6c6-rdair?=Q.tlo V. 5 - I I r--r--r- 1 f 1 1 i i , 1 I i -r---r--r--r--r--1---,---I---i- 1 1 i I I 1 I 1 i I Q?/ Q ? --r-?--Pear I I I I , , i i - Y - - r - _ r "' 1 i f 1 I , I I ; I , -' f-' - --- _ - i- - - I- - - - - -1 - - -+ - - -I - ! I i , I I f I 1 I 1 1 I 1 _I S tY . M e-? .09 ?i 1 1 I i I I I I I , 1 I i I , , I 1 , Y , 1 I I I 1 f I t I 1.24 cis 1 1_ I -- ------------------------- ''- I i iii f I t 1 t ; ; ------------------------- '----- I1 I - ? I I , I I I , i ? i I 1 i I I , I 1 I I 1 t Iri i 0.W00 cfS i I 1 I 1 1 1 ; j 1 1 1 i 1 I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 246-230-85%TSS Charlotte 6-hr 1-Inch finch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD09 00 s/n 03513 02009 HydroCAD Software Solutions LLC Paoe 1 Summary for Reach 15R: Grass Swale #2 Inflow Area = 15.000 ac, 40.00% Impervious, Inflow Depth = 0.36" for finch event Inflow = 1.24 cfs @ 3.66 hrs, Volume= 0.448 of Outflow = 1.12 cfs @ 3.89 hrs, Volume= 0.448 af, Atten= 10%, Lag= 14.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Max. Velocity= 0.30 fps, Min. Travel Time= 6.8 min Avg. Velocity = 0.08 fps, Avg. Travel Time= 27.0 min Peak Storage= 459 cf @ 3.78 hrs, Average Depth at Peak Storage= 0.55' Bank-Full Depth= 2.00', Capacity at Bank-Full= 17.72 cfs 4.00' x 2.00' deep channel, n= 0.124 Side Slope Z-value= 5.07' Top Width= 24.00' Length= 125.0' Slope= 0.0023? Inlet Invert= 732.79', Outlet Invert= 732.50' t Reach 15R: Grass Swale #2 Hydrograph Y. I 1 1 t I I I 1 1 i i I i I I I I I I I 1.24 ds 1 ? I I I 1 1 1 1 I I ? I I I I I I 1 1 I I I { I 1 1 1 I I I I I I I I I ,.,2cfs ; ,Infio? Area=15.000 arc t t 1 I I 1 1 I 1 1 1 I I 1 1 I I I 1 ?n> low 1.24; c% Orutflow=1.1Zcfs I I 1 I I I I 1 1 ? 1 ! , 1 i ! I I 1 1 I I I 1 1 I 1 t I 1 , AVg; Depthi- 55 ! I I ? I I ? I I 1 I i ? V I I 1 I i;fp1 Maxl Vet=0.30s ? 1 I 1 I I I 1 I I 1 , i 1 1 1 I 1 I 1 1 1 i 1 I 1 1 I , 1 1 i t 1 1 i 1 1 I 1 1 1 I 1 I 1 1 1 1 1 I I -? In-0.124 1 1 I 1 1 I 1 I i I 1 1 1 1 1 t 1 I I I I f t ? ? 1 1 1 i ( 1 ? I ? 1 1 i S=0.01023 'J' 4 ! i i I 1 1 I 1 I 1 I 1 I I 1 1 Capa6ity=17.12: cfS i t 1 1 i I I I 1 1 ! I I I I I I I I i I I I I I I t I ? I I 1 I I I 1 ? I I I ? I 1 I 1 1 1 1 I I I 1 I 1 ? 1 I I 1 ? ? I I 1 I 1 ? I I I , I ? { ? 1 I I I I I 1 I I I ? I 1 1 ? ? I I I V I I i 1 I ? I I I 1 1 1 I I 1 . 1 ? I I n S In 1S 2n 25 30 35 40 AS 50 55 80 65 70 75 80 85 90 95 100 105 110 115 1, inliow outflow Tim* (hours) 246-230-85%TSS Charlotte 6-hr 1-Inch l inch Rainfall=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 2 Summary for Pond 12P: Level Spreader #2 [57] Hint: Peaked at 732.53' (Flood elevation advised) [61] Hint: Exceeded Reach 15R outlet invert by 0.03'@ 3.89 hrs Inflow Area = 15.000 ac, 40.00% Impervious, Inflow Depth= 0.36" for f inch event Inflow = 1.12 cfs @ 3.89 hrs, Volume= 0.448 of Outflow = 1.12 cfs @ 3.89 hrs, Volume= 0.448 af, Atten= 0%, Lag= 0.0 min Primary = 1.12 cfs @ 3.89 hrs, Volume= 0.448 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 732.53'@ 3.89 hrs Device Routing Invert Outlet Devices #1 Primary 732.50' 70.0' long x ON breadth B.C. Rect. Weir (Level Spreader) Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Qrimary OutFlow Max=1.11 cfs @ 3.89 hrs HW=732.53' (Free Discharge) 1=13.C. Rect. Weir (Level Spreader) (Weir Controls 1.11 cfs @ 0.50 fps) Pond 12P: Level Spreader #2 Hydrograph LL I I , ? 1 I 1 I 1 1 I ? I I I I 1 I I 1 1 I 1.12 cfs I I I I ? 1 1 1 I I I I I I { I I I 1 I I I ? ? 1 1 1 I 1 I 1 I I I I I 1 I 1 1 I ? I I I I 1 1 I I I 1 I I 1 I I ? 1 1 I i I I 1 I I I I I I i lnfloW ,Ar!e_a=15.0.00I , aO I 1 ?? ? I I I f 1 I I-_ I-? I?_ I-_ I__ 1 I I I I I I 1 I -- ? I I 1 I I I I I I I I I 1 1 'Inflow`-'x.112 of$ I I 1 I I I I I I I I I 1 1 1 1 ? I I 1 ? 1 I ? I I I t 1 I I 1 ?' I I I I I 1 ? 1 1 1 I Priroary-= x.12 cf$ 1 1 1 1 I I ? ? ? ? ? I I 1 I I I 1 Pe4I k, Eley=732.63' I 1 I 1 I ? I 1 I I I I I 1 ? I I I I I 1 1 I I I I I I ? I I 1 1 1 ? I 1 1 I I I I 1 i 1 1 1 I 1 I ? ? I I 1 ? 7 I ? I 1 ? I 1 1 I 1 1 1 I 1 I I 1 1 1 ! I 1 ? I I I I I I I 1 I I 1 1 1 I I I I 1 1 1 I I 1 ?. 1 I 1 1 1 1 I ? I 1 I 1 ? 1 1 I 1 1 I 1 i I 1 1 ! i t I I. 1 I 1 I I 1 ? ? 1 I 1 1 1 ? 1 1 1 I 1 ? I I 1 1 I I 1 I 1 1 1 I 1 ? I I 1 1 1 1 I 1 I I I I I I 1 I 1 ? 1 I 1 I I 1 I I I 1 1 I I 1 I I I 1 I 1 1 I 1 I I 1 I 1 1 1 I 1 1 1 I 1 1 1 1 1 1 1 1 I I 1 1 1 ? ? I 1 I I I 1 I 1 1 I t 1 1 I I I I 1 I I I 1 1 I I 1 1 I 1 I I 1 1 I 1 t 1 I 1 I I 1 1 1 f 1 I 1 I t 1 1 I I 1 I ? I 1 1 1 1 t f 1 I 1 1 1 I ! 1 I 1 I 1 1 I 1 1 1 I 1 1 t 1 1 I 1 I I 1 1 t 1 1 1 1 I { 1 I 1 I 1 1 1 1 ? 1 I I I 1 1 I 1 I 1 1 I 1 1 1 I I f 1 1 1 I 1 1 1 1 1 1 1 I I I t I f I ? 1 1 1 1 1 1 I 1 I 1 1 1 ! I ( I I I ? 1 ? I 1 1 10 15 20 25 30 35 45 50 55 60 85 70 75 80 85 90 95 100 105 110 115 12 Inflow Primary I Time (hours) 246-230-85%TSS Charlotte 6-hr 1-Inch finch Rainfal1=1.00" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Hydrograph for Pond 11 P: Ext. Dry Pond #1 Time Inflow Storage Elevation Outflow Primary Secondary Outflow-Volume (hours) (cfs) (acre-feet) (feet) (cfs) (cfs) (cis) (acre-feet) 0.00 0.00 0.000 833.00 0.00 0.00 0.00 0.000 5.00 0.42 0.303 836.23 0.48 0.48 0.00 0.114 10.00 0.00 0.177 835.02 0.33 0.33 0.00 0.272 15.00 0.00 0.067 833.85 0.20 0.20 0.00 0.381 20.00 0.00 0.014 833.18 0.06 0.06 0.00 0.434 25.00 0.00 0.004 833.06 0.01 0.01 0.00 0.444 30.00 0.00 0.002 833.03 0.00 0.00 0.00 0.446 35.00 0.00 0.001 833.02 0.00 0.00 0.00 0.447 ?4 ? wn d 40.00 0.00 0.001 833.01 0.00 0.00 0.00 0.447 v YbW 45.00 0.00 0.000 833.01 0.00 0.00 0.00 0.448 50.00 0.00 0.000 833.00 0.00 0.05 0.0 0.448 9 X hrS 55.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 60.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 2 ?wys 65.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 J 70.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 75.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 80.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 85.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 90.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 95.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 100.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 105.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 110.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 115.