HomeMy WebLinkAbout20110483 Ver 1_DCM Permit_20110901Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Permit Number
99-11
Coastal Resources Commission r
for
X Major Development in an Area of Environment c ATt?sr t?rr
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Georgia Capital, LLC, 3525 Piedmont Road, 6 Piedmont Center, Suite 305, Atlanta, Ga, 30305
Authorizing development in Carteret County at West Mouth Bay, 295 Guthrie Drive, Harkers
Island. Harkers Island S/D and Marina, as requested in the permittee's application dated 1/12/11 includin tg he
attached workplan drawings (12) all dated 1/12/11
This permit, issued on Ang»s 18, 2011 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
he subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Marina/Observation Platfrom
1) Unless specifically altered herein, this permit authorizes the docks, piers, platforms and other
structures and uses located in or over the water that are expressly and specifically set forth in the
permit application. No other structure, whether floating or stationary, shall become a permanent part
of this marina or observation platfrom without permit modification. No non-water dependent uses of
structures shall be conducted on, in or over public trust waters without permit modification.
2) No sewage, whether treated or untreated, shall be discharged at any time from any vessels using the
marina or observation platform. Any sewage discharge at the marina or observation platfrom shall be
considered a violation of this permit for which the permittee is responsible. This prohibition shall be
applied and enforced throughout the entire existence of the permitted structure.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
May 13, 2015
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
-e-l"I, James H. Grb'gKson, Director
iDivision of Coastal Management
This permit and its conditions are hereby accepted.
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee
Georgia Capital, LLC
ADDITIONAL CONDITIONS
Spoil Disposal
Permit #99-11
Page 4 of 5
24) All excavated materials shall be confined above normal high water level and landward of regularly or
irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of
solids into any marsh or surrounding waters.
25) No spoil material shall be placed within 30 feet of the normal high water line.
26) The disposal area shall be properly graded and provided a ground cover sufficient to restrain erosion
within 30 working days of project completion.
27) The spoil area shall be inspected and approved by the Division of Coastal Management prior to the
beginning of any dredge activities.
General
28) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the work or obstructions caused
thereby, without expense to the United States or the state of North Carolina. No claim shall be made
against the United States or the state of North Carolina on account of any such removal or alteration.
29) No wetlands shall be excavated or filled, even temporarily, outside the area indicated on the attached
workplan drawings.
30) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
31) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required, including, but not limited to, an authorization
to construct from the Division of Environmental Health, Public Water Supply Section.
MOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 808-32808 prior to the commencement of any
such activity for this determination.
Georgia Capital, LLC
ADDITIONAL CONDITIONS
Permit #99-11
Page 5 of 5
NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No.
11-0483.
NOTE: The U.S. Army Corps of Engineers authorizer the proposed project under COE Action Id. No.
SAW- 2011-00912, which was issued on 7/19/11.