Loading...
HomeMy WebLinkAbout20110072 Ver 1_Time Ext Request_20110526Mcmillan, Ian From: Betty Farr [bfarr@jewellengr.com] Sent: Thursday, May 26, 2011 7:50 AM To: Mcmillan, Ian; Turlington, Chad; Kulz, Eric Cc: Mary DePina; Doug Jewell; Greg Caison Subject: Forest Hills Drive dwq 11-0072 Hello Ian, We had anticipated performing revisions for this project by now, but due to delays beyond our control, we would like to request an extension for another 90 days to about September 1, 2011, for the Forest Hills project DWQ 11- 0072, in the City of Fayetteville, NC, currently on hold. The reason for the delay is that the original design exceeded the allowable budget due to complications at the site. The modified plan is an environmentally improved solution by removing and daylighting a portion of the proposed culvert upgrade by replacing it with a restored length of stream. This requires the purchase of an adjacent lot, which the City tried to negotiate, but was unable to reach a fair settlement with the owner. The next step was to obtain approval by City Council to proceed with condemnation. The authorization to proceed from Council was issued on April 26, 2011. The condemnation process of the adjacent lot was begun immediately and is currently in the 30 day notification of the condemnation period process. The City has already submitted a review fee for this project of $570 to NC DENR and would prefer not to have to submit that fee again for the same project as funds are tight. We appreciate your cooperation and patience in this matter. Please feel free to call with questions. Thank you. OSVC rep Betty Farr, PE Ii WELL Engineering Consultants is 36) 972 9921 (m) bfarr@jewellengr.com NOTICE: This electronic mail message including attachments, if any, is intended for the use of the individual or entity to whom it is addressed. It may contain information that is privileged, proprietary, confidential, and/or exempt from disclosure. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this message in error, please notify the sender via reply e- mail and delete this message from your computer immediately. From: Betty Farr Sent: Tuesday, March 01, 20112:56 PM To: 'Mcmillan, Ian'; 'chad.turlington@ncdenr.gov'; 'eric.kulz@ncdenr.gov' Cc: Mary DePina; Doug Jewell; Greg Caison Subject: Forest Hills Drive dwq 11-0072 Hello Ian, Thank you for your assistance in regard to our potential revision for the Forest Hills Project, DWQ 11-0072. We would like to request putting the Forest Hills Drive project on hold at this time. We anticipate getting back to you with revisions to start the project back up in approximately 90 days, or about June 1, 2011. Please feel free to call if you have any questions. Thanks again. l cb1 Elizabeth (Betty) A. Farr, PE JEWELL Engineering Consultants 311 S. Main St. Kernersville. NC 27284