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 120.00 0.00 0.000 833.00 0.00 0.00 0.00 0.448 246-230-85%TSS Type 1124-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD09 00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 9S: DA Hambright Rd (East) Runoff = 86.64 cfs @ 11.96 hrs, Volume= 4.040 af, Depth= 3.23" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type 1124-hr 10yr24hrHuntersville Rainfall=4.80" Area (ac) CN Description 9.000 77.2 74 CNm=77.2 >75% Grass cover, Good, HSG C 6.000 98.0 98 CNm=99.6100% Imp 15.000 85.5 Weighted Average 9.000 77.2 60.00% Pervious Area 6.000 98.0 40.00% Impervious Area Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment 9S: DA Hambright Rd (East) Hydrograph Y. -----; ---- --,-- 1--,-- ---; ---- ;---'I---; --; - ; -- ;- ---- - --,---;--- -r 86.64 cis ------i--r------r--r--r--r --r--r--r--?--?--?-- -- --- I 1 I 1 ? i ! t 1 I 1 ? I I I I I i ! '.. I 1 I 11 1 1 I 1 1 1 I I I Runoff=86,64_c_,fs _ T _ ' e it 24-hr'40 ` r24hrHu6tersviite _ ; ; I /t i ?! I t 1 ; I I i 1 I 1 i ! t Iff *Te?- 1 I6.Y V tt ??0 w - - r - - r T - - r '- - I - - - - -i - - I - - -I - - -1- - - i - - r - - r - - r - - r - RN ? ? Q i 1 I I 1 1 1 tI --r--+- -^--'--*--,-- ,-- 1---1---I---1--------I --r--;Runoff Yiiume=4.040af 1 t I --L-_L I 1 i , i 1 I I I I i I 1 t t 1 R = f 1 1 I 1 I t 1 1 I 1 I I 1 i 1 1 1) i 1 I I 1 i I 1 1 t i , i 1 f i_-t i i I { i -r--r -r --i-r -- l --l------I---I---I- 4--1 --?--i--1--j--j--i--s i I I I ? I 1 f 1 i 1 1 i ! 1 I 1 1 ! I 1 F t 1 ( V 1 1 I I i I i I 1 I I i { i ! 1 1 1 1 4 I I I 1 1 ! 1 1 I 1 I I I ( I f I I 1 L. L _ 1 1 J 11 _ _ - 1 I I 1 I ! i 1 1 1 1 I I t I 1 1 1 I 1 1 { I 1 I 1 I I I_ ! 1 _ I ? i I I -_ _ 1'__ 1 ! s i 1 1 I t I i 1 1 1 1 I 1 1 1 I i I 1 I 1 1 I 1 t 1 1 I I I 1 I 1 --r -'-'r -r--*--y--?--y--'.y--_.-I---1---r--r-'-r--r--r.--_r-..i--r'--r-- ?--y---.----1--.. I 1 1 I I I I i r i 1 i I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 '415''1 -Runoff - - - - - Time (hours) 246-230-850/oTSS Type 1124-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 2 Summary for Reach 15R: Grass Swale #2 Inflow Area = 15.000 ac, 40.00% Impervious, Inflow Depth = 1.75" for 10yr24hrHuntersville event Inflow = 7.53 cfs @ 11.97 hrs, Volume= 2.188 of Outflow = 7.45 cfs @ 12.08 hrs, Volume= 2.188 af, Atten= 1%, Lag= 6.3 min Routing by Stor-Ind+Trans method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Max. Velocity= 0.51 fps, Min. Travel Time= 4.1 min Avg. Velocity = 0.11 fps, Avg. Travel Time= 19.3 min Peak Storage= 1,837 cf @ 12.01 hrs, Average Depth at Peak Storage= 1.36' Bank-Full Depth= 2.00', Capacity at Bank-Full=17.72 cfs Reach It Grass Swale #2 Hydrograph LL . I i I I 1 I I I I I I ! I I I I I I I 1 1 7.?$ I i 1 I I 1 1 1 I li I I I I ' 1 I I I I I 1 I 1 I ! f I I I i 1 1 1 1 I 1 I 1 I 1 I 1 1 I I ! 1 I i I 1 1 1 - F - lnfioW area=1I 5:000 ad- - 1 I i ! ! I 1 i I 1 I 1 I I I I 1 1 I i 1 I I 1 ! 1 I ! 1 I I 1 I ! I 1 I 1 I 1 1 I 1 ! 1 I n f loW-1.0 cN I I 1 I f 1 1 I I i I 1 I 1 OiutfloWnr=7.145 cfa I I I ? I ? 1 I I 1 1 ? i I 1 t 1 1 I I 1 yvL - - ; ; - - : ; - - i , I - j a ?' g -depth; 1;:3 ' I 1 I I I i 1 I i 1 i f f 1 ! I i I I 1 I I 1 I ! ? t I 1 ! I i I I I ! Max Vol-;O 1 fps I I 1 i I 1 1 1 I I 1 ! t In 0.124 t i 1 I i i 1 1 1 I 1 I I 1 1 I I I I I 1 1 I I I I I 1 1 I I I 1 i I I ? I I ! I I I I I I 1 I I 1 I I I 1 1 I 1 1 ! 1 I I 1 I I 1 I I 1 i 1 I i I 1 ! I I I I I t 1 t I I I I 1 I 1 1 i , ? 1 I ! I ! I ! I , I I 1 1 ! I I I ! I 1 i ! 1 S=0.0023 T } { _ _ { _ _ { _ _ i _ _ -- - - { _ _ _I_ _ 0apacity=l 71i cfs I I i 1 I 1 I 1 I I I i 1 I I I 1 I 1 I I I 1 ! ? i I , I I I 1 i I 1 I 1 I I I I I 1 i ? 1 t I 1 I I I I I 1 1 t I I I I 1 1 1 I 1 I 1 I I 1 t 1 1 I I I I 1 I I I I I 1 { I I I 1 I 1 n 5 10 15 70 25 30 35 l0 AS 50 55 60 65 70 75 e0 95 20 25 100 105 110 115 1 Inflow ouMow Time (hours) 4.00' x 2.00' deep channel, n= 0.124 Side Slope Z-value= 5.0'/' Top Width= 24.00' Length= 125.0' Slope= 0.0023'/' Inlet Invert= 732.79', Outlet Invert= 732.50' 246-230-85%TSS Type 1124-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 3 Summary for Pond 11 P: Ext. Dry Pond #1 Inflow Area = 15.000 ac, 40.00% Impervious, Inflow Depth= 3.18" for 10yr24hrHuntersville event Inflow = 86.48 cfs @ 11.96 hrs, Volume= 3.974 of Outflow = 85.63 cfs @ 11.97 hrs, Volume= 3.974 af, Atten=1%, Lag= 0.6 min Primary = 7.53 cfs @ 11.97 hrs, Volume= 2.188 of Secondary = 78.10 cis @ 11.97 hrs, Volume= 1.786 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 837.11'@ 11.97 hrs Surf.Area= 0.123 ac Storage= 0.405 of Plug-Flow detention time= 91.1 min calculated for 3.974 of (100% of inflow) Center-of-Mass det. time= 91.3 min ( 901.2 - 809.9 ) Volume Invert Avail.Storage Storage Description #1 833.00' 0.521 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 833.00 0.073 0.000 0.000 834.00 0.088 0.080 0.080 835.00 0.100 0.094 0.174 836.00 0.107 0.103 0.278 838.00 0.136 0.243 0.521 Device Routing Invert Outlet Devices #1 Primary 833.00' 12.0" Round Culvert L= 42.0' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 832.79' S= 0.0050? Cc= 0.900 n= 0.012 #2 Device 1 833.00' 3.0" Vert. Orifice/Grate (1" Drawdown) C= 0.600 #3 Device 1 836.22' 16.0' long Top of Box 0 End Contraction(s) 5.2' Crest Height #4 Secondary 836.30' 40.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 Qrimary OutFlow Max=7.53 cis @ 11.97 hrs HW=837.11' (Free Discharge) T =Culvert (Barrel Controls 7.53 cfs @ 9.59 fps) =Culvert 0" Drawdown) (Passes < 0.47 cfs potential flow) 3=Top of Box (Passes < 44.58 cfs potential flow) econdary OutFlow Max=77.91 cfs @ 11.97 hrs HW=837.11' (Free Discharge) Broad-Crested Rectangular Weir (Weir Controls 77.91 cis @ 2.42 fps) 246-230-85%TSS Type// 24-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD0 9 00 s/n 03513 02009 HydroCAD Software Solutions LLC Paae 4 Pond 11 P: Ext. Dry Pond #1 Hydrograph LL ----- 1 1 I I 1 1 I I I , I I ----- t 1 I 1 --r165.63 Cfs -r--r--. I---I'- 1 1 I 1 1 1 ---i---I---?--?--?--?--T --1--1--7 --1--r--r--r-- --r--r -r--r--I'---I---i---i-- 78.10 .. _ ? -1_.__.1___7.,.-'t---I---t'--f--7--'1'-Y--7--?--r--*--r- a- I L ,L t I 1 1 1 I ! _ L I 1 1 I t I I I 1 J 1 l_ S 1 1 I 1 ! I 1 j,' ' _ t i _ I_ t I I I I I 1 I I T i 1 1 t ! Q?? _- _ _ _ _ _ _ _ _ _ _ _ I I 1 I I I t I I I 1 1 1 I 1 1 I 1 I 1 I 1 1 1 I I i 1 I 1 t I 1 I I - I I 1 ':4tI .- I3- 6{ I 1 i I 1 - utf?? 666 - 1 1 - - r i t I 1 I 1 1 ] --I------I---1---1-- I I I 1 ( 1 1 1 t 1 I I 1 I I l i t --,----------- I--i-Rrrmary=7:5x3-?cfs- 1 1 1 I I t I 1 1 --t---I- 1 t 1 I 1 -1------I---f---1----- I 1 1 i 1 ( __ __l 1 i 1 ! -----------;-sko6da I I I -. ? 1 1 i 1 I 1 I < I I ! 