HomeMy WebLinkAbout20061785 Ver 1_More Info Letter_20061130~~~ WAT X94
~O ~
~? r
> =i
O "C'
Michael F. Easley, Governor
William G. Ross ]r., Secretary
North Carolina Department of Environment and Natural Resources
November 30, 2006
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Karl Cubler
BC Custom Builders
8845 Caratoke Highway, Suite 5
Point Harbor, NC 27964
Subject Property: Price Property -Lot 101- Block 6
Roanoke Sound [030151, 30-21, SA, HQW]
REQUEST FOR MORE INFORMATION
Dear Mr. Cubler:
Alan W. Klimek, P.E. Director
Division of Water Quality
DWQ Project # 06-1785
Dare County
On November 9, 2006, the Division of Water Quality (DWQ) received your application dated
November 7, 2006, to fi110.095 acres of 404/wetland to construct a residence on the subject
property. The DWQ has determined that your application was incomplete and/or provided
inaccurate information as discussed below. The DWQ will require additional information in
order to process your application to impact protected wetlands and/or streams on the subject
property. Therefore, unless we receive five copies the additional information requested below,
we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and
will place this project on hold as incomplete until we receive this additional information. Please
provide five copies of the following information so that we may continue to review your project.
Additional Information Requested:
1. Under Section XI. -Stormwater (required by DWQ) on page 8 of 9 of your
application, regarding the proposed project imperviousness, your response to the question
was 30.4 percent. You are seeking approval for your project under General Water
Quality Certification No. 3402 (Nationwide 18) of which Condition No. 4. states,
"Additional site-specific stormwater management requirements may be added to this
Certification at DWQ's discretion on a case by case basis for projects that have or are
anticipated to have impervious cover of greater than 30 percent. Site-specific
stormwater management shall be designed to remove 85% TSS according to the latest
version of DWQ's Stormwater Best Management Practices manual at a minimum.
Additionally, in watersheds within one mile and draining to 303(d) listed waters, as well
as watersheds that are classified as nutrient sensitive waters (NSW), water supply waters
(WS), trout waters (Tr), high quality waters (HQW), and outstanding resource waters
(ORW), the Division shall require that extended detention wetlands, bio-retention areas,
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http~//h2o enr.state.nc.us/ncwetlands
N Carolina
,1~atura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Mr. Karl Cubler
Page 2 of 2
November 30, 2006
and ponds followed by forested filter strips (designed according to latest version of the
NCDENR stormwater Best Management Practices Manual) be constructed as part of the
stormwater management plan when asite-specific stormwater management plan is
required. Unless specified otherwise in the approval letter, the final, written stormwater
management plan shall be approved in writing by the Division of Water Quality's
Wetlands Unit before the impacts specified in this Certification occur. The facilities
must be designed to treat the runoff from the entire project, unless otherwise explicitly
approved by the Division of Water Quality. Also, the stormwater management plan (as
approved by the Wetlands Unit) shall be implemented before any permanent building or
other structure is occupied at the subject site. The structural stormwater practices as
approved by the Wetlands Unit as well as drainage patterns must be maintained in
perpetuity. No changes to the structural stormwater practices shall be made without
written authorization from the Division of Water Quality. Your site is in a HQW
watershed and therefore based on your submitted plans, you will need to provide the
location and details for the required stormwater management provision. This includes all
applicable worksheets and a signed and notarized Operations and Maintenance
Agreement.
Please contact the DWQ within three weeks of the date of this letter to verify that you have
received this letter and that you remain interested in continuing to pursue permitting of your
project and will be providing the DWQ the requested information at a later date. Please contact
me in writing and Kyle Barnes of the DWQ Washington Regional Office. If we do not hear
from you within three weeks, we will assume that you no longer want to pursue this project and
we will consider the project as withdrawn.
This letter only addresses the application review and does not authorize any impacts to wetlands,
waters or protected buffers. Please be aware that any impacts requested within your application
are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian
McMillan at 919-733-1786 if you have any questions regarding this matter or would like to set
up a meeting to discuss this matter.
Sincer,~ly, ,/ f~l e
n~,' ,401 Oversight/Express Review Permitting Unit
CBKlijm V
cc: Kyle Barnes, DWQ Washington Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Louise Hanson, Environmental Professionals, Inc., P.O. Box 3368, Kill Devil Hills, NC 2794
Filename: 061785PriccPropertyLot101 Bfk6(Dare)On_Hold