1 _? 1 1 i i I I ! t 1 NO i I '--r--r 1 1 I I i I I 1 -r--I---t---I---I-"-1--' r 1 I i I 1 i 1 I 1 I I 1 I I I 1 I II 1 t -'1'-'-I---1-'--I'-'I-'-.?----SA a-a of 1 ! -- - 1 - I I 1 1 I I I I I t i 1 1 { I I ___1___1___I__J__ f ! I I I 1 ? 1 I I 1 I i I I -__I__J_._!__J 1 1 1 i ! I I I I I I I I 1-- I I 1 1 1 I t - 1 - t ? 1 _ _ __ ___ ___ 1 1 1 1 1 I 7.5 tars _ 1 __ __ __ __ -__ _._ __ _ _ _ _ _ _ _ _ _ - __ - _ I i I t ( I I 1 1 1 1 I I I i I t 1 I I I I ? ! I 1 1 t 1 I 1 1 1 I I 1 i I I 1 { t I 1 I 1 I I I 1 I 1 1 n 5 10 15 20 25 30 35 40 45 50 55 60 B5 70 75 90 85 Z Z 100 105 110 115 1i - Inflow - Outflow - Primary - Secondary Time (hours) 246-230-85%TSS Type// 24-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Paae 5 Summary for Pond 12P: Level Spreader #2 Inflow Area = 15.000 ac, 40.00% Impervious, Inflow Depth = 1.75" for 10yr24hrHuntersville event Inflow = 7.45 cfs @ 12.08 hrs, Volume= 2.188 of Outflow = 7.45 cfs @ 12.08 hrs, Volume= 2.188 af, Atten= 0%, Lag= 0.0 min Primary = 7.45 cfs @ 12.08 hrs, Volume= 2.188 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 732.61'@ 12.08 hrs Device Routing Invert Outlet Devices #1 Primary 732.50' 70.0' long x 0.5' breadth B.C. Rect. Weir (Level Spreader) Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Qrimary OutFiow Max=7.44 cfs @ 12.08 hrs HW=732.61' (Free Discharge) T-1=B.C. Rect. Weir (Level Spreader) (Weir Controls 7.44 cfs @ 0.94 fps) Pond 12P: Level Spreader #2 Hydrograph LL ! 7.45 CIO I I i ! I I 1 I I 1 I i 1 I i ! I 1 t ! i 1 1 I I I 1 1 ! I I I 7 1 1 - , 1 --, - 1 1 I ; -; - , --, ,- i I I I I 1 I 1 Inflaw?t±ea=?sOQE?a ! 1 ? ! _ 1 I 1 i 1 I ? ! I 1 I I . ? 1 I I I I { I 1 I I - - ` I ? I I I I 1 I 1 I i ? I I i 1 I ii- i - l $-- - e __ i -, - -r- T ,- - , , , , , , - , 1 1 I 1 i I i I 1 I r I I I i 1 I I i ! I ? ! ? ? 1 1 I I 1 1 I 1 i I I I i r I I I I i 1 I _7 O/$ 1 I OMr -7 .45 I 1 ! ?I i Pe$k, E;lev=732.01;' 4 t 1 - r--r ! ! 1 I I 1 r--r -r-- I ? I I I 1 I I 1 I I I r r--r -T--t -r--? ( 1 1 I I I I I 1 I I I I i I I 1 I I I 1 , I -t- ---- ? --1--?--?-- ? -?--?---I - I I I I ! 1 ! 1 1 I 1 I I I I I I 1 I I I f r ` - r - - I 1 I I 1 1 r - - r - - r - - I I I I I I I 1 1 I I I I I i . r - - r - - r - - t - - - T I I 1 I I 1 1 1 1 I 1 I t 1 I I I 1 I I 1 I I I I I i I I ! I ! I I I I 1 1 1 I 1 1 I 1 I I 1 1 I 1 I I I 1 I 1 I 1 I I I ! I I I I - - t ' _ I I I 1 L I I I I I I i I I I I I I T t _ - t - I I I I I I I I I i I I 1 1 I I 1 i 1 I I I I 1 I 1 I i I I I i 1 i i 1 I 1 f I 1 I 1 I I I i I i I 1 1 I I t 1 I 1 I I I I i 1 1 1 I I 1 I t I . 1 I I I r 1 1 I I I 1 1 I I 1 f I I I I I I I I I 1 i I I I ! I I I I I I 1 1 I I V I I t 1 1 0 I 1 1 ,4 , ! I I I I I 1 V 1 I 1 I 1 I " I I l 1 I I 1 1 I I { 1 I 1 1 I 0 5 1 6 15 20 A 30 35 40 45 26 55 Z Z 70 75 80 a5 90 4 100 105 110 115 12 Inflow Primary Time (hours) 246-230-85%TSS Type 1124-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 6 Summary for Pond 13P: Creek Inflow Area = 15.000 ac, 40.00% Impervious, Inflow Depth = 3.18" for 10yr24hrHuntersville event Inflow = 85.26 cfs @ 11.97 hrs, Volume= 3.974 of Primary = 85.26 cfs @ 11.97 hrs, Volume= 3.974 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Pond 13P: Creek Hydrograph LL LL I I , I I I I I I I I I I I I I 1 I I 1 90 L 1-_1___I_.__I___I_ i 115.26 I I 1 1 1 1 I 1 I f 1 t I 1 1 1 I BO ! I 1 1 I 1 I I r r- r --r ,--T -, ,- -I -Inf1oW, -kea 1 5100;a,?- - _ ? I i 1 i I I I 1 I I 1 1 Y 1? ? ? 75 - r -- r - r--r--r--*--i--t--4---------I---r--.---I---r--r--r--r--r--LCr-- 7 I I r f ! 1 ? I I I I a5 __L__L _L__1__1__1__1__1__J__J__J__J__J___I___I___L__I___I___I___I___L__f¦¦fL??--__L__ t I f I I I I I I I ' -¦ r' m'a. 1/ •_ Y-f 4 a0 ?-RR I I I I I I 1 I i i 1 ( 1 I 55 --r--r -r--r-`r--r--r--T---1--i--?--?--?---r--1---I---r--r--r--r--r--r--r-- i I I I I I I 1 1 ! I 1 1 I I 50 -- r - F" -t - -+ T T T--T ` l- 7 1 - - -- -1- -1 - -1 --I--- I - -1---r --r -- r - 1 t I I I I I i 1 1 I I I I I 1 I I I I I 1 45 F .. - - - - L L - L _. _' ? ?- I I I 1 1 I I 1 I I I I f I I i I I ; 40 _ _ L L 1 I 1 1 1 .1 J J J _ _ _i L I_ L .. I I I I I I I I 1 I I I I I? 1 1 I I I I ? I 1 35 I - - - -1 --I- - _ _ -1 -- 1 -? - -j _ -- - - j -- -- - - - ------,---i--_I---,- - 1 I 1 30 ' -- -- -i --T'-""r--?--J-?--,--,---I---I--l_--I-'?-1---I---1-- --r- i f i I I 1 I I ! I I I I I I 25 -- r--r -r--+--+--+--+--+ -y---I---1--7-_7__'1 -- --I --I --!---!---?---r--r-f-- I I ? I i I I I 1 ? 1 i I I I 1 I I I 1 I 20 _L__L _L__1__1__1-_1__1L_._ L L__ I , 1 1 I I I I I i I 1 1 1 I 1 I 1 I I I 15 _ _ __L L1 J _____-1___L__LL__ i ! I I I I t 1 I I I I 1 I 1 t i I I 1 1 I I I i I t I 1 1 1 1 1 1 1 10 - - ir - -- r - 1 - - -- - -- -I -I - " I- -I - - -- - -- -r _- I ; S I I 1 I I I I I 1 f I ? i I i I I i I 1 0 0 5 10 15 20 25 30 35 40 45 SO 55 a0 BS 70 75 80 85 90 95 100 105 Ito 11s 11 - iMbw Primary I Time (hours) 246-230-85%TSS Type 1124-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD0 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 7 Summary for Pond 22P: Forebay Inflow Area = 15.000 ac, 40.00% Impervious, Inflow Depth = 3.23" for 10yr24hrHuntersville event Inflow = 86.64 cfs @ 11.96 hrs, Volume= 4.040 of Outflow = 86.48 cfs @ 11.96 hrs, Volume= 3.974 af, Atten= 0%, Lag= 0.2 min Primary = 86.48 cis @ 11.96 hrs, Volume= 3.974 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 835.25@ 11.96 hrs Surf.Area= 0.059 ac Storage= 0.107 of Plug-Flow detention time= 16.5 min calculated for 3.974 of (98% of inflow) Center-of-Mass det. time= 6.4 min ( 809.9 - 803.6 ) Volume Invert Avaii.Storage Storage Description #1 833.00' 0.322 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 833.00 0.038 0.000 0.000 834.00 0.046 0.042 0.042 835.00 0.055 0.051 0.093 836.00 0.072 0.064 0.156 837.00 0.083 0.077 0.233 838.00 0.095 0.089 0.322 Device Routing Invert Outlet Devices #1 Primary 834.50' 50.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Z Qrimary OutFiow Max=86.28 cfs @ 11.96 hrs HW=835.25' (Free Discharge) 1=13road-Crested Rectangular Weir (Weir Controls 86.28 cfs @ 2.32 fps) 246-230-85%TSS Type// 24-hr 10yr24hrHuntersville Rainfall=4.80" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD0 9 00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 8 Pond 22P: Forebay Hydrograph 1 I i 1 1 I I I 1 I 1 i 1 1 ! i I 1 r as.d8CfE -r--r--r-- -- ---1------t--7---t---1---!---r--I- `I--- I--- r --r--r--r-- i V 1 I I I 1 I ! 1 1 1 ! i ! 1 I 1 ------ -------- - - - - ; - - - - ; ; - - - - ; - - lnflGW-A ea=-15;.000;a - - I I 7 I 1 1 1 1 I I I 1 f i i I i ! ---- I 1 1 i I 1 i ! 1 I I ! I 1 ! I I 1 i I ! I 1 1 I I 1 ! ? -- --r--r -r -- r -- r -- r -- t --- --,--,---1--,---1---1-- - ma v ---I--?--(--? _- -(/yy: -OW 1 1 ! i 1 1 1 1 I I ?r _-? ? - - ? _ _ _ , _ _ I 1 -( 1 1 ! 1 i 1 1 1 1 1 ! 1 1 I I 1 1 1 --?--? ?--.- ?--}--+--a-------- -:---4--l---1--Peak I t I V 1 1 1 1 1 f i I ! _. _ _L- _11J_.._J_._JJ., _._1 _.__1 i___1___I__ _ i I ! I I 1 I i { 1 I i 1 I I I I ! ! I 1 I !---L L_ I - - +__1i __1! S! 1__!__J_____JStora =0.4,0 -afi - 1 I 1 i 1 I ! ! 1 ! I i I I I , I ! ! ! f 1 1 ! I I i I I I I 1 1 ! 1 1 t ! 4 1 I 1 --r--r 'r'-r--r--r--z--?-` ?---------------t---t---r ---v---!---r--r'-r _'r--r-- ! ! I 1 I I ! ! ! i , ! ! i 1 1 1 I I I I ? I --r--r ---------- L ... ._Y--Y--'t---'--'Y' _y._...-i---Y--?---f---------?-_r f"'_ : I ( I 1 ! i 1 ! I I I I I 1 1 ! I I i ! 1 I 1 1 i ! 1 I 1 1 1 I i I I I 1 ------------ Ii I 1 1 i I I ! I 1 I I ! i I I I I 1 i I 1 1 I 1 I 1 1 j __j ! t I 1 I 1 ------------- T II I I ( I 1 I 1 I f 1 1 1 I 1 t I I t 1 i 1 I i I I 1 1 I ? ! I i I I i I 1 i 1 1 i 1 I I I 1 I , i I 1 I n 5 "in is 20 2s 30 35 420 a5 50 55 so 65 16 75 aU S5 90 95 100 105 110 115 1: inflow- Primary Time (hours) V 246-230-85%TSS Prepared by Burton Engineering Associates HvdroCAD® 9.00 s/n 03513 ® 2009 HvdroCAD S< Type 1124-hr 50yr24hrhuntersville Rainfall=6.48" Printed 9/6/2011 LLC Summary for Pond 22P: Forebay Inflow Area = 15.000 ac, 40.00% Impervious, Inflow Depth = 4.81" for 50yr24hrhuntersville event Inflow = 125.91 cfs @ 11.96 hrs, Volume= 6.015 of Outflow = 125.71 cfs @ 11.96 hrs, Volume= 5.949 af, Atten= 0%, Lag= 0.2 min Primary = 125.71 cfs @ 11.96 hrs, Volume= 5.949 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 835.46'@ 11.96 hrs Surf.Area= 0.063 ac Storage= 0.120 of Plug-Flow detention time= 12.3 min calculated for 5.948 of (99% of inflow) Center-of-Mass det. time= 5.3 min ( 797.6 - 792.3 ) Volume Invert Avail Storage Storage Description #1 833.00' 0.322 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet) 833.00 0.038 0.000 0.000 834.00 0.046 0.042 0.042 835.00 0.055 0.051 0.093 836.00 0.072 0.064 0.156 837.00 0.083 0.077 0.233 838.00 0.095 0.089 0.322 Device Routing Invert Outlet Devices #1 Primary 834.50' 50.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 erimary OutFlow Max=125.49 cfs @ 11.96 hrs HW=835.46' (Free Discharge) 1=13road-Crested Rectangular Weir (Weir Controls 125.49 cfs @ 2.62 fps) 246-230-85%TSS Type// 24-hr 50yr24hrhuntersville Rainfall=6.48" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD® 9.00 s/n 03513 ® 2009 HydroCAD Software Solutions LLC Page 4 Pond 22P: Forebay Hydrograph 140 --- -- ----- -- -------- ----- -- --^----- -- -------------- ---------- i I I : I I i I ! I I 1 i 1 I I 1 i 1 i i f -Inflow 130 -- 1 125.7 1 ? 1c s ----------------- +--+--+--}-- --} -{--{--{--+--+ -?--_--?-- f i 1 i i 1 I I I 1 I 1 1 1 1 I 1 1 i I 1 1 ? - Primary 120 1 --? --? ! f 1 i 1 1 1 1 1 1 I I 1 , t -`---}--+--?--}--}-----+--}--+- - --'--- J-5- 1?nf?oWvrea= a - 00 - i - 4 I 1 1 1 i i { 1 i i 1 ?infl4=1'25.9{1 Wv - --E - -} -}- }.. }--+- + +--+--}- - ?I 90 I --- I --; I 1 I i 1 t i 1 ! I 1 I 1 i i i 1 1 t t 1 - --?--; -- --; -- -- --; --; -- ---- Ric?aa/=1;25.7;1-- -- $ I -; - ; i . ! I I I 1 1 i 1 i t I I -; - - - , . ; } - - ; - ; - ; - Peak, Eie` 3,5-.40 i I i I i I ? 1 1 1 i 1 f 1 1 1 i LL 70-: 1 4 i I : , : : : : : ; Storage=0.1120 of I - - ? 1 I f 1 1 1 I 1 I I I 1 I 1 1 1 1 I I i I . { t I 1 I 1 1 I I 1 1 1 ?. 1 ! 1 I 1 I 1 1 ! 1 I 1 I I 1 I 1 ? , i I 1 I ! 1 1 I t t i I I i I i I I 1 1 f 1 I 1 i 1 I i I I 1 1 1 1 i 1 I I 1 I I 1 1 1 1 1 I 1 1 I I I I 1 1 1 1 I I 1 , I ? i 4 1 I i , ? I 1 I I 1 I 1 1 I 1 l I 1 I 1 1 I t - ? i I 1 I i 1 ? 1 I I 1 I ? ? 10 1 I 1 1- i i 1 ! I t ! i I t 1 I I -F F - i f i 1 I I I 1 1 1 i t 1 0 { { t I 1 I I I 1 t I 1 1 i i ! 1 I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 80 85 100 105 110 115 12 0 Time (hours) . 246-230-85%TSS Type// 24-hr 50yr24hrhunfersville Rainfall=6.48" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD09 00 s/n 03513 ® 2009 HydroCAD Software Solutions LLC Page 1 Summary for Pond 11 P: Ext. Dry Pond #1 Inflow Area = 15.000 ac, 40.00% Impervious, Inflow Depth = 4.76" for 50yr24hrhuntersville event Inflow = 125.71 cfs @ 11.96 hrs, Volume= 5.949 of Outflow = 124.72 cfs @ 11.97 hrs, Volume= 5.949 af, Atten= 1%, Lag= 0.5 min Primary = 7.81 cfs @ 11.97 hrs, Volume= 2.910 of Secondary = 116.91 cfs @ 11.97 hrs, Volume= 3.039 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Peak Elev= 837.36@ 11.97 hrs Surf.Area= 0.127 ac Storage= 0.437 of Plug-Flow detention time= 65.2 min calculated for 5.948 of (100% of inflow) Center-of-Mass det. time= 65.4 min ( 863.1 - 797.6 ) Volume Invert Avail.Storage Storage Description #1 833.00' 0.521 of Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) ( acres) (acre-feet) (acre-feet) 833.00 0.073 0.000 0.000 834.00 0.088 0.080 0.080 835.00 0.100 0.094 0.174 836.00 0.107 0.103 0.278 838.00 0.136 0.243 0.521 Device Routing Invert Outlet Devices #1 Primary 833.00' 12.0" Round Culvert L= 42.0' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 832.79' S= 0.0050? Cc= 0.900 n= 0.012 #2 Device 1 833.00' 3.0" Vert. Orifice/Grate (1" Drawdown) C= 0.600 #3 Device 1 836.22' 16.0' long Top of Box 0 End Contraction(s) 5.2' Crest Height #4 Secondary 836.30' 40.0' long x 8.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 Primary OutFlow Max=7.81 cfs @ 11.97 hrs HW=837.36' (Free Discharge) T =Culvert (Barrel Controls 7.81 cfs @ 9.95 fps) 2=Orifice1Grate (1" Drawdown) (Passes < 0.49 cfs potential flow) 3=Top of Box (Passes < 65.29 cfs potential flow) econdary OutFlow Max=116.81 cfs @ 11.97 hrs HW=837.36' (Free Discharge) Broad-Crested Rectangular Weir (Weir Controls 116.81 cfs @ 2.76 fps) 0 ' r 246-230-85%TSS Type 1124-hr 50yr24hrhuntersville Rainfall=6.48" Prepared by Burton Engineering Associates Printed 9/6/2011 HydroCAD0 9.00 s/n 03513 02009 HydroCAD Software Solutions LLC Page 2 Pond 11 P: Ext. Dry Pond #1 Hydrograph 140 --- - -- ? - - -- - - --- - 77 ! f I t 1 1 ! , ( 1 1 i t , i I I Inflow 13 --; 1247 r------. 2ci -! --+ - -- --r--- 1 I y- y -* -}--Y--Y--?--Y -+---l- -! --1---1-- ---I--- 1 t I i + 1 1 1 f f ! 1 t 1 - Outflow ; 116.81 cis 1 -Primary 12 -- 1 1 -- - 1 ------ i 1 1 1 -+---y--i-'i--r--Y- - - - 1 1 , 1 lnflo?iv -0 0? 90 - I 1 I I 1 4 ! 1 r f I - ^dary 110 _-_,___ {-_y-_ Inflaw?=125.71 Cf$ 100 __ __F. 60 1 1 1 I ---+- 1 I 1 1 1 I 1 I -: --;---;---;-- 1 1 1 1 1 I i r I I 1 I 1 1 ! 1 1 I I 1 ! 1 1 1 ! 1 1 ;------ ;--?--; --; - ; --;Primary=':$1- cfs- ? . I 1 I 1 i f + i 1 i i I I ! 1 ! 1 I I i I , i i . ? 7 II E ? ? ? ? Secon?a?y=1?6:?1- ?f$ LL I 1 I I t ! I i I 1 f " Pe OX Eil0- 837.36' - - ? 40 1 I --?--- I 1 i f 1 l i ! ----;-- ;-- ;-- t 1 1 1 I i i 1 ! ! 1 ? 1 1 1 1 1 1 ; -;- ;--;-- -- -- --:---;Storage=A:43,7-af- I , I I ? , I i I , ! t f I i f ! 1 l ! I I I 1 I I i 1 ; i i I I i 1 I i I 1 i 1 I 20 I i V ! 1 I i I I 1 i I 1 1 1 1 1 I I I Cft 1 1 1 1 I i ( I 1 1 1 [ 1 I I I ( 1 1 1 1 i ! 1 1 t t 1 I 1 10 1 I 1 I I + 1 1 I ! 1 t f I 1 i 1 1 0 1 1 i I 1 + 1 i 1 1 1 I I I I I I i 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 65 90 95 100 105 110 115 12 0 Time (hours) 1 11 • 0 N N W LL N co O = W t + n °-? O D m o 12 w Cl) CO) nn it Q' Lo = O 3 x W y a? o m ° .., v n o 0 33 II U U -6 m F Z o c ? ? 1 u d m O N O o _ a c) in x N E ? O c 3 O I O Y ?A C N ? O !Y Q V 21 c 0 Q LL J O D U. a C ft x = O C v C 32 C .. a LL ? cs) CL u -1 I 3 I c L U. LL ,a M) N O N O O ti I Q Lq co N O O O e- O ?f N M t? O H + II G '`? c t ? ? ? II m LL d C7 a m m °' N t0 O > O 1 O to Z u- = c c C . . 15 'a a s ? o CL . a 1 F 1 V O ..1 > W N1 FL fA a tl? m O O to O O O C4 v; 6 4 ad U; 0 J Q Q. o J a O E ? ? v 8 c O -i v J .0 N ? ? a _ O N rn M C? U U ? U? N Lq Z Q Lo . ? < m 6 m? N 0 0 CL O G. C O m O M CV co a r C1 N 01 M vb w LL N J a 'a ?v O 2 R + c 0 h O cc m o eh CO) Q W N II c a w N p tLl O G T .-, VV A O o z c t+ ? x E N O m ° M LL c o M Y 'm c = ME r c O Z V. Q 0 v ? c 0 0 LL + O c LL m 3 +n x c o s o r.. c .C = m Q n 3 J c V tL U. U. U. -CC U) Q N T T ,, OWN O O d? M O co 0 0 __ T O O ?! O ?f T N e1 3 U. O 3 o t p O L 3 ? N a o > o p m m E' c _ 3 c 0 0 z a I+- ? = c c -OW rn a a 1° o Q Q m m a. 1 - V g > N to 0 W m o , c g gg 1 R aq Q IV M " v o w c J Q E E -J E t9 9 E J , v o c r ? O 'Z j a 0 ra US 5 r ! 0 N 6 m? c .N N c 0 Q a. LY O. i C0 C O m Q M N co C7 0 IL . 0 N CY) r r w LL N A o ? ? A ? J O = A c c + +} O O g Q M M Q' w 8 11 11 x 33 W ? oa o Qi A V O p ? i ' 11 2 c o W vi ? +A+ d O 0 x E N O A LD U. ' c I CF o ° N W 11! c O Of . . G V . 13 A s 9 m 0 0 + ; J LL 0 O c .Z' x ° c O a. O 10 ; r -- LA c A y C _ Q 11 -OI 3 u I L J c V IL L L LL LL to N C? to ; 0 6 C '0 3 L? O G ? ?- ` 11 ? p A U al E CL 3 ? M J U) c • o z Y r c Q N 5l a a a a.. H O log O J ILI m ° O te; o o ?ef Q IC4 M ei 4 ,H ki O J Q W E E ro _ m F- 40 O J J >1 O ~ E ,4 .2 0 ? U) c J ? J a 22 A Wm C? U) N C O a a A a m c 0 m 0 m t V 9 a Nev Permit No. (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requiremehts have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. _ Plans (1' - 50' or larger) of the entire site with labeled drainage area boundaries System dimensions (length, width, and depth) for both the sedimentation chamber and the filter Chamber, Maintenance access, Flow splitting device, ?/- Proposed drainage easement and public right of way (ROW), ?/ - Design at ultimate build-out, W/o - Off-site drainage (if applicable), and v' Boundaries of drainage easement. Plan details 0' = 30' or larger) for the sand filter showing: ?- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber, ?--'Maintenance access, Flow splitting device, N/p,, Vegetative filter strip dimensions and slope (if SA waters), V' Proposed drainage easement and public right of way (ROW), i/'- Design at ultimate build-out, Flom br°i h+ e4' ®n l? WAS, - Qff-site drainage (if applicable), and ?- Boundaries of drainage easement. 3. Section view of the sand filter (1' = 20' or larger) showing: ?Depth(s) of the sedimentation chamber and sand filter chamber, I% Depth of sand filter media, ?Connection between the sedimentation chamber and the sand filter chamber and weir elevation, WA, SHWT elevation, ?Outlet pipe, and t/N Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable). ?? 4. A soils report that is basepd upAin act'u ff9ld fnves IgatioP,, soil bo ngs, an?infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. Supporting calculations (including drainage calculations) 04*-tivft wKSigned and notarized operation and maintenance (O&M) agreement It'` pr09 res-r QV' . A copy of the deed restrictions (if required). Form SW401-Sand Fiker-Rev.5 2009Seot17 Part III, Page 1 of 1 5ti n d t?.f er •,,j•}• I G11 1¢6? Permit Number. ?•1• (to be provided by DWQ) W I SI o?0F WAT 19 NCDENR P STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, punted and submitted with all of the required information. Make sure to also rill out and submit the Required Items Checklist (Section 111) and the I &M Agreement (Section I V) F. Gx?NF0 . ON Project name Bryton, Hambright Road Water Quality Contact name Glenn Morris Phone number 704-553-8881 Date September 2, 2011 Drainage area number West Basin il. DSIG jJ1NORMAT101 _ Site Characteristics Drainage area (AD) 113,256.00 fe OK Impervious area 96,268.00 fe % Impervious (Q 85.0%% Design rainfall depth (RD) 1.00 M Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre-development 1-yr, 24-hr runoff Post-development 1 yr, 24-hr runoff Pre/Post 1-yr, 24-hr peak control in In/hr fe/sec fOisec fe/sec Storage Volume Design volume (WQV) Adjusted water quality volume (WQV4 Volume contained in the sedimentation basin and on top of the sand filter Top of sand filter/grate elevation Weir elevation (between chambers) Maximum head on the sedimentation basin and sand filter (h,,,) Average head on the sedimentation basin and sand filter (h4 Runoff Coefficient (Rv) Type of Sand Finer Open sand filter? SHWT elevation Bottom of the sand filter elevation Clearance (dam) Closed/pre-cast sand filter? SHWT elevation Bottom of the sand filter elevation Clearance (dsw) If this Is a dosed, underground dosed sand filter. The clearance between the surface of the sand filter and the bottom of the roof of the underground structure (dam,) 7,692.00 fO 5,769.00 e 7,685.00 ft' 831.8 ft amsl 831.5 ft amsl 2.00 ft 1.00 ft 0.82 (unitiess) Y Yor N Not encounterd ft amsl 828.50 ft amsl n/a N YorN ft amsl ft amsl OK OK OK Form SM01-Sand FYter-Rev.5 2009Seot17 Parts I and N. Proled Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Sedimentation Basin Surface area of sedimentation basin (As) Sedimentation basinkhamber depth Sand Filter Surface area of sand filter (AF) Top of sand media filter bed elevation Bottom of sand media filter bed/drain elevation Depth of the sand media filter bed (dF) Coefficient of permeability for the sand filter (k) Outlet diameter Outlet dischargelflowrate Time to drain the sand filter (t) Time to drain the sand filter (t) 1,400.00 ft 2.00 ft 1,375.00 fe 830.00 ft amsl 828.50 ft amsl 1.50 ft 3.50 (Nday) nla in 0.05 fe/sec 39.60 hours 1.65 days OK. Meets minimum, but may need to be increased to Additional Information Does volume In excess of the design volume bypass the sand filter? Is an off-tine flow-splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated flfter? What Is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft If SA waters)? If not a closed bottom, is BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What Is the width of the sedimentation chambedforebay (Ws,d)? What is the depth of sand over the outlet pipe (dope)? OK. Meets minimum, but may need to be increased to OK. Submit drainage calculations. Y Y or N OK Y Y or N OK Y Y or N OK nla ft Y YorN OK Y Y or N OK Y Y or N OK Y YorN OK Y Y or N OK 24.00 ft OK 1.50 ft OK Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and It. Project Design Summary, Page 2 of 2 S wile :4t, J Permit No: (to be assigned by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No er) of the entire site showing: 1 PI ns (1" = 50' or lar g . Z sign at ultimate build-out, r/lj* Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Swale dimensions (width, length, depth), - Maintenance access, n,Jr 3 - Proposed drainage easement and public right of way (ROM, Grass species, and - Boundaries of drainage easement. 2. Plan details (1" = 50' or larger) for the grassed swale showing: ? le dimensions (width, length, depth), - Maintenance access, Proposed drainage easement and public right of way (ROW), ;Design at ultimate build-out, ? Grass species, 6,..- Off-site drainage (if applicable),and 'Boundaries of drainage easement. 6M 3. Section view of the grassed swale (1" = 20' or larger) showing: Side slopes, Longitudinal slope, Freeboard pee Swale dimensions, and I,?SHWT level(s) N/A Gdk?s 4. Supporting calculations (including maximum velocity calculations for applicable storms) Tn a?? Q r° py of the signed and notarized operation and maintenance (O&M) agreement. 5 A _ 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 Permit Number. W V1 ? ? I (to be provided by DWQ) 6?ytiur <J\ V o??F W ATF9OG • > ?+,? 1?11es? ?3ars1? p WDEHR. STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must also be filled out, printed and submmed along with all of the required information. i, PR ION Project name Bryton, HambNht Road Water Quality Contact name Glenn Morris 15/ ?04 Phone number q*amwo Data September 12, 2011 Drainage area number East Basin h.A SIGN NFOWION Site Characteristics Drainage area 113,256.00 fe Impervious area 96,268.00 e Percent impervious 85.0%% Design rainfall depth 1.00 Inch Peak Flow Calculations 10-yr storm runoff depth in 10-yr storm intensity irilhr Post-development 10-yr storm peak flow 6.88 fOisec Velocity Maximum non-erosive velocity (peak 10-year storm) 4.50 ftisec Soil characteristics (enter Y below) Sand/sift (easily erodible) x Clay mix (erosion resistant) Grass Type (enter Y below) Bermuda Tall fescue x Bahiagrass Kentucky bluegrass Grass-legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Conveyance Swale Seekino Pollutant Credit: (Y or N) Maximum velocity for 10-yr storm ftisec Side slopes :1 Swale length ft Form SW401-Grassed Swale-Rev.3 Parts I and H. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an *x* in the appropriate cell below: Trapezoidal x Parabolic V-shaped Width of the bottom of the swale 4.00 ft Width of the top of the swale 19.00 ft Additional Information Is the Swale sized for all runoff from ultimate build-out? y (Y or N) OK Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? y (Y or N) OK 176L er e rA/? What Is the distance from the bottom of the swale to the SHWT? #VALUEI ft #VALUEI What is the ground level elevation? 823.50 fmsl What Is the elevation of the bottom of the swale? 824.00 fmsl What Is the SHWT elevation? nla fmsl CvQ? What is the longitudinal slope of the swale? 18.00% Slope too steep. lain why it is impractical to achieve 5%. What is the depth of freeboard? 0.50 ft OK Form SW401-Grassed Swale-Rev.3 Parts I and 11. Project Design Summary, Page 2 of 2 Level P V 01 ()Mem -f 111. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. M incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial In the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1' - 51Y or larger) of the entire site showing: r/%ign at ultimate build-out, Wpff-afte drainage (If applicable), r?/ lineated drainage basks (ks hide Rational C coefficient per basin), - Forebay (if applicable), High flow bypass system, Maintenance access, ?f roposed drainage easement and public right of way (ROW), and Boundaries of drainage easement 2. Plan details (1' = NY or larger) for the level spreader showing: VA- Forebay (t applicable), ?/Hlgh flow bypass system, V* One foot topo Ines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build-out , 3. Section view of the level spreader (1' 4or larger) showing: N/Ac - Underdrain system (d applicable), Level Ip, ,,oeUpslope channel, and ;/Downslope Offer fabric. go or plan sheet number and any notes: 2 3 4M I 3 ?4. Plan details of the flow spiting device and supporting calculations (If applicable). V 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area Is stabilized. W ? /? 6. If a non-engineered VFS Is being used, then provide a photograph of the VFS showing W that no draws are present VIT The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (O&M) agreement (,M 3 3 ?JA Ce,14s -xl.% proauq ress Form SW401- LS-VFS - 27Ju12011- Rev.9 page 3 of 3 ovel S pyeadev 150;/7) ?? o?OF W AtF9oG n > y r?M p < WDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, Initialed, and submitted. I. PRpJEG`T3INFORMATION Project name Bryton, Hambright Road Water Quality Contact name Glenn Morris Phone number 704553-6861 Date September 6, 2011 Drainage area number Level Spreader 81 (Wee Basin) The purpose of the LS-VFS Stomm+ater enters LS-VFS from Type of VFS Explanation of any 'Other responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 Mr storm Time of concentration Rainfall Intensity,l0-yr storm Peak flow from the 10-yr storm Design storm Maximum amount of flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any "Other responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10-year storm Maximum capacity of a 100-foot long LS-VFS Peak flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any "Other responses above LS-VFS Design Forebay surface area Depth of forebay, at stommathr entry point Depth of forebay at stormwater exit point Feet of level Np needed per cis Computed minimum length of the level llp needed Length of level tip provided Width of VFS Elevation at downslope base of level 111p Elevation at the end of the VFS that Is farthest kom the LS Other. Explained below A BMP Other. Explained below receives water from V drawdown from BMP, also requesting 40% TSS credit fe Do not complete this section of the form. flz Do not complete this section of the form. % Do not complete this section of the form. Do not complete this section of the form. Cis Do not complete this section of the form. min Do not complete this section of the form. in1hr Do not complete this section of the form. cis Do not complete this section of the form. Cis Do not complete this section of the form. (Y or N) Do not complete this section of the form. Other. Explained below 0.07 cis 6.88 cis It cis 0.07 cis Y (Y or N) Sand Fitter & Grass Swale W sq ft in in 445 fV ?5/???s xo,o7 ??s -ft dr 101 (rhttn 65 R 30 ft 624.00. imsl 819.00 imsl Form SW401- LS-VFS - 27Jul2011 - Rev.9 page 1 of 3 Slope (from level rip to the end of the VFS) Are any draws present In the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10-year storm) freeboard (during the 10-year storm) Peak velocity in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any'0ther" responses above 16.67 % VFS is too steep. N (Y or N) OK N (Y or N) Y (Y or N) Y (Y or N) Please provide plan detalis of flow splitter & supporting cats. It it ft ft ft Mac Pick one: (Y or N) (Y or N) W 1 B Form SW401- LS-VFS - 27Ju12011- Rev.9 page 2 of 3 Zd- Permit (to be provided by DWQ) Please Indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional Information. This will delay final review and approval of the project. Initial In the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. initials, zlom_ Pagel Plan SheI k- 100 ! C'C'* 'C6V), - Show ey4ipe, 1. Plans (1" - or larger) of the entire site showing: V-"'- Design at ultimate build-out, ske drainage (if applicable), N - Delineated drainage basins (include Rational C coefBdent per basin), - Basin dimensions, - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. ?L 42-M.- ?r P? &Z 2. Plan details (1" = 30' or larger) for the biere?wing: 2. Basin dimensions Pretreatment system, Maintenance access, Outlet structure, ?/- Overflow device, t/ low distribution detail for basin inflow, and Vegetation specifications. 3. Section view of the basin (1" = 20' or larger) showing: ?Side slopes, 3:1 or lower, Pretreatment and treatment areas, and ?Alet and outlet structures. V407-construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area Is stabilized. VI"The supporting calculations. n F 8*0 pyy§the signed and notarized operation and maintenance (0&M) agreement. V& 9. A copy of the deed restrictions (if required). _ 1 QXsoils report that Is based upon an actual field investigation, soil borings, and infiltration tests. County V soil maps are not an acceptable source of soils information. Form SW401 Adlld*vtqpVen 13aain-Rev. Part III. Required Items Checklist, Page 1 of 1 pry Pond Lw"t sasih) Permit No. (to be provided by DWQJ ? OF W ATF,q O AMA STORMWATER MANAGEMENT PERMIT APPLICATION FORM c WNW 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part ill) must be printed, filled out and sutxnNed along with all the required Information. Project name Contact person Phone number Date Drainage area number Bryton, Hambright Road Water Qua ft Glenn Morris 704.553-8881 91212011 East Basin I. `;D?$I,?N I?IFORII?AT10l,?:" F _ - . , Site Characteristics Drainage area 653,400.00 fe Impervious area 261,360.00 fe % Impervious 0.40 Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth In Rational C, pre-development (unitless) Rational C, post-development (unitiess) Rainfall intensi4r.1-yr, 24-hr storm in/hr Pre-development 1-yr, 24-hr peak flow fe/sec Post-development 1-yr, 24-hr peak flow felsec Pre/Post 1-yr, 24-hr peak control fe/sec Storage Volume: Non-SA Waters Minimum required volume 22,325.00 fe Provided volume 27,922.00 fe OK Sediment storage volume provided 7,841.00 fe OK Storage Volume: $A Waters 1.5' runoff volume fe Pre-development 1-yr, 24-hr runoff volume fit' Post-development 1-yr, 24-hr runoff volume ft' M+ inknum required volume it' Provided volume it' Sediment storage volume provided fe Basin Design Parameters Drawdown time 2.30 days OK }'?r, I = 7 ?iC? P ` SHWT elevation 730.50 fmsl erw . Basin bottom elevation 731.00 fmsi Raise basin bottom, Must be at least 2-11 above SHWT Storage elevation 736.22 fmsl Basin side slopes 3.0 :1 OK Top elevations 738.30 imsl OK Freeboard provided 1.00 ft OK Basin Bottom Dimensions Basin length 57.00 ft Basin width 38.00 ft Length to width ratio 1.50 :1 OK Form SW401-Dry Extended Detention Ba*Aev.3 Puts I. & M. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Additional Information Total runoff volume captured by basin 6.16 ac-in Forebay is not required Forebay provided Y (Y or N) Is basin In a recorded drainage easement? Y (Y or N) OK Does basin capture all runoff at ultimate build-out? Y (Y or N) OK Is a sediment depth Indicator Included? Y (Y or N) OK Does the basin include a drain? Y (Y or N) OK Forth SW401-Dry Extended DeWOon Basin-Rev.3 Parts I. i H. Design Summary, Patio 2 or 2 1,p Permit No: (to be assigned by DW() Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet Nom j1'461 ' A- &M- 1. Plans (1" = W or larger) of the entire site showing: ?- Design at ultimate build-out, W slte drainage (if applicable), V- Delineated drainage basins (include Rational C coefficient per basin), '?- Swale dimensions (width, length, depth), - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Grass species, and - Boundaries of drainage easement. 2. Plan details (1" = 59 or larger) for the grassed swale showing: t/ Swale dimensions (width, length, depth), V-'- Maintenance access, ff Proposed drainage easement and public right of way (ROW), ?'- Design at ultimate build-out, Grass species, Off-site drainage (if appiicable),and Boundaries of drainage easement. ?- 30 3. Section view of the grassed Swale (1" =,?eor larger) showing: Side slopes, Woo'- Longitudinal slope, Freeboard Swale dimensions, and SHWT level(s) y/?I 4. Supporting calculations (including maximum velocity calculations for applicable storms) Pr5-Ane?sS copy of the signed and notarized operation and maintenance (O&M) agreement. A!/s 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 Permit Number. f ^ ?/ (to be provided by DWQ) cif 1 t S ?W \o?OF W ATF9OG / > y AC*A HCDENR (\V 13 o Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, panted and submitted. The Required Items Checklist (Part 111) must also be filled out, printed and submitted along with all of the required Information. Project name Bryton, Hambright Road Water Quality Contact name Glenn Morris Phone number 704-55M I Date Septernber 12, 2011 Drainage area number East Basin Ill.- DIEM.- T 010- T[ON Site Characteristics Drainage area 653,400.00 fe Impervious area 261,360.00 ftz Percent impervious 40.0%% Design rainfall depth 1.00 Inch Peak Flow Calculations 10-yr storm runoff depth In 10-yr storm intensity In/hr Post-development 10-yr storm peak flow 7.50 ft3lsec Velocity Maximum non-erosive velocity (peak 10-year storm) 4.50 ft/sec Soil characteristics (enter Y below) Sand/sift (easily erodible) x Clay mix (erosion resistant) Grass Type (enter Y below) Bermuda Tall fescue x Bahiagrass Kentucky bluegrass Grass-legume mixture Swale type: FBI out one of the options below: Option 1: Curb Outlet Swale: (Y or N) Maximum velocity Side slopes :1 Swale length it Option 2• Conveyance Swale Seeking Pollutant Credit: (Y or N) Maximum velocity for 10-yr storm fusec Side slopes :1 Swale length it Form SW401-Grassed Swale-Rev.9 Parts I and II. Pr*ct Design Summary, Page 1 of 2 Permit Number. (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an Y in the appropriate cell. below: Trapezoidal x Parabolic V-shaped Width of the bottom of the swale 4.00 ft Width of the top of the Swale 24.00 ft Additional Information Is the Swale sized for all runoff from ultimate bulld-out? y (Y or N) OK Is the BMP located in a proposed drainage easement with a y (Y or N) OK recorded access easement to a public Right of Way (ROW)? What Is the distance from the bottom of the swale to the SHWT? 2.00 ft OK What Is the ground level elevation? 732.50 fmsl What Is the elevation of the bottom of the swale? 732.00 fmsl What Is the SHWT elevation? 730.50 frnsl What is the longitudinal slope of the swale? 8.30% Slope too steep. Explain why it is Impractical to achieve 5%. What Is the depth of freeboard? 0.50 ft OK Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 2 of 2 T EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result In a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requded Item: Intt al Page or_pIan sheet number and any notes: > Plans (I'- 50' or larger) of the entire site showing: y ?- Design at ultimate bulld-out, -sDe drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), )iigh flow bypass system, ? Maintenance access, Proposed drainage easement and public right of way (ROW), and ?- Boundaries of drainage easement. 2. Plan details 0" = 30' or larger) for the level spreader showing: 6M ?Forebay (if applicable), Vffligh flow bypass system, VAN) ne foot topo Ones between the level Op and top of stream bank, L,etroposed drainage easement, and j;e n at ultimate build-out. 3. Section view of the level spreader (1" = 20' or larger) showing: 4%M 4- W/h- Underdrain system (If applicable), .level up, ?' pslope channel, and nslope filter fabric. Plan details of the Dow splitting device and supporting calculations (I applicable). J?rY ??n? ?/ ? iI ? -Cl' Cm eyyene y i X11 y V5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. Nlk 6. If a non-engineered VFS Is being used, then provide a photograph of the VFS showing that no draws are present The supporting calculations. 6. A copy of the signed and notarized operation and maintenance (OEM) agreement. ? Ga1G5 ?r pro??er?S Form SW401- LS-VFS - 27M2011- Rev.9 page 3 of 3 L,Q,,,e? Spreader #t 2 65of Basin) ffAA o? o?'o?wArF9 HCDENR ? < STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely tilled out, printed, Initialed, and submitted. I. PROECT 1140.; MATION Project name Briton, Hambright Road Water Quality Contact name Glenn Morris Phone number 704-5538881 Date September 6, 2011 Drainage area number Level Spreader $2 (East Be*) 11 QESI i INFQRMATION . The purpose of the LS-VFS Other. Explained below Stormwater enters LS-VFS from A BMP Type of VFS Other. Explained below Explanation of any "Other" responses above receives water from V drawdown from BMP, also requesting 40% TSS credit If Stormwater Enters the LS-VFS from the Drainage Area Drainage area fe Do not complete this section of the form. Impervious surface area fe Do not complete this section of the form, Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flow from the 1 In/hr storm cis Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall Intenstty, l0-yr storm Inthr Do not complete this section of the form. Peak flow from the 10-yr storm crs Do not complete this section of the form. Design storm Maximum amount of flow directed to the LS-VFS cis Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other' responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10-year storm Maximum capacity of a 100-foot long LS-VFS Peak flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any 'Other responses above LS-VFS Design Forebay surface area Depth of forebay at Ammeter entry point Depth of forebay at stomwvater exit point Feet of level 6p needed per cis Computed mtrtimum length of the level by needed Length of level tip provided Width of VFS Elevation at downsbpe base of level Bp Elevation at the end of the VFS that Is farthest from the LS Other. Explained below 0.28 cfs 7.5 cfs icis 0.28 cis Y (Y or N) Ext. Dry Pond 6 Grass Swale _ sq tt in in goe Nds I r2 It 125 It 30 ft 732.50 fmsl 730.00 finsl SwX- 62$J5 Level spreader Is too short to handle the flow. Form SW401- L&VFS - 27Jur2o11- Rev.9 page 1 of 3 Slope (from level Up to the end of the VFS) Are any draws present in the VFS? Is there a collector Swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10-year stone) freeboard (during the 10-year storm) Peak velocity In the channel during the 10-yr storm Channel fining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any'Othee responses above 8.33 % VFS is too steep. N (Y or N) OK N (Y or N) Y (Y or N) Y (Y or N) Please provide plan details of flow splitter & supporting talcs. LL It it It it ft/sec: Pick one: (Y or N) (Y or N) W 4 B 4 Form SW401 - LS-VFS - 27Jtd2011- Rev.e page 2 of